HomeMy WebLinkAboutT-4214041:1
_.
ON
a
O
C9
N
N
C2
a
Z
O
z
W
ry
LF
X
3
a
Z
O
z
W
ry
�I
J
X
a
Z
O
z
W
rK
I
z
O
Q
X
ry
c
0
m
C9
N
N
00
a
z
O
z
W
ry
I
z
z
Q
U
Z
X
a
z
O
z
W
ry
>I
X
a
Z
C�
J
Q
X
3
a
0
N
O
N
ry
I
W
W'
O
m
0
H
U
Y
a
O
U
W
O W
0_
J
Cz X
a> > co� . .
�
E70
000
cv W
MLoCD
LLJ
O J
o X
co C\j
a N
a
m0 N O
O 01
� O
NI X
_�
Cz0w�
Q
oaxx2E
WIRING SCHEDULE
RUN NO.
X
CONDUIT SIZE
CONDUCTORS
REMARKS
1
4" PVC
WSDOT 1-12 SMFO***, SDOT 1-288 SMFO**
INSTALL 3-1.25" HDPE INNERDUCTS, ***REINSTALL BY WSDOT, **REINSTALL BY SEATTLE IT
3" PVC
SPARE
2
2" PVC
WSDOT 1-12 SMFO***
***REINSTALL BY WSDOT
4" HDPE
WSDOT 1-12 SMFO***, SDOT 1-288 SMFO**
INSTALL 3-1.25" HDPE INNERDUCTS, ***REINSTALL BY WSDOT, **REINSTALL BY SEATTLE IT
4
3" HDPE
SPARE
3" HDPE
SDOT 1-288 SMFO**
**REINSTALL BY SEATTLE IT
5
3" HDPE
SPARE
GENERAL NOTES
COORDINATE WITH SEATTLE IT FIBER MANAGER, KRIS HENRY-SIMMONS AT
(206)-255-6258 A MINIMUM OF SIX WEEKS IN ADVANCE OF WORK FOR
SEATTLE IT TO DISCONNECT AND REINSTALL THE 288-CT SMFO CABLE
THROUGH NEW CONDUITS ON TALBOT RD S.
2. COORDINATE WITH WSDOT FIBER OPTICS SYSTEM MANAGER, TODD
TURNER AT (360)-705-7694 OR TURNERT@WSDOT.WA.GOV A MINIMUM OF SIX
WEEKS IN ADVANCE OF WORK FOR WSDOT TO REMOVE AND REINSTALL THE
12-CT SMFO CABLE THROUGH NEW CONDUITS ON TALBOT RD S.
CONSTRUCTION NOTES
G
INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04.
TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES.
BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY BORING
OPERATIONS BACK TO PRECONSTRUCTION CONDITION.
WSDOT TO REMOVE AND REINSTALL THE EXISTING 12-CT WSDOT FIBER FROM THE WSDOT FIBER VAULT ON THE SW
CORNER OF TALBOT RD S AND S RENTON VILLAGE PL TO THE EXISTING CABLE VAULT IN THE LANDSCAPING NEAR
TRITON TOWER PARKING LOT.
REMOVE EXISTING JUNCTION BOX AND ABANDON EXISTING CONDUITS AFTER THE EXISTING 288-CT SMFO CABLE HAS
BEEN REMOVED AND REINSTALLED BY SEATTLE IT AND THE EXISTING 12-CT SMFO CABLE HAS BEEN REMOVED AND
REINSTALLED BY WSDOT THROUGH THE NEW ITS PATHWAY BETWEEN TALBOT RD S/S 7TH ST FIBER VAULT AND
VILLAGE PL FIBER VAULT.
J
J
I
0' 20' 40'
LDEVELOPMENT ENGINEERING
Sippo 09/11 /2024 '
SCALE: 1" = 20'
T-421441
AD -READY SUBMITTAL 19 DESIGNED: APPROVED: DATE
METRO TRANSIT CAPITAL DIVISION JUNE 2024
WA
P M. POWERS G. FRANCO
(425) 453-5000 of°��� DRAWN: RAP I D RI D E I LINE
1100 112TH AVE NE, SUITE 500 ti L
A jacobBELLEVUE, WA 98004 02 z A. KING King County
CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO:
4 728
�• � STER1S. RAHMAN E00566E18 METRO INTERCONNECT PLAN 111.05
concord SIONAL ��� CHECKED: CONTRACT NO: SHEET N0 OF
FNo. REVISION BY APP'D DATE ENGINEERING TAL-B 14+00 TO TAL-B 18+50 NO: 473
6/21/2024 K. CHANG YUEN CXXXXXXXX
O
to
N
O
O
O
1
N
N
a