HomeMy WebLinkAboutT-4214122qq
r
N
11
r
qe
O
a
z
O
z
w
n'
I
x
a
z
O
z
w
J
Q
z
c�
X
a
z
O
z
w
ry
0
X
z
O
z
w
ry
0
J
X
a
z
O
z
w
ry
z
O
Q
x
z
O
z
w
ry
X
a
z
O
z
w
ry
z
z
Q
U
Z
X
a
Z
O
H
Z
w
r'
i�:I
O
X
z
O
F-
z
w
J
x
a
z
O
F-
z
w
ry
ry
x
3
a
Z
U'
J
Q
X
rn �
o O
d
O
FT
x
CU
J a
C
� O
a y
o �
~C;
60 U) N
°M°ON�
m �
E
QQ�
CULO CD
COo
to V N
ary-i
04
gory
N O
a c F-
Y U
I F- U) LU
w Q
U a_ x 2Ei
SIGNAL HEADS
NEW
Ni 2]
28,29
12"
12"
AD -READY SUBMITTAL
No. I REVISION
SIGNS
CROSSWALK
STOP I STOP ON
ON RED FLASHING
• NO{
THEN
PROCEED
S1 S2
R10-23 MOD (30" W x 48" H)
BY I APP'D I DATE
PRE-EMPTION SCHEDULE
CHANNEL PHASE
A & B 1
ON
(425) 453-5000
1100 112TH AVE NE, SUITE 500
cobBELLEVUE, WA 98004
41141
�sS'9 AL
PHASE DIAGRAM
1
2
A
�
W
DESIGNED:
J. DOWDS BENNETT
DRAWN:
P. OSUNA
CHECKED:
R.JAHNS
CHECKED
06/13/2ti I K. CHANG YUEN
APPROVED:
G.FRANCO
PROJECT NO:
E00566E18
CONTRACT NO:
Cxxxxxxxx
160
- 1 '
NOTES:
1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00.
2. FOR SIGNAL POLE DETAILS SEE 1TS1.09C & COR STD. PLAN 138.
3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.09B AND 1TS1.09D.
4. FOR LIGHTING PLANS AND SERVICE BREAKER PANEL SCHEDULE DETAILS SEE 1 L1.01.
5. FOR ITS PLANS AND DETAILS SEE 111.00.
6. FOR ELECTRICAL PLANS AND DETAILS SEE 1 E1.01.
7. NEW VEHICLE SIGNAL HEADS 11, 12,13 AND 14 SHALL BE INSTALLED WITH NEW
MOUNTING TYPE "M" ON NEW MAST ARMS PER COR STD. PLAN 138.
8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28 AND 29 SHALL BE INSTALLED WITH
N
NEW MOUNTING TYPE "E" ON NEW POLE PER COR STD. PLAN 138. r
r
9. SEE COR STD. PLAN 138 FOR HAWK INSTALLATION REQUIREMENTS AND DETAILS. 0
r
N
0
CONSTRUCTION NOTES:
0
CONSTRUCT FOUNDATION PER SIGNAL POLE CHART 1TS1.09C, COR STD. PLAN 138 AND WSDOT
STD. PLANS J-26.10 AND J-26.15. TOP OF FOUNDATION SHALL BE FLUSH WITH GRADE. FURNISH AND
INSTALL TYPE III SIGNAL POLE WITH 25' MAST ARM. FURNISH AND INSTALL TWO 3-SECTION HAWK
SIGNAL HEADS, TWO EMERGENCY PRE-EMPTION DETECTOR AND ONE R10-23 MOD SIGN ON THE
N
MAST ARM. FURNISH AND INSTALL PEDESTRIAN SIGNAL HEAD AND TERMINAL CABINET ON SIGNAL
M
POLE. REFER TO LIGHTING PLANS FOR LUMINAIRE AND LUMINAIRE BRACKET ARM.
r
O
1A
FURNISH AND INSTALL TYPE PPB SIGNAL POST PER WSDOT STANDARD PLAN J-20.11 AND DETAIL
1TS1.09C. FURNISH AND INSTALL ONE APS PEDESTRIAN PUSH BUTTON WITH SIGN ON SIGNAL POLE.
r
CCONSTRUCT
FOUNDATION PER SIGNAL POLE CHART 1TS1.09C, COR STD. PLAN 138 AND WSDOT
N
STD. PLANS J-26.10 AND J-26.15 TOP OF FOUNDATION SHALL BE FLUSH WITH GRADE. FURNISH AND
a
INSTALL TYPE III SIGNAL POLE WITH 25' MAST ARM. FURNISH AND INSTALL TWO 3-SECTION HAWK
SIGNAL HEADS AND ONE R10-23 MOD SIGN ON THE MAST ARM. FURNISH AND INSTALL PEDESTRIAN
SIGNAL HEAD AND TERMINAL CABINET ON SIGNAL POLE. REFER TO LIGHTING PLANS FOR
LUMINAIRE AND LUMINAIRE BRACKET ARM.
2A
FURNISH AND INSTALL TYPE PPB SIGNAL POST PER WSDOT STANDARD PLAN J-20.11 AND DETAIL
O
1TS1.09C. FURNISH AND INSTALL ONE APS PEDESTRIAN PUSH BUTTON WITH SIGN ON SIGNAL POLE.
�O
N
0FURNISH
AND INSTALL A NEW TYPE 8 JUNCTION BOX PER WSDOT STD. PLAN J-40.30.
O
O
O4
CONSTRUCT JOINT CONTROLLER/SERVICE CABINET FOUNDATION PER CITY OF RENTON STANDARD
PLANS 126.1 AND 126.2. INSTALL ALL CONTROLLER EQUIPMENT AND CONNECT FIELD WIRING.
N
N
VERIFY FINAL LOCATION WITH THE ENGINEER IN THE FIELD PRIOR TO POURING THE FOUNDATION.
a
O5INSTALL
CONDUIT UNDER ROADWAY USING APPROVED DIRECTIONAL BORING METHOD.
0
mi
L'a King County
METRO
0' 10, 20'
LDEVELOPMENT ENGINEERING `
Sippo 09/11 /2024
SCALE: 1" = 20'
T-4214122
METRO TRANSIT CAPITAL DIVISION
RAPIDRIDE I LINE
RENTON SEGMENT
HAWK SIGNAL PLAN
108TH AVE SE & SE 186TH ST
DATE:
JUNE 2024
DRAWING NO:
1TS1.09A
SHEET NO: OF
406 473