HomeMy WebLinkAboutT-42140420
a
X
Ly
Z
O
L
z
w
0�
i rFNFRAI NOTFq
cf), To
N
X
a �
Z
O
z
J
X
J
w
X
z
O
z
w
O
N
N
02
z
O
z
w
ry
LF
X
z
O
z
w
0
J
x
z
O
z
w
ry
z
O
Q
X
_
0
ry
CV
N
02
z
O
z
w
ry
z
z
Q
O
Z
X
z
O
z
w
ry
X
Z
J
Q
X
0
CV
0
NI
r'
w
0
ry
O
m
d
O
Y
O
co cf)
o
O
o�w
�0_
J (O
—C° X
a
�E-o
omo
w
�Lo(D
LU
00co
J
o N X
co
0 3
p N O
O : 0
O
o X
LU cis
0 ~ W LU
Q
o a- xx 2Ei
SIGNA
W
_�W
10 if
1 � dH
SD
ON Ru-
�-
JH0
rH
�
d
0
dH0
0
d
d
dH0
d
o
dH0
�HO I d dH0 1
V-1I\J1 tl/-lL VlI LJI
SEE SIGNAL PLANS 1TS1.07 FOR ADDITIONAL WORK AT THE
INTERSECTION.
COORDINATE WITH SEATTLE IT FIBER MANAGER, KRIS
HENRY-SIMMONS AT (206)-255-6258 A MINIMUM OF SIX WEEKS IN
ADVANCE OF WORK FOR SEATTLE IT TO DISCONNECT AND
REINSTALL THE 288-CT SMFO CABLE THROUGH NEW CONDUITS ON
TALBOT RD S.
2. COORDINATE WITH WSDOT FIBER OPTICS SYSTEM MANAGER,
TODD TURNER AT (360)-705-7694 OR TURNERT@WSDOT.WA.GOV A
MINIMUM OF SIX WEEKS IN ADVANCE OF WORK FOR WSDOT TO
REMOVE AND REINSTALL THE 12-CT SMFO CABLE THROUGH NEW
CONDUITS ON TALBOT RD S.
nnKICTOI InTInKI KInTCC'
INSTALL TYPE 2 JUNCTION BOX PER WSDOT STANDARD PLAN
J-40.10-04.
INSTALL SMALL CABLE VAULT PER WSDOT STANDARD PLAN
N
J-90.21.02.
r
TRENCH AND INSTALL CONDUIT. ADJUST ROUTING OF TRENCH
O
AND CONDUIT TO AVOID UTILITIES.
O
r
INTERCEPT EXISTING CONDUITS AND EXTEND TO NEW JUNCTION
N
V
BOX.
WSDOT TO REMOVE AND REINSTALL THE EXISTING 12-CT WSDOT
FIBER FROM THE WSDOT FIBER VAULT ON THE SW CORNER OF
TALBOT RD S AND S RENTON VILLAGE PL TO THE EXISTING CABLE
VAULT IN THE LANDSCAPING NEAR TRITON TOWER PARKING LOT.
`J
N
--t ------ 21
REPLACE EXISTING TRAFFIC SIGNAL CONTROLLER. SEE
M
SPECIFICATIONS FOR CONTROLLER TYPE.
r
O
O
D
REMOVE EXISTING JUNCTION BOX AND ABANDON EXISTING
O
CONDUITS AFTER THE EXISTING 288-CT SMFO CABLE HAS BEEN
REMOVED AND REINSTALLED BY SEATTLE IT AND THE EXISTING
N
12-CT SMFO CABLE HAS BEEN REMOVED AND REINSTALLED BY
WSDOT THROUGH THE NEW ITS PATHWAY BETWEEN TALBOT RD
a
S/S 7TH ST FIBER VAULT AND TALBOT RD S/S RENTON VILLAGE PL
FIBER VAULT.
GREMOVE
EXISTING COR COMM PULL BOX AFTER EXISTING FIBER
HAS BEEN REMOVED AND REINSTALLED THROUGH NEW CONDUIT
PATHWAY.
O
EXISTING TALBOT RD S/S RENTON VILLAGE PL WSDOT FIBER VAULT
NO
]STING WSDOT ITS CABINET 19
O
O
WIRING SCHEDULE
RUN NO.
X
CONDUIT SIZE
CONDUCTORS
REMARKS
4" PVC
WSDOT 1-12 SMFO***, SDOT 1-288 SMFO**
INSTALL 3-1.25" HDPE INNERDUCTS, 'REINSTALL BY WSDOT, **REINSTALL BY SEATTLE IT
1
3" PVC
SPARE
4" PVC
SDOT 1-288 SMFO**
**REINSTALL BY SEATTLE IT
2
4" PVC
SPARE
EX. 4"
SDOT 1-288 SMFO**
**REINSTALL BY SEATTLE IT
3
EX. 4"
REMOVE EX. 1-25R COPPER (CUT)
4
EX 2"
WSDOT 1-12 SMFO****
****REMOVE BY WSDOT
5
EX 2"
WSDOT 1-12 SMFO***
***REINSTALL BY WSDOT
EX 2"
WSDOT 2-12 SMFO****, 1-24 SMFO
****REMOVE BY WSDOT
6
EX 2"
EMPTY
EX 2"
EMPTY
7
2" PVC
WSDOT 1-12 SMFO***
***REINSTALL BY WSDOT
v
N
TR ❑ Cn r 0' 20' 40'
DEVELOPMENT ENGINEERING
U) u Michael Sippo 09/11/2024
SCALE: 1" = 20'
F-T-421442
AD -READY SUBMITTAL ' DESIGNED: APPROVED METRO TRANSIT CAPITAL DIVISION DATE JUNE 2024
P M.POWERS G.FRANCO
(425) 453-5000 ofN P.
�v:� DRAWN: RAP I D R I D E I LINE
1 100 112TH AVE NE, SUITE 500 Q �w''a L� •
A bBELLEVUE, WA 98004 z� A. KING King County
'■ti�� � CHECKED: PROJECT N0: RENTON SEGMENT DRAWING N0:
0 �4*
Q \ �`4`'72$ 0 �ww S. RAHMAN E00566E18 METRO INTERCONNECT PLAN 111.06
concordSTERN t
�J�`�IDNAL E6/21/2024 KCHECKED: CONTRACT N0: SHEET N0: OF
No. REVISION BY APP'D DATE ENGINEERING TAL-B 18+50 TO TAL-B 23+50 326 473