Loading...
HomeMy WebLinkAboutR-4214225a z O F- z w J X a z O z w ry z O w J w J J w rK a O N N F2 a Z O F- z w ry F- X 3 a Z O F- z w ry r 0 X 3 z O F- z w ry i z O F- Q cn _. a� 3 a z O z w ry i�:I O X 3 a Z 0 J Q X a O a O FT X 3 a Z O F- z w 0 X 3 a c 0 c m m N N 0 z o w LU � X J a O N � O 3: NI Of o w . o of 77C)m U � J 0 M o m Y �� � Lo7p �j M � o o OI c Y) o ~ o N U a w w 0 o X . w v> L w w C� Q U a X 2i N S TALBOT RD p (TAL-21-LINE) 0 W G G G BEGIN WALL R02R WALL R02R 0+00.00 = TAL-21 56+42.18, RT 16.48' G ANGLE POINT WALL R02R 0+06.07 = TAL-21 56+42.27, RT 22.55' E E wwww UD WALL UNDERDRAIN EXISTING GROUND PEDESTRIAN GUARDRAIL OR TRAFFIC BARRIER RETAINING WALL RIGHT-OF-WAY (EXISTING) RIGHT-OF-WAY (PROPOSED) PROPERTY LINE (EXISTING) • TEMPORARY CONSTRUCTION EASEMENT UD UD UD UD U OHF- WALL R02R LAYOUT LINE ANGLE POINT RETAINING WALL R02R 0+48.56 = TAL-21 56+84.76, RT 21.93' WALL FOOTING EXISTING 57+00 - G - G G G G G G G END WALL R02R WALL R02R 1+11.78 = TAL-21 57+37.09, RT 15.63' SHELTER I r ), \ I � o UD \ r------------------ --� FOOTING 1 1 _ -j- J D UD - OHP � I i GHP13 Up Up UD UD ANGLE POINT \ — — — — — — — — — — WALL R02R 0+87.50 = END SHELTER FOOTING ANGLE POINT TAL-21 57+21.47, RT 24.39' WALL R02R 0+65.98, LT 0.83' = WALL R02R 0+77.05 = ROW ANGLE POINT TAL-21 57+00.10, RT 25.88' TAL-21 57+11.25, RT 26.54' WALL R02R 0+55.63 = BEGIN SHELTER FOOTING TAL-21 56+89.83, RT 26.86' WALL R02R 0+55.98, LT 0.83' = TAL-21 56+90.16, RT 26.02' WALL R02R - PLAN - CIP CONC WALL KC METRO TYPE COUNTERFORT CO � r 00 C� Z_00 co C7) O LO O LO O OCO LU O CD JIO h ANGLE POINT WALL R02R 1+03.25 = TAL-21 57+37.22, RT 24.15' Lq LO r— N N ti co +O O+ _ 10 , + GENERAL NOTES 1. UNLESS OTHERWISE NOTED, ALL DIMENSIONS ARE IN FEET. 2. SEE RENTON SEGMENT ROW, SURVEY CONTROL AND ALIGNMENT PLANS FOR ROADWAY ALIGNMENT INFORMATION. LEGEND 00 ti ELEV 92.90� ELEV 92.90� ELEV 92.90� ELEV 92.90� ELEV 92.90� BOTTOM OF WALL 0' 5' 10, g......... .................. .................. _.................. _.................. _.................. _...................................... _.................. _.................. _.................. _.................. .................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. .................. _............... ..............._.................._.................._.................._.................._.................._.................._................................................_.................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. .................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. .................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. _.................. _.............. D ...' -0+10 0+00 0+20 0+40 0+60 0+80 1+00 1+20 HORIZONTAL SCALE 0' 2.5' 5' WALL R02R - DEVELOPED ELEVATION - CIP CONC WALL KC METRO TYPE COUNTERFORT DEVELOPMENT ENGINEERINGAr IL I VERTICAL SCALE Michael Sippo 09/11 /2024 CALL 811 BEFORE YOU DIG R-4214225 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL 7 M. D, H. UACCI G. FRANCO JUNE 2024 (425) 453-5000 of wAs�I 9�, DRAWN: RAP I D RI D E I LINE 1100 112TH AVE NE, SUITE 500 .jaco 717 Kin COIJnt sBELLEVUE, WA 98004 ° g y H. D'ACCI CHECKED: PROJECT NO: R E N T O N SEGMENT DRAWING NO: 57217��yWw� X.wu E00566E18 METRO RETAINING WALL PLAN AND ELEVATION 1 R1.01 AL No. No. REVISION BY APP'D DATE SIQNAL E1� CHECKED: CONTRACT NO: WALL R02R SHEET NO: OF 06/11/2024 K. CHANG YUEN CXXXXXXXX 247 473