Loading...
HomeMy WebLinkAboutT-4214122qq r N 11 r qe O a z O z w n' I x a z O z w J Q z c� X a z O z w ry 0 X z O z w ry 0 J X a z O z w ry z O Q x z O z w ry X a z O z w ry z z Q U Z X a Z O H Z w r' i�:I O X z O F- z w J x a z O F- z w ry ry x 3 a Z U' J Q X rn � o O d O FT x CU J a C � O a y o � ~C; 60 U) N °M°ON� m � E QQ� CULO CD COo to V N ary-i 04 gory N O a c F- Y U I F- U) LU w Q U a_ x 2Ei SIGNAL HEADS NEW Ni 2] 28,29 12" 12" AD -READY SUBMITTAL No. I REVISION SIGNS CROSSWALK STOP I STOP ON ON RED FLASHING • NO{ THEN PROCEED S1 S2 R10-23 MOD (30" W x 48" H) BY I APP'D I DATE PRE-EMPTION SCHEDULE CHANNEL PHASE A & B 1 ON (425) 453-5000 1100 112TH AVE NE, SUITE 500 cobBELLEVUE, WA 98004 41141 �sS'9 AL PHASE DIAGRAM 1 2 A � W DESIGNED: J. DOWDS BENNETT DRAWN: P. OSUNA CHECKED: R.JAHNS CHECKED 06/13/2ti I K. CHANG YUEN APPROVED: G.FRANCO PROJECT NO: E00566E18 CONTRACT NO: Cxxxxxxxx 160 - 1 ' NOTES: 1. FOR GENERAL NOTES AND SYMBOLOGY SEE 1TS1.00. 2. FOR SIGNAL POLE DETAILS SEE 1TS1.09C & COR STD. PLAN 138. 3. FOR CONDUIT RUN AND WIRING INFORMATION SEE 1TS1.09B AND 1TS1.09D. 4. FOR LIGHTING PLANS AND SERVICE BREAKER PANEL SCHEDULE DETAILS SEE 1 L1.01. 5. FOR ITS PLANS AND DETAILS SEE 111.00. 6. FOR ELECTRICAL PLANS AND DETAILS SEE 1 E1.01. 7. NEW VEHICLE SIGNAL HEADS 11, 12,13 AND 14 SHALL BE INSTALLED WITH NEW MOUNTING TYPE "M" ON NEW MAST ARMS PER COR STD. PLAN 138. 8. NEW COUNTDOWN PEDESTRIAN SIGNAL HEADS 28 AND 29 SHALL BE INSTALLED WITH N NEW MOUNTING TYPE "E" ON NEW POLE PER COR STD. PLAN 138. r r 9. SEE COR STD. PLAN 138 FOR HAWK INSTALLATION REQUIREMENTS AND DETAILS. 0 r N 0 CONSTRUCTION NOTES: 0 CONSTRUCT FOUNDATION PER SIGNAL POLE CHART 1TS1.09C, COR STD. PLAN 138 AND WSDOT STD. PLANS J-26.10 AND J-26.15. TOP OF FOUNDATION SHALL BE FLUSH WITH GRADE. FURNISH AND INSTALL TYPE III SIGNAL POLE WITH 25' MAST ARM. FURNISH AND INSTALL TWO 3-SECTION HAWK SIGNAL HEADS, TWO EMERGENCY PRE-EMPTION DETECTOR AND ONE R10-23 MOD SIGN ON THE N MAST ARM. FURNISH AND INSTALL PEDESTRIAN SIGNAL HEAD AND TERMINAL CABINET ON SIGNAL M POLE. REFER TO LIGHTING PLANS FOR LUMINAIRE AND LUMINAIRE BRACKET ARM. r O 1A FURNISH AND INSTALL TYPE PPB SIGNAL POST PER WSDOT STANDARD PLAN J-20.11 AND DETAIL 1TS1.09C. FURNISH AND INSTALL ONE APS PEDESTRIAN PUSH BUTTON WITH SIGN ON SIGNAL POLE. r CCONSTRUCT FOUNDATION PER SIGNAL POLE CHART 1TS1.09C, COR STD. PLAN 138 AND WSDOT N STD. PLANS J-26.10 AND J-26.15 TOP OF FOUNDATION SHALL BE FLUSH WITH GRADE. FURNISH AND a INSTALL TYPE III SIGNAL POLE WITH 25' MAST ARM. FURNISH AND INSTALL TWO 3-SECTION HAWK SIGNAL HEADS AND ONE R10-23 MOD SIGN ON THE MAST ARM. FURNISH AND INSTALL PEDESTRIAN SIGNAL HEAD AND TERMINAL CABINET ON SIGNAL POLE. REFER TO LIGHTING PLANS FOR LUMINAIRE AND LUMINAIRE BRACKET ARM. 2A FURNISH AND INSTALL TYPE PPB SIGNAL POST PER WSDOT STANDARD PLAN J-20.11 AND DETAIL O 1TS1.09C. FURNISH AND INSTALL ONE APS PEDESTRIAN PUSH BUTTON WITH SIGN ON SIGNAL POLE. �O N 0FURNISH AND INSTALL A NEW TYPE 8 JUNCTION BOX PER WSDOT STD. PLAN J-40.30. O O O4 CONSTRUCT JOINT CONTROLLER/SERVICE CABINET FOUNDATION PER CITY OF RENTON STANDARD PLANS 126.1 AND 126.2. INSTALL ALL CONTROLLER EQUIPMENT AND CONNECT FIELD WIRING. N N VERIFY FINAL LOCATION WITH THE ENGINEER IN THE FIELD PRIOR TO POURING THE FOUNDATION. a O5INSTALL CONDUIT UNDER ROADWAY USING APPROVED DIRECTIONAL BORING METHOD. 0 mi L'a King County METRO 0' 10, 20' LDEVELOPMENT ENGINEERING ` Sippo 09/11 /2024 SCALE: 1" = 20' T-4214122 METRO TRANSIT CAPITAL DIVISION RAPIDRIDE I LINE RENTON SEGMENT HAWK SIGNAL PLAN 108TH AVE SE & SE 186TH ST DATE: JUNE 2024 DRAWING NO: 1TS1.09A SHEET NO: OF 406 473