Loading...
HomeMy WebLinkAboutT-4214037X 3 a X Ly Z O z w ry \` 1 P. a Z O F— z w O x a z O F— z w i J X a z O F— z w J W X a z O F— z w J Q z 0 x O N N 02 a z O z w LF X a z O z w 0 J X z O z w z O Q X 3 c 0 m CV N 02 z O z w z z Q O Z X a Z O z w ry X a Z CD J Q X a 0 CV O N �I W ry O 00 H 73 O Y a O N CO O O H o�w �0_ J (O -C° X a � E-o omCO `O w w 00co J o N X �� � p N O O 0 O m ~ W Q oa-x2E To N O C C d- Q ry 0 I U Q GENERAL NOTES 1. SEE SIGNAL PLANS 1TS1.05 FOR ADDITIONAL WORK AT THE INTERSECTION. 2. COORDINATE WITH THE CITY OF RENTON TRANSPORTATION MAINTENANCE SUPERVISOR, ERIC CUTSHALL AT (425) 430-7423 FOR ACCESS INTO THE TRAFFIC SIGNAL CONTROLLER CABINETS FOR DISCONNECT OF EXISTING FIBER FOR REINSTALL THROUGH NEW CONDUITS ON S GRADY WAY. CONSTRUCTION NOTES 2 REMOVE EXISTING SMALL CABLE VAULT. 3 INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. 43 INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN J-90.21.02. � N 5 TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. O O 13 CUT EXISTING 2-12CT FIBER LATERAL CABLES FROM EXISTING FIBER TRUNK. N V 17 BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY CORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. 22 SPLICE FIBERS ACCORDING TO FIBER OPTIC SPLICE DIAGRAM 112.03-112.09. N COIL SLACK FIBERS IN THE VAULT ACCORDING TO QUANTITIES SHOWN IN M THE FIBER ROUTE SCHEMATIC ON DRAWING 112.01-112.02. r O 29 REMOVE EXISTING JUNCTION BOX AND ABANDON EXISTING CONDUITS AFTER EXISTING 48-CT SMFO CABLE HAS BEEN REMOVED AND REINSTALLED THROUGH NEW ITS PATHWAY BETWEEN NEW CABLE VAULT r AT S GRADY WAY/LAKE AVE S AND NEW CABLE VAULT AT S GRADY N WAY/TALBOT RD S. a 32 SPLICE LATERAL CABLES TO PRE -TERMINATED PIGTAIL IN THE NEW FIBER PATCH PANELS IN THE UPPER AND LOWER COMPARTMENTS OF THE TRAFFIC SIGNAL CABINET (ACCORDING TO SPLICE DETAILS) BY CORRESPONDING COLOR/NUMBER. O N O O . O N N a 0' 20' 40' I— DEVELOPMENT ENGINEERING Michael Sippo 09/11 /2024 Cr SCALE: 1" = 20' T-42143 7 AD -READY SUBMITTAL ' � DESIGNED: APPROVED E METRO TRANSIT CAPITAL DIVISION DATE: A coKN P M.POWERS G.FRANCO JUNE 2024 (425) 453-5000 of�v:� DRAWN: RAP I D R I D E I LINE ing County 1 100 112TH AVE NE, SUITE 500a b Q A L� • BELLEVUE, WA 98004 � x A. KING LIM CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO: 4 728 sv�METRO ° STEROID S. RAHMAN E00566E18 INTERCONNECT PLAN 111.02 No. REVISION BY APP'D DATE concord `SIGNAL E� CHECKED: CONTRACT NO: G RA 1 4+00 TO G RA 1 9+00 SHEET NO: OF tA E N G I N E E R I N G 6/21/2024 K.CHANGYUEN CXXXXXXXX 321 473