Loading...
HomeMy WebLinkAboutR-4214248U Q LL X Z z Nw 0' c� X z 0 o W z w Of X i� z O z w J X z O z w Of I J w X i3A z O z w X iz�) z O z w Ir 0 X O z J LU U Q X �A z O z w I z z Q U Z Cn X Z O Z w ry Z O Q Cl? X z� O Cl? C) CV N C2 Z� Z O z w ry }I 0 X 0 m N N C2 z O z w �I O i� .z CO o X a co J ?� 0) CD NI w 0 co'pm COLo 0 > U c�Q�1 Ln a r` no a) CD >�o cal w !ELo(D w N O J V X o CD O N a) O Iz ��O 0 X c!) Lw 0-0 w Q C� U a X 2E STATION 60366 (IB) AMENITIES DESCRIPTION TYPE QTY SHELTER FOOTING F50-10'-0" x 4'-4" 1 SHELTER F50 1 FLAG 1 CURB PAINT 1 TRASH RECEPTACLE 1 FREESTANDING BENCH 1 BOLLARD 0 PEDESTRIAN GUARDRAIL 0 13" RTIS AND SOLAR PANEL SHELTER MOUNTED 1 LED LIGHT AND SOLAR PANEL BUS FLAG MOUNTED 1 TEXT TO SPEECH BUTTON 1 a-� 71 71 �� �� -A -A T • P V • > D p � T \ �I �I D p D � a ° pD �o PROPOSED ROW (TYPICAL) r - � 1 C6.09 EXISTING UTILITY POLE TO REMAIN EXISTING JUNCTION ri TAL-21 26+02.74, 28.84' LT BOX TO REMAIN BOS 193.51 EX 194.29 TAL-21 25+91.73, 28.86' LT ,,, BOS 193.94 C/) EX 194.63 16.1' I 5.0' 11.0' 10.0' 4.0' 5.5' / TAL-21 25+86.73, 25.35' LT T BOS 194.09 EX 194.07 T a 11 i -A -A T -A -A T T D .T Ti 74 T T d -A-A T T T T p -A�d� T P' D771 �L1 • D All � � 1 D• .D 10 771 (� '1VXt. D p� �i• � I D � ,V D p n n 6 C D Ap •D' D D O 4 � cD D; . o .. •p p ? .. v D D Lf� LC� p Lf) .. I' :D ��►nn D C V , 6 Do .. • .° D p -0.5% D� I • D c c .v p N DA D. _ O c `y p �cD p`/^P `• D p I D Q Q•D. Q D QI . QD � � 'D r 1 M V / D \�.v D DAA D DoAAp �" D. ID_AAD 4°. De -4.0% D ,•MA -3.2% - nD o TAL-21 26+12.74, 28.82' LT BOS 193.12 EX 193.97 TAL-21 26+12.70, 23.95' LT BOS 193.04 EX 193.14 EXISTING POLE AND JUNCTION BOX TO REMAIN TAL-21 26+16.70, 23.81' LT BOS 193.02 EX 193.02 MATCH EXISTING L/ L/ M 0 0 N �Q -T- LOCATION MAP u M M M u IN STATION GENERAL NOTES 1. SEE SHEET 1S1.00 FOR STATION GENERAL NOTES AND LEGEND. STATION NOTES 0 EXISTING STATION. MODIFY SIGN TO I LINE STATION 20 SHELTER FOUNDATION PER RAPIDRIDE 2 STD DWG S1.01-S2.22 AND FOOTING DETAILS OTECH PYLON FOUNDATION PER RAPIDRIDE 2 STD DWG S3.01 AND FOOTING DETAILS 40 PEDESTRIAN GUARDRAIL PER DETAIL D ON SHEET 1S5.01 OSTEM WALL PER RAPIDRIDE 2 STD DWG S2.22, DETAIL 5 OF50 SHELTER FOOTING WITH STEM WALL PER DETAIL ON SHEET 1 R2.03 OF50 SHELTER FOUNDATION PER METRO STD DETAIL D101C Og CEMENT CONCRETE THICKENED EDGE SIDEWALK PER DETAIL A ON SHEET 105.02 Og SHELTER OR PYLON FOOTING WITH THICKENED EDGE PER DETAIL B ON SHEET 105.02 10 F50 SHELTER FOOTING WITH THICKENED EDGE PER DETAIL C ON SHEET 105.02 11 CEMENT CONCRETE SIDEWALK WITH INTEGRAL CURB PER DETAIL D ON SHEET 105.02 12 SHELTER OR PYLON FOOTING WITH INTEGRAL CURB PER DETAIL E ON SHEET 105.02 13 GATE IN PEDESTRIAN GUARDRAIL PER TYPCAL STATION DETAIL D ON SHEET 1S6.02. GB31 SHELTER FOOTING PER METRO STD DETAIL D103 TAL-21 26+16.66, 18.38' LT �S TOC 192.83 EX FL 192.31 TAL-21 25+86.73, 17.85' LT'' MATCH EXISTING o TOC 193.99 as as _ (IS FL 193.49 _ (IS(IS - � as - • • ', • . TAL-21 26+02:73, 17.84' LT. TAL-21 26+12.66, 17.84' LT TAL-21 25+91.73, 17.85' LT. ' �' TOC 193.35' TOC 192.95 • , FL 192.85 EX FL 192.50 .' •'.' .' •',' •'.' TOC193.79' MATCH EXISTING ' • .' FL193.29'.' '''' '•.''''' '' ''' '.''•.'' 26+00 TALBOTRDS • (TAL-21-LINE) 0' 5' 10, DEVELOPMENT ENGINEERING I PLAN - STATION 60366 (IB) TIER 3 Michael Sippo 09/11/2024 ='� � SCALE: 1" = 5' FR--4214248 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL ' JUNE 2024 (425) 453-5000 �. s. A. VILLAR G. FRANCO RAPIDRIDE I LINE �•� ®g w •� 1 100 1 12TH AVE NE, SUITE 500 DRAWN: � BELLEVUE, WA 98004 ®x� C. WILCOX King County CHECKED: PROJECT N0: LQ R E N TO N SEGMENT DRAWING N0: �®�54834 B. MANN E00566E18 MET STATION PLAN 1S1.13 is ssj®NALN0: OF 6/12/24 FK CKED: CONTRACT N0: SHEET No. REVISION BY APP'D DATE I D# 60366 270 473 HANG YUEN CXXXXXXXX 00 N r qrm O r N U N M qrm O O 9 qrm a O N O O O N N a