Loading...
HomeMy WebLinkAboutT-4214036X 3 a X Ly Z O z w P. a Z O z w O X a z O z w J X a z O z w i J w X a z O z w J Q z 0 X a O N N Ib z O z w LF X a z O z w 0 J X z O z w z O Q x r= 0 m CV N 02 z O z w z z Q U Z X a Z O z w ry �I d X a z CD J Q X a O CV O NI n' w 0 ry O 0 73 U Y a O o co U H Yw o c u1 0= J (6 c? —�° X a co 0) �E�� omo o w w 00co J o N X 0 3 a p N O O 0 O a F7 o X m ~ W U Q oa-x2E D D i Ld Z_ J U Q ' I •- I l I J -'1 / l l � � / GENERAL NOTES 1. SEE SIGNAL PLANS 1TS1.04 FOR ADDITIONAL WORK AT THE INTERSECTION. 2. COORDINATE WITH THE CITY OF RENTON TRANSPORTATION MAINTENANCE SUPERVISOR, ERIC CUTSHALL AT (425) 430-7423 FOR ACCESS INTO THE TRAFFIC SIGNAL CONTROLLER CABINETS FOR DISCONNECT OF EXISTING FIBER FOR REINSTALL THROUGH NEW CONDUITS ON S GRADY WAY. CONSTRUCTION NOTES 0 REMOVE EXISTING JUNCTION BOX 2O REMOVE EXISTING SMALL CABLE VAULT. 4O INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02. O5 TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. N 10 CUT EXISTING 2-12CT FIBER LATERAL CABLES FROM EXISTING FIBER TRUNK AND CUT r EXISTING FIBER TRUNK. PULL BACK EXISTING LATERALS INTO SIGNAL CABINET AND O PULL BACK EXISTING TRUNK WEST TO NEW TYPE 8 JUNCTION BOX FOR O REINSTALLATION. ABANDON EXISTING FIBER EAST TO GRADY/TALBOT. r N C� 14 INSTALL TYPE 8 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.30-04. 20 PULL BACK EXISTING 1-48CT FIBER FROM THE EXISTING SPLICE POINT AND REINSTALL THROUGH EXISTING CONDUIT AND NEW INTERCEPTED CONDUIT TO THE EAST TO THE NEW CABLE VAULT AT THE GRADY/LAKE INTERSECTION. 22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.09. COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. 29 REMOVE EXISTING JUNCTION BOX AND ABANDON EXISTING CONDUITS AFTER EXISTING 48-CT SMFO CABLE HAS BEEN REMOVED AND REINSTALLED THROUGH NEW ITS PATHWAY BETWEEN NEW CABLE VAULT AT S GRADY WAY/LAKE AVE S AND NEW CABLE VAULT AT S GRADY WAY/TALBOT RD S. 32 SPLICE LATERAL CABLES TO PRE -TERMINATED PIGTAIL IN THE NEW FIBER PATCH PANELS IN THE UPPER AND LOWER COMPARTMENTS OF THE TRAFFIC SIGNAL CABINET (ACCORDING TO SPLICE DETAILS) BY CORRESPONDING COLOR/NUMBER. WIRING SCHEDULE RUN NO. X CONDUIT SIZE CONDUCTORS REMARKS 3" PVC 1 - 48 SMFO 1 3" PVC SPARE 2 3" PVC 2 - 12 SMFO 3 EX 3"** 1 - 48 SMFO* *REINSTALL, **SEE SIGNAL PLAN FOR CONDUIT MODIFICATIONS 4 3" PVC 1 - 48 SMFO* *REINSTALL FMic VELOPMENT ENGINEERING hael Sippo 09/11/2024 T-421436 0' 20' 40' SCALE: 1" = 20' AD -READY SUBMITTAL ' DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE. JUNE 2024 N P M.POWERS G.FRANCO (425) 453-5000 ofjv:� DRAWN: RAP I D R I D E I LINE cob1 100 112TH AVE NE, SUITE 500 Q ew k'A L� • BELLEVUE, WA 98004 z� A. KING LIM King County `ti � CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO: 0 ��4}. Q\',�`4tiJ28 S. RAHMAN E00566E18 INTERCONNECT PLAN 111.01 METRO co n co r ��. ISTER� 't No. REVISION BY APP'D DATE JSIDNAL E�� CHECKED: CONTRACT NO: G RA 1 0+00 TO G RA 1 4+00 SHEET NO: OF E N G I N E E R I N G 6/21/2024 K.CHANGYUEN CXXXXXXXX 320 473