Loading...
HomeMy WebLinkAboutT-4214098z CD Q X 0 z w w J X z O z w JI Q z 0 C9 X a O O FT X 0 ry C0 m N N 22 z O F- z w ry 0 X z O z w ry z O X a z O z w ry LF X 3 Z O z w z z Q U Z X Z O z w fy 3: O X N � O z O z w O J CU T X o z O in z ~ CLLJ U) rr rn ry°M°OD o �x �m E QQCU � ti v O o 0� L 04 gory N O a � � Y � U O � Y w w Q U 0- X 2Ei SIGNAL HEADS NEW 1211 O 12" LQ 12" 21, 22, 23, 41 42, 61, 62, 63 81,82 NOTES: Q 12" © 12" 1211 Y FLASHING © 1211 11/OLA, 12/OLA, 31/OLB, 32/OLB 51/OLC, 52/OLC, 71/OLD, 72/OLD 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. 2. FOR SIGNAL POLE DETAILS SEE 1TS1.02D & COR STD. PLAN 140. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.02C AND 1TS1.02E. 4. FOR CONSTRUCTION NOTES SEE 1TS1.02B. 5. FOR LIGHTING PLANS AND DETAILS SEE 1 L1.01. 6. FOR ITS PLANS AND DETAILS SEE 111.00. 7. FOR ELECTRICAL PLANS AND DETAILS SEE 1 E1.01. 8. STREET NAME SIGN SIZE / LAYOUT TO FOLLOW COR STANDARDS. SIZES SHOWN ON THIS PLAN ARE ESTIMATED. SIGNS S Grady Way CD D3-103 (114" W x 24" H) S2 D3-103 (114" W x 24" H) 9. NEW VEHICLE SIGNAL HEADS 21, 22, 23, 41, 42, 61, 62, 63, 81 AND 82 SHALL BE INSTALLED WITH NEW MOUNTING TYPE 1" ON NEW MAST ARMS, NEW VEHICLE SIGNAL HEADS 11, 31, 51, AND 71 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M" ON NEW MAST ARMS PER COR STD. PLAN 140. 10. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28, 29, 48, 49, 68, 69, 88 AND 89 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "E" ON NEW POLE PER WSDOT STD. PLAN J-75.10. 11. NEW VEHICLE SIGNAL HEADS 12, 32, 52 AND 72 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "D" ON NEW TYPE I POLES PER WSDOT STD. PLAN J-75.10. PHASE DIAGRAM 1 5 OLA FYA W FYA OLC. _j I - i 2 6 3 7 <- ,. il FYA OLBI t OLD FYA, Shattuck Ave O2j S3 D3-103 (168" W x 24" H) S4 D3-103 (168" W x 24" H) S11 SPECIAL (24" W x 36" H) S12 SPECIAL (24" W x 36" H) REFER TO SHEET 1TS1.00 FOR SIGN LAYOUT DETAILS PRE-EMPTION SCHEDULE CHANNEL PHASES A 1 & 6, OLA (FYA) B 2 & 5, OLC (FYA) C 4 & 7, OLD (FYA) D 3 & 8, OLB (FYA) � PROTECTED VEHICLE MOVEMENT ----� PERMISSIVE VEHICLE MOVEMENT > PEDESTRIAN MOVEMENT FYA = FLASHING YELLOW ARROW OLA = OVERLAP A MOVEMENT, WESTBOUND LEFT OLB = OVERLAP B MOVEMENT, NORTHBOUND LEFT OLC = OVERLAP C MOVEMENT, EASTBOUND LEFT OLD = OVERLAP D MOVEMENT, SOUTHBOUND LEFT AD -READY SUBMITTAL DESIGNED: APPROVED �VwEG� J. DOWDS BENNETT G. FRANCO (425) 453-5000 �-�OF 8 DRAWN: 1 112TH AVE NE, SUITE 500 �� %jat.*.obs13ELLEVUE, � King County WA 98004 '� 1 P.OSUNA / LQ CHECKED: PROJECT NO: 41141 ���w� R. JAHNS E00566E18 METRO rSIDNAL �G CHECKED: CONTRACT NO: No. REVISION BY APP'D DATE 06/13/2ti K. CHANG YUEN icxxxxxxxx LEFT TURN YIELD ON FLASHING YELLOW 0 S5 S6 S7 S8 R10-101 (RELOCATED, APS PUSH BUTTON MESSAGES PHASE AUDIBLE MESSAGE "WAIT" "WAIT TO CROSS GRADY AT 2 SHATTUCK" "WAIT" "WAIT TO CROSS SHATTUCK 4 AT GRADY" "WAIT" "WAIT TO CROSS GRADY AT 6 SHATTUCK" "WAIT" "WAIT TO CROSS SHATTUCK 8 AT GRADY" DEVELOPMENT ENGINEERING Michael Sippo 09/11 /2024 ' METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT SIGNAL PLAN S GRADY WAY & SHATTUCK AVE S S9 S10 R3-8LTR (RELOCATED) SCALE: 1" = 20' T-421498 DATE: JUNE 2024 DRAWING NO: 1TS1.02A SHEET NO: OF 382 473