Loading...
HomeMy WebLinkAboutT-4214111V NOTES N 10 FOR HEADS ON NEW MAST ARMS, 3 SECTION, 4 SECTION AND GREATER SIGNAL HEADS SHALL USE TYPE M MOUNTING COUPLING INSTALLED AT OFFSET INDICATED IN PLANS. r O FIELD INSTALLED. SIGN SIZES SHALL NOT EXCEED THE MAXIMUM VALUES LISTED AT RIGHT. O 30 LOCATION SHALL BE APPROVED BY WSDOT ENGINEER PRIOR TO INSTALLATION. ® VIDEO DETECTION CAMERA LOCATED BETWEEN THROUGH AND LEFT TURN LANE, OR CENTERED ON 0 APPROACH IF LEFT TURN LANE DOES NOT EXIST. z w �I 5 1'- 0" MIN. TO 2'- 6" MAX. FROM POLE CENTERLINE TO SIGN EDGE. x 6O FOR POST MOUNTED SIGNS THERE SHALL BE 2'- 0" MIN. FROM THE FACE OF CURB OR THE EDGE OF o THE SHOULDER TO THE EDGE OF THE SIGN. w �I 40PLACEMENT SHALL BE T - 0" MIN. FROM FACE OF CURB OR EDGE OF SHOULDER; 3' - 0" MIN. FROM z FACE OF GUARDRAIL; 4'- 0" MIN. FROM CONC. BARRIER TYPE 2 (MEASURED FROM A POINT WHERE THE BARRIER BASE MEETS THE SHOULDER SURFACE (TOE). MEASUREMENT TAKEN FROM TRAFFIC x SIDE OF BARRIER; TO FACE OF POLE. 0 O8 NEW POLES AND ALL RELATED HARDWARE SHALL BE PAINTED CASCADE GREEN PER WSDOT STANDARDS. o SIGNAL STANDARD NO. STD. NO.02 X STATE ROUTE AND SR97, MP 069.09 MILE POST NO. MANUFACTURER 0 APPROVED DRAWING NO. APPROVED DWG. AB 12345 Uj FABRICATION DATE FAB. 6/14/2002 o' x EXAMPLE SIGNAL STANDARD IDENTIFICATION TAG z 0 TAG NOTES: z Uj �I CORROSION RESISTANT METAL TAG SECURED WITH (2) 0.125" RIVETS AS FOLLOWS: 0 - POLE SHAFT - LOCATED WITHIN 6" ABOVE HAND HOLE (TYPE II & III). X - SIGNAL AND LUMINAIRE MAST ARM (TYPE II & III). - LOCATED WITHIN 6" OF THE LUMINAIRE ARM AND THE POLE SHAFT CONNECTION POINT (TYPE III). o - TEXT SHALL BE A MINIMUM OF 16" HIGH, STAMPED OR EMBOSSED. z w co I a. VEHICLE DISPLAY e. POST MTD. SIGN i. APS PUSH BUTTON X b. MAST ARM MTD. SIGN f. LUMINAIRE j. HANDHOLE z 0 Uj C. STREET NAME SIGN g. PEDESTRIAN DISPLAY k. VIDEO DETECTION CAMERA z d. PRE-EMPT DETECTOR h. TERMINAL CABINET I. PTZ CAMERA U z X z 0 z w �I 0 x z 0 z w JI X z 0 z w Of Of 0 x 0 z w CD w J X a z cD J Q X 0 � v � SIGNAL DISPLAY VERTICAL CLEARANCE TO ROADWAY MIN. MAX. HORIZONTAL DISTANCE ALL 40' 45' 50' 53- 180' FROM STOP LINE 3 SECTION 12" 5 SECTION CLUSTER 12" 16.5' 17.5' 19.2' 20.9' 22.0' 4 SECTION 12" 16.5' 17.0' 18.0' 1 19.7' 1 20.8' MEASURED FROM BOTTOM OF SIGNAL HEAD HOUSING TO ROADWAY MEASURE ATTACHMENT POINT ANGLES CLOCKWISE FROM POLE ORIENTATION LINE (El ATTACHMENT POINT) TO THE ATTACHMENT POINT LOCATION E2 w POLE ORIENTATION LINE (E1 ATTACHMENT POINT) POLE ORIENTATION ANGLE (P.O.A.) DEGREES CLOCKWISE FROM OFFSET LINE TO POLE ORIENTATION LINE (E1 ATTACHMENT POINT) 'ILL Lm ,/A/ 'L�q �Lv� -. STANDARD TYPE WSDOT STANDARD PLAN REFERENCES POLE FOUNDATION ELECTRICAL STANDARD CURB PPB FIXED J-20.10 J-20.10 0 J-20.10 BREAKAWAY J-20.15 J-20.15 J-20.15 PS J-20.16 J-21.10 J-20.20 I J-21.15 J-21.10 J-21.20 II, III, SD N/A J-26.10, J-26.15 N/A N/A - ATTACHMENT POINT - ALL HANDHOLES AT 180A FROM E1 -ANCHOR BOLT PLATE -LOCATION STATION �O -9� POLE ORIENTATION AND ATTACHMENT POINT O3- 6" MEASURED FROM SIDEWALK SURFACE TO CENTER OF PEDESTRIAN PUSH BUTTON XYZ ft3 MAST ARM LENGTH X Y Z (ft) 6' 19.8 8' 26.4 10, 33.0 12' 39.6 14' 46.2 16' 52.8 m o i i 00 < nun _LL O O TYPE PPB TYPE PS PPB POST PED. HEAD POLE TYPE VEHICLE HEAD POLE B1 B8 --- - 2 2 3 1 B2 k B3 B5 2 1 O b b d B6 B9 2 b B7 a b B10 B11 a b c- a a 2 POLE AND MAST ARM PER MANUFACTURER'S PLANS. MANUFACTURER'S PLANS SHALL BE SIGNED AND STAMPED BY A WASHINGTON STATE THICKENED EDGE FOR FOUNDATIONS LOCATED WITHIN SIDEWALK: LICENSED STRUCTURAL ENGINEER. ANCHOR BOLTS, PROVIDE ADEQUATE ADDITIONAL LENGTH TO ACCOMMODATE SIDEWALK THICKNESS WHILE MAINTAINING EMBEDMENT REQUIREMENTS. AT LEAST TWO FULL THREADS SHALL EXTEND ABOVE THE TOP HEAVY -HEX NUT. ANCHOR BOLTS MAY BE CUT TO ACCOMMODATE ANCHOR BOLT COVER SIDEWALK & THICKENED EDGE, SIDEWALK THICKNESS DEFINED IN CONTRACT PLANS, PLACE ABOVE AND AROUND PERIMETER OF TOP OF FOUNDATION Z" MINIMUM SPACE BETWEEN BOTTOM OF HEAVY -HEX NUT AND CONCRETE ROj ODMS OR VMS IS NOT ALLOWED ON THESE POLES. LIMITS OF VERTICAL CLEARANCE TYPE II, III & SD SIGNAL POLE all •'.1 SIGNAL POLE CHART SIGNAL MAST ARM DATA MAST MOUNTING LUMINAIRE FOUNDATION FIELD LOCATION ARM HEIGHT (FT) (X)(Y)(Z) = ARM (FT) POLE ATTACHMENT POINT ANGLES (deg) DEPTHS (FT) TYPE OFFSET DISTANCE - Z(FT) (POLE CENTERLINE TO ATTACHMENT POINT) WINDLOAD AREAS - XY (FT)2 REMARKS LENGTH TOTAL (FT) (FT)3 POLE # STATION OFFSET LT. RT. P.O.A. Al A2 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 ** C D E1 E2 F G1 G2 H 11 12 T RD. T SQ. 4' RD. ®1 22 + 01.2 52.9' X 0 PS 90 1A 22 + 39.1 69.1' X 0 PS 0 2B 21 + 96.9 34.4' X 0 PPB 270 2C 22 + 05.5 43.4' X 0 PPB 0 P.O.A MEASURED FROM TAL-B-LINE. ®3 22 + 71.9 42.3' 180 0 ®4 23 + 05.9 57.6' 40 50 45.5 38 26 23 15 6 9.2 7.5 9.2 0 9.2 10.2 12 1627 SEE LIGHTING 0 0 180 EXISTING PLAN 54 43.5 39 30 48 25.5 9.2 7.5 9.2 7.5 0 9.2 1734 4A 22 + 97.7 _ . " EXISTING 0 0 0 *FOUNDATION DEPTH IS BASED ON DESIGN LATERAL BEARING PRESSURE OF 2,500 PSF, (RAPIDRIDE I -LINE GEOTECHNICAL ENGINEERING REPORT, PRE -FINAL JULY 2023) **ASSUMES ADDITIONAL 500 FT' FOR FUTURE EQUIPMENT ON NEW SIGNAL STANDARDS. O S C J mco C O � o N ~ OP (6 C C/? 6o Cn ( N 0 � �22 o co m . CU CN o AD -READY SUBMITTALCCN 7 � � o O N CIA�I (425) 453-5000 coba 4 w 1100 112TH AVE NE, SUITE 500 N BELLEVUE, WA 98004 oo ja ��m Y � U O Y 2 W (n U)LL_ W Q 00 w Df Q U a- No. REVISION BY APP'D DATE X � DESIGNED: APPROVED: wEG�� J. DOW DS BENNETT G. FRANCO P.OSUNA CHECKED: PROJECT NO: 41141 ww GISTERti G SIDNAL R. JAHNS E00566E18 CHECKED: CONTRACT NO: 06/13/2ti K. CHANG YUEN CXXXXXXXX DEVELOPMENT ENGINEERING Michael Sippo 09/11/2024 (DI F-T-42141 11 METRO TRANSIT CAPITAL DIVISION DATE: L14 RAPIDRIDE I LINE JUNE2024 King County RENTON SEGMENT DRAWING NO: METRO POLE SCHEDULE 1TS1.04D TALBOT RD S & 1-405 SB OFF RAMP SHEET NO OF 395 473 00 N To O O N V