HomeMy WebLinkAboutS-4214002ABBREVIATIONS:
ABBREVIATIONS (CONTINUED):
GENERAL NOTES:
COR CONDITIONS OF APPROVAL:
o a�
Coo
ti J Z
� _ W
cV w
00
U
o CO X
70
co
� Uo
C) �_ CD
cal c� NI
rr
N 0
��ry
o N O
o92 0,5 m
W
a > 0
Y U
0 0 e
LU (n
�I LL L7
w
a
U 0- X 2E
AFO
AERIAL FIBER OPTIC
AP
ANGLE POINT
BOC
BACK OF CURB
BOS
BACK OF SIDEWALK
BOT
BOTTOM
BOW
BOTTOM OF WALL
BTWN
BETWEEN
CB
CATCH BASIN
CIP
CAST IN PLACE
CJ
CONSTRUCTION JOINT
COA
CITY OF AUBURN
COK
CITY OF KENT
CONC
CONCRETE
CONT
CONTINOUS
COR
CITY OF RENTON
CL
CENTERLINE
CID
CENTER POINT
CSBC
CRUSHED SURFACING BASE COURSE
CSTC
CRUSHED SURFACING TOP COURSE
DIA
DIAMETER
DWG
DRAWING
E
EASTING
EJ
EXPANSION JOINT
ELEV, EL
ELEVATION
EX
EXISTING
FF
FRONT OF FACE
FG
FINISH GRADE
FL
FLOW LINE
HMA
HOT MIX ASPHALT
IB
INBOUND
IE
INVERT ELEVATION
KCM
KING COUNTY METRO
L
LENGTH
LT
LEFT
MAX
MAXIMUM
MH
MANHOLE
MIN
MINIMUM
N
NORTHING
NO.
NUMBER
NTS
NOT TO SCALE
NST
NOT STEEPER THAN
OB
OUTBOUND
OC
ON CENTER
OHP
OVERHEAD POWER
OHT
OVERHEAD TELEPHONE/ TELECOM
PC
POINT OF CURVATURE
No. I REVISION
PCC POINT OF COMPOUND CURVATURE
POB POINT OF BEGINNING
POE POINT OF END
PRC POINT OF REVERSE CURVE
PROP PROPOSED
PSE PUGET SOUND ENERGY
PT POINT
PI POINT OF INTERSECTION
PVC POINT OF VERTICAL CURVE
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENT
RT RIGHT
RTIS REAL TIME INFORMATION SYSTEM
ROW RIGHT OF WAY
SD STORM DRAIN
SF SQUARE FOOT/FEET
SHLDR SHOULDER
SPA SPACING
STA STATION
SR STATE ROUTE
STD STANDARD
SYM SYMMETRICAL
TC, TOC TOP OF CURB
TCE TEMPORARY CONSTRUCTION EASEMENT
TESC TEMPORARY EROSION AND SEDIMENT CONTROL
TOW TOP OF WALL
TSP TRANSIT SIGNAL PRIORITY
TYP TYPICAL
UD UNDERDRAIN
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
W/ WITH
WSDOT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
BY I APP'D I DATE
APPLICABILITY
THE REQUIREMENTS IN THESE NOTES, AS WELL AS IN THE CONTRACT SPECIFICATIONS, SUPPLEMENT THE
REQUIREMENTS OF THE AGENCY OR AGENCIES HAVING JURISDICTION OVER THE WORK IN THIS CONTRACT. IN THE
CASE OF CONFLICT, THE MOST STRINGENT REQUIREMENTS SHALL APPLY. IN CASE THAT ONE OR MORE ELEMENTS OF
THE WORK ARE NOT COVERED BY REQUIREMENTS OF AN AGENCY, OR AGENCIES, THE REQUIREMENTS IN THESE
NOTES SHALL APPLY.
GENERAL NOTES - (KING COUNTY METRO)
1. ALL WORK METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE
LATEST EDITION OF THE SPECIFICATIONS AND THE APPLICABLE DEVELOPMENT GUIDELINES AND DESIGN AND
CONSTRUCTION STANDARDS FROM THE AGENCY HAVING JURISDICTION OVER THE SITES OF WORK.
2. CONTACT EACH AGENCY'S PUBLIC WORKS DEPARTMENT AND SCHEDULE AND ATTEND A PRECONSTRUCTION
MEETING AT LEAST ONE WEEK BEFORE BEGINNING CONSTRUCTION. ATTENDANTS TO INCLUDE EACH AGENCY'S
APPOINTED REPRESENTATIVE(S) AND THE PROJECT REPRESENTATIVE.
3. ASSUME FULL RESPONSIBILITY FOR WORKER SAFETY, AND DAMAGE TO STRUCTURES AND IMPROVEMENTS
RESULTING FROM CONSTRUCTION OPERATIONS.
4. MAINTAIN THE FOLLOWING THROUGHOUT THE EXECUTION OF THIS PROJECT, AND AT A LOCATION KNOWN AND
ACCEPTABLE TO THE PROJECT REPRESENTATIVE AND THE JURISDICTIONAL REPRESENTATIVES ASSIGNED TO
THE PROJECT:
A. ALL APPLICABLE PERMITS, AND CONDITIONING THEREIN.
B. THE APPROVED PLANS.
C. A CURRENT COPY OF THE DEVELOPMENT GUIDELINES AND DESIGN AND CONSTRUCTION STANDARDS FROM EACH
AGENCY HAVING JURISDICTION OVER THE SITES OF WORK.
D. TRAFFIC CONTROL AND STREET MAINTENANCE PLANS APPROVED BY THE AGENCY OR AGENCIES HAVING
JURISDICTION OVER THE SITES OF WORK.
E. A CURRENT SET OF RECORD (AS CONSTRUCTED) DRAWINGS.
F. COPIES OF THE HEALTH, SAFETY AND ACCIDENT PREVENTION PLANS.
5. WORK SHALL CONFORM TO THE APPROVED DRAWINGS AND THE CONTRACT SPECIFICATIONS. CHANGES TO
THESE DOCUMENTS REQUIRE PRE -APPROVAL FROM THE PROJECT REPRESENTATIVE AND THE AGENCY HAVING
JURISDICTION OVER THE SITES OF WORK.
6. PROVIDE THE PROJECT REPRESENTATIVE WITH A SET OF RECORD DRAWINGS THAT MEET THE CONTRACT
REQUIREMENTS PRIOR TO THE PROJECT FINAL APPROVAL.
7. PRIOR TO CONSTRUCTION OF METRO FOOTINGS AND FACILITIES, PLEASE CONTACT METRO INSPECTORS AND
CONSTRUCTION AT BUSSTOPINSPECTIONS@KINGCOUNTY.GOV OR BY PHONE AT 206-263-2381. PLEASE NOTE
THAT METRO REQUIRES NOTICE OF AT LEAST THREE WEEKS IN ADVANCE TO SCHEDULE AN INSPECTION. ALL
METRO FOOTINGS MUST BE INSPECTED AND APPROVED BY METRO INSPECTORS BEFORE ANY CONCRETE IS
POURED.
WORK SCHEDULE NOTES
1. DAYS AND HOURS OF WORK SHALL CONFORM TO THE CONDITIONS IN THE PERMITS ISSUED BY THE AGENCY
HAVING JURISDICTIONS OVER SITES OF WORK.
ON
(425) 453-5000
1100 112TH AVE NE, SUITE 500
cobBELLEVUE, WA 98004
DESIGNED: APPROVED:
A. VILLAR G. FRANCO
DRAWN:
C. WILCOX
CHECKED: PROJECT NO:
A.STOTT E00566E18
CHECKED: CONTRACT NO:
l
K. CHANG YUEN CXXXXXXXX
1. ISSUANCE OF CIVIL CONSTRUCTION PERMIT C2 1 00 1 1 28 IS FOR THE PURPOSES OF PROJECT BID AND
CONTRACTOR PROCUREMENT. CONSTRUCTION SHALL NOT OCCUR UNTIL THE CITY PROJECT MANAGER
ISSUES A NOTICE TO PROCEED.
2. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE APPLICANT, PROJECT CONTRACTOR, CITY
REPRESENTATIVES AND INSPECTION STAFF PRIOR TO NOTICE TO PROCEED.
3. ALL PROJECT CONSTRUCTION AND INSPECTION FEES SHALL BE PAID PRIOR TO SCHEDULING OF
PRE -CONSTRUCTION MEETING AND ISSUANCE OF THE NOTICE TO PROCEED.
4. ALL PROJECT ENTITLEMENTS SUCH AS CONSTRUCTION EASEMENTS AND ROW ACQUISITIONS SHALL BE IN
PLACE AND COPIES PROVIDED TO THE CITY PRIOR TO ISSUANCE OF THE NOTICE TO PROCEED.
5. PROJECT PUBLIC AGENCY SERVICE AGREEMENT SHALL BE IN PLACE AND EXECUTED PRIOR TO NOTICE TO
PROCEED.
6. ALL OUTSIDE AGENCY PERMITS OR APPROVALS SUCH AS PERMITS FROM SOOS CREEK WATER AND SEWER
DISTRICT, DEPARTMENT OF ECOLOGY OR WASHINGTON STATE DEPARTMENT OF TRANSPORTATION SHALL BE
IN PLACE AND PROVIDED TO THE CITY PRIOR TO NOTICE TO PROCEED.
7. SHEET 1 EC.OA (PAGE 107): ADD ADDITIONAL NOTES FOR PRE -CONSTRUCTION. NOTES TO BE ADDED TO
SPECIFICATIONS.
8. SHEETS 1 L 1 .02, 1 L 1 .04A, 1 L 1 .13, ITS 1 .02B, ITS 1 .07B (PAGES 348, 351 , 360, 383, 400):
ITERIS APEX VECTOR (4-WAY) VIDEO DETECTION SYSTEM IS REQUIRED FOR ALL VIDEO DETECTION ON THE
PROJECT IN LIEU OF GRIDSMART VIDEO DETECTION CAMERAS. UPDATE PROJECT SPECIFICATIONS.
9. SHEET 1 L2.05 (PAGE 370): CONTRACTOR TO REQUEST STREETLIGHT POLE ID TAG NUMBERS FROM COR
TRANSPORTATION MAINTENANCE AFTER ALL STREET LIGHTS ARE INSTALLED AND FURNISH/INSTALL
STREETLIGHT ID TAGS PER CITY OF RENTON STANDARD PLANS 12 1.
10. SHEET 1 L2.05 (PAGE 370): A COLUMN ON THE POLE & FIXTURE SCHEDULE IS REQUIRED FOR ADDING
LAT/LONG BY CONTRACTOR ON AS -BUILT PLANS.
1 1. SHEET 1 TS 1.00 (PAGE 376): ADD ADDITIONAL NOTES. NOTES TO BE ADDED TO SPECIFICATIONS.
12. SHEET 1 TS 1.0 1 B (PAGE 378): VECTOR VANTAGE FOR VIDEO DETECTION.
13. SHEET 1 TS 1.0713 (PAGE 400): PROVIDE ADDITIONAL SCOOT SYSTEM INFORMATION TO CITY
TRANSPORTATION DEPARTMENT FOR REVIEW PRIOR TO NOTICE TO PROCEED.
14. SHEET I C8.02 (PAGE 422): INSTALL STOP BAR TO SOUTHERN EDGE OF WBTL.
15. SHEETS I C8.10, 1 C8.1 1, 1 C8.1 5 (PAGES 434, 436, 44): REMOVE STOP BARS AT RRFB CROSSINGS
ON CITY STREETS. KEEP STOP BARS AT RRFB CROSSINGS ON WSDOT HIGHWAYS.
Lal King County
METRO
DEVELOPMENT ENGINEERING
Michael Sippo 09/11/2024
T-421402 FS-42140-21 0-4-21400 R-421402
METRO TRANSIT CAPITAL DIVISION DATE:
RAPIDRIDE I LINE JUNE2024
GENERAL NOTES AND
ABBREVIATIONS
DRAWING NO:
1 G0.01
SHEET NO: OF
2 473
O
N
O
O
O
9
N
N
Q
J