Loading...
HomeMy WebLinkAboutR-4214286z O z w ry 0 X z O z w z O U w O ry w w ry FT a z O z w Of I J X 3 O w z J w U ry Q X Y U) 00 N CV 0) O N N 0 o' N N F2 a Z O F- z w Of I 0 J _. a z O z w �I O X z Q X 0 CV �p O CN �I w 0 of o O m JCD 0 � U Y N � �x-q �0 CC) J (--) C) C) FLo U CY)w L;�w CD&j= ULO C9 N X 0 X 4pj M O 6 ow LU c U' J 0 0 x w v> �IF ---wC7 w Q U a x 2i 28+00 108TH AVE SE (SR 515) 29+00 (108TH-LINE) 322305-9082 / \ I / \ I PLANTING AREA \ / \ I I / . TCE \/ y\ / \ \� 1 U�:O \ \ o / EX ROW 21 I .c 1 U2.02 SOIL PREP DETAIL C SHALL EXTEND TO 10' RADIUS FROM CENTER OF TREE WITHIN WORK LIMITS. 30+00 31+00 911710-0160 A 1 U2.02 32+00 C) C~� 00 W U) 33+00 GENERAL NOTES 1. ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, CITY OF RENTON STANDARDS, AND THESE PLANS. 2. CONTRACTOR SHALL BE FAMILIAR WITH AND COORDINATE WITH LOCATIONS OF ALL EXISTING AND NEW ON -SITE UTILITIES PRIOR TO COMMENCING ANY SOIL PREPARATION, AND PLANTING WORK. 3. LIMITS OF PLANTING EQUALS LIMITS OF DISTURBANCE. MEET AND MATCH EXISTING LANDSCAPE CONDITIONS WITH A SMOOTH TRANSITION. 4. REPAIR OR REPLACE IN KIND ANY IRRIGATION DAMAGED DURING CONSTRUCTION PER SPECIFICATIONS. 5. PROTECT ALL VEGETATION NOT INDICATED FOR REMOVAL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO RESTORE AND REPLACE ANY PLANTING AREAS THAT ARE DAMAGED AS A RESULT OF CONSTRUCTION ACTIVITY TO PRECONSTRUCTION CONDITION. 6. REFER TO ROW, SURVEY CONTROL & ALIGNMENT PLAN FOR TEMPORARY CONSTRUCTION EASEMENT ALIGNMENT AND REVISED ROW ALIGNMENT LOCATIONS. 7. REFER TO THE SITE PREPARATION PLANS AND THE APPROVED PROTECTED TREE AND PLANT MAINTENANCE PLAN. SEE TREE AND PLANT PROTECTION SPECIFICATIONS FOR TREE PROTECTION AND TREE REMOVALS. 8. REFER TO LANDSCAPE DETAILS FOR SOIL PREP REQUIREMENTS IN TREE PROTECTION ZONES. —dti .. aH'_ \ — d 0 dH0 dH0 dH0 — — 1 ROW PROPOSED o o°o°o°o°o 0 \ / / O o°o°• 3223 2 G00000 BARK OR WOOD CHIP 00 000 00 / 1 U2.02 MULCH 000 00 � I \7 �'0 00 I / `y B 0 00 / C / 1 U3.01 1 U2.02 00 U) Lij 00 1 U2.02 \� PLANTING AREA 0°0 \ I / A7 0 0 322305-9070 \ — — / 322305-9135 (/ O 0 \/ 0 0 f I / \ 0 0 A B / o / 0 1 U3.01 1 2 2 � 1 0 PLANTING AREA A8 BARK OR WOOD CHIP \ \ 00 MULCH — — _ — O I 00 o � 00 so o° I I 0' 20' 40' DEVELOPMENT ENGINEERING 0 Michael Sippo 09/11/2024 SCALE: 1" = 40' R-4214286 DESIGNED: APPROVED: METRO TRANSIT CAPITAL DIVISION DATE: AD -READY SUBMITTAL ' JUNE 2024 a F W C. FLOREANI G.FRANCO oEL RAP I D RI D E I LINE (425) 453-5000 1� DRAWN: aco s1100 112TH AVE NE, SUITE 500 �� �M o • BELLEVUE, WA 98004 Co _ �J _ Z King County Z C. FLOREANI CHECKED: PROJECT NO: R E N TO N SEGMENT DRAWING NO: UMET 2 74 L. FRENCH E00566E18 LANDSCAPE PLAN 1U1.16 I No. REVISION BY APP'D DATE NDSCAP�P�6/11/24 CHECKED: CONTRACT NO: 108TH 28+00 TO 108TH 33+00 SHEET NO: OF K. CHANG YUEN CXXXXXXXX 468 473