Loading...
HomeMy WebLinkAboutT-4214041:1 _. ON a O C9 N N C2 a Z O z W ry LF X 3 a Z O z W ry �I J X a Z O z W rK I z O Q X ry c 0 m C9 N N 00 a z O z W ry I z z Q U Z X a z O z W ry >I X a Z C� J Q X 3 a 0 N O N ry I W W' O m 0 H U Y a O U W O W 0_ J Cz X a> > co� . . � E70 000 cv W MLoCD LLJ O J o X co C\j a N a m0 N O O 01 � O NI X _� Cz0w� Q oaxx2E WIRING SCHEDULE RUN NO. X CONDUIT SIZE CONDUCTORS REMARKS 1 4" PVC WSDOT 1-12 SMFO***, SDOT 1-288 SMFO** INSTALL 3-1.25" HDPE INNERDUCTS, ***REINSTALL BY WSDOT, **REINSTALL BY SEATTLE IT 3" PVC SPARE 2 2" PVC WSDOT 1-12 SMFO*** ***REINSTALL BY WSDOT 4" HDPE WSDOT 1-12 SMFO***, SDOT 1-288 SMFO** INSTALL 3-1.25" HDPE INNERDUCTS, ***REINSTALL BY WSDOT, **REINSTALL BY SEATTLE IT 4 3" HDPE SPARE 3" HDPE SDOT 1-288 SMFO** **REINSTALL BY SEATTLE IT 5 3" HDPE SPARE GENERAL NOTES COORDINATE WITH SEATTLE IT FIBER MANAGER, KRIS HENRY-SIMMONS AT (206)-255-6258 A MINIMUM OF SIX WEEKS IN ADVANCE OF WORK FOR SEATTLE IT TO DISCONNECT AND REINSTALL THE 288-CT SMFO CABLE THROUGH NEW CONDUITS ON TALBOT RD S. 2. COORDINATE WITH WSDOT FIBER OPTICS SYSTEM MANAGER, TODD TURNER AT (360)-705-7694 OR TURNERT@WSDOT.WA.GOV A MINIMUM OF SIX WEEKS IN ADVANCE OF WORK FOR WSDOT TO REMOVE AND REINSTALL THE 12-CT SMFO CABLE THROUGH NEW CONDUITS ON TALBOT RD S. CONSTRUCTION NOTES G INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN J-40.10-04. TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH AND CONDUIT TO AVOID UTILITIES. BORE AND INSTALL CONDUIT. ADJUST BORE TO AVOID UTILITIES AS NEEDED. RESTORE AREA DISTURBED BY BORING OPERATIONS BACK TO PRECONSTRUCTION CONDITION. WSDOT TO REMOVE AND REINSTALL THE EXISTING 12-CT WSDOT FIBER FROM THE WSDOT FIBER VAULT ON THE SW CORNER OF TALBOT RD S AND S RENTON VILLAGE PL TO THE EXISTING CABLE VAULT IN THE LANDSCAPING NEAR TRITON TOWER PARKING LOT. REMOVE EXISTING JUNCTION BOX AND ABANDON EXISTING CONDUITS AFTER THE EXISTING 288-CT SMFO CABLE HAS BEEN REMOVED AND REINSTALLED BY SEATTLE IT AND THE EXISTING 12-CT SMFO CABLE HAS BEEN REMOVED AND REINSTALLED BY WSDOT THROUGH THE NEW ITS PATHWAY BETWEEN TALBOT RD S/S 7TH ST FIBER VAULT AND VILLAGE PL FIBER VAULT. J J I 0' 20' 40' LDEVELOPMENT ENGINEERING Sippo 09/11 /2024 ' SCALE: 1" = 20' T-421441 AD -READY SUBMITTAL 19 DESIGNED: APPROVED: DATE METRO TRANSIT CAPITAL DIVISION JUNE 2024 WA P M. POWERS G. FRANCO (425) 453-5000 of°��� DRAWN: RAP I D RI D E I LINE 1100 112TH AVE NE, SUITE 500 ti L A jacobBELLEVUE, WA 98004 02 z A. KING King County CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO: 4 728 �• � STER1S. RAHMAN E00566E18 METRO INTERCONNECT PLAN 111.05 concord SIONAL ��� CHECKED: CONTRACT NO: SHEET N0 OF FNo. REVISION BY APP'D DATE ENGINEERING TAL-B 14+00 TO TAL-B 18+50 NO: 473 6/21/2024 K. CHANG YUEN CXXXXXXXX O to N O O O 1 N N a