HomeMy WebLinkAboutT-421411511
r
N
11
1
r
ql
1
O
0
X
z
O
z
w
ry
o'
J
x
a
z
O
z
w
ry
z
O
Q
C9
x
z
O
z
w
ry
I
x
3
a
z
O
z
w
z'
z
Q
U
z
x
Z
O
z
w
3
O
x
z
O
z
w
J'
x
z
O
z
w
rr
r'
0
x
0
z
w
w
J
x
a
Z
U'
J
Q
x
Q�
O
x
cu
c
J
C
m O
o �
m
~c;
�_
6000 U) N
c') 0
o
co
76 E
QQcu CD
ti
ov o
ai cli
cl,
o
CO ory
N O
a � �
Y � U
O � Y
�I L
w CD
U a_ xJ�f 2Ei
NOTES:
1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00.
2. FOR SIGNAL POLE DETAILS SEE 1TS1.07D & COR STD. PLAN 140.
3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.07C AND 1TS1.07E.
4. FOR CONSTRUCTION NOTES SEE 1TS1.07B.
5. FOR LIGHTING PLANS AND DETAILS SEE 1L1.01.
6. FOR ITS PLANS AND DETAILS SEE 111.00.
7. FOR ELECTRICAL PLANS AND DETAILS SEE 1E1.01.
8. STREET NAME SIGN SIZE / LAYOUT TO FOLLOW COR STANDARDS. SIZES SHOWN ON
THIS PLAN ARE ESTIMATED.
9. NEW VEHICLE SIGNAL HEADS 21, 22, 31, 51, 61, 62, 71 AND 72 SHALL BE INSTALLED
WITH NEW MOUNTING TYPE l" ON NEW MAST ARMS PER COR STD. PLAN 140.
10. NEW VEHICLE SIGNAL HEAD 52 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "D"
ON NEW TYPE I POLE PER WSDOT STD. PLAN J-75.10.
11. NEW COUNTDOWN PEDESTRIAN SIGNAL HEAD 68 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "E" ON NEW TYPE I POLE PER WSDOT STD. PLAN J-75.10-02.
12. NEW COUNTDOWN PEDESTRIAN SIGNAL HEAD 69 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "D" ON NEW PS POLE PER WSDOT STD. PLAN J-75.10-02.
13. NEW COUNTDOWN PEDESTRIAN SIGNAL HEAD 88 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "E" ON NEW TYPE II POLE PER WSDOT STD. PLAN J-75.10-02.
14. NEW COUNTDOWN PEDESTRIAN SIGNAL HEAD 89 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "E" ON NEW TYPE III POLE PER WSDOT STD. PLAN J-75.10-02.
15. BOTH DETECTION ZONES V31 AND V32 SHALL CALL BUS PHASE 3. PHASE & PROGRAM
THE CONTROLLER SO THAT BOTH DETECTION ZONES MUST BE OCCUPIED AT THE
SAME TIME TO CALL BUS PHASE 3.
PHASE DIAGRAM
1
5
NOT USED
OLC
2
6
OLA
3
7
BUS
4
8
NOT USED
OLA
BLANKOUT SIGN INDICATION SHALL
BE ON ONLY DURING A PHASE 6
PED CALL OR A PHASE 8 PED CALL
CONTROLLER SHALL SKIP
PHASES 3,7 AND 8 IF THEY ARE
NOT CALLED.
PROTECTED VEHICLE MOVEMENT
> PEDESTRIAN MOVEMENT
OLA = OVERLAP A MOVEMENT, BLANK -OUT SIGN INDICATION
OLC = OVERLAP C MOVEMENT, NORTHBOUND RIGHT
PRE-EMPTION SCHEDULE
CHANNEL
PHASES
A
6
B
2 & 5
D
3 & 7
APS PUSH BUTTON MESSAGES
PHASE
AUDIBLE MESSAGE
6
"WAIT" "WAIT TO CROSS CARR AT
105TH"
3 & 8
"WAIT" "WAIT TO CROSS 105TH AT
CARR"
SIGNAL HEADS SIGNS *I ow
NEW BUS
R BUS ONLY
12 12Ini 2 SIGNAL ONLY
O 12" HQ
1211 S6 68,69,88,89 SPECIAL (20" W x 14" H) R3-1 (36" W x 36" H) SPECIAL (24" W x 36" H) R3-5R (30" W x 36" H)
GG12" 12" REFER TO SHEET 1TS1.00 BLANK -OUT REFER TO SHEET 1TS1.00
FOR SIGN LAYOUT DETAILS FOR SIGN LAYOUT DETAILS
21, 22, 61, 62 71,72
12" R 12" SE Carr Rd
O
O� Y 12 S3 D3-101 (90" W x 20" H)
12
O 12" Q 12"
105th PI SE
Bus 51,52 SIGNAL
31 2D3-103 (102" W x 20" H)
AD -READY SUBMITTAL DESIGNED: APPROVED
�VwEG� J. DOWDS BENNETT G. FRANCO
(425) 453-5000 �-�oF Hl� DRAWN:
.jacob1100 112TH AVE NE, SUITE 500 Q"� � c �� King County
BELLEVUE, WA 98004 ti P.OSUNA
/ CHECKED: PROJECT NO:
41141 ���w� R. JAHNS E00566E18 METRO
rSIDNAL �G CHECKED: CONTRACT NO:
No. REVISION BY APP'D DATE 06/13/2ti K. CHANG YUEN CXXXXXXXX
S5 D3-103 (102" W x 20" H) 0' 10, 20'
DEVELOPMENT ENGINEERING
-
Michael Sippo 09/11 /2024
SCALE: 1" = 20'
F—T-4214115
METRO TRANSIT CAPITAL DIVISION DATE:
RAPIDRIDE I LINE I
JUNE2024
RENTON SEGMENT DRAWING NO:
SIGNAL PLAN I 1TS1.07A
SE CARR RD & 105TH PL SE SHEET NO: OF
399 473
O
N
O
O
O
1
N
N
a
J