Loading...
HomeMy WebLinkAboutTESC UpdatesX X X X CONC CONC CONC SIGN DEBRIS SIGN SIG N SIGN //// ///// / / / /// / / / / / / //// / // CONC UT UT UT UT H H H H H HH VLT VLT VLT VLT VLT VLTS VLT / / / / BUS SHELTERTRASHBIN TRASHBIN SW SW SW SW DRW DRW / /BUS SHELTER TRASHBIN SW SW SW DRW DRW SW SW DRW SW SW SW SW DRWSD SD SD SS SS SD 36" C M P 36" DI 30" CONC 30" CONC 27" CONC 27" CONC 27" CONC 24" CMP 12" C O N C 4" C O N C 6" DI 12" C P P 12" C P P 12" C O N C 6" CONC 6" CONC 6" CONC 6" P V C 12" DI 12" CONC 12" CONC 6" C O N C 15" C M P 15 " C M P 6" CONC 8" VC 8" C O N C 18 " C O N C TT T E TMH GV 2WV FOFO GVGV GV WV4WV WV WV GV 2 MISCMH GV GV FO FO FO TMH ICVICV 2WV TMH GV WVWVWV ICV ICVICVICVICV WV WV ICV ICV WM WV 2WM WV WM ICV GV GATE CW SW SW FH 4' W O O D F N C CW SW AR T W O R K DR W DRW SW CONC SEAMS (TYP)OE OE OE OE OE OE OE OE OE OE SW SW SW DR W DRW E CO E E E E E E E E W E EE EE EE WV WV 3WV WV WV 3WV WV WV WV WV3WVWV WV WV 3IRRG 2IRRG 2IRR G GV GV GV WM WM E 2WV WM FOEG G GE E E E ET FO E E E E W W FO E EE T T TT T E E E E E E WW W G G G G CO W FO GV GV GM WM WM WM WM WV WV 3WV WV WM W VLT 2VLTS HH T E W T T T E T T E E E E TMH GM E E E E E E E E E EE E E E E E E E E E E E E E G G G G FO FO FO FO FO FOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO W W W W W W W SDSDSD SD SD SD SD F O FO FO FO FO FO FO FOFO FO FO FO FO FO SD SDSD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSD SD W SS SSSS SSSSSSSSSSSS SS E E E E E FOFOFOFOFOFO 6" CONC 12" RC P ////// // / / /////// / / //// / / / / ///////// / / / / //// / / / / / / / / / / / / /// / / / / //// / // / / /// / /// / / X X X X X X X 6' CLEF X X6' TEMP CLEF X X X XX 6' TEMP CLEF X6' TEMP CLEF X 6' TEMPCLEF X X X X 8' CLEF / / // X X X X X X X X X 5.5' CLEF SW 2' FNC GATE /// //6' CL E F 5.5' CLEF 6' CLEF BLDGEQUIP GAZEBO CONC SW SW SW SW SW SW SW SW ///// / / / / / / / / / ///// / / / / / / / // / / // 4 BLRD 3 BLRD 3 BLRD 2 BLRD X X 6' T E M P C L E F 6' CLEF 2 BLRD // // / / / / // / / / / / //// // / ////////// / / / ///// ///// / / / / / / / / / / ///// / / / / / / / /// / /// OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE O E OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE O E OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE O E OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE O E OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE O E OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE / ///////// / / / / / / / //// // //// / / / / / / //////// / / / / / / // / / / / / ////// / / /// /////// / /////// / / 3 BLRD 6' TE M P C L E F 6' CLEF OE OE OE OE OE OE OE OE OE OE OE PIV GATE STORAGESHED MISCVALV SHELTERCANOPYBLDG BLDG BLDG BLDG CBRIM=25.13NEEDS TRAFFIC CONTROL SD 12" RCP 8" CONC 8" CONC 4" CONC 30" C P P 24" C P P 18" D I 18" DI 12" CP P 12" CP P 12" CPP SS E SS SS SS SS SS SS SS G FO FO E E E E E E METAL POLE METAL POLE METAL POLE OE OE OE OE OE OE OE OE OE OE OE OE OE / / / / / ////// / // / / /// / // SL SL G G G E E E E E E E E E E E FO FOFO FO FO FO FO FO FO FOFO FO FO FO FO FOFO FOFOFOFOFOFOFOFO FO FOFO FO FO FO FO FO FOFO FO F O FO FOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO SSSS SS SS SS SS SS SS SS SS W W W W W W W W W WW W W W W W WWWWW W W W W WW W W W W W W W WWW W W W W SDSD SDSDSDSDSDSDSDSD SD SD SS SS SS FO FO FO FO F O FO FO SS S D SD SD SD S D SD SS SS SD SS SS SD SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S S SS SS SS SS SS SS SS SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD W W W WW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSS SSSSSSSSSSSSSSSSSSSS SS FO SS SS E E E E E E COM C A S T COMC A S T COMC A S T COM C A S T COM C A S T CO M C A S T COM C A S T COM C A S T CO M C A S T CO M C A S T CO M C A S T COMCAST COMCAST COMCAST CO M C A S T CO M C A S T CO M C A S T COMCAST CO M C A S T COMCAST COMCAST F O COM C A S T CENTURYLINK CENTURYL I N K F O CENTURY L I N K F O CENTURYLINK F O CENTURY L I N K F O CENTURYLINK FO CENTURYLINK FO CE N T U R Y L I N K F O PS E 2-PS E 2-P S E 3-P S E PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PS E PS E PSE PSE PSE RENTONRENTON RENTON RENT O N REN T O N REN T O N REN T O N RE N T O N RENTON RENTON RENTON REN T O N RENTON REN T O N RE N T O N RE N T O N WSD O T F O WS D O T F O 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAY O F O 2-ZAYO FO PSE GAS PS E G A S PSE G A S PSE G A S PSE GAS PSE GAS PSE G A S PSE GA S PSE GAS PSE GAS PSE GAS PS E G A S E E G E E E E E E FOVLT T T T HH GV IRRG BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 BOREHOLERW10EL=25.30 BOREHOLEGA-3EL=25.97 BOREHOLEGA-4EL=26.06 BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 5'4" DP 6'8" DP 5' DP 4' DP 4' DP 3' DP 3'9" DP3'4" DP 2'11" DP 6'9" DP 1'DP 1'1 1 " D P 2'3"DP 2' D P 2' DP 3'11" DP 3'6" DP 5'9" DP 7'2" DP 6'11" DP 7' DP 6'6" DP 4'4" DP 4'3" DP 3'7" DP 2' DP 4'10" DP 5'9" DP 4'7" DP 1'11" DP 1'11" DP 2'6" DP 5' DP 1'4" DP 2'6" DP 2'2" DP 3'1" DP2'6" DP 1'7" DP 1'9" DP 1'8" DP 1'6" DP 1'6" DP 1'7" DP 1'6" DP 1'9" DP 7'11" DP 11' DP4'9" DP4'9" DP13'6" DP 6'3" DP 5'8" DP 4'1" D P 3'6 " D P 4'8" D P 12'6" DP 13'6" DP11'6"DP10' DP 8' 5 " D P 8'1 1 " D P 8'1 0 " D P 9' D P 3'3" DP 3'1" DP 3'2" DP2'10" DP 1'6" DP 1'3" DP 1'9" DP1'7" DP 2'5" DP 1'7" DP1'7" DP 1'4" DP 1'5" DP 1'10" DP 3'1" DP 1' DP 1'10" D P 1'11 " D P 2' DP 3'1" DP 3'1" DP 2'2" D P 2'8" DP2'7" DP 2'8" D P 3'6"DP 3'6" DP 3'9" DP 3'10" DP 4'3" DP 2'3" D P 1'7" DP 1'7" D P 2'9" D P 2'1" D P 1'9" D P 1'6" D P 2'1" D P 2'3" D P 2'1" D P 2'3" D P 1'11" D P 1'11 " D P 1'11" D P 2'5" D P 1'8" D P 2'1" D P 1'11 " D P 2'5" D P 2' D P 2'4"DP 2'10 " D P 2'5" D P 2' D P 2'4"DP 2'5" DP 5'4" DP5' DP5'5" DP4'8" DP 4'DP3'7"DP2' D P 4'11" DP 5'2" D P 4'6"DP 3'5" DP 1'9" D P 2' DP 1'9" DP 5'7" D P 2'7"DP 2'4"DP 2'4" DP 2' DP 1'10" D P 2'1" DP 5'8" D P 3' D P 3'9" D P 3'6"DP 4'11" D P 6'7" D P 3'9" D P 2'2" D P 2'4" D P 5'8" D P 8'6" D P 9'11" D P 10' D P 2'DP 5'10 " D P 10' D P 3'8" DP3'11"DP 5'1" DP5'3" DP 5'2" DP 6'4" DP 6'3" DP 6'7" DP 2' DP 3'2"DP2'6" DP 1'4" D P 2'1" D P 7' DP 7' DP 2'8 " D P 4'11" D P 6'3" D P 8' DP 2'2" DP 1'3"DP 2'5" D P 1'10 " D P 2'3" D P 4'11" D P 3'11 " D P 2'8" D P 3'6"DP 3'10 " D P 2'7" DP 2'4" DP 3'4" DP 3'10" DP 3'5" D P 3'2" D P 3'11" D P 3'9" D P 2'4" D P 3'3" D P 5'5"DP 4'10 " D P 4'4" D P 5'3" D P 1'10 " D P 1'2" D P 1'6" DP 1'8" D P 2'3" D P 5'6" D P 4'8" DP 5'8" DP 3'11" DP6'1" DP 6'4" DP6'1" DP 5'4" DP 4' DP 5'4" DP4'11"DP 4' DP 3'6" D P 5' DP 5'11" DP 6'9" DP 5'4" DP7'11" DP 6'7" DP 4'5" DP 2'8 " D P 6'9" DP 6' DP 7'6" DP 5'6" DP 1'9 " D P 2'5" D P 2'DP 12"W 12" W 12" W 12"W 12"W 12"W 12"W 12"W 12"W 12"W ABAN-W ABAN-W ABAN- W ABAN-W ABAN - W ABAN - W ABAN-W ABAN-W ABA N - W AB A N - W 12"W 12 " W 12" W 12" W 12"W 12"W 400 404 418 CONC SEAMS (TYP) WV WV SD SD SD SD CO 2 BLRD FH 2'4' 3'11" DP4'11" DP 3'5" DP 5'5" DP 2'6" DP1'3" DP 1'11" DP3'9" DP 3'10" DP 2'2" DP 2'2" DP 1'5" DP BROADBANDVAULT 2'11" DP 3' DP 2'3" DP 1'11" DP 1' 11" DP 2'3" DP3'11" DP 4'11" DP 5'2" DP4'4" DP 1'7" DP 4'5" DP5'6" DP 1' 8" DP 2'5" DP 1'11" DP 3'8" DP4'9" DP 1'4" DP 3' DP5'8" DP 5'10" DP6'2" DP5'5" DP 6' DP4' DP 1'5" DP 1'7" DP 2'8" DP 2'4" DP 2'6" DP 5'5"DP6'7" DP 4'2" DP 2'4" DP 12' DP SS SS SS 6'11" 3'6" 4'8" 8'11 " 1'7" 2' 3'9" 4'10" 6'9"4'5" ED(TYP.) ED(TYP.) ED(TYP. ) ED (TYP . ) SS SS SS 2'5"2'7"3'8" 2'2" 2'9" 4'2' 3' 3' 3' 3' SS 3'10" 4'1" 4'9" 7" 4'1" 3'11" 5'9" 5" 2'1" 1'11" 9"2'4" 3'1"2'11"3'3" 3'11" 3' 5'2 " 4'1" 4'7" 2'11"2'9"1'4"1'7" 2'9" 2'1" 2'7"2'11" 3'4" 3'9" 2'10" 4'9" 4'11"2'8"2'1" 2'8" 2'7"2'5" 7"1'1" 1'4" 2' 2'1" 2'9" 6'3" 5'4 " 5'3" 4'9" 5'7"3'10" 4'11 " 5'11 " 6'8" 6'11" 3'10" 1'6" 4'1" 4'2" 4'7" 5'9" 5'8"4'8" 5'11" 3'11 " 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11 " 4'7" 4'1"4'6" 4'8" 4'6" 5'3" 4'6" 4'9" 4'11 " 3'7" 4' 1' 2 WM ///// // / / / / BIKESTORAGE WV 6" TREE30' DLN SD SS SS SS 2'10" 3'10" 3'0" 4'0" 4'3" 4'6" 4'11" 5'0" 5'5" 6'0" 6'3" 6'6" 7'0" 7'2" 7'9" 8'0" 8'2" 8'6" 10'0" 10'7" SS SS CO SD SD ^ ^ ^ ^ ^ ^ ^ ^^^^^^^^^^^ F / // / / / // / // // / // // //////////// SF SF SF SF SF SF 1.50 CO COCOCOCOCOCO CO CO CO CO CO CO CO CO STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL TESC PLAN AREA PLAN AND GENERAL NOTES BT120-CTP100 BT120 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=80' SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 10 / 2 9 / 2 4 | 2 : 1 4 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 1 0 0 . D W G S1-BT120-CTP100 FACILITY ID: Xrefs: xS1-BT120-VRX001 xS1-BTP120-VSF100 xS1-BT120-CPP001 xBRT-CUD05-TB22x34 xS1-BTP120-GZK020 xS1-BT120-CAP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 202022-3-12 (ST DES TECH '23) OSBORNCONSULTINGINCORPORATED N SCALE IN FEET 0 (CUSTOM) 60 30 60 120 HA R D I E A V E AREA MAP 1" = 80' S GRADY WA Y LA K E A V E S SR - 1 6 7 RAIN I E R A V E S NORTH DRIVEWAY SOUTH DRIVEWAY102 103 201 202 203 204 205 101 104 105 106 107 CROSS REFERENCING OF DRAWINGS BASE SHEET TITLE 1"=20' DRAWING SETS S1-BT120-CTP101 S1-BT120-CTP102 S1-BT120-CTP103 S1-BT120-CTP104 S1-BT120-CTP105 S1-BT120-CTP106 NOT USED 101 102 103 104 105 106 107 CROSS REFERENCING OF DRAWINGS BASE SHEET TITLE 1"=20' DRAWING SETS S1-BT120-CTP201 S1-BT120-CTP202 S1-BT120-CTP203 S1-BT120-CTP204 NOT USED 201 202 203 204 205 12-02-2024 0049 RTA/CN 0205-24 GENERAL NOTES: 1.CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL (TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205. 3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESS NOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHIN THE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT. STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDES PERMIT WAR314062 FOR DETAILS. INLET PROTECTION SILT FENCE COMPOST SOCK CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA KEY NOTES: 1 WHERE CURB INLETS ARE PRESENT, INSTALL INLETPROTECTION PER COR STD PLAN 216.30 AND PLACESANDBAGS BARRIER UPSTREAM OF CATCH BASIN PER COR STD. PLAN 216.50. SEE DRAWING BT120-CTD102 ANDBT120-CTD103 FOR DETAILS. CONSTRUCTION PHASES: NOTE THAT THE CONSTRUCTION PHASING BELOW IS A RECOMMENDATION AND THE CONTRACTOR MAYREVISE THE PHASING AS SUITABLE FOR THE PROJECT CONSTRUCTION SEQUENCE. PHASE 1 COMPLETE ALL DEMOLITION AND CONSTRUCTION ALONG RAINIER AVE S INCLUDE THE FOLLOWING: ·RAINIER AVE S/HARDIE AVE SW INTERSECTION IMPROVEMENTS. ·SOUTHBOUND LEFT-TURN LANE AT RAINIER AVE S/HARDIE AVE SW INTERSECTION. PHASE 2COMPLETE ALL DEMOLITION AND CONSTRUCTION ALONG NORTH SIDE OF S GRADY WAY INCLUDE THEFOLLOWING: ·ROADWAY ( TWO WESTBOUND LANES) AND DRAINAGE IMPROVEMENTS. ·SIDEWALK AND LANDSCAPE AREA. PHASE 3COMPLETE ALL DEMOLITION AND CONSTRUCTION WITHIN THE LAKE AVE S INCLUDE THE FOLLOWING: ·TRANSIT CENTER EAST ENTRANCE/EXIT CONNECTION TO LAKE AVE S. ·ROADWAY AND DRAINAGE IMPROVEMENTS. ·SIDEWALK AND LANDSCAPE AREA. CONCURRENT TO CONSTRUCTION PHASESCOMPLETE ALL DEMOLITION AND CONSTRUCTION WITHIN THE PROJECT SITE INCLUDE THE FOLLOWING: ·SRTC ZONE A - TRANSIT CENTER. ·SRTC ZONE B - BUS LAYOVER AREA. ·SRTC ZONE C - INTERNAL ACCESSES, SIDEWALK, BIORETENTION SWALE AND LANDSCAPE AREA. ·SURFACE PARKING AREA. H S S M H 36 " Ø C O N C RI M = 2 7 . 9 7 IE 8 " V C N E = 1 4 . 5 IE 8 " C O N C S = 1 3 . 9 CB 2. 3 ' X 2 . 0 ' C O N C RI M = 2 5 . 6 6 IE 1 2 " D I W = 2 2 . 2 WA T = 2 2 . 2 B O T = 2 0 . 8 IN L E T RI M = 2 5 . 3 7 CB 2. 1 ' X 1 . 9 ' C O N C RI M = 2 6 . 6 1 IE 1 2 " D I S E = 2 2 . 7 IE 1 2 " D I W = 2 2 . 7 WA T = 2 2 . 6 B O T = 1 9 . 8 IN L E T R I M = 2 6 . 8 8 SD M H 48 " Ø C O N C RI M = 2 9 . 4 3 IE 1 2 " D I N = 2 0 . 6 IE 3 6 " D I E = 2 0 . 0 IE 3 6 " C M P S = 2 0 . 2 IE 1 2 " C O N C W = 2 0 . 0 W A T = 2 0 . 4 B O T = 1 9 . 7 IN L E T RI M = 2 8 . 7 5 SD M H 48 " Ø B R I C K R I M = 2 8 . 8 9 IE 3 0 " C O N C E = 1 9 . 9 IE 2 4 " C O N C W = 1 9 . 8 W A T = 2 0 . 4 B O T = 1 9 . 5 IN L E T R I M = 2 8 . 6 4 IN L E T RI M = 2 8 . 7 2 IN L E T RI M = 2 8 . 3 8 IN L E T RI M = 2 8 . 2 2 IN L E T RI M = 2 8 . 2 2 IN L E T RI M = 2 7 . 7 0 UN A B L E T O S E E P I P E S WA T = 2 0 . 3 B O T = 1 8 . 8 CBRI M = 2 6 . 6 7 IN L E T R I M = 2 5 . 9 3 IN L E T RI M = 2 5 . 8 5 SS M H RI M = 2 8 . 4 0 IE 8 " C O N C N = 1 3 . 2 IE 1 8 " C O N C S E = 1 0 . 4 IE 1 8 " C O N C N W = 1 0 . 2 SD SD SSSSSSSSSSSS SS SS SS SS SS SD 36" CMP 36 " D I 8" CONC 18" CONC YI E L D FH CONC BENC H YI E L D 8" T R E E 9' D L N 4' WOOD FNC US E CR O S S W A L K CWG R A S S 37 " T R E E 40 ' D L N CONC BENCH CON C B E N C H YI E L DARTWORK LA N D S C A P I N G CONC DRW 5" T R E E 8' D L N 5" T R E E 11 ' D L N SW OE O E OE OE OE OE O E OE OE OE OE OE O E O E O E OE OE OE OE O E OE OE OE OE O E OE LANDSCAPING DRW E EE W E E IN L E T RI M = 2 8 . 6 6 W V W V 3W V W V W V W V H H HH HH H H HH H H HH H H 3H H H H HH H H HH HH HHHHH H HH ELEC VLT 4 E L E C V L T EL E C VL T E L E C VL T 3I R R G 2I R R G W M EEEE E WWWWWW W W E W W FO E E E E E E E E E WWW W G G G E E E E E E E E E E E EEE E E E EEEEEEEEEE E E E E EE E E E E E EEEE E E E E E E E E E G G G G G G G G G G G FO FO FO FO FO F O F O FO FO FO FO F O FO FO FO FO FO F O FO FO FO FO FO W W W W FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO SDSD SD S D S D SD SD SD SD SD SD SD SD SD SD SDSD SD SS SS SS SS SS SS SS SS SS S S S S EE E E E E E E E E E E E E E E E E E E E EEEEEEE E E E E E E E E E E E E FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO X X X X X X X X X X 6 ' T E M P C L E F X CBRI M = 2 5 . 5 3 M I S C V A L V SS M H R I M = 2 8 . 6 6 NE E D S T R A F F I C C O N T R O L SS M H R I M = 2 8 . 7 5 N E E D S T R A F F I C C O N T R O L IN L E T RI M E L = 2 7 . 0 1 NE E D S T R A F F I C C O N T R O L IN L E T 60 " C O N C RI M E L = 2 5 . 3 4 IE 2 4 " C P P N = 2 0 . 1 IE 1 2 " C P P E = 2 0 . 7 IE 6 " P V C S = 2 2 . 2 IE 2 4 " C P P S = 2 3 . 0 W A T = 2 0 . 4 B O T = 1 8 . 0 IN L E T RI M E L = 2 6 . 7 8 U N A B L E T O O P E N CB60 " C O N C RI M E L = 2 8 . 3 5 IE 2 4 " C P P N = 1 9 . 4 IE 3 0 " C P P N E = 1 9 . 8 IE 1 2 " C P P S = 2 1 . 7 IE 3 6 " C P P S W = 1 9 . 6 BO T = 1 7 . 8 SD M H 48 " C O N C RI M E L = 2 8 . 7 1 IE 1 2 " D I N = 2 2 . 6 IE 1 2 " D I S = 2 2 . 8 W A T = 2 2 . 6 B O T = 2 0 . 6 CB1. 9 ' X 2 . 2 ' C O N C RI M E L = 2 8 . 0 2 TO P O F 1 2 " D I S E = 2 4 . 3 IE 1 2 " D I N = 2 3 . 2 W A T = 2 3 . 3 B O T = 2 2 . 1 CB1. 9 ' x 2 . 2 ' C O N C RI M E L = 2 6 . 8 2 IE 1 2 " D I N E = 2 3 . 7 W A T = 2 3 . 8 B O T = 2 2 . 2 CBRI M E L = 2 7 . 3 6 NE E D S T R A F F I C C O N T R O L 30" CPP 24" CPP SSSSSSSSSSSSSSSSSSSS FO FO FO FO FO FO FO FO FO FO FO FO E E E FO FO FO FO FO FO COMCAST COMCAST COMCAST COMCA S T COMCAST C O M C A S T 2-PSE3-PSE P S E 2- P S E RENTO N RENTONRENTON R E N T O N R E N T O N R E N T O N RENTON R E N T O N RENTON RENTON RENTON WSDOT FOWSDOT FO 2 - Z A Y O F O PS E G A S PSE GAS PS E G A S E E U T I L V L T HH E E E TH 1 3 GN D E L = 2 9 . 0 5 2" P O W E R C N D TO P O F C N D E L = 2 6 . 8 4 TH 1 4 G N D E L = 2 5 . 9 6 2" P O W E R C N D TO P O F C N D E L = 2 3 . 9 6 TH 0 1 GN D E L = 2 9 . 0 5 4" F I B E R O P T I C TO P O F C N D E L = 2 7 . 0 1 BO R E H O L E G A - 1 3 EL = 2 6 . 0 6 BO R E H O L E P - 1 5 EL = 2 5 . 6 6 2'5" DP 1'8" DP 2'1" DP1'11" DP 2'5" DP2' DP2'4"DP2'10" DP2'5" DP2' DP 2'4 " DP 2'5 " D P 5 ' 4 " D P 5 ' D P 5' 5 " D P 4 ' 8 " D P 4'DP3'7 " DP 2' DP 4'1 1 " D P 5'2" DP E E 2'8" DP 2'5" DP 2'7" DP 2'6" DP 2'4" DP2'6" DP'3'4" DP2'9" DP5' DP2'8" DP 3' DP 2' DP 2'10" DP 2'3" DP 2 ' 6 " D P 2'DP 12"W 12"W 12"W2' D P 2' D P 3' D P 2' 3 " D P 1' 1 1 " D P 3' D P 1' 1 1 " D P 5' 2 " D P 4' 4 " D P 1' 7 " D P 1' 8 " D P 4' 5 " D P 5' 6 " D P 3' 1 " DP 3' 3 " D P 1' 8 " D P 3' 2 " D P 2' 5 " D P 1' 9 " D P 1' D P 1' 1 1 " D P 2'10"1'9" 1' 1'5"1'7"1'7"1'10"1'8" 1'7 " 2'1 1 " 4'9" 4'1 1 " H H RE C N O . 2 0 1 1 0 8 1 2 0 0 1 7 1 8 4' S L O P E & U T I L I T Y EA S E M E N T ///////////// ///////////////////////////// GR A D Y 1 4 9 + 0 0 GRADY 150+00 GR A D Y 1 5 1 + 0 0 RAINIER 200+00 RAINIER 201+00 RAINIER 202+00 RAINIER 203+00 RAINIER 204+0 0RAINIER STA 200+00.07= GRADY STA 150+00.02 RAINIER AVE S S W G R A D Y W A Y S G R A D Y W A Y SF SF SF SFSFSF CONC CONC CONC SIGN DEBRIS SIGNSIGN SIGN / // / CONC UT UT UT UT H H H H H VLT VLT VLT VLT VLT VLT HH VLTS VLT TRASHBIN TRASHBIN BUS SIGNPOWERCABINET SW SW SW SW DRW DRW TRASHBIN SW SW SW DRW DRW SW SW DRW SW SW SW SW DRW CONC WALL 36" CMP 36" DI 30" CONC 30" CONC 27" CONC 27" CONC 27" CONC 24" CMP 12" CONC 4" CONC 6" DI 12" CPP 12" CPP 12" CONC 6" CONC 6" CONC 6" CONC6" PVC 12" DI 12" CONC 12" CONC 6" CONC 15" CMP 15" CMP 6" CONC 8" VC 8" CONC 18" CONC HH TTTETS SLHHTMHGV2WVFOFO2FOMHGVGVGVITSVLT2TS LTVLT WV4WV LTVLT TC SLHHLTHHCENTURYLINKVLTWV ELECVLT WV GV TS LTHH TS LTVLTELECVLT2 MISCMH TS-LTVLT GVGVSLHHHHLTHHTCHH FOFOMH FOFOMHFOFOMHTS LTHH LTHHTMHICVICV 2WV TMH GV WVWVWV BROADBANDVLTLTHHICVICVICVICVICVHHWV WV ELECVLT HH ICVICV 2HHWM ELECVLTLT HHWV ELEC VLT2WMWV LT HH ELECVLT LTHHWMICV GV GATE CW SW SW FH CONCBENCH 4' WOOD F N C CW SW CON C B E N C H CONC BENCH ART W O R K CONC DRW DRW SW CONC SEAMS (TYP) SW SW SW DRW DRW E COEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWVWV HH HH HH HH HH HH HH HHHH HH HH HHHH HH HHHH HHHH HH HH HH3HHHH HH HH HHHH HHHHHHHHHHHHHH HHHH HH 2 HH HH ELEC VLT ELECVLT ELEC VLT 4ELEC VLTELECVLTELECVLT 2ELEC VLT ELECVLT 3IRRG 2IRRG 2IRRG GV GV GV WM WMELECVLT E HH 2WV HHELECVLT HH HH WM CO GV GV GM WM WM WM WM WVWV 3WV WV WM W VLT 2VLTS HH T TSHHHH HH HHHH HHTMH VLTTS VLTHH VLT 2" DROP 2" DROP HH GM 6" CONC HH HH 12" RCP /// / // / / // / / / 6' CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF 8' CLEF 5.5' CLEF PP PP PP SW 2' FNC GATE //6' CLEF 5.5' CLEF 6' CLEF BLDGEQUIPCONCELECEQUIP SW SW SW SW SW SW SW SW / / // / / CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRDPM 6' TEMP C L E F 6' CLEF 2 BLRD / / / /// / / / // / //// /// / // / / // /// 3 BLRD 6' TEMP CLE F BLDEQUIP SIGN POST ONCONC BASE 6' CLEF PIVGATE STORAGESHED MISCVALV INLETRIM EL=24.52NEEDS TRAFFIC CONTROL CBRIM=25.13NEEDS TRAFFIC CONTROL 12" RCP 8" CONC 8" CONC4" CONC 30" CPP 24" CPP 18" DI 18" DI 12" CPP 12" CPP 12" CPP SS METAL POLE METAL POLE METAL POLE //// SL SL FOFO W SD SS SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMC A S T COMCAST COMCAS T COMCAST COMCAS T COMCAST COMCAST COMCAST COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYL I N K F O RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GASPSE GAS UTIL VLT HH HH HH UNKNOWN UTILITY HH HH HHELECVAULT HH2WM HH GV IRRG 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP 2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 4'10" DP 5'9" DP 4'7" DP1'11" DP1'11" DP2'6" DP5' DP1'4" DP2'6" DP2'2" DP3'1" DP2'6" DP 1'7" DP1'9" DP 1'8" DP1'6" DP1'6" DP 1'7" DP 1'6" DP 1'9" DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 8'5" DP 8'11" DP8'10" DP 9' DP3'3" DP3'1" DP3'2" DP2'10" DP1'6" DP1'3" DP1'9" DP1'7" DP2'5" DP1'7" DP1'7" DP1'4" DP1'5" DP1'10" DP3'1" DP1' DP 1'10" DP 1'11" DP 2' DP 3'1" DP3'1" DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6"DP 3'6" DP 3'9" DP3'10" DP4'3" DP 2'3" DP 1'7" DP2'9" DP 2'1" DP1'9" DP1'6" DP 2'1" DP 2'3" DP 2'1" DP 2'3" DP 1'11" DP 1'11" DP 1'11" DP 2'5" DP 1'8" DP 2'1" DP 1'11" DP 2'5" DP 2' DP 2'4"DP 2'10" DP 2'5" DP 2' DP 2'4"DP2'5" DP5'4" DP5' DP5'5" DP4'8" DP4'DP3'7"DP2' DP 4'11" DP5'2" DP 4'6"DP3'5"DP 1'9" DP 2' DP 4' DP 1'9" DP5'7" DP 2'7"DP2'4"DP2'4" DP 2' DP 1'10" DP 2'1" DP 5'8" DP 3' DP3'9" DP3'6"DP 3'11"DP 6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 7' DP 7' DP 2'8" DP 4'11" DP6'3" DP 8' DP2'2" DP1'3"DP 4'11" DP 3'11" DP 2'8" DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP 3'3" DP 5'5"DP 4'10" DP4'4" DP 5'3" DP 4' DP1'9" DP2'8" DP 2' DP1'11" DP 4'4" DP 6' DP 5' DP2'8" DP3'8" DP3'10" DP2'8" DP2' DP 3'7" DP2'2" DP 2'4" DP3'8" DP 3' DP3' DP 3'11" DP 3'9" DP 3'7" DP 1'8" DP4' DP 5'11" DP 3' DP 1'10" DP1'2" DP1'6" DP 5'6" DP 2'4" DP 5'4" DP 2'4" DP1'6" DP1'4"DP1'8" DP 1'5" DP1'1" DP1'4" DP1'3" DP1'6" DP1'8" DP1'5" DP1'5" DP1'4" DP1'5" DP 1'8" DP1'7" DP2'3" DP 1'7" DP 4' DP 2'6" DP3' DP 1'5" DP 1'6" DP 1'7" DP2'2" DP2'5" DP 4' DP2'5" DP2'2" DP1'11" DP2' DP 2'1" DP 2'2" DP 1'11" DP 1'6" DP 2'4" DP 2'4" DP2'4" DP 1'8" DP 1'10" DP 2' DP2'8" DP2'4" DP3' DP 3'8" DP1'9" DP 4' DP 7'11" DP6'7" DP4'5" DP 2'8" DP 2'2" DP 2' DP2' DP 2'6" DP 2'2" DP 1'9" DP1' DP3' DP 3' DP 3' DP 2'5" DP 2'6" DP 2'2" DP 2'6" DP 2'5" DP 2'7" DP 2'8" DP 2'5" DP2'7" DP 2'6" DP 2'4" DP 2'6" DP' 3'4" DP 2'9" DP 5' DP2'8" DP3' DP 2' DP 2'10" DP 4'8" DP 5' DP 5'9" DP5'10" DP 5'8" DP5'10" DP 3' DP 6'9" DP 6' DP 7'6" DP 2'1" DP 5'6" DP4' DP2'4" DP 2'5" DP2'5" DP2'8" DP2'3" DP 1' DP 2'5" DP2'5" DP 1'6" DP1'5" DP 2'6" DP2'DP4'DP4'DP 2'5" DP 2'DP PSE 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) WV WV CO 2 BLRDFH 2'4' HH 3'11" DP4'11" DP 3'5" DP 2'6" DP1'3" DP1'11" DP3'9" DP1' DP3' DP 2' DP 4' DP3'10" DP 2'5" DP 2'3" DP2'2" DP 2' DP1'11" DP 1'5" DP 5'11" DP3'8" DP 1' DP2'8" DP 2' DP 2' DP 3' DP2'3" DP 1'11" DP 3' DP 1' 11" DP 2'3" DP3'11" DP1'8" DP1'10" DP 4'11" DP 5'2" DP4'4" DP1'7" DP 1'8" DP 4'5" DP5'6" DP 3'1"DP 3'3" DP1' 8" DP3'2" DP 2'5" DP 1'9" DP1' DP 1'11" DP 1'5" DP 1'5" DP3'8" DP4'9" DP 1'4" DP 3' DP5'8" DP 5'10" DP6'2" DP5'5" DP 6' DP4' DP1'7" DP 1'9" DP3' DP 1'5" DP1'7" DP 2'8" DP2'4" DP2' DP 1'9" DP1'5" DP 1'5" DP2'6" DP1'4" DP 1'5" DP1'9" DP 2'4" DP2'4" DP2'6" DP3'10" DP 2' DP2' DP3'5" DP1'8" DP 4'2" DP2'4" DP12' DP 2'4" DP 1' DP 1' DP 6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 1'1" 1'5"1'4"1'7" 1'10" 1'7" 1'11" 2'2" 1'0'11" 6'9"4'5" 1' 2'10"1'9"1' 3' ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 1'2"1'10" 2'9" 2'3" 2' 2' 3'3'4"1'3"4'3'2"3'4' 2'6" 2' 3' 3' 1'8"1'2"1'2" 2'7" 2'5"2'7"3'8"2'2" 1'7" 2'9" 4'2' 3'3'3'3' 3'10" 4'1"4'9"7" 4'1"3'11" 5'9" 2'1" 1'11" 1'9" 2'1"1'8" 4'3"3'9"4'7"3'11"3'7"3'11" 10" 1'9"1'7" 5" 2'1" 1'11" 9"2'4" 3'11"3' 5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4"3'9"2'10" 2'2" 2'11"1'9" 1'5" 1'7" 1'7"1'10" 1'8" 1'7"2'11"2'1"2'2'3"1'9" 1'6" 1'8" 1'7"1'11"2'1" 1'7" 1'6"1'6"1'2"1'4" 1'5" 2'3" 2'1" 2'7"3'1"3'1"2'3'4"3'3"1'11"3'5"2'1"2'3" 2'9" 2'1" 2'4" 1'4"1'5"1'4"1'3"1'6"1'6"1'11"1'5"2'3'10"1'3"1'6"1'4"3'9"1'5"1'11" 3'11"3'9"1'7" 3'10"4'10"4'9" 4'10"1'3" 1'8" 4'1"4'9"4'9"2'7"2'10" 4'1"6'6"5'7"2'9"1'1" 2'7" 3'4" 2'10" 2'3"1'10"8"10" 2'9" 2'6" 2'1"1'8"1'11" 2'5"2'3" 2'7" 2'11" 1'7"1'9"2'2"2'2"1'7" 4'9" 4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6"4'1"4'2"4'7" 5'9"5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 4' 1' HH HHHHHH ELEC VLT 2 WMELEC VLT HHHH SLHH SLHH WV ELECPEDGROUNDROD 6" TREE30' DLN 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" CO 2 WV ELECVLT HH HH CO COCOCOCOCOCOCOCO COCOCO CO CO CO INLET PROTECTIONSUMPSILT FENCETEMPORARY CURBTEMPORARY SLOPE DRAINHIGH VISIBILITY FENCEHIGH VISIBILITY SILT FENCECONSTRUCTION STORMWATERCONVEYANCE PIPETEMPORARY DRAIN PIPEINTERCEPTOR DIKESTRAW BALESSTRAW WATTLESBIODEGRADABLE CHECK DAMSCONSTRUCTION STORMWATER STORAGESLOPE PROTECTIONSTABILIZED CONSTRUCTION ENTRANCE(STEEL PLATE)LANDSLIDE HAZARD AREANEW RIGHT OF WAY AREATEMPORARY CONSTRUCTION EASEMENTAREA 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL TESC PLAN RAINIER STA 200+00 TO RAINER STA 204+00 BT120-CTP101 BT120 50 0 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 1 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 1 0 1 - 1 0 6 . D W G S1-BT120-CTP101-106 FACILITY ID: Xrefs: xS1-BT120-VRX001 xS1-BTP120-VSF100 xS1-BT120-CPP001 xBRT-CUD05-TB22x34 xS1-BTP120-GZK010 xS1-BT120-CAP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 OSBORNCONSULTINGINCORPORATED 1 MA T C H L I N E : R A I N I E R S T A 2 0 4 + 0 0 SE E D W G BT 1 2 0 - C T P 1 0 2 MATCHLINE : G R A D Y S T A 1 5 1 + 0 0 SEE DWG BT120-CTP1 0 4 MATCHL I N E : SEE DW G BT120-C T P 2 0 5 MATCHLINE:SEE DWG BT120-CTP205 102 103 106 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 107 01-20-2025 RTA/CN 0205-24 Stormwater Flow Direction Sanitary Flow Direction GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUST TEMPORARY EROSION AND SEDIMENT CONTROL(TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, AND BT120-CSP201-205.3. PROTECT EXISTING DRAINAGE STRUCTURES SUCH AS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205. 5. CLEARING LIMITS IN LANDSCAPING AREAS WITHINTHE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BESODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THE NPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING IS REQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. KEY NOTES: 1 WHERE CURB INLETS ARE PRESENT, INSTALL INLETPROTECTION PER COR STD PLAN 216.30 AND PLACE SANDBAGS BARRIER UPSTREAM OF CATCH BASIN PER COR STD. PLAN216.50. SEE DRAWING BT120-CTD102 AND BT120-CTD103 FOR DETAILS. 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEEDRAWING BT120-CTD102 FOR DETAILS. 4 INSTALL COMPOST SOCK PER WSDOT STD PLAN I-30.40-02. WHEN COMPOST SOCKS ARE USED ON PAVEMENT, HEAVYCONCRETE BLOCKS SHALL BE USED TO PREVENT THE COMPOST SOCK FROM MOVING DURING RAINFALL/RUNOFFEVENTS. INLET PROTECTION SILT FENCE CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA S I G N SIGN S I G N //////// / /////// / / / / / / ///////// /////////// ////////// / U T H H H H V L T V L T V L T V L T S 6 " T R E E ± 1 2 ' D L N 4 " T R E E ± 2 2 ' D L N 6 " T R E E ± 1 2 ' D L N 6 " T R E E ± 1 4 ' D L N 6 " T R E E ± 1 4 ' D L N SW I N L E T R I M = 2 5 . 2 5 C B 1 . 7 ' X 2 . 2 ' C O N C R I M = 2 4 . 7 4 I E 6 " C O N C W = 2 3 . 9 W A T = 2 3 . 8 B O T = 2 2 . 0 I N L E T R I M = 2 5 . 1 2 I N L E T R I M = 2 3 . 6 2 IE 1 2 " C O N C N = 2 0 . 5 W A T = 2 0 . 6 B O T = 1 9 . 3 S D R I M = 2 4 . 4 9 I E 6 " C O N C E = 2 3 . 5 W A T = 2 3 . 7 B O T = 2 1 . 8 S D SS S S SD SD SD SD SD SD SD SD SD 12" CON C 6 " C O N C 6" C O N C 3 5 M P H 6 " T R E E 1 2 ' D L N 5 " T R E E 1 1 ' D L N 5 " T R E E 1 3 ' D L N 6 " T R E E 1 3 ' D L N DRW 5 " T R E E 1 5 ' D L N 6 " T R E E 1 4 ' D L N 8 " T R E E 1 6 ' D L N 5 " T R E E 1 2 ' D L N LANDSCAPING 6 " T R E E 1 4 ' D L N 5" TREE8' DLN 5 " T R E E 1 1 ' D L N LANDSCAPING E C O EE E E WV 3WV WV W V 3 W V W V WV HH HH HH HH HH HHHH HH H H HH H H ELEC VLT E L E C V L T 2IRRG GV G V WM G G FO FO FO FO FO E E E E E E EG G G G G E E E E E E E E E E E E E E E G G G G G G FO FO FO FOFOFOFO FO FO SDSD FO F O FO FO FO FO FO FO FO FO FO FO FO FO FO FO SDSDSDSDSDSD SD SD SD SD SD SD SD SD SDSD SD SD SD SD SD SD SD SD SD E E E E E EEE F O FO F O FO F O FO 6 " C O N C C B 2 . 2 ' X 1 . 8 ' C O N C R I M E L = 2 3 . 6 0 I E 1 8 " D I N E = 2 0 . 5 I E 1 2 " C P P S E = 2 0 . 8 I E 1 8 " D I S W = 2 0 . 6 W A T = 2 0 . 5 B O T = 1 9 . 4 I N L E T R I M E L = 2 5 . 0 9 I N L E T R I M E L = 2 5 . 0 4 I N L E T R I M E L = 2 4 . 3 7 I N L E T R I M E L = 2 5 . 7 0 N E E D S T R A F F I C C O N T R O L I N L E T R I M E L = 2 7 . 0 1 N E E D S T R A F F I C C O N T R O L 18" DI SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS F O FO F O F O FO FO W W W SS SS SS SD SD SD SD COMCAST COMCAST 2-PSE PSE RENTO N RENTON RENTON RENTON PSE GAS PSE GAS P S E G A S PS E G A S T T T T T T T T T G V I R R G B O R E H O L E P - 1 4 E L = 2 5 . 4 3 B O R E H O L E P - 1 2 E L = 2 5 . 1 4 B O R E H O L E P - 1 5 E L = 2 5 . 6 6 6 ' 9 " D P 1 ' D P 1'11" DP2'3"DP 2' DP 2' D P 3 ' 1 1 " D P 1'7" DP 2'9" DP2'1" DP1'9" DP1'6" DP2'1" DP2'3" DP2'1" DP2'3" DP 4' 6 " DP 3'5 " DP 3' D P 3'9 " D P DP 8'6" DP 3' 8 " D P 3 ' 1 1 " DP 5 ' 1 " D P 5' 3 " D P 5 ' 2 " D P 6 ' 4 " D P 6' 3 " D P 6' 7 " D P 2'5" DP 1'10" DP 2'3" DP 4'11" DP 3'11" DP 2'8" DP3 ' 6 " D P 3'10" DP 2 ' 7 " D P 2' 4 " D P 3 ' 4 " D P 3 ' 1 0 " D P 3'5" DP 3'2" DP 3'11" DP3'9" DP 2'4" DP 3'3" DP 5'5"DP4'10" DP 4'4" DP5'3" DP 4' DP 1'9" DP 2'8" DP 2' DP 1'11" DP4'4" DP 6' DP 5' DP 2'8" DP 3'8" DP 3'10" DP 2'8" DP 2' DP 3'11" DP 3'9" DP 3'7" DP 1'8" DP 4' DP 5'11" DP 3' DP 1'8" DP2'3" DP 5'6" DP 2'4" DP 5 ' 4 " D P 1'8" DP 2'6" DP 2'2" DP1'9" DP 1' D P 3' DP 3' DP3' DP2'5" DP2'6" DP 2'2" DP2'6" DP 4'8" DP 5' DP 5'9" DP 5'10" DP 5'8" DP 5'10" DP 2'1" DP P S E GG 12"W 12"W 12"W ABAN-W ABAN-W AB A N - W AB A N - W ABAN-W ABAN-W 1 2 " W 12" W 12"W 12"W 4 0 4 2' 3 " D P 2 ' 2 " D P 2' 1 1 " D P 1 ' D P 2' 8 " D P 2' 3 " D P 3 ' 1 1 " D P 1' 8 " D P 1' 1 0 " D P 4' 1 1 " D P 3'9 " 4'10" 1' ED(TYP.) ED(TYP.) RAINIER AVE S HARDIE A V E S W N T C 5 0 9 + 5 3 N TC 510+00 S TC 609+53 S TC 610+00 HA R D I E 3 1 0 + 0 0 HAR D I E 3 0 9 + 0 0 HA R D I E 3 1 0 + 0 0 RAINIER 20 4 + 0 0 RAINIER 205+00 RAINIER 206+00 RAINIER 207+00 RAINIER 208 + 0 0 RAINIER 2 0 9 + 0 0 N TC STA 510+04.91= RAINIER STA 207+16.93 S TC STA 610+02.99= RAINIER STA 206+67.81 CONC CONC CONC SIGN DEBRIS SIGNSIGN SIGN / // / CONC UT UT UT UT H H H H H VLT VLT VLT VLT VLT HH VLTS VLT TRASHBIN TRASHBINSW SW SW SW DRW DRW TRASHBIN SW SW SW DRW DRW SW SW DRW SW SW SW SW DRW CONC WALL SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7 SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9 SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0 SSMHRIM=27.27UNABLE TO OPEN SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2 SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2 6" CONC 8" VC 8" CONC 18" CONC TTTETMHGVCO2WVFOFOGVGVGVCO WV4WV WVWV GV 2 MISCMH GVGV FO FOFO TMHICVICV 2WV TMH GV WVWVWV ICVICVICVICVICV WVWVCOCOICVICV WMWV 2WMWV WMICV GV GATE CW SW SW FH CONCBENCH 4' WOOD F N C CW SW CON C B E N C H CONC BENCHARTWORKCONC DRW DRW SW CONC SEAMS (TYP) SW SW SW DRW DRW E COEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWVWV3IRRG 2IRRG 2IRRG GV GV GV WM WM E 2WV WM CO GV GV GM WM WM WM WM WVWV 3WV WV WM W VLT 2VLTS HH TTMH GM 6' CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF 8' CLEF 5.5' CLEF SW 2' FNC GATE 6' CLEF 5.5' CLEF 6' CLEF BLDGEQUIPCONC SW SW SW SW SW SW SW SW CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRD 6' TEMP C L E F 6' CLEF 2 BLRD 3 BLRD 6' TEMP CLE F SIGN POST ONCONC BASE 6' CLEF PIVGATE STORAGESHED MISCVALV SSMHRIM=25.21NEEDS TRAFFICCONTROLSSMHRIM=26.31NEEDS TRAFFIC CONTROL SSMHRIM=24.31NEEDS TRAFFIC CONTROL SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL SS METAL POLE METAL POLE METAL POLE //// SL SL FOFO W SD SS SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAS T COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMC A S T COMCAST COMCAS T COMCAST COMCAS T COMCAST COMCAST COMCAS T COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYL I N K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS FOVLT 2WM HH GV IRRG 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP 2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 4'10" DP 5'9" DP 4'7" DP1'11" DP1'11" DP2'6" DP5' DP1'4" DP2'6" DP2'2" DP3'1" DP2'6" DP 1'7" DP1'9" DP 1'8" DP1'6" DP1'6" DP1'7" DP 1'6" DP 1'9" DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 8'5" DP 8'11" DP8'10" DP 9' DP3'3" DP3'1" DP3'2" DP2'10" DP1'6" DP1'3" DP1'9" DP1'7" DP2'5" DP1'7" DP1'7" DP1'4" DP1'5" DP1'10" DP3'1" DP1' DP 1'10" DP 1'11" DP 2' DP 3'1" DP3'1" DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6"DP 3'6" DP 3'9" DP3'10" DP4'3" DP 2'3" DP 1'7" DP 1'7" DP2'9" DP 2'1" DP1'9" DP1'6" DP 2'1" DP 2'3" DP 2'1" DP 2'3" DP 1'11" DP 1'11" DP 1'11" DP 2'5" DP 1'8" DP 2'1" DP 1'11" DP 2'5" DP 2' DP 2'4"DP 2'10" DP 2'5" DP 2' DP 2'4"DP2'5" DP5'4" DP5' DP5'5" DP4'8" DP4'DP3'7"DP2' DP 4'11" DP5'2" DP 4'6"DP3'5"DP 1'9" DP 2' DP 4' DP 1'9" DP5'7" DP 2'7"DP2'4"DP2'4" DP 2' DP 1'10" DP 2'1" DP 5'8" DP 3' DP3'9" DP3'6"DP4'11" DP6'7" DP 3'9" DP 2'2" DP 2'4" DP 5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP 5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP6'3" DP 8' DP2'2" DP1'3"DP 2'5" DP 1'10" DP 2'3" DP 4'11" DP 3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP4'4" DP 5'3" DP 4' DP1'9" DP2'8" DP 2' DP1'11" DP 4'4" DP 6' DP 5' DP2'8" DP3'8" DP3'10" DP2'8" DP2' DP 3'7" DP2'2" DP 2'4" DP3'8" DP 3' DP3' DP 3'11" DP 3'9" DP 3'7" DP 1'8" DP4' DP 5'11" DP 3' DP 1'10" DP1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 2'4" DP 5'4" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 2'4" DP1'6" DP1'4"DP1'8" DP 1'5" DP 1'1" DP1'4" DP1'3" DP1'6" DP1'8" DP1'5" DP1'5" DP1'4" DP1'5" DP1'8" DP1'7" DP2'3" DP 1'7" DP 4' DP 2'6" DP3' DP 1'5" DP 1'6" DP 1'7" DP2'2" DP2'5" DP 4' DP2'5" DP2'2" DP1'11" DP2' DP 2'1" DP 2'2" DP 1'11" DP 1'6" DP 2'4" DP 2'4" DP2'4" DP 1'8" DP 4' DP 5'4" DP4'11"DP 1'10" DP 2' DP2'8" DP2'4" DP3' DP 3'8" DP1'9" DP 4' DP4' DP 3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 2'2" DP 2' DP2' DP 2'6" DP 2'2" DP 1'9" DP1' DP 3' DP 3' DP 3' DP 2'5" DP 2'6" DP 2'2" DP 2'6" DP 2'5" DP 2'7" DP 2'8" DP 2'5" DP2'7" DP 2'6" DP 2'4" DP 2'6" DP' 3'4" DP 2'9" DP 5' DP2'8" DP3' DP 2' DP 2'10" DP 4'8" DP 5' DP 5'9" DP5'10" DP 5'8" DP5'10" DP 2'8" DP 3' DP 6'9" DP6' DP 7'6" DP 2'1" DP 5'6" DP4' DP2'4" DP 2'5" DP2'5" DP2'8" DP 2'3" DP 1' DP 2'5" DP2'5" DP 1'6" DP1'5" DP 2'6" DP2'DP 4'DP4'DP 1'9" DP2'5" DP 2'DP PSE 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) WV WV CO SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.2 BLRDFH 3'11" DP4'11" DP 3'5" DP 5'5" DP2'6" DP1'3" DP1'11" DP3'9" DP1' DP3' DP 2' DP 4' DP3'10" DP 2'5" DP 2'3" DP2'2" DP 2'2" DP 2' DP1'11" DP 1'5" DPBROADBANDVAULT2'11" DP 5'11" DP3'8" DP 1' DP2'8" DP 2' DP 2' DP 3' DP2'3" DP 1'11" DP 3' DP 1' 11" DP 2'3" DP3'11" DP1'8" DP1'10" DP 4'11" DP 5'2" DP4'4" DP1'7" DP 1'8" DP 4'5" DP5'6" DP 3'1"DP 3'3" DP1' 8" DP3'2" DP 2'5" DP 1'9" DP1' DP 1'11" DP 1'5" DP 1'5" DP3'8" DP4'9" DP 1'4" DP 3' DP5'8" DP 5'10" DP6'2" DP5'5" DP 6' DP4' DP1'7" DP 1'9" DP3' DP 1'5" DP1'7" DP 2'8" DP2'4" DP2' DP 1'9" DP1'5" DP 1'5" DP2'6" DP1'4" DP 1'5" DP1'9" DP 2'4" DP2'4" DP2'6" DP3'10" DP 2' DP2' DP5'5"DP6'7" DP3'5" DP1'8" DP 4'2" DP2'4" DP12' DP 2'4" DP 1' DP 1' DP 6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 1'1" 1'5"1'4"1'7" 1'10" 1'7" 1'11" 2'2" 1'0'11" 6'9"4'5" 1' 2'10"1'9"1' 3' ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 1'2"1'10" 2'9" 2'3" 2' 2' 3'3'4"1'3"4'3'2"3'4' 2'6" 2' 3' 3' 1'8"1'2"1'2" 2'7" 2'5"2'7"3'8"2'2" 1'7" 3'10" 4'1"4'9"7" 4'1"3'11"5'9" 2'1" 1'11" 1'9" 2'1"1'8" 4'3"3'9"4'7"3'11"3'7"3'11" 10" 1'9"1'7" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3' 5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4"3'9"2'10" 2'2" 2'11"1'9" 1'5" 1'7" 1'7"1'10" 1'8" 1'7"2'11"2'1"2'2'3"1'9" 1'6" 1'8" 1'7"1'11" 2'1" 1'7" 1'6"1'6"1'2"1'4" 1'5" 2'3" 2'1" 2'7"3'1"3'1"2'3'4"3'3"1'11"3'5"2'1"2'3" 2'9" 2'1" 2'4" 1'4"1'5"1'4"1'3"1'6"1'6"1'11"1'5"2'3'10"1'3"1'6"1'4"3'9"1'5"1'11" 3'11"3'9"1'7" 3'10"4'10"4'9" 4'10"1'3" 1'8" 4'1"4'9"4'9"2'7"2'10" 4'1"6'6"5'7"2'9"1'1" 2'7" 3'4" 2'10" 2'3"1'10"8"10" 2'9" 2'6" 2'1"1'8"1'11" 2'5"2'3" 2'7" 2'11" 1'7"1'9"2'2"2'2"1'7" 4'9" 4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6"4'1"4'2"4'7" 5'9"5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 2 WM WV 6" TREE30' DLN 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" CO 2 WV HH CO COCOCOCOCOCOCOCO COCOCO CO CO CO 20 40 SCALE IN FEET 01020 (1" = 20') N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 1 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 1 0 1 - 1 0 6 . D W G S1-BT120-CTP101-106 FACILITY ID: Xrefs: xS1-BT120-VRX001 xS1-BTP120-VSF100 xS1-BT120-CPP001 xBRT-CUD05-TB22x34 xS1-BTP120-GZK010 xS1-BT120-CAP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 OSBORNCONSULTINGINCORPORATED MATCHLINE:SEE DWG BT120-CTP201MATCHLINE:SEE DWG BT120-CTP203 M A T C H L I N E : R A I N I E R S T A 2 0 4 + 0 0 S E E D W G B T 1 2 0 - C T P 1 0 1 MA T C H L I N E : R A I N I E R S T A 2 0 8 + 5 0 SE E D W G BT 1 2 0 - C T P 1 0 3 EX ROW EX ROW 102 103 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 106 107 21 1 4 2 2 EXIST. CB NOT SHOWN IN VIEWPORT. APPROX. LOCATION AT STA 308+25.7, 23.0' RT 2 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 08/30/2024 J. ALTCHECH 12/04/2024 08/30/2024 CIVIL TESC PLAN RAINER STA 204+00 TO RAINIER STA 208+50 BT120-CTP102 BT120 -------- S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' 2 2 01-20-2025 0051 RTA/CN 0205-24 Stormwater Flow Direction Asphalt Berm SI G N SW SW SW DR W 18 " T R E E ±4 6 ' D L N YI E L D ±8 ' D L N 10 " T R E E ±1 0 ' D L N 6" T R E E ±1 2 ' D L N 4" T R E E ±2 2 ' D L N BU S SI G N 6" T R E E ±1 0 ' D L N //// // BU S S H E L T E R TR A S H BI N YI E L D 6" T R E E ±1 6 ' D L N 6" T R E E ±1 8 ' D L N 6" T R E E ±1 2 ' D L N 8" T R E E ±1 4 ' D L N 8" T R E E ±2 0 ' D L N 6" T R E E ±1 4 ' D L N 6" T R E E ±1 4 ' D L N 6" T R E E ±1 4 ' D L N 6" T R E E ±1 4 ' D L N SW SW DRW DRWSW SW DRW SW SW SW CONC WALL CB1.7 ' X 2 . 1 ' C O N C RI M = 2 4 . 6 8 IE 6 " C O N C N = 2 3 . 4 IE 6 " C P P E = 2 3 . 5 IE 6 " C O N C S = 2 3 . 3 YA R D D R A I N 0. 9 ' X 0 . 9 ' C O N C RI M = 2 4 . 9 6 IE 6 " P V C S W = 2 4 . 0 YA R D D R A I N 0.9 ' X 0 . 9 ' C O N C RI M = 2 5 . 1 7 IE 6 " P V C N E = 2 4 . 0 IE 6 " P V C S W = 2 4 . 0 BO T = 2 3 . 7 IN L E T RI M = 2 4 . 2 0 CB2. 2 ' X 1 . 9 ' C O N C RI M = 2 4 . 0 7 IE 1 2 " D I S E = 2 1 . 5 W A T = 2 1 . 5 B O T = 1 9 . 6 CB2.3 ' X 2 . 1 ' C O N C RI M = 2 4 . 5 8 IE 6 " C O N C N E = 2 3 . 4 W A T = 2 3 . 4 B O T = 2 0 . 7 IN L E T RI M = 2 3 . 9 7 CBRI M = 2 3 . 7 9 CBRI M = 2 4 . 5 1 CB2.2 ' X 1 . 9 ' C O N C RI M = 2 4 . 2 5 IE 6 " D I N = 2 2 . 3 IE 1 2 " D I S E = 2 1 . 7 IE 1 2 " D I N W = 2 1 . 6 W A T = 2 1 . 7 B O T = 2 0 . 1 CB CB2.2 ' X 1 . 9 ' C O N C RI M = 2 6 . 3 7 IE 1 2 " C O N C N E = 2 2 . 9 IE 6 " C O N C S = 2 2 . 8 IE 1 2 " C O N C S W = 2 2 . 9 W A T = 2 2 . 9 B O T = 2 1 . 7 SD SD SD SD SD SD SD SD CBRI M = 2 5 . 8 5 UN A B L E T O O P E N DU E T O B R O K E N H A N D L E SD CB2. 2 ' X 1 . 9 ' C O N C RI M = 2 5 . 4 4 CB2. 3 ' X 1 . 9 ' C O N C RI M = 2 4 . 8 1 IE 6 " D I S W = 2 2 . 7 W A T = 2 1 . 0 B O T = 2 0 . 7 SD 2. 2 ' X 1 . 9 ' C O N C RI M = 2 4 . 9 4 IE 1 2 " D I S E = 2 3 . 1 IE 6 " C O N C W = 2 3 . 2 W A T = 2 3 . 0 B O T = 2 1 . 2 SD SD CB2. 2 ' X 1 . 9 ' C O N C RI M = 2 4 . 7 7 IE 6 " P V C S = 2 1 . 4 IE 6 " C O N C S W = 2 1 . 7 W A T = 2 1 . 4 B O T = 2 0 . 1 1.6 ' X 2 . 1 ' C O N C IE 6 " C O N C E = 2 3 . 5 W A T = 2 3 . 7 B O T = 2 1 . 8 SD 6" CONC 6" C O N C 6" PVC 12 " D I 12" CON C 12" C O N C6" CONC IN L E T RI M = 2 4 . 4 6 CBRI M = 2 4 . 4 6 T T E CO IT SVL T 2T S L T VL T W V 4W V LTVL T LTHH WV WV GV TS LTHH TS LT VLT ELEC VLT 2 M I S C M H TS - L T VL T G V G V LTHH TM H TM H GV W V W V W V BR O A D B A N D VL T LTHHIC VICVIC VICVIC V HH WVWV ELECVLT HH COCO ICVICV 2HH WMELECVLT LT HH WV ELEC VLT 2WM WV LT HH ELECVLT LTHH WM ICV GV DRW WV WV HH HH GV FO G G FO FO FO FO FO E E E E E G G G G G G G G G G G G G G G GEEEEEEE E E E E E E E E E E E E E T T T T T T FO FO FO FO FO E E E E E FO FO FO FO FO FO E E E EEEEFO T T T T T T T T T T T T T T T T T T T T T T T E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G E E F O F O F O F O F O F O F O F O F O F O F O FOFOFOFOFOFOFOFO F O F O F O FO F O FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFO FO FO FOFOFOFOFOFOFOFOFOFOFOFO W S D S D SD SD SD FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO SD SD SD SD SD SD S D SD SD SD SDSDSDSDSD SD SD SD S D SD SD SD SDSDSDSDSDSDSDSD SD SD SD SDSDSDSDSDSD S D S D S D S D S D SD S D S D S D S D SD S D S D SD S D S D S D S D S D S D SD SD SD S D S D SD S D S D SS SS S S S S S S S S SS S S S S S S S S S S S S SS S S F O F O F O F O F O F O F O F O F O F O F O F O F O F O F O FO FO FO SD M H RI M = 2 5 . 4 7 SD M H RI M = 2 4 . 7 8 IN L E T RI M E L = 2 6 . 2 5 NE E D S T R A F F I C C O N T R O L CB2. 2 ' X 1 . 8 ' C O N C RI M E L = 2 5 . 6 2 IE 1 2 " C P P S E = 2 2 . 5 IE 1 2 " C P P N W = 2 2 . 6 W A T = 2 2 . 5 B O T = 2 0 . 7 SD M H RI M = 2 5 . 6 9 12 " C P P E = N A NE E D S T R A F F I C C O N T R O L CB2. 2 ' X 1 . 8 ' C O N C RI M E L = 2 5 . 2 0 IE 6 " D I E = 2 1 . 6 IE 1 2 " C P P W = 2 1 . 6 W A T = 2 1 . 6 B O T = 1 9 . 7 SD M H RI M = 2 5 . 6 7 NE E D S T R A F F I C C O N T R O L IN L E T RI M E L = 2 4 . 9 4 NE E D S T R A F F I C C O N T R O L IN L E T RI M E L = 2 5 . 1 6 NE E D S T R A F F I C C O N T R O L SD M H RI M = 2 6 . 0 4 12 " C P P S W = N A NE E D S T R A F F I C C O N T R O L CB2. 2 ' X 1 . 8 ' C O N C RI M E L = 2 5 . 3 6 IE 1 2 " C P P N E = 2 1 . 5 IE 1 2 " C P P S E = 2 1 . 5 IE 1 2 " C P P S W = 2 1 . 6 W A T = 2 1 . 7 B O T = 1 9 . 9 SD M H RI M = 2 4 . 9 9 12 " C P P N W = N A NE E D S T R A F F I C C O N T R O L CB2. 2 ' X 1 . 8 ' C O N C RI M E L = 2 4 . 6 0 IE 1 2 " C P P S E = 2 0 . 8 W A T = 2 0 . 8 B O T = 1 9 . 1 SD M H RI M = 2 5 . 5 9 NE E D S T R A F F I C C O N T R O L NE E D S T R A F F I C C O N T R O L SD M H RI M = 2 4 . 6 6 NE E D S T R A F F I C C O N T R O L SD M H RI M = 2 5 . 1 3 NE E D S T R A F F I C C O N T R O L RI M = 2 4 . 9 9 NE E D S T R A F F I C C O N T R O L CB2. 2 ' X 1 . 8 ' C O N C RI M E L = 2 4 . 7 1 IE 1 2 " C P P N E = 2 1 . 4 IE 1 2 " C P P S E = 2 1 . 5 IE 1 8 " D I S W = 2 1 . 5 W A T = 2 1 . 5 B O T = 2 0 . 3 IN L E T RI M E L = 2 4 . 2 1 NO P I P E , F U L L O F PA C K E D D I R T / S I L T / D E B R I S CB36 " C O N C RI M E L = 2 4 . 2 9 IE 1 8 " D I N = 2 0 . 8 IE 8 " C P P N E = 2 1 . 1 IE 1 2 " C P P E = 2 1 . 2 IE 1 8 " D I S W = 2 0 . 8 W A T = 2 0 . 9 B O T = 1 7 . 8 CB2. 2 ' X 1 . 8 ' C O N C RI M E L = 2 4 . 0 4 IE 1 8 " D I N E = 2 0 . 7 IE 1 8 " D I S W = 2 0 . 7 W A T = 2 0 . 8 B O T = 1 9 . 3 SS M H RI M = 2 6 . 3 1 NE E D S T R A F F I C C O N T R O L CB2. 3 ' X 1 . 9 ' C O N C RI M E L = 2 5 . 7 4 IE 1 2 " P V C S E = 2 2 . 2 W A T = 2 2 . 1 B O T = 2 0 . 6 S D SD M H RI M = 2 5 . 7 7 12 " C P P N W = N A N E E D S T R A F F I C C O N T R O L S D S D 18" DI 12 " C P P 12" CPP12" CPP SS SS SS SS E E E E E E FO FO FO FO E E SS S S FO SSSS SS S S SS SS COMCAST COMCAST COMCAST COMCAST C O M C A S T F O C E N T U R Y L I N K CENTURYLINK FO PSE PSE PSE RENTON RENTONRENTON P S E G A S PSE GAS PSE GAS T TH 4 9 G N D E L = 2 4 . 5 2 2 x 2 " P O W E R TO P O F C N D E L = 2 2 . 6 3 TH 4 9 A GN D E L = 2 4 . 5 2 2 x 4 " C O M M TO P O F C N D E L = 2 2 . 6 0 BO R E H O L E P- 1 2 EL = 2 5 . 1 4 5'4" DP 6'8" DP 5' DP 4' DP 4' DP 3' DP 3'9" DP3'4" DP 1'10" DP1'11" DP 2' DP 3'1" DP3'1" DP 2'2" DP 2'8" DP 2'7" DP 2'8" DP 3'6"DP 3'6" DP 3'9" DP 3'10" D P 4'3" D P 2'3" DP 1'7" DP1'9" DP 2' DP 4' D P 1'9" DP 5' 7 " D P 2' 7 " DP 2' 4 " D P 2'4" DP 1'10" DP 2'1" DP 5' 8 " D P 3' D P 3' 9 " D P 3' 6 " DP 4'11" DP6'7" DP 3'9" DP 2' DP 3'2 "DP2' 6 " D P 1' 4 " D P 2' 1 " D P 7' D P 7' D P 2'8 " D P 4'11" DP 6'3" DP 8' DP 2'2" DP 1'3"DP 1'8" DP 4' DP5'4" DP4'11"DP 1'10" DP 2' DP 2'8" DP 2'4" D P3' DP 3'8" DP1'9" DP 4' DP 4' DP 3'6" DP 5' DP 5'11" DP 6'9" DP 5'4" DP 7'11" D P 6'7" DP 4'5" DP 2'8" DP 2'2" DP2' DP2' DP 2'8 " D P 3' DP 6' 9 " D P 6 ' D P 7' 6 " D P 5'6" DP4' DP 2'4" DP 2'5" DP2'5" DP2'8" DP1' DP 1'9 " D P 2'5" DP 12"W 12"W 12"W 12"W ABAN-WABAN-WABAN-WABAN-W CBRI M = 2 3 . 7 5 CB1. 7 ' X 2 . 2 ' C O N C RI M E L = 2 3 . 7 5 IE 6 " C O N C N W = 2 2 . 4 2' 3'1 1 " D P 4'1 1 " D P 3'5 " D P 5'5 " D P 2'6 " D P 1'3 " D P 1'1 1 " D P 3'9 " D P 1' D P 3' D P 2' D P 4' D P 3'1 0 " D P SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS 1'7 " 2' 3'9 " 6'9" 4'5" ED(TYP.) 2' TH - 1 5 3 2 1 - P - A TH - B R T - 1 5 1 9 1 W GN D E L = 2 4 . 3 0 12 " D I W A T E R TO P O F P I P E = 1 9 . 6 9 S 7 T H S T S W 7 T H S T 2 4 9 + 0 0 SW 7TH ST 250+00 S W 7 T H S T 2 5 1 + 0 0 RAINIER 208+00 RAINIER 209+00 RAINIER 210+00 RAINIER 211+00 RAINIER 212+00 RAINIER 213+00 RAINIER 214+00 SW 7TH ST STA 249+99.98= RAINIER STA 212+42.13 RAINIER AVE S S W 7 T H S T GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL(TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESS NOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205.3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESS NOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205. 4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHINTHE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROM THE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BESODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDES PERMIT WAR314062 FOR DETAILS. KEY NOTES: 1 WHERE CURB INLETS ARE PRESENT, INSTALL INLETPROTECTION PER COR STD PLAN 216.30 AND PLACE SANDBAGS BARRIER UPSTREAM OF CATCH BASIN PER COR STD. PLAN216.50. SEE DRAWING BT120-CTD102 AND BT120-CTD103 FORDETAILS. 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEE DRAWING BT120-CTD102 FOR DETAILS. 4 INSTALL COMPOST SOCK PER WSDOT STD PLAN I-30.40-02. WHEN COMPOST SOCKS ARE USED ON PAVEMENT, HEAVYCONCRETE BLOCKS SHALL BE USED TO PREVENT THECOMPOST SOCK FROM MOVING DURING RAINFALL/RUNOFFEVENTS. CONC SIGN DEBRIS SIGNSIGN SIGN / // / UT UT UT UT H H H H H VLT VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTERTRASHBINBUSSIGN TRASHBINBUS SIGNPOWERCABINET SW SW SW SW DRW DRW YIELD BUSSIGN BUS SHELTERTRASHBIN YIELD SW SW SW DRW DRW SW SW DRW SW SW SW SW DRW CONC WALL SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7 SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9 SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0 SSMHRIM=27.27UNABLE TO OPEN SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2 SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2 6" CONC 8" VC 8" CONC 18" CONC HH TTTETS SLHHTMHGVCO2WVFOFO2FOMHGVGVGVCOITSVLT2TS LTVLT WV4WV LTVLT TC SLHHLTHHCENTURYLINKVLTWV ELECVLT WVGVTS LTHHTS LTVLTELECVLT2 MISCMH TS-LTVLT GVGVSLHHHHLTHHTCHH FOFOMH FOFOMHFOFOMHTS LTHHMW LTHHTMHICVICV 2WV TMH GV WVWVWV BROADBANDVLTLTHHICVICVICVICVICVHH WV WV ELECVLTHHCOCOICVICV 2HHWM ELECVLTLT HHWV ELEC VLT2WMWV LT HH ELECVLT LTHHWMICV GV GATE CW SW SW YIELDFH CONCBENCH YIELD 4' WOOD F N C USECROSSWALK CW SW CON C B E N C H CONC BENCHYIELDARTWORKCONC DRW35MPH DRW SW CONC SEAMS (TYP) SW SW SW DRW DRWECOEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWVWV HH HH HH HH HH HH HH HHHH HH HH HHHH HH HHHH HHHH HH HH HH3HHHH HH HH HHHH HHHHHHHHHH HH HH HHHH HH 2 HH HH ELEC VLT ELECVLT ELEC VLT 4ELEC VLTELECVLTELECVLT 2ELEC VLT ELECVLT 3IRRG 2IRRG 2IRRG GV GV GV WM WMELECVLT E HH 2WV HHELECVLT HH HH WM CO GV GV GM WM WM WM WM WVWV 3WV WV WM W VLT 2VLTS HH T TSHHHH HH HHHH HHTMH VLTTS VLTHH VLT 2" DROP 2" DROP HH GM HH HH/// / // / / // / / / 6' CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF SOUNDCOLLISIONCENTER 8' CLEF 5.5' CLEF PP PP PP SIGN LOADLIMIT USECROSSWALK SW PARK &RIDE USECROSSWALK 2' FNC GATE //6' CLEF 5.5' CLEF 6' CLEF BLDGEQUIP GAZEBO CONCELECEQUIP SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SOUNDCOLLISIONCENTER SW SW SW SW SW MAZDASIGN SW SW SW / / // / / SIGN ONCONC BASE SIGN ONCONC BASE CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRDPM 6' TEMP C L E F 6' CLEFWELCOME TOTRUCK CITY SIGN SIGN 2 BLRD / / / /// / / / // / //// /// / // / / // /// 3 BLRD 6' TEMP CLE F SIGN ONCONC BASE BLDEQUIP SIGN POST ONCONC BASE 6' CLEF SIGN PIVGATE STORAGESHED MISCVALV SHELTERCANOPY 15 MPHSIGN BLDG BLDG BLDG BLDG SSMHRIM=25.21NEEDS TRAFFICCONTROLSSMHRIM=26.31NEEDS TRAFFIC CONTROL SSMHRIM=24.31NEEDS TRAFFIC CONTROL SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL SS METAL POLE METAL POLE METAL POLE //// SL SL FOFO W SD SS SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAS T COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMC A S T COMCAST COMCAS T COMCAST COMCAS T COMCAST COMCAST COMCAS T COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYL I N K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS UTIL VLT HH HH HH UNKNOWN UTILITY FOVLT HH HH HHELECVAULT HH2WM HH GV IRRG BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 MWEL=25.08 BOREHOLERW10EL=25.30 MWGWMW-3EL=26.16 BOREHOLEGA-3EL=25.97 MWGWMW-1EL=26.60 BOREHOLEGA-4EL=26.06 BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 1'11" DP1'11" DP2'6" DP5' DP1'4" DP2'2" DP3'1" DP 1'7" DP1'9" DP 1'8" DP1'6" DP1'6" DP1'7" DP 1'6" DP 1'9" DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP1'6" DP1'3" DP1'9" DP1'7" DP2'5" DP1'7" DP1'7" DP1'4" DP1'5" DP1'10" DP1' DP 1'10" DP 1'11" DP 2' DP 3'1" DP3'1" DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6"DP 3'6" DP 3'9" DP3'10" DP4'3" DP 2'3" DP1'7" DP 1'7" DP2'9" DP 2'1" DP1'9" DP1'6" DP 2'1" DP 2'3" DP 2'1" DP 2'3" DP 1'11" DP 1'11" DP 1'11" DP 2'5" DP 1'8" DP 2'1" DP 1'11" DP 2'5" DP 2' DP 2'4"DP 2'10" DP 2'5" DP 2' DP 2' DP 4'11" DP5'2" DP 4'6"DP3'5"DP 1'9" DP 2' DP1'9" DP5'7" DP 2'7"DP2'4"DP2'4" DP 2' DP 1'10" DP 2'1" DP 5'8" DP 3' DP3'9" DP3'6"DP4'11" DP6'7" DP 3'9" DP 2'2" DP 2'4" DP 5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP 5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP 6'3" DP 8' DP2'2" DP1'3"DP 2'5" DP 1'10" DP 2'3" DP 4'11" DP 3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP4'4" DP 5'3" DP 1'10" DP1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 4' DP 5'4" DP 4'11"DP 4' DP3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 6'9" DP6' DP 7'6" DP 5'6" DP 1'9" DP2'5" DP 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) WV WV CO SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.2 BLRDFH HH 3'11" DP4'11" DP 3'5" DP 5'5" DP2'6" DP1'3" DP1'11" DP3'9" DP 3'10" DP 2'2" DP 2'2" DP 1'5" DPBROADBANDVAULT2'11" DP 3' DP2'3" DP 1'11" DP 1' 11" DP 2'3" DP3'11" DP 4'11" DP 5'2" DP4'4" DP1'7" DP 1' 8" DP 2'5" DP 1'11" DP 1'4" DP 1'5" DP1'7" DP 2'8" DP2'4" DP2'6" DP 5'5"DP6'7" DP 4'2" DP2'4" DP12' DP6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 6'9"4'5" ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 2'5"2'7"3'8"2'2" 3'10" 4'1"4'9"7" 4'1"3'11"5'9" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3' 5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4"3'9"2'10" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6"4'1"4'2"4'7" 5'9"5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" HH HHHHHH ELEC VLT 2 WMELEC VLT HHHH SLHHSOUTHRENTON RULES &REGULATIONSLOADLIMIT LP W / SPEEDLIMIT SIGNSLHH HANDICAPGUIDELINES PERMITPRKGBIKESTORAGEHANDICAPNO PARKFIRE LANE WV ELECPEDGROUNDROD STOPSIGN BUSINFO STOPSIGN STOPSIGNBUSINFO HANDICAPSOUTHRENTONSOUTHRENTONSOUTHRENTON PERMITPRKG PERMITPRKG 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" CO 2 WV ELECVLT HH HH CO COCOCOCOCOCOCOCO COCOCO CO CO CO INLET PROTECTION SILT FENCE CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL TESC PLAN RAINIER STA 208+50 TO RAINIER STA 212+42.13 BT120-CTP103 BT120 52 0 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N MA T C H L I N E : R A I N I E R S T A 2 0 8 + 5 0 SE E D W G BT 1 2 0 - C T P 1 0 2 SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 2 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 1 0 1 - 1 0 6 . D W G S1-BT120-CTP101-106 FACILITY ID: Xrefs: xS1-BT120-VRX001 xS1-BTP120-VSF100 xS1-BT120-CPP001 xBRT-CUD05-TB22x34 xS1-BTP120-GZK010 xS1-BT120-CAP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 OSBORNCONSULTINGINCORPORATED M A T C H L I N E S E E D W G B T 1 2 0 - C T P 2 0 1 4 102 103 106 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 106 107 1 1 1 12 2 1 1 01-20-2025 0052 RTA/CN 0205-24 Stormwater Flow Direction Asphalt Berm GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL(TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESS NOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, AND BT120-CSP201-205.3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205. 4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205. 5. CLEARING LIMITS IN LANDSCAPING AREAS WITHINTHE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS. 6. AT A MINIMUM, DISTURBED AREAS SHALL BESODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THE NPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. KEY NOTES: 1 WHERE CURB INLETS ARE PRESENT, INSTALL INLETPROTECTION PER COR STD PLAN 216.30 AND PLACE SANDBAGS BARRIER UPSTREAM OF CATCH BASIN PER COR STD. PLAN216.50. SEE DRAWING BT120-CTD102 AND BT120-CTD103 FORDETAILS. 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEEDRAWING BT120-CTD102 FOR DETAILS. 3 INSTALL SILT FENCE PER COR STD PLAN 214.00 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINKFENCE WITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO INLET PROTECTION SILT FENCE CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA X X X XXXXXXXXXX X X X X X CONC VLT SSMH36"Ø CONC RIM=26.49IE 18" CON C N W = 1 2 . 3IE 18" CONC E = 1 2 . 3IE 8" CONC S = 1 3 . 0 RIM=25.85 CBRIM=26.78IE 8" DI S=25. 5 WAT=25.3 B O T = 2 2 . 9 CB RIM=26.20 CB RIM=25.90 SS SS SS SS SS SS SS SS SS SD 1 8 " C O N C SW GRASS GRASS 43" TREE 45' DLN 32" TREE 34' DLN 11" TREE 31' DLN 5" TREE12' DLN 12" TREE 28' DLN 11" TREE 28' DLN 5" TREE 11' DLN 5" TREE 11' DLN 10" STUMP 11" STUMP 11" STUMP C O N C B E N C H C O N C B E N C H YIELD A R T W O R K LA N D S C A P I N G MULTIPLE6" TREES35' DLN CONC SEAMS (TYP) OE OE OE OE OE OE OE OE SW SWE E HH HH 2 HH HH2ELEC VLT E E E E E E E E E E E E E E E EEE E EEEEE E E E E E E E E E E E FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO W W W W SD SD SD SD SD SD SD SD SD SD SD SD FO FO FO FO FO FO FO FO FO FO SD SD SD FO FO FO OEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE CB1.6' X 2.1' C O N C RIM EL=26. 9 IE 12" RCP N E = 2 3 . 2 IE 8" DI SW = 2 3 . 2IE 8" DI NW = 2 3 . 6 WAT=23.2 B O T = 2 2 . 0 0 CB 1.7' X 2.2' C O N C RIM EL=26. 5 5 IE 4" CON C W = 2 5 . 2 WAT=25.2 B O T = 2 4 . 9 CB1.9' X 2.4 CONCRIM EL=26.10IE 8" CONC S=24.4WAT=24.7 BOT=21.8 SD SD CB 1.6' X 2.1' C O N C RIM EL=26. 9IE 8" DI N = 2 4 . 9 IE 8" DI NE = 2 4 . 6IE 8" DI N W = 2 4 . 9 WAT=24.5 B O T = 2 3 . 2 4" CONC SL FO FO FO FO FO FO FO SS SS SS SS SS SS SS SS SS SS SS CO M C A S T COMCAST CO M C A S T CE N T U R Y L I N K F O CENTURYLI N K F O 2-PSE 2-PSE PSE 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 0.5" CABLE C O M M TOP OF C N D = 2 5 . 4 5 FO VLT TH 40 GND EL=2 7 . 3 3 DUG 5' DID N O T F I N D TH 43 GND EL=26. 9 8 DUG 6' DID N O T F I N D TH 42GND EL=2 6 . 9 8 2-6" POWE R C N D TOP OF CN D = 2 3 . 9 9 3'6" DP 5'9" DP 7'2" DP 6'11" DP 7' DP 6'6" DP 4'4" DP 4'3" DP 3'7" DP 2' DP 8 ' 5 " D P 8 ' 1 1 " D P 8' 1 0 " D P 9 ' D P 4'DP 3'7"DP 400 W W E E E E E TTTT CONC SEAMS (TYP) WV WV C C CB48"Ø CONCRIM EL=26.77IE 12" RCP W=22.4IE 8" CONC N=22.3IE 12" RCP E=22.2BOT=20.3 SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDMH 2.0' X 1.5' C O N C RIM EL=25 . 7 3 IE 8" CON C S W = 2 3 . 5 IE 8" CON C E = 2 2 . 2 IE 12" RC P W = 2 2 . 0 IE 12" RCP N = 2 2 . 0 IE 12" RC P S = 2 1 . 9 WAT=21.7 B O T = 2 1 . 4 SD SD SD 6' DP4' DP 6'11" 8'1 1 " ED(TYP.) 4'7 " 4'1" 4'6" 4'8"4'6" TH-15162GND=27.331" PVC POWERTOP OF CND=25.67 TH-15156-AGND=26.982-6" PVC POWERTOP OF CND=23.98 TH-15156-BGND=26.982-4" FIBER OPTICTOP OF CND=24.05 TH-15142-AGND=26.694" FIBER OPTICTOP OF CND=23.66 TH-15142-BGND=26.694" FIBER OPTICTOP OF CND=23.77 TH-15140-AGND=26.696" POWERTOP OF CND=23.64 TH-15140-BGND=26.696" POWERTOP OF CND=23.78 TH-15153GND=27.571" POWERTOP OF CND=26.50 TH-15161GND=26.286" DI WATERTOP OF PIPE=21.90 TH-375-C- A GND EL=27 . 2 1 4" PVC CO M M TOP OF CN D = 2 4 . 7 4 TH-374-P GND EL=27. 2 1 2.5" PVC PO W E R TOP OF CN D = 2 6 . 1 2 TH-15155-P GND EL=2 7 . 4 8 2.5" PVC P O W E R TOP OF C N D = 2 6 . 4 4 TH-368-C- A GND EL=27 . 4 2 4" PVC CO M M TOP OF CN D = 2 1 . 6 0 TH-368-C-B GND EL=27. 4 2 4" PVC CO M M TOP OF CN D = 2 1 . 5 0 TH-367-FO GND EL=27. 4 5 2.5" PVC FI B E R O P T I C TOP OF CN D = 2 6 . 0 9 TH-366-P GND EL=2 7 . 4 7 2.5" PVC P O W E R TOP OF C N D = 2 6 . 2 7 TH-363-FO GND EL=27. 5 62.5" PVC FIB E R O P T I C TOP OF C N D = 2 6 . 0 2 TH-15154-S GND EL=2 6 . 9 6 12" RCP ST O R M TOP OF PI P E = 2 4 . 2 9 TH-360-C-B GND EL=27. 5 9 4" PVC CO M M TOP OF CN D = 2 1 . 1 5 TH-360-C-A GND EL=27. 5 9 4" PVC CO M M TOP OF CN D = 2 1 . 4 4 TH-359-C GND EL=27. 5 3 2.5" PVC C O M M TOP OF CN D = 2 5 . 4 6 TH-358-P GND EL=27. 4 6 2.5" PVC P O W E R TOP OF CN D = 2 6 . 4 3 TH-356-P GND EL=2 7 . 5 9 2.5" PVC P O W E R TOP OF C N D = 2 6 . 4 4 TH-402-FO GND EL=27. 5 9 2.5" PVC PO W E R TOP OF CN D = 2 6 . 3 0 TH-352-P GND EL=27. 5 92.5" PVC PO W E RTOP OF CN D = 2 5 . 8 6 TH-351-P GND EL=2 7 . 4 7 2" STEEL P O W E R TOP OF C N D = 2 6 . 3 1 TH-15163- W GND EL=27. 2 58" DI WATE RTOP OF PIP E = 2 1 . 0 0 TH-15168-C GND EL=27. 0 8 DUG 13' DI D N O T F I N D TH-15169-C GND EL=27. 6 8 DUG 13' DID N O T F I N D SD SD SD SD SD SD SD SD SD TH-BRT-38 2 P GND EL=26. 8 8 7 X 14" CABLES P O W E R TOP OF BU N D L E = 2 4 . 7 4 TH-BRT-37 9 C - A GND EL=26. 8 2" PVC CO M M TOP OF CN D = 2 0 . 2 6 TH-BRT-150 8 2 F O - B GND EL=26. 6 2 4" PVC UNK N TOP OF CN D = 2 1 . 4 6 TH-BRT-379 C - B GND EL=26. 8 2" PVC CO M M TOP OF CN D = 2 0 . 2 9 TH-BRT-41 0 C GND EL=26 . 9 5 2" PVC CO M M TOP OF CN D = 2 4 . 8 5 TH-BRT-381 F O GND EL=2 6 . 7 5 4" PVC CO M M TOP OF C N D = 2 2 . 3 6 2 WV CB1.6' X 2.1' CONCRIM EL=25.93IE 6" PVC NW=23.8IE 6" PVC S=23.7WAT=23.7 BOT=23.3 HH S D S D rec. no. 870 2 2 5 0 4 7 5 LIMITS OF P U B L I C U T I L I T Y EASEMENT ////////////////////// S GRADY WAY GRADY 151+00 GRADY 152+00 GRADY 153+00 GRADY 154+00 GRADY 155+00 GRADY 156+00 SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF CONC CONC CONC SIGN DEBRIS SIGNSIGN SIGN / // / CONC UT UT UT UT H H H H H VLT VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTERTRASHBINBUSSIGN TRASHBINBUS SIGNPOWERCABINET SW SW SW SW DRW DRW YIELD BUSSIGN BUS SHELTERTRASHBIN YIELD SW SW SW DRW DRW SW SW DRW SW SW SW SW DRW CONC WALL SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7 SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9 SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0 SSMHRIM=27.27UNABLE TO OPEN SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2 SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2 36" CMP 36" DI 30" CONC 30" CONC 27" CONC 27" CONC 27" CONC 24" CMP 12" CONC 4" CONC 6" DI 12" CPP 12" CPP 12" CONC 6" CONC 6" CONC 6" CONC6" PVC 12" DI 12" CONC 12" CONC 6" CONC 15" CMP 15" CMP 6" CONC 8" VC 8" CONC 18" CONC HH TTTETS SLHHTMHGVCO2WVFOFO2FOMHGVGVGVCOITSVLT2TS LTVLT WV4WV LTVLT TC SLHHLTHHCENTURYLINKVLTWV ELECVLT WV GV TS LTHH TS LTVLTELECVLT2 MISCMH TS-LTVLT GVGVSLHHHHLTHHTCHH FOFOMH FOFOMHFOFOMHTS LTHHMW LTHHTMHICVICV 2WV TMH GV WVWVWV BROADBANDVLTLTHHICVICVICVICVICVHHWV WV ELECVLT HHCOCOICVICV 2HHWM ELECVLTLT HHWV ELEC VLT2WMWV LT HH ELECVLT LTHHWMICV GV GATE CW SW SW YIELDFH CONCBENCH YIELD 4' WOOD F N C USECROSSWALK CW SWCONC BENCHCONC BENCHYIELDARTWORKCONC DRW35MPH DRW SW CONC SEAMS (TYP) SW SW SW DRW DRW E COEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWVWV HH HH HH HH HH HH HH HHHH HH HH HHHH HH HHHH HHHH HH HH HH3HHHH HH HH HHHH HHHHHHHHHH HH HH HHHH HH 2 HH HH ELEC VLT ELECVLT ELEC VLT 4ELEC VLTELECVLTELECVLT 2ELEC VLT ELECVLT 3IRRG 2IRRG 2IRRG GV GV GV WM WMELECVLT E HH 2WV HHELECVLT HH HH WM CO GV GV GM WM WM WM WM WVWV 3WV WV WM W VLT 2VLTS HH T TSHHHH HH HHHH HHTMH VLTTS VLTHH VLT 2" DROP 2" DROP HH GM FO FO FOFO FO FO FOFO 6" CONC HH HH 12" RCP /// / // / / // / / / X6' CLEF 6' TEMP CLEF X 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF SOUNDCOLLISIONCENTER 8' CLEF X 5.5' CLEF PP PP PP SIGN LOADLIMIT USECROSSWALK SW PARK &RIDE USECROSSWALK 2' FNC GATE //6' CLEF 5.5' CLEF 6' CLEF BLDGEQUIP GAZEBO CONCELECEQUIP SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SOUNDCOLLISIONCENTER SW SW SW SW SW MAZDASIGN SW SW SW / / // / / SIGN ONCONC BASE SIGN ONCONC BASE CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRDPM 6' TEMP C L E F 6' CLEFWELCOME TOTRUCK CITY SIGN SIGN 2 BLRD / / / /// / / / // / //// /// / // / / // /// 3 BLRD 6' TEMP CLE F SIGN ONCONC BASE BLDEQUIP SIGN POST ONCONC BASE 6' CLEF SIGN PIVGATE STORAGESHED MISCVALV SHELTERCANOPY 15 MPHSIGN BLDG BLDG BLDG BLDG INLETRIM EL=24.52NEEDS TRAFFIC CONTROL CBRIM=25.13NEEDS TRAFFIC CONTROL SSMHRIM=25.21NEEDS TRAFFICCONTROLSSMHRIM=26.31NEEDS TRAFFIC CONTROL SSMHRIM=24.31NEEDS TRAFFIC CONTROL SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL 12" RCP 8" CONC 8" CONC4" CONC 30" CPP 24" CPP 18" DI 18" DI 12" CPP 12" CPP 12" CPP SS METAL POLE METAL POLE METAL POLE //// SL SL FOFO W SD SS SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAS T COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMC A S T COMCAST COMCAS T COMCAST COMCAS T COMCAST COMCAST COMCAS T COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYL I N K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS UTIL VLT HH HH HH UNKNOWN UTILITY FOVLT HH HH HHELECVAULT HH2WM HH GV IRRG BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 MWEL=25.08 BOREHOLERW10EL=25.30 MWGWMW-3EL=26.16 BOREHOLEGA-3EL=25.97 MWGWMW-1EL=26.60 BOREHOLEGA-4EL=26.06 BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6" DP 3'9" DP3'10" DP4'3" DP 2'3" DP1'7" DP 4'11" DP5'2" DP 4'6"DP3'5"DP 5'7" DP 2'7"DP2'4"DP 5'8" DP 3' DP3'9" DP3'6"DP4'11" DP6'7" DP 3'9" DP 2'2" DP 2'4" DP 5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP 5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP 6'3" DP 8' DP2'2" DP1'3"DP 2'5" DP 1'10" DP 2'3" DP 4'11" DP 3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP4'4" DP 5'3" DP 1'10" DP1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 4' DP5'4" DP4'11"DP4' DP 3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 6'9" DP 6' DP 7'6" DP 5'6" DP 1'9" DP2'5" DP 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) WV WV CO SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.2 BLRDFH 2'4' HH 4'11" DP5'5" DP2'6" DP1'3" DP1'11" DP 2'2" DP 2'2" DPBROADBANDVAULT2'11" DP 3' DP2'3" DP 1'11" DP 2'3" DP3'11" DP 4'11" DP 5'2" DP4'4" DP 5'5"DP6'7" DP 4'2" DP2'4" DP12' DP6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 6'9"4'5" ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 2'5"2'7"3'8"2'2" 2'9" 4'2' 3'3'3'3' 3'10" 4'1"4'9"7" 4'1"3'11"5'9" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3' 5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4"3'9"2'10" 4'9" 4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6"4'1"4'2"4'7" 5'9"5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 4' 1' HH HHHHHH ELEC VLT 2 WMELEC VLT HHHH SLHHSOUTHRENTON RULES &REGULATIONSLOADLIMIT LP W / SPEEDLIMIT SIGNSLHH HANDICAPGUIDELINES PERMITPRKGBIKESTORAGEHANDICAPNO PARKFIRE LANE WV ELECPEDGROUNDROD STOPSIGN BUSINFO STOPSIGN STOPSIGNBUSINFO HANDICAPSOUTHRENTONSOUTHRENTONSOUTHRENTON PERMITPRKG PERMITPRKG 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" CO 2 WV ELECVLT HH HH WSDO T L I M I T E D A C C E S S SOUR C E : A S - B U I L T WSDOT L I M I T E D A C C E S S SOUR C E : A S - B U I L T EXIST I N G B A T L A N E CO COCOCOCOCOCOCOCO COCOCO CO CO CO 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL TESC PLAN GRADY STA 151+00 TO GRADY STA 156+50 BT120-CTP104 BT120 53 0 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 2 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 1 0 1 - 1 0 6 . D W G S1-BT120-CTP101-106 FACILITY ID: Xrefs: xS1-BT120-VRX001 xS1-BTP120-VSF100 xS1-BT120-CPP001 xBRT-CUD05-TB22x34 xS1-BTP120-GZK010 xS1-BT120-CAP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 OSBORNCONSULTINGINCORPORATED 3 1 3 7 3 MA T C H L I N E : G R A D Y S T A 1 5 1 + 0 0 SE E D W G B T 1 2 0 - C T P 1 0 1 MA T C H L I N E : G R A D Y S T A 1 5 6 + 5 0 SE E D W G B T 1 2 0 - C T P 1 0 5 MATCHLINE:SEE DWG BT120-CTP205 MATCHLINE:SEE DWG BT120-CTP204 102 103 106 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRADY WAY 101 104 105 KEY MAP 106 107 7 7 1 2 01-20-2025 0053 RTA/CN 0205-24 Stormwater Flow Direction Asphalt Berm X XUT VLT IE 6" DI W=2 6 . 0 WAT=26.4 B O T = 2 4 . 5 WAT=20.6 B O T = 1 9 . 1 2.2' X 1.9' C O N CRIM=24.95IE 12" CONC S E = 2 0 . 9 WAT=21.5 B O T = 1 9 . 3 S D S D SW T T T T T T T T T T T E EEEEEE T TS HH HH HH HHHH HH TMH VLT TS VLT HH VLT HH E EEEEEEEEEEE E E E E E E E E E FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO SDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD FO FO FO HH HH 12 " R C P ///////////////// / / / / / / / // / X X X X X X X X LOAD LIMIT USE CROSSWA L K SW PARK & RIDEUSE CROSSWA L K X X X X2' FNC GATE / / /////// 6' CLE F LANDSCAPI N G LANDS C A P I N G SW MAZDA SIGN GRASS SW SW SW /////////// / / / ////////////// / // SHELTER CANOPY CB 2.2' X 1.9' C O N C RIM EL=25. 0 2IE 12" RCP E = 2 1 . 8 WAT=21.9 B O T = 2 0 . 4 CB 1.9' X 2.2' C O N C RIM EL=24 . 2 3 IE 8" CON C E = 2 2 . 5 IE 8" CPP S = 2 2 . 6 CB 1.9' X 2.2' C O N C RIM EL=24. 6 8 IE 12" RC P N E = 2 1 . 1 IE 12" RCP W = 2 1 . 0 WAT=21. 7 B O T = 1 9 . 8 CB1.9' X 2.2' C O N C RIM EL=25. 3 3 IE 8" CONC E = 2 3 . 8 WAT=23.4 B O T = 2 2 . 8 SD SD SD SD SD SD SDMH RIM=15.02 NEEDS TR A F F I C C O N T R O L CB RIM=25.13 NEEDS TR A F F I C C O N T R O L 12" RCP 8" CONC 8" CONC SL FO FO FO FO FO FO FO FO FO FO FO SS CENTURYLINK FO CENTURYLINK FO 2-PSE 2-PSE 2-PSE 2-PSE 2-ZAYO FO 2-ZAYO FO 2-ZAYO F O 2-ZAYO FO TOP CENT E R O F C N D = 2 4 . 7 3 TH SRTC-3 7 GND=26.13 DNF W TH SRTC-37 A GND=26.17 DNF W EEEEE 7'11" DP11' DP 4'9" DP 4'9" DP 13'6" DP 6'3" DP 5'8" DP 12'6" DP13'6" DP11'6"DP 10' DP 4'8" DP5'8" DP3'11" DP6'1" DP6'4" DP6'1" DP5'4" DP TTTTTT E SD SD SDHH 5'5" DP 6'7" DP 4'2" DP 2'4" DP 12' DP ED(TYP.) 5'3"4'6"4'9" 4'1 1 " 3'7 " MW EL=26.43 TH-342 GND=26.43 DUG 5' DID N O T F I N D TH-15072 GND=26.29 DUG 40" DI D N O T F I N D TH-15070 GND=26.06 DUG 50" DI D N O T F I N D TH-15069 GND=26.17DUG 27" DI D N O T F I N D TH-15173- P GND EL=26 . 5 8 4" PVC PO W E R TOP OF CN D = 2 3 . 2 6 TH-345-P GND EL=26. 0 8TOP OF CDF = 2 4 . 9 3 WIDTH OF C D F = 4 ' TH-343-P GND EL=26. 2 62" PVC PO W E RTOP OF CN D = 2 4 . 6 9 TH-395-FO GND EL=26. 4 6 2" PVC FIB E R O P T I C TOP OF CN D = 2 5 . 0 3 TH-394-P GND EL=26 . 2 2 2" PVC PO W E R TOP OF CN D = 2 5 . 5 0 SD SD CB1.8' X 2.1' C O N C RIM EL=24.2IE 12" RCP N E = 2 1 . 1IE 12" RCP S W = 2 0 . 9IE 12" RCP N W = 2 1 . 2 0 WAT=21.10 B O T = 1 9 . 5 WOOD RE A C H E D AT 30" DID N O T F I N D TH-BRT-151 7 5 P GND EL=25. 4 2 4" PVC PO W E R TOP OF CN D = 2 3 . 8 5 TH-BRT-15 1 7 6 F O GND EL=25 . 3 7 3" PVC CO M M TOP OF CN D = 2 3 . 7 3 TH-BRT-39 6 P GND EL=25. 6 0 DUG 4' DID N O T F I N D TH-BRT-15 1 7 7 P GND EL=25 . 6 1 DUG TWO H O L E S AT 3.5' DID N O T F I N D TH-BRT-150 8 2 - A GND EL=26. 6 22 X 2" PVC C O M MTOP OF CN D = 2 4 . 0 6 TH-BRT-390 P - A GND EL=2 6 . 5 5 1" PVC PO W E R TOP OF C N D = 2 3 . 9 1 TH-BRT-39 0 P - B GND EL=26. 5 5 6 X 14" CABLES P O W E RTOP OF BU N D L E = 2 3 . 6 1 TH-BRT-388 F O GND EL=26. 5 6 2" PVC CO M M TOP OF CN D = 2 5 . 0 1 TH-BRT-38 7 P GND EL=26 . 5 4 DUG 5' DID NOT FI N D TH-BRT-39 2 P GND EL=26. 2 9 DUG 5' DID NOT FI N D TH-BRT-381 F O GND EL=26. 7 5 4" PVC CO M M TOP OF CN D = 2 2 . 3 6 HH CB1.6' X 2.1' CONCRIM EL=25.90IE 6" CONC NE=22.9IE 6" CONC W=22.8IE 6" CONC E=22.8WAT=23.0 BOT=22.0 CB1.6' X 2.1' CONCRIM EL=25.77IE 4" PVC W=24.5WAT=24.4 BOT=23.4 CB1.6' X 2.1' CONCRIM EL=25.93IE 6" PVC NW=23.8IE 6" PVC S=23.7WAT=23.7 BOT=23.3 REC NO. 91 0 3 1 1 0 8 4 3 15' PUBLIC U T I L I T Y E A S E M E N T REC NO. 74 0 7 3 0 0 4 7 6 ELECTRIC T R A N S M I S S I O N / DISTRIBUTI O N E A S E M E N T O V E R PARCEL D REC NO. 74 0 7 3 0 0 4 7 6 ELECTRIC T R A N S M I S S I O N / DISTRIBUT I O N E A S E M E N T O V E R PARCEL C 20' PUBLIC U T I L I T Y E A S E M E N T APPROX C E N T E R L I N E O F E S M REC NO 292 4 6 1 7 , T O P S P & L . POWER PO L E S T O B E S E T "NEAR" THI S L I N E , B E I N G T H E PROJECTE D W E S T L I N E O F SHATTOCK A V E . N O E S M WIDTH PR O V I D E D I N T H E LINE STRU C T U R E S . REC NO. 86 0 3 0 2 0 0 3 7 9 , OVERHEA D P O W E R E S M T T O SEATTLE CI T Y L I G H T S GRADY WAY LAKE 399+48 LAKE 400+00 LAKE 4 0 1 + 0 0 GRADY 160+46GRADY 157+00 GRADY 158+00 GRADY 159+00 GRADY 160+00 LAKE STA 400+00.05= GRADY STA 158+70.91 RAILAKDW 722+12 RAILAKDW 7 1 9 + 0 0 RAILAKDW 72 0 + 0 0 RAILAKD W 7 2 1 + 0 0 RAILAKDW STA 722+12.21= LAKE STA 401+91.32 LAKE A V E S SF SF SF SF SF SF SF SF SF SF SF 1. 5 0 GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL(TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATION PLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205. 3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGS BT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHINTHE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT AT DRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED. 8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. KEY NOTES: 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEEDRAWING BT120-CTD102 FOR DETAILS. 3 INSTALL SILT FENCE PER COR STD PLAN 214.00 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINK FENCE WITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO. 9 CONSTRUCTION RUNOFF TO BE CONVEYED TO A CONTRACTORDESIGNED STORAGE/TREATMENT SYSTEM, WHICH MAYINCLUDE TEMPORARY SURFACE WATER DETENTION VAULT AND TEMPORARY SEDIMENT POND/TANKS. TEMPORARY DITCHESMAY BE MOSTLY USED DUE TO SITE TOPOGRAPHY, BUT TEMPORARY CATCH BASINS AND STORM DRAINS MAY BE ADDEDWHERE NECESSARY. DISCHARGE TO NEAREST PERMITTEDDISCHARGE LOCATION WHEN STORMWATER MEETS PROJECTPERMIT REQUIREMENTS. NOTE THAT THESE TESC MEASURESWILL BE COVERED WITHIN THE CONTRACTOR'S MEANS AND METHODS AND THE CONTRACTOR WILL EMPLOY THEAPPROPRIATE METHODOLOGY BASED ON SITE STAGING ANDPROVIDE UPDATES TO THE SWPPP AS REQUIRED. POTENTIAL TEMPORARY SEDIMENT STORAGE TANKS AND INLET PROTECTION SILT FENCE COMPOST SOCK CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA CONC CONC CONC SIGN DEBRIS SIGNSIGN SIGN / // / CONC UT UT UT UT H H H H H VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTERTRASHBINBUSSIGN TRASHBINSW SW SW SW DRW DRW18" TREE±46' DLN YIELD 10" TREE±8' DLN10" TREE±10' DLN 6" TREE±12' DLN 4" TREE±22' DLN BUSSIGN6" TREE±10' DLN BUS SHELTERTRASHBIN YIELD 6" TREE±16' DLN 6" TREE±18' DLN 6" TREE±12' DLN 8" TREE±14' DLN 8" TREE±20' DLN6" TREE±14' DLN 6" TREE±14' DLN 6" TREE±14' DLN 6" TREE±14' DLN SW SW SW DRW DRW SW SW DRW SW SW SW SW DRW CONC WALL SSMH36"Ø CONCRIM=25.17IE 8" PVC N=20.7IE 6" PVC W=20.7 SSMH36"Ø CONCRIM=27.97IE 8" VC NE=14.5IE 8" CONC S=13.9 SSMH36"Ø CONCRIM=26.49IE 18" CONC NW=12.3IE 18" CONC E=12.3IE 8" CONC S=13.0 SSMHRIM=27.27UNABLE TO OPEN SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2 SSMHRIM=28.40IE 8" CONC N=13.2IE 18" CONC SE=10.4IE 18" CONC NW=10.2 36" CMP 36" DI 30" CONC 30" CONC 27" CONC 27" CONC 27" CONC 24" CMP 12" CONC 4" CONC 6" DI 12" CPP 12" CPP 12" CONC 6" CONC 6" CONC 6" CONC6" PVC 12" DI 12" CONC 12" CONC 6" CONC 15" CMP 15" CMP 6" CONC 8" VC 8" CONC 18" CONC TTTETMHGVCO2WVFOFOGVGVGVCO WV4WV WVWVGV2 MISCMH GVGV FO FOFOMW TMHICVICV 2WV TMH GV WVWVWVICVICVICVICVICV WV WV COCOICVICV WM WV 2WMWV WMICV GV GATE CW SW SW YIELDFH CONCBENCH YIELD 9" TREE10' DLN 6" TREE8' DLN8" TREE9' DLN 11" TREE10' DLN 11" TREE27' DLN14" TREE24' DLN10" TREE20' DLN14" TREE23' DLN14" TREE25' DLN 14" TREE25' DLN GRASS GRASS 4' WOOD F N C USECROSSWALK CW SW GRASS GRASS 37" TREE40' DLN 43" TREE45' DLN32" TREE34' DLN11" TREE31' DLN 5" TREE12' DLN12" TREE28' DLN 11" TREE28' DLN 5" TREE11' DLN5" TREE11' DLN 10" STUMP 11" STUMP 11" STUMP CON C B E N C H CONC BENCHYIELDARTWORKLANDSCAPINGCONC DRW35MPH 5" TREE8' DLN 5" TREE11' DLN 5" TREE11' DLN 6" TREE12' DLN 5" TREE11' DLN 5" TREE13' DLN 6" TREE12' DLN6" TREE13' DLN DRW 5" TREE15' DLN 6" TREE14' DLN 8" TREE16' DLN 5" TREE12' DLN LANDSCAP I N G 6" TREE14' DLN SW MULTIPLE6" TREES35' DLN 5" TREE8' DLN 5" TREE11' DLN CONC SEAMS (TYP) LANDSCAPIN G SW SW SW LANDSCAPIN G DRW DRW GRASSECOEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWVWV3IRRG 2IRRG 2IRRG GV GV GV WM WM E 2WV WM CO GV GV GM WM WM WM WM WVWV 3WV WV WM W VLT 2VLTS HH TTMH GM FO FO FOFO FO FO FOFO 6" CONC 12" RCP /// / // / / // / / / X6' CLEF 6' TEMP CLEF X 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF SOUNDCOLLISIONCENTER 8' CLEF X 5.5' CLEF SIGN4" TREE10' DLN LOADLIMIT USECROSSWALK SW PARK &RIDE USECROSSWALK 2' FNC GATE //6' CLEF 5.5' CLEF 6' CLEF BLDGEQUIP GAZEBO CONC SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SOUNDCOLLISIONCENTER LANDSCAP I N G LANDSC A P I N G LANDSCAPING LANDSCAPING LANDSCA P I N G 2 11" TREES32' DLN MULTIPLE5-7" TREES20' DLN SW SW SW SW SWLANDSCAPING MAZDASIGN GRASS SW SW SW / / // / / SIGN ONCONC BASE SIGN ONCONC BASE 5" TREE8' DLN4" TREE7' DLN CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRD 6' TEMP C L E F 6' CLEFWELCOME TOTRUCK CITY SIGN SIGN 2 BLRD 3 BLRD 6' TEMP CLE F SIGN ONCONC BASE SIGN POST ONCONC BASE 6' CLEF SIGN PIVGATE STORAGESHED MISCVALV SHELTERCANOPY 15 MPHSIGN BLDG BLDG BLDG BLDG INLETRIM EL=24.52NEEDS TRAFFIC CONTROL CBRIM=25.13NEEDS TRAFFIC CONTROL SSMHRIM=25.21NEEDS TRAFFICCONTROLSSMHRIM=26.31NEEDS TRAFFIC CONTROL SSMHRIM=24.31NEEDS TRAFFIC CONTROL SSMHRIM=28.66NEEDS TRAFFIC CONTROLSSMHRIM=28.75NEEDS TRAFFIC CONTROL 12" RCP 8" CONC 8" CONC4" CONC 30" CPP 24" CPP 18" DI 18" DI 12" CPP 12" CPP 12" CPP SS METAL POLE METAL POLE METAL POLE //// SL SL FOFO W SD SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAS T COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMC A S T COMCAST COMCAS T COMCAST COMCAS T COMCAST COMCAST COMCAS T COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYL I N K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS FOVLT 2WM HH GV IRRG BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 MWEL=25.08 BOREHOLERW10EL=25.30 MWGWMW-3EL=26.16 BOREHOLEGA-3EL=25.97 MWGWMW-1EL=26.60 BOREHOLEGA-4EL=26.06 BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP 2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 8'5" DP 8'11" DP8'10" DP 9' DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6" DP 3'9" DP3'10" DP4'3" DP 2'3" DP1'7" DP 5'4" DP4'DP3'7"DP 4'11" DP5'2" DP 4'6"DP3'5"DP 5'7" DP 2'7"DP2'4"DP 5'8" DP 3' DP3'9" DP3'6"DP4'11" DP6'7" DP 3'9" DP 2'2" DP 2'4" DP 5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP 5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP 6'3" DP 8' DP2'2" DP1'3"DP 2'5" DP 1'10" DP 2'3" DP 4'11" DP 3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP4'4" DP 5'3" DP 1'10" DP1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 4' DP 5'4" DP 4'11"DP 4' DP3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 6'9" DP6' DP 7'6" DP 5'6" DP 1'9" DP2'5" DP 2'DP 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) WV WV CO SSMHRIM EL=25.10IE 6" DI NE=23.3IE 6" PVC SW=22.83WAT=22.9 BOT=19.4IT IS BELIEVED THIS STRUCTUREAND THE ASSOCIATED PIPES MAYBE STORM DRAIN, NOT SEWER.2 BLRDFH 2'4' 4'11" DP5'5" DP2'6" DP1'3" DP1'11" DP 2'2" DP 2'2" DPBROADBANDVAULT2'11" DP 3' DP2'3" DP 1'11" DP 2'3" DP3'11" DP 4'11" DP 5'2" DP4'4" DP 4'5" DP5'6" DP 6' DP4' DP 5'5"DP6'7" DP 4'2" DP2'4" DP12' DP6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 6'9"4'5" ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 2'5"2'7"3'8"2'2" 2'9" 4'2' 3'3'3'3' 3'10" 4'1"4'9"7" 4'1"3'11"5'9" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3' 5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4"3'9"2'10" 4'9" 4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6"4'1"4'2"4'7" 5'9"5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 4' 1' 8" TREE20' DLN8" TREE15' DLN 10" TREE20' DLN 6" TREE10' DLN 8" TREE20' DLN 8" TREE20' DLN 12" TREE20' DLN 2 WM 8" TREE20' DLN6" TREE20' DLN8" TREE20' DLN 10" TREE20' DLN 12" TREE25' DLN8" TREE20' DLN SOUTHRENTON RULES &REGULATIONSLOADLIMIT LP W / SPEEDLIMIT SIGN HANDICAPGUIDELINES PERMITPRKGBIKESTORAGEHANDICAPNO PARKFIRE LANE WV STOPSIGN BUSINFO STOPSIGN STOPSIGNBUSINFO6" TREE30' DLN HANDICAP BUS STOPCANOPY BUS STOPCANOPY SOUTHRENTON SOUTHRENTONSOUTHRENTON PERMITPRKG PERMITPRKG 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" CO 2 WV HH CO COCOCOCOCOCOCOCO COCOCO CO CO CO KEY NOTES: 10 POTENTIAL TEMPORARY SEDIMENT STORAGE TANKS AND STORMWATER TREATMENT SYSTEM SET-UP AREA.CONTRACTOR TO FIELD LOCATE AS NECESSARY, USE THISSYSTEM PRIOR TO WATER QUALITY FACILITY CONSTRUCTIONOR IN CONJUNCTION WITH TEMPORARY SURFACE WATERDETENTION VAULT TO MEET THE SITE FLOW AND WATER QUALITY PERMIT DISCHARGE REQUIREMENTS. CONTRACTORSHALL DETERMINE NUMBER OF TANKS REQUIRED BASED ON STAGING. SEE CONSTRUCTION STORMWATER VOLUMES ANDFLOW RATES TABLE ON DRAWING BT120-CTN-101. 20 40 SCALE IN FEET 01020 (1" = 20') N MA T C H L I N E : G R A D Y S T A 1 5 6 + 5 0 SE E D W G B T 1 2 0 - C T P 1 0 4 MATCHLINE: LAKE STA 401+50SEE DWG BT120-CTP106 MATCHL I N E SEE DW G BT120-C T P 2 0 4 2 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL TESC PLAN GRADY STA 156+50 TO GRADY STA 160+46.15 BT120-CTP105 BT120 54 0 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' 3 10 3 2 SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 2 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 1 0 1 - 1 0 6 . D W G S1-BT120-CTP101-106 FACILITY ID: Xrefs: xS1-BT120-VRX001 xS1-BTP120-VSF100 xS1-BT120-CPP001 xBRT-CUD05-TB22x34 xS1-BTP120-GZK010 xS1-BT120-CAP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 OSBORNCONSULTINGINCORPORATED 102 103 106 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRADY WAY 101 104 105 KEY MAP 106 107 7 3 7 2 9 01-20-2025 0054 RTA/CN 0205-24 Stormwater Flow Direction GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL (TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205. 3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESS NOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHIN THE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THE NPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. KEY NOTES: 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEEDRAWING BT120-CTD102 FOR DETAILS. 3 INSTALL SILT FENCE PER COR STD PLAN 214.00 4 INSTALL COMPOST SOCK PER WSDOT STD PLAN I-30.40-02.WHEN COMPOST SOCKS ARE USED ON PAVEMENT, HEAVY CONCRETE BLOCKS SHALL BE USED TO PREVENT THECOMPOST SOCK FROM MOVING DURING RAINFALL/RUNOFFEVENTS. 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINK FENCE WITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO. INLET PROTECTION SILT FENCE CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA SD M H 36 " Ø C O N C RI M = 2 5 . 2 4 N P I P E N O T V I S I B L E IE 2 4 " C M P E = 1 9 . 3 IE 2 7 " C O N C S W = 1 9 . 2 WA T = 2 0 . 6 B O T = 1 9 . 1 CB 2. 2 ' X 1 . 9 ' C O N C RI M = 2 4 . 9 5 IE 1 2 " C O N C S E = 2 0 . 9 WA T = 2 1 . 5 B O T = 1 9 . 3 CB 2. 3 ' X 1 . 9 ' C O N C RI M = 2 5 . 9 4 IE 1 2 " C O N C S = 2 0 . 5 IE 1 2 " C O N C N W = 2 0 . 3 WA T = 2 0 . 7 B O T = 1 9 . 2 SD SD SD SD SD SD SD SD SD 2 7 " C O N C 2 4 " C M P 12" CONC E HH 2W V HH EL E C VL T HH HH E E E SD SD SD SD SD 12" R C P X X X XX X X X X X X X X XXXXXXXXXX 5. 5 ' C L E F PP SI G N 4" T R E E 10 ' D L N 6' CLEF LANDSCAPING LANDSCAPING LANDSCAPING 2 1 1 " T R E E S 32 ' D L N MU L T I P L E 5- 7 " T R E E S 20 ' D L N SW SW SW SW SW LA N D S C A P I N G 2 B L R D OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE 15 M P H SI G N CBRI M = 2 7 . 3 0 UN A B L E T O A C C E S S S D S D 2 - P S E BO R E H O L E GA - 7 EL = 2 7 . 6 7 BO R E H O L E GA - 6 EL = 2 7 . 9 0 1'7 " D P 2'2" D P 2'5" DP 4 ' D P 2 ' 5 " D P 2 ' 2 " D P 1'11" DP 2' DP 2'1" DP 2'2" DP 1'11" DP 1'6" DP2'4" DP2'4" DP2'4" DP 41 8 2' 4 " D P 1' D P 1' D P 1'7" 1'11"2'2"1' 0'11 " 1' 2 " 1' 1 0 " 2'9" 2'3" 3' 3'4 " 1'3 " 4'2'6" 2' 3' 2'5 " 2' 7 " 3'8 " 2'2" 1'7" HH 8" T R E E 20 ' D L N 8" T R E E 15 ' D L N 10 " T R E E 20 ' D L N 2 W M EL E C V L T 10 " T R E E 20 ' D L N / / / / / / / / / / / // / / HA N D I C A P FI R E L A N E WV EL E C PE D GR O U N D RO D S T O P S I G N BU S IN F O BU S S T O P CA N O P Y SO U T H RE N T O N PL A N T E R SD SD CB 1. 8 ' X 2 . 1 ' C O N C RI M E L = 2 4 . 2 IE 1 2 " R C P N E = 2 1 . 1 IE 1 2 " R C P S W = 2 0 . 9 IE 1 2 " R C P N W = 2 1 . 2 0 WA T = 2 1 . 1 0 B O T = 1 9 . 5 SD SD TH - B R T - 1 5 1 7 8 P G N D E L = 2 5 . 6 8 WO O D R E A C H E D AT 3 0 " D I D N O T F I N D TH - B R T - 1 5 1 7 6 F O TO P O F C N D = 2 3 . 7 3 TH - B R T - 1 5 0 5 8 F O GN D E L = 2 5 . 2 8 D I D N O T F I N D H O L E B O T T O M = 2 0 . 3 5 TH - B R T - 3 9 9 P GN D E L = 2 5 . 9 6 1" P V C P O W E R TO P O F C N D = 2 3 . 6 3 TH - B R T - 1 5 1 7 9 S GN D E L = 2 5 . 3 1 24 " C M P S T O R M TO P O F P I P E = 2 0 . 7 8 TH - B R T - 1 5 1 8 0 P GN D E L = 2 5 . 7 5 1" S T E E L P O W E R TO P O F P I P E = 2 3 . 1 2 TH - B R T - 1 5 1 8 1 W GN D E L = 2 6 . 0 3 8" D I W A T E R TO P O F P I P E = 2 3 . 1 6 ^ ^ ^ ^ ^ ^ ^ F F F F C C LAKE AVE S N T C 5 1 8 + 7 5 N T C 5 1 8 + 0 0 LA K E A V E S SF 1.50 SF SF CONC CONC CONC SIGN SIGNSIGN SIGN / // / CONC UT UT UT UT H H H H H VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTER DRW DRW BUS SHELTER DRW DRW DRW DRW TTTTMHGV2WVGVGVGVWV4WV WVWVGV2 MISCMH GVGV MW TMH2WV TMH GV WVWVWV WV WV WM WV 2WMWV WM GV GATE FH 4' WOOD F N C DRW DRW CONC SEAMS (TYP) DRW CO WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWVWV3IRRG 2IRRG 2IRRG GV GV GV WM WM 2WV WM CO GV GV GM WM WM WM WM WVWV 3WV WV WM W VLT 2VLTS HH TTMH GM 6' CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF 8' CLEF 5.5' CLEF 2' FNC GATE 6' CLEF 5.5' CLEF 6' CLEF GAZEBO CONC 4 BLRD 3 BLRD 3 BLRD 2 BLRD 6' TEMP C L E F 6' CLEF 2 BLRD 3 BLRD 6' TEMP CLE F 6' CLEF PIVGATE MISCVALV SHELTERCANOPYBLDG BLDG BLDG BLDG SS METAL POLE METAL POLE METAL POLE //// SL SL FOFO W SD SS SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAS T COMCAST COMCAS T COMCAST COMCAST COMCAST COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYL I N K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GASPSE GAS FOVLT 2WM HH GV IRRG BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 MWEL=25.08 BOREHOLERW10EL=25.30 MWGWMW-3EL=26.16 BOREHOLEGA-3EL=25.97 MWGWMW-1EL=26.60 BOREHOLEGA-4EL=26.06 BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 3' DP3'9" DP3'6"DP 3'11"DP 6'4" DP6'3" DP6'7" DP 7' DP7' DP 2'8" DP 4'11" DP6'3" DP 8' DP2'2" DP1'3"DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP 5'5"DP 4'10" DP4'4" DP 5'3" DP 1'10" DP1'2" DP1'6" DP 400 404 418 CONC SEAMS (TYP) WV WV CO 2 BLRDFH 2'2" DP BROADBANDVAULT 3'11" DP 4'2" DP2'4" DP12' DP6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 6'9"4'5" ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 3'10" 4'1"4'9"7" 4'1"3'11" 5'9" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3' 5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4"3'9"2'10" 4'9" 4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 2 WM BIKESTORAGE WV 6" TREE30' DLN 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 CO 2 WV HH S GRADY WAY LAKE AVE S RAINIER A V E S S 7TH ST WSDO T L I M I T E D A C C E S S SOUR C E : A S - B U I L T WSDOT L I M I T E D A C C E S S SOUR C E : A S - B U I L T EXISTIN G B A T L A N E HARDIE A V E S W S GRADY WAY RAINIER AV E S RAINIE R A V E S SW GRADY WAY S GRADY WAY SW 7TH ST LAKE AVE S CO COCOCOCOCOCOCOCO COCOCO CO CO CO 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL TESC PLAN LAKE STA 401+50 TO LAKE STA 405+50 BT120-CTP106 BT120 55 0 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 2 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 1 0 1 - 1 0 6 . D W G S1-BT120-CTP101-106 FACILITY ID: Xrefs: xS1-BT120-VRX001 xS1-BTP120-VSF100 xS1-BT120-CPP001 xBRT-CUD05-TB22x34 xS1-BTP120-GZK010 xS1-BT120-CAP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 OSBORNCONSULTINGINCORPORATED 2 22 2 2 EXISTING FENCE TOREMAIN UNTIL PROJECT ISCOMPLETE 4 EXISTING FENCE TO BE REMOVED 7 2 MAT C H L I N E : L A K E S T A 4 0 1 + 5 0 SEE D W G BT1 2 0 - C T P 1 0 5 MATCHLINE:SEE DWG BT120-CTP204 MATCHLINE:SEE DWG BT120-CTP202 102 103 106 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRADY WAY 101 104 105 KEY MAP 107 106 4 7 7 3 4 2 7 2 MATCHLINE: NOT USED THIS SERIES 2 2 01-20-2025 0055 RTA/CN 0205-24 Stormwater Flow Direction Asphalt Berm GENERAL NOTES: 1.CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL(TESC), AS NEEDED. 2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205.3. PROTECT EXISTING DRAINAGE STRUCTURES SUCH AS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGS BT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHINTHE PROJECT LIMITS SHALL BE DELINEATED WITH SILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT AT DRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BESODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL. 7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING IS REQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. INLET PROTECTION SILT FENCE CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA KEY NOTES: 1 WHERE CURB INLETS ARE PRESENT, INSTALL INLET PROTECTIONPER COR STD PLAN 216.30 AND PLACE SANDBAGS BARRIERUPSTREAM OF CATCH BASIN PER COR STD. PLAN 216.50. SEE DRAWING BT120-CTD102 AND BT120-CTD103 FOR DETAILS. 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEE DRAWING BT120-CTD102 FOR DETAILS. 4 INSTALL COMPOST SOCK PER WSDOT STD PLAN I-30.40-02. WHENCOMPOST SOCKS ARE USED ON PAVEMENT, HEAVY CONCRETEBLOCKS SHALL BE USED PREVENT THE COMPOST SOCK FROMMOVING DURING RAINFALL/RUNOFF EVENTS. 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINK FENCE WITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO. CONC SIGN DEBRISSIGNSIGN SIGN ASPH ASPH ASPH ASPH ASPH ASPH UT UT UT UT H H H H H VLT VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTERTRASHBINBUSSIGN TRASHBINBUS SIGNPOWERCABINET SW SW SW SW DRW DRW YIELD BUSSIGN BUS SHELTERTRASHBIN YIELD TRAFFICCONTROLCABINET C&G C&G C&G C&G C&G C&G C&G C&G SW SW SW DRW DRW SW SW DRW SW SW SW SW DRW EXTR CONC C U R B EXTR CONC CURB EXTR CONCCURB CONC WALL 36" CMP 36" DI 30" CONC 30" CONC 27" CONC 27" CONC 27" CONC 24" CMP 12" CONC 4" CONC 6" DI 12" CPP 12" CPP 12" CONC 6" CONC 6" CONC 6" CONC6" PVC 12" DI 12" CONC 12" CONC 6" CONC 15" CMP 15" CMP 6" CONC 8" VC 8" CONC 18" CO N C HH TTTETRAFFICVLTTS SLHH TMHGV2WVFOFO2FOMHGVGV GVITSVLT2TS LTVLT WV4WV LTVLT TC SLHH LTHHCENTURYLINKVLTWV ELECVLT WV GVTS LTHH TS LTVLTELECVLT2 MISCMH TS-LTVLT GVGVSLHHHHLTHHTCHH FOFOMH FOFOMHFOFOMHTS LTHHMW LTHHTMHICVICV 2WV TMH GV WVWVWV BROADBANDVLTLTHHICVICVICVICVICVHHWV WV ELECVLT HH ICVICV 2HH WM ELECVLT LT HHWV ELEC VLT2WMWV LT HH ELECVLT LTHHWMICV GV GATE CW SW SW YIELDFH CONCBENCH YIELD ASPH 4' WOOD FNC USECROSSWALK CW SW CON C B E N C H CONC BENCHYIELD ART W O R K CONC DRW 35MPH DRW SW ASPH ASPH ASPH C&G C&G C&G C&G C&G ASPH SW SW SW DRW DRW E COEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWV WV HH HH HH HH HH HH HH HHHH HH HH HHHH HH HHHH HHHH HH HH HH3HH HH HH HH HHHH HHHHHHHHHH HH HH HHHH HH 2 HH HH ELEC VLT ELECVLT ELEC VLT 4ELEC VLTELECVLTELECVLT 2ELEC VLT ELECVLT 3IRRG 2IRRG 2IRRG GV GV GV WM WMELECVLT E HH 2WV HHELECVLT HH HH WM 3TRAFFIC CONTROLCABINETS CO GV GV GM WM WMWM WM WVWV 3WV WV WM W VLT 2VLTS HH T TSHHHH HH HH HH HHTMH VLTTS VLTHH VLT 2" DROP 2" DROP HH GM DETECTORLOOP (TYP) DETECTORLOOP (TYP) 6" CONC HH HH 12" RCP6' CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF SOUNDCOLLISIONCENTER 8' CLEF ASPH ASPH ASPH 5.5' CLEF PP PP PP SIGN LOADLIMIT USECROSSWALK SW PARK &RIDE USECROSSWALK 2' FNC C&G C&G C&G GATE 6' CLEF ASPH 5.5' CLEF 6' CLEF BLDGEQUIP GAZEBO CONCELECEQUIP SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SOUNDCOLLISIONCENTER SW SW SW SW SW MAZDASIGN C&G SW SW SWC&G SIGN ONCONC BASE SIGN ONCONC BASE CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRDPM 6' TEMP CLEF 6' CLEFWELCOME TOTRUCK CITY SIGN SIGN 2 BLRD / / / /// / / / // / //// /// / // / / // /// 3 BLRD WHEEL STOPS (TYP) WHEEL STOP S ( T Y P ) 6' TEMP C L E F SIGN ONCONC BASE BLDEQUIP SIGN POST ONCONC BASE WHEELSTOPS (TYP) 6' CLEF DETECTORLOOP (TYP)DETECTORLOOP (TYP) SIGN PIVGATE STORAGESHED MISCVALV SHELTERCANOPY EOP EOP EOP EOP 15 MPHSIGN BLDG BLDG BLDG BLDG INLETRIM EL=24.52NEEDS TRAFFIC CONTROL CBRIM=25.13NEEDS TRAFFIC CONTROL 12" RCP 8" CONC 8" CONC4" CONC 30" CPP 24" CPP 18" DI 18" DI 12" CPP 12" CPP 12" CPP SS METAL POLE METAL POLE METAL POLE //// SL SL FOFO W SD SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAS T COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAST COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK F O CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURY L I N K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTO NRENTON WSDOT F O WSDOT FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GASPSE GAS UTIL VLT HH HH HH UNKNOWN UTILITY FOVLT HHHH HHELECVAULT HH2WM HH GV IRRG BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 MWEL=25.08 BOREHOLERW10EL=25.30 MWGWMW-3EL=26.16 BOREHOLEGA-3EL=25.97 MWGWMW-1EL=26.60 BOREHOLEGA-4EL=26.06 BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 4'10" DP 5'9" DP 4'7" DP 2'6" DP2'6" DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP8'5" DP 8'11" DP8'10" DP 9' DP3'3" DP3'1" DP3'2" DP2'10" DP 3'1" DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6" DP 3'9" DP3'10" DP4'3" DP 2'3" DP 2'4"DP2'5" DP5'4" DP5' DP5'5" DP4'8" DP 4'DP3'7"DP 4'11" DP5'2" DP 4'6"DP3'5"DP 4' DP 5'7" DP 2'7"DP2'4"DP 5'8" DP 3' DP 3'9" DP 3'6"DP 3'11"DP 6'4" DP6'3" DP6'7" DP 2' DP 3'2"DP2'6" DP 7' DP7' DP 2'8" DP 4'11" DP6'3" DP 8' DP2'2" DP1'3"DP 4'11" DP3'11" DP 2'8" DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP3'2" DP 3'11" DP3'9" DP 3'3" DP 5'5"DP 4'10" DP 4'4" DP 5'3" DP 4' DP1'9" DP2'8" DP 2' DP1'11" DP4'4" DP6' DP 5' DP2'8" DP 3'8" DP 3'10" DP 2'8" DP2' DP 3'7" DP2'2" DP 2'4" DP3'8" DP 3' DP 3' DP 3'11" DP 3'9" DP 3'7" DP 1'8" DP4' DP5'11" DP 3' DP 1'10" DP 1'2" DP 1'6" DP 5'6" DP 2'4" DP 5'4" DP 2'4" DP1'6" DP1'4"DP1'8" DP 1'5" DP 1'1" DP1'4" DP1'3" DP1'6" DP1'8" DP1'5" DP1'5" DP1'4" DP 1'5" DP1'8" DP1'7" DP2'3" DP 1'7" DP 4' DP 2'6" DP3' DP 1'5" DP 1'6" DP 1'7" DP2'2" DP 2'5" DP 4' DP2'5" DP2'2" DP1'11" DP2' DP2'1" DP 2'2" DP 1'11" DP 1'6" DP 2'4" DP 2'4" DP2'4" DP 1'8" DP 1'10" DP 2' DP2'8" DP2'4" DP3' DP3'8" DP1'9" DP 4' DP 7'11" DP6'7" DP4'5" DP 2'8" DP 2'2" DP 2' DP 2' DP 2'6" DP 2'2" DP 1'9" DP1' DP3' DP 3' DP 3' DP 2'5" DP 2'6" DP 2'2" DP 2'6" DP 2'5" DP 2'7" DP 2'8" DP 2'5" DP2'7" DP 2'6" DP 2'4" DP 2'6" DP' 3'4" DP 2'9" DP 5' DP 2'8" DP3' DP 2' DP 2'10" DP 4'8" DP 5' DP 5'9" DP5'10" DP 5'8" DP5'10" DP 3' DP 6'9" DP6' DP 7'6" DP 2'1" DP 5'6" DP4' DP2'4" DP2'5" DP2'5" DP2'8" DP 2'3" DP 1' DP 2'5" DP2'5" DP 1'6" DP1'5" DP 2'6" DP2'DP 4'DP4'DP 2'5" DP 2'DP PSE 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 C&G WV WV EXTRUDED CURB CO 2 BLRDFH 2'4' HH EXTR CONCCURB EXTR CONCCURB 4'11" DP 2'6" DP1'3" DP1'11" DP1' DP3' DP 2' DP 4' DP 2'5" DP 2'3" DP2'2" DP 2' DP1'11" DP BROADBANDVAULT 5'11" DP3'8" DP 1' DP2'8" DP 2' DP 2' DP 3' DP2'3" DP 1'11" DP 3' DP 2'3" DP3'11" DP1'8" DP1'10" DP 4'11" DP 5'2" DP4'4" DP 1'8" DP 4'5" DP5'6" DP3'1"DP 3'3" DP3'2" DP 1'9" DP1' DP 1'5" DP 1'5" DP3'8" DP4'9" DP 3' DP5'8" DP 5'10" DP6'2" DP5'5" DP 6' DP4' DP1'7" DP 1'9" DP3' DP 2' DP1'9" DP1'5" DP 1'5" DP 1'4" DP 1'5" DP1'9" DP 2'4" DP2'4" DP2'6" DP3'10" DP 2' DP2' DP3'5" DP1'8" DP 4'2" DP 2'4" DP12' DP 2'4" DP 1' DP 1' DP 6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 1'1" 1'5"1'4"1'7" 1'10" 1'7" 1'11" 2'2" 1'0'11" 6'9"4'5" 1' 2'10"1'9"1' 3' ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 1'2"1'10"2'9" 2'3" 2' 2' 3'3'4"1'3"4'3'2"3'4' 2'6" 2' 3' 3' 1'8"1'2"1'2" 2'7" 2'5"2'7"3'8"2'2" 1'7" 2'9" 4'2' 3'3'3'3' 3'10"4'1"4'9"7" 4'1"3'11" 5'9" 2'1" 1'11" 1'9" 2'1" 1'8" 4'3"3'9"4'7"3'11"3'7"3'11" 10" 1'9"1'7" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3'5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11"3'4"3'9"2'10" 2'2" 2'11"1'9" 1'5" 1'7" 1'7" 1'10" 1'8" 1'7"2'11"2'1"2'2'3"1'9" 1'6" 1'8" 1'7"1'11"2'1" 1'7" 1'6" 1'6"1'2"1'4"1'5" 2'3" 2'1" 2'7"3'1"3'1"2'3'4"3'3"1'11"3'5"2'1"2'3" 2'9" 2'1" 2'4" 1'4"1'5"1'4"1'3"1'6"1'6"1'11"1'5"2'3'10" 1'3"1'6"1'4"3'9"1'5"1'11" 3'11"3'9"1'7" 3'10"4'10"4'9" 4'10" 1'3" 1'8" 4'1"4'9"4'9"2'7"2'10" 4'1"6'6"5'7"2'9"1'1" 2'7" 3'4" 2'10" 2'3"1'10"8"10" 2'9" 2'6" 2'1"1'8"1'11" 2'5"2'3" 2'7" 2'11" 1'7"1'9"2'2"2'2"1'7" 4'9"4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4" 2'2'1" 2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11"6'8"6'11"3'10" 1'6"4'1"4'2"4'7" 5'9"5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11"3'7" 4' 1' HH HHHHHHELEC VLT 2 WMELEC VLT HHHH SLHH SOUTHRENTON RULES &REGULATIONSLOADLIMITLP W / SPEEDLIMIT SIGNSLHH HANDICAPGUIDELINES PERMITPRKGBIKESTORAGEHANDICAPNO PARKFIRE LANE WV ELECPEDGROUNDROD STOPSIGN BUSINFO STOPSIGN STOPSIGNBUSINFO HANDICAPSOUTHRENTON SOUTHRENTONSOUTHRENTON PERMITPRKG PERMITPRKG 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 2'10" 3'10" 3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0"10'7" CO 2 WV ELECVLT HH HH PROPER T Y LINE, TY P 24 CO COCOCOCOCOCOCOCO COCOCO CO CO CO SIGN RA I N I E R A V E S N B ASPH H VLT C CSD SD SD SD SD SD SD COMCAST FO CO M C A S T C C C C C C C C C IT IS BE L I E V E D T H I S S T R U C T U R E AND TH E A S S O C I A T E D P I P E S M A Y BE STOR M D R A I N , N O T S E W E R . SS SS SS SS SS SS SS SS SS SS SS S S 3'1 0 " 4'0" 4'3"4'6"4'11"5'0" 5'5" 6'0" 6'3" 6'6" 7' 0 " ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ N TC 511+00 N TC 512+00 N TC 513+00 N TC 514+00 S TC 611+00 S TC 612+00 S TC 613+00 S TC 614+00 RAINIER 207+00 N TC STA 510+04.91= RAINIER STA 207+16.93 S TC STA 610+02.99= RAINIER STA 206+67.81 28 27 26 25 24 24 2726 25 26 27 28 27 26 25 28 COCOCOCOCOCOCO SDSD 9 CONSTRUCTION RUNOFF TO BE CONVEYED TO A CONTRACTORDESIGNED STORAGE/TREATMENT SYSTEM, WHICH MAY INCLUDETEMPORARY SURFACE WATER DETENTION VAULT ANDTEMPORARY SEDIMENT POND/TANKS. TEMPORARY DITCHES MAY BE MOSTLY USED DUE TO SITE TOPOGRAPHY, BUT TEMPORARYCATCH BASINS AND STORM DRAINS MAY BE ADDED WHERENECESSARY. DISCHARGE TO NEAREST PERMITTED DISCHARGELOCATION WHEN STORMWATER MEETS PROJECT PERMITREQUIREMENTS. NOTE THAT THESE TESC MEASURES WILL BE COVERED WITHIN THE CONTRACTOR'S MEANS AND METHODSAND THE CONTRACTOR WILL EMPLOY THE APPROPRIATE METHODOLOGY BASED ON SITE STAGING AND PROVIDE UPDATESTO THE SWPPP AS REQUIRED. 10 POTENTIAL TEMPORARY SEDIMENT STORAGE TANKS ANDSTORMWATER TREATMENT SYSTEM SET-UP AREA. CONTRACTORTO FIELD LOCATE AS NECESSARY, USE THIS SYSTEM PRIOR TOWATER QUALITY FACILITY CONSTRUCTION OR IN CONJUNCTION WITH TEMPORARY SURFACE WATER DETENTION VAULT TO MEETTHE SITE FLOW AND WATER QUALITY PERMIT DISCHARGEREQUIREMENTS. CONTRACTOR SHALL DETERMINE NUMBER OFTANKS REQUIRED BASED ON STAGING. SEE CONSTRUCTIONSTORMWATER VOLUMES AND FLOW RATES TABLE ON DRAWING BT120-CTN-101. KEY NOTES: 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 04/05/2024 J. ALTCHECH 10/22/2024 04/05/2024 CIVIL TESC PLAN S RENTON TRANSIT CENTER BT120-CTP201 BT120 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 1 2 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 2 0 1 - 2 0 5 . D W G S1-BT120-CTP201-205 FACILITY ID: Xrefs: xS1-BT120-VSF100 xS1-BTP120-CPP001 xBRT-CUD05-TB22x34 xS1-BT120-GZK010 xS1-BTP120-CAP001 xS1-BT120-CGP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 xS1-BT120-VRX001 OSBORNCONSULTINGINCORPORATED 2 1 2 2 2 2 7 4 RETAINING WALLSEE PAVING PLANS ANDRETAINING WALL PLAN 4 102 103 106 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 107 MATCHLINE:SEE DWG BT120-CTP103 MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 2 0 2 MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 1 0 2 MATCHLINE:SEE DWG BT120-CTP203 22 2 2 2 7 2 222 2 7 2 2 2 4 9 10 01-20-2025 0056 RTA/CN 0205-24 Stormwater Flow Direction Asphalt Berm GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL (TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205. 3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGS BT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHIN THE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT. STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. INLET PROTECTION SILT FENCE CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA KEY NOTES: 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEE DRAWING BT120-CTD102 FOR DETAILS. 4 INSTALL COMPOST SOCK PER WSDOT STD PLAN I-30.40-02. WHENCOMPOST SOCKS ARE USED ON PAVEMENT, HEAVY CONCRETE BLOCKS SHALL BE USED TO PREVENT THE COMPOST SOCK FROMMOVING DURING RAINFALL/RUNOFF EVENTS. 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINK FENCEWITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO. CONC CONC CONC SIGN DEBRIS SIGNSIGN SIGN CONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH UT UT UT UT H H H H H VLT VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTERTRASHBIN TRASHBINBUS SIGNPOWERCABINET SW SW SWSWDRWDRW BUS SHELTERTRASHBIN SW SW SW DRW DRWSWSW DRW SW SW SW SW DRW CONC WALL 36" CMP 36" DI 30" CONC 30" CONC 27" CONC 27" CONC 27" CONC 24" CMP 12" CONC 4" CONC6" DI 12" CPP 12" CPP 12" CONC 6" CONC 6" CONC 6" CONC6" PVC 12" DI 12" CONC 12" CONC 6" CONC 15" CMP 15" CMP 6" CONC 8" VC 8" CONC 18" CONC HH E TS SLHHTMHGV2WVFOFO2FOMHGVGVGVITSVLT2TS LTVLT WV4WV LTVLT TC SLHHLTHHCENTURYLINKVLTWV ELECVLT WVGVTS LTHH TS LTVLTELECVLT2 MISCMH TS-LTVLT GVGVSLHHHHLTHHTCHH FOFOMH FOFOMHFOFOMHTS LTHHMW LTHHTMHICVICV 2WV TMH GV WVWVWV BROADBANDVLTLTHHICVICVICVICVICVHHWV WV ELECVLT HHICVICV 2HHWM ELECVLT LT HHWV ELEC VLT2WMWV LT HH ELECVLT LTHHWMICV GV GATE CW SW SW FH CONCBENCH ASPH 4' WOOD F N C CW SW CO N C B E N C H CONC BENC HARTWORKCONC DRW DRW SW ASPH ASPH ASPHCONC SEAMS (TYP) ASPH SW SW SW DRW DRW E EE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWV WV HH HH HH HH HH HH HH HHHH HH HH HHHH HH HHHH HHHH HH HH HH 3HH HH HH HH HHHH HH HHHHHH HHHHHH HHHH HH 2 HH HH ELEC VLT ELECVLT ELEC VLT 4ELEC VLTELECVLTELECVLT 2ELEC VLT ELECVLT 3IRRG 2IRRG 2IRRG GV GV GV WM WMELECVLT E HH 2WV HHELECVLT HH HH WM CO GV GV GM WM WMWM WM WVWV 3WV WV WM W VLT HH TSHHHH HH HHHH HHTMH VLTTS VLTHH VLT 2" DROP 2" DROP HH GM 6" CONC HH HH 12" RCP X6' CLEF 6' TEMP CLEF X 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF 8' CLEF ASPH ASPH ASPH X 5.5' CLEF PP PP PP SW 2' FNC GATE 6' CLEFASPH 5.5' CLEF 6' CLEF BLDGEQUIP GAZEBO CONCELECEQUIP SW SW SW SW SW SW SW SW CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRDPM 6' TEMP C L E F 6' CLEF 2 BLRD / / / /// / / / // / //// /// / /// / // /// 3 BLRD 6' TEMP CLEF BLDEQUIP SIGN POST ONCONC BASE 6' CLEF PIVGATE STORAGESHED MISCVALV SHELTERCANOPY EOP EOP EOP EOP BLDG BLDG BLDG BLDG INLETRIM EL=24.52NEEDS TRAFFIC CONTROL CBRIM=25.13NEEDS TRAFFIC CONTROL 12" RCP 8" CONC 8" CONC4" CONC 30" CPP 24" CPP 18" DI 18" DI 12" CPP 12" CPP 12" CPP METAL POLE METAL POLEMETAL POLE //// SL SL FOFO W SD S S SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAST COMC A S T COMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYLIN K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT F O 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GA S PSE GAS PSE GAS PSE GAS UTIL VLT HH HH HH UNKNOWN UTILITY FOVLT HH HH HHELECVAULT HH2WM HH GV IRRG MWEL=25.08 MWGWMW-3EL=26.16MWGWMW-1EL=26.60 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP 2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 4'10" DP 5'9" DP 4'7" DP1'11" DP1'11" DP2'6" DP5' DP1'4" DP2'6" DP2'2" DP3'1" DP2'6" DP 1'7" DP1'9" DP 1'8" DP1'6" DP1'6" DP1'7" DP 1'6" DP 1'9" DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 8'5" DP 8'11" DP8'10" DP 9' DP3'3" DP3'1" DP3'2" DP2'10" DP1'6" DP1'3" DP1'9" DP1'7" DP2'5" DP1'7" DP1'7" DP1'4" DP1'5" DP1'10" DP3'1" DP1' DP 1'10" DP 1'11" DP 2' DP 3'1" DP3'1" DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6"DP 3'6" DP3'9" DP3'10" DP4'3" DP 2'3" DP1'7" DP 1'7" DP 2'9" DP 2'1" DP1'9" DP1'6" DP 2'1" DP 2'3" DP 2'1" DP 2'3" DP 1'11" DP 1'11" DP 1'11" DP 2'5" DP 1'8" DP 2'1" DP 1'11" DP 2'5" DP 2' DP 2'4"DP 2'10" DP 2'5" DP 2' DP 2'4"DP2'5" DP5'4" DP5' DP5'5" DP4'8" DP4'DP3'7"DP2' DP 4'11" DP5'2" DP 4'6"DP3'5"DP 1'9" DP 2' DP 4' DP 1'9" DP5'7" DP 2'7"DP2'4"DP2'4" DP 2' DP 1'10" DP 2'1" DP 5'8" DP 3' DP3'9" DP3'6"DP4'11" DP 6'7" DP 3'9" DP 2'2" DP2'4" DP5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP6'3" DP8' DP2'2" DP1'3"DP 2'5" DP 1'10" DP 2'3" DP 4'11" DP3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP 4'4" DP 5'3" DP 4' DP1'9" DP2'8" DP 2' DP1'11" DP4'4" DP 6' DP 5' DP2'8" DP 3'8" DP 3'10" DP 2'8" DP 2' DP 3'7" DP2'2" DP 2'4" DP3'8" DP 3' DP 3' DP 3'11" DP 3'9" DP 3'7" DP1'8" DP4' DP5'11" DP 3' DP 1'10" DP 1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 2'4" DP 5'4" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 2'4" DP1'6" DP1'4"DP1'8" DP 1'5" DP 1'1" DP1'4" DP1'3" DP1'6" DP1'8" DP1'5" DP1'5" DP1'4" DP1'5" DP1'8" DP1'7" DP2'3" DP 1'7" DP 4' DP 2'6" DP3' DP 1'5" DP 1'6" DP 1'7" DP2'2" DP 2'5" DP 4' DP2'5" DP2'2" DP1'11" DP 2' DP2'1" DP 2'2" DP 1'11" DP 1'6" DP 2'4" DP 2'4" DP2'4" DP 1'8" DP 4' DP 5'4" DP4'11"DP 1'10" DP 2' DP2'8" DP2'4" DP3' DP 3'8" DP1'9" DP 4' DP 4' DP 3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 2'2" DP 2' DP2' DP 2'6" DP 2'2" DP 1'9" DP1' DP 3' DP3' DP 3' DP 2'5" DP 2'6" DP 2'2" DP 2'6" DP 2'5" DP 2'7" DP 2'8" DP 2'5" DP2'7" DP2'6" DP 2'4" DP 2'6" DP' 3'4" DP 2'9" DP 5' DP2'8" DP3' DP 2' DP 2'10" DP 4'8" DP 5' DP 5'9" DP5'10" DP 5'8" DP 5'10" DP 2'8" DP 3' DP 6'9" DP6' DP 7'6" DP 2'1" DP 5'6" DP4' DP2'4" DP2'5" DP2'5" DP2'8" DP 2'3" DP 1' DP 2'5" DP2'5" DP 1'6" DP1'5" DP 2'6" DP2'DP 4'DP4'DP 1'9" DP2'5" DP 2'DP PSE 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) WV WV 2 BLRDFH 2'4' HH 3'11" DP4'11" DP 3'5" DP 5'5" DP2'6" DP1'3" DP1'11" DP3'9" DP1' DP3' DP 2' DP 4' DP3'10" DP 2'5" DP 2'3" DP2'2" DP 2'2" DP 2' DP1'11" DP1'5" DPBROADBANDVAULT2'11" DP 5'11" DP3'8" DP 1' DP2'8" DP 2' DP 2' DP 3' DP2'3" DP 1'11" DP 3' DP 1' 11" DP 2'3" DP3'11" DP1'8" DP1'10" DP 4'11" DP 5'2" DP4'4" DP 1'7" DP 1'8" DP 4'5" DP5'6" DP 3'1"DP 3'3" DP1' 8" DP3'2" DP 2'5" DP 1'9" DP1' DP 1'11" DP 1'5" DP 1'5" DP3'8" DP4'9" DP 1'4" DP 3' DP5'8" DP 5'10" DP6'2" DP5'5" DP 6' DP4' DP1'7" DP 1'9" DP3' DP 1'5" DP1'7" DP 2'8" DP2'4" DP2' DP 1'9" DP1'5" DP 1'5" DP2'6" DP1'4" DP 1'5" DP1'9" DP 2'4" DP2'4" DP2'6" DP3'10" DP 2' DP2' DP5'5"DP6'7" DP3'5" DP1'8" DP 4'2" DP2'4" DP12' DP 2'4" DP 1' DP 1' DP 6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 1'1" 1'5"1'4"1'7" 1'10" 1'7" 1'11" 2'2"1'0'11" 6'9"4'5" 1' 2'10" 1'9"1' 3' ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 1'2"1'10" 2'9"2'3" 2' 2' 3'3'4"1'3"4'3'2"3'4'2'6" 2'3' 3' 1'8"1'2"1'2" 2'7" 2'5"2'7"3'8"2'2" 1'7" 2'9" 4'2' 3'3'3'3' 3'10" 4'1"4'9"7"4'1" 3'11"5'9" 2'1" 1'11" 1'9" 2'1"1'8" 4'3"3'9"4'7"3'11"3'7"3'11" 10" 1'9"1'7" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11" 3'5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4" 3'9"2'10" 2'2" 2'11"1'9" 1'5" 1'7" 1'7"1'10" 1'8" 1'7"2'11"2'1"2'2'3"1'9" 1'6" 1'8"1'7"1'11" 2'1" 1'7" 1'6"1'6"1'2" 1'4"1'5" 2'3" 2'1"2'7"3'1"3'1"2'3'4"3'3"1'11"3'5"2'1"2'3" 2'9" 2'1" 2'4" 1'4"1'5"1'4"1'3"1'6"1'6"1'11"1'5"2'3'10"1'3"1'6"1'4"3'9"1'5"1'11" 3'11"3'9"1'7" 3'10"4'10"4'9" 4'10"1'3" 1'8" 4'1"4'9"4'9"2'7"2'10"4'1"6'6"5'7"2'9"1'1" 2'7" 3'4" 2'10"2'3"1'10"8"10" 2'9" 2'6" 2'1"1'8"1'11" 2'5"2'3" 2'7" 2'11" 1'7"1'9"2'2"2'2"1'7" 4'9"4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6" 4'1"4'2"4'7" 5'9" 5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 4' 1' HH HHHHHHELEC VLT 2 WMELEC VLT HHHH SLHH SLHH BIKESTORAGE WV ELECPEDGROUNDROD 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" 2 WV ELECVLT HH HH 24 CO COCOCOCOCOCOCOCO COCOCO CO CO CO 2 11" TREES32' DLN SS SS SS SS SS 6'0" 6'3" 6'6 " 7'0 " 7'2 " 7'9 " ^ ^ ^ ^ ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ N TC 514+00 N TC 515+00 N TC 516+00 N TC 517+00 L=54.74', R=130.00' =24°07'33" S TC 615+00 S TC 616+00 S TC 617+00 S TC 618+00 2928 2829 3 030 27 29 28 28 29 28 2729 29 29 28 28 29 CO COCOCOCOCOCO SD 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 04/05/2024 J. ALTCHECH 10/22/2024 04/05/2024 CIVIL TESC PLAN S RENTON TRANSIT CENTER BT120-CTP202 BT120 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 9 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 2 0 1 - 2 0 5 . D W G S1-BT120-CTP201-205 FACILITY ID: Xrefs: xS1-BT120-VSF100 xS1-BTP120-CPP001 xBRT-CUD05-TB22x34 xS1-BT120-GZK010 xS1-BTP120-CAP001 xS1-BT120-CGP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 xS1-BT120-VRX001 OSBORNCONSULTINGINCORPORATED MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 2 0 1 MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 1 0 6 RETAINING WALLSEE PAVING PLANS ANDRETAINING WALL PLAN 7 4 103 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 107 106 102 103 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 107 106 MATCHLINE:SEE DWG BT120-CTP204 2 2 2 01-20-2025 0057 RTA/CN 0205-24 Asphalt Berm GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL (TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESS NOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205.3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESS NOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205. 4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHINTHE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROM THE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BESODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESS OTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDES PERMIT WAR314062 FOR DETAILS. INLET PROTECTION SILT FENCE CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA KEY NOTES: 1 WHERE CURB INLETS ARE PRESENT, INSTALL INLETPROTECTION PER COR STD PLAN 216.30 AND PLACESANDBAGS BARRIER UPSTREAM OF CATCH BASIN PER CORSTD. PLAN 216.50. SEE DRAWING BT120-CTD102 ANDBT120-CTD103 FOR DETAILS. 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEE DRAWING BT120-CTD102 FOR DETAILS. 3 INSTALL SILT FENCE PER COR STD PLAN 214.00. 4 INSTALL COMPOST SOCK PER WSDOT STD PLAN I-30.40-02.WHEN COMPOST SOCKS ARE USED ON PAVEMENT, HEAVYCONCRETE BLOCKS SHALL BE USED TO PREVENT THE COMPOST SOCK FROM MOVING DURING RAINFALL/RUNOFFEVENTS 5 INSTALL ABOVE GRADE TEMPORARY CONCRETE WASHOUT FACILITY. SEE DRAWING BT120-CTD103 FOR DETAILS. 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINK CONC CONC CONC SIGN SIGNSIGN SIGN CONC UT UT UT UT H H H H H VLT VLT VLT VLT VLT HH VLTS VLT SW SW SW SW DRW DRW TRAFFICCONTROLCABINET C&G C&G C&G C&G C&G C&G C&G C&G SW SW SW DRW DRW SW SW DRW SW SW SWSWDRW EXTR CONC CUR B EXTR CONC C U R B EXTR CONCCURB CONC WALL TTTETRAFFICVLTTMHGVFOFOGVGVGV GV 2 MISCMH GVGV FO FOFOMW TMH TMH GV GV CW SW SW CONCBENCH CW SW CO N C B E N C H CONC BENC H CONC DRW DRW SW CONC SEAMS (TYP) C&G C&G C&G C&G C&G SW SW SW DRW DRW E COEE E E E E E E E EE EEEE GV GV GV E 3TRAFFIC CONTROLCABINETS CO GV GV GM 2VLTS HH TTMH GM DETECTORLOOP (TYP) DETECTORLOOP (TYP) X X X SW C&G C&G C&G CONC SW SW SW SW SW C&G SW SW SWC&G CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRD 2 BLRD 3 BLRD WHEEL STOPS (TYP) WHEEL ST O P S ( T Y P ) SIGN POST ONCONC BASE WHEELSTOPS (TYP) DETECTORLOOP (TYP)DETECTORLOOP (TYP) MISCVALV SS METAL POLE METAL POLEMETAL POLE //// SL SL FOFO W SD SSCOMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCAS T COMCAST COMC A S T COMCAST COMCAST COMCAST COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAST COMCAST COMCAST COMCA S T COMCAST COMCAST FO COMCAST CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYLIN K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT F O 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO FOVLT HH GV BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 MWEL=25.08 BOREHOLERW10EL=25.30 MWGWMW-3EL=26.16 BOREHOLEGA-3EL=25.97 MWGWMW-1EL=26.60 BOREHOLEGA-4EL=26.06BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP 2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 4'10" DP 5'9" DP 4'7" DP1'11" DP1'11" DP2'6" DP5' DP1'4" DP2'6" DP2'2" DP3'1" DP2'6" DP 1'7" DP1'9" DP 1'8" DP1'6" DP1'6" DP1'7" DP 1'6" DP 1'9" DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 8'5" DP 8'11" DP8'10" DP 9' DP3'3" DP3'1" DP3'2" DP2'10" DP1'6" DP1'3" DP1'9" DP1'7" DP2'5" DP1'7" DP1'7" DP1'4" DP1'5" DP1'10" DP3'1" DP1' DP 1'10" DP 1'11" DP 2' DP 3'1" DP3'1" DP 3'6"DP 1'7" DP 1'7" DP 2'9" DP 2'1" DP1'9" DP1'6" DP 2'1" DP 2'3" DP 2'1" DP 2'3" DP 1'11" DP 1'11" DP 1'11" DP 2'5" DP 1'8" DP 2'1" DP 1'11" DP 2'5" DP 2' DP 2'4"DP 2'10" DP 2'5" DP 2' DP 2'4"DP2'5" DP5'4" DP5' DP5'5" DP4'8" DP 4'DP3'7"DP2' DP 4'11" DP5'2" DP 4'6"DP3'5"DP 1'9" DP 2' DP1'9" DP5'7" DP 2'7"DP2'4"DP2'4" DP 2' DP 1'10" DP 2'1" DP 5'8" DP 3' DP 3'9" DP3'6"DP4'11" DP 6'7" DP 3'9" DP 2'2" DP2'4" DP5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP6'3" DP8' DP2'2" DP1'3"DP2'5" DP 1'10" DP 2'3" DP 4'11" DP3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP 4'4" DP 5'3" DP 1'10" DP 1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 4' DP 5'4" DP 4'11"DP 4' DP 3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 6'9" DP6' DP 7'6" DP 5'6" DP 1'9" DP2'5" DP 2'DP 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) C&G EXTRUDED CURB CO 2 BLRD EXTR CONCCURB EXTR CONCCURB 3'11" DP4'11" DP 3'5" DP 5'5" DP 3'9" DP 3'10" DP 2'2" DP 2'2" DP 1'5" DPBROADBANDVAULT2'11" DP 3' DP2'3" DP 1'11" DP 1' 11" DP 2'3" DP3'11" DP 4'11" DP 5'2" DP4'4" DP 1'7" DP 4'5" DP5'6" DP 1' 8" DP 2'5" DP 1'11" DP 3'8" DP4'9" DP 1'4" DP 3' DP5'8" DP 5'10" DP6'2" DP5'5" DP 6' DP4' DP 1'5" DP1'7" DP 2'8" DP2'4" DP2'6" DP 5'5"DP6'7" DP 4'2" DP2'4" DP12' DP6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 6'9"4'5" ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 2'5"2'7"3'8"2'2" 3'10" 4'1"4'9"7"4'1" 3'11"5'9" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3'5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4" 3'9"2'10" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6" 4'1"4'2"4'7" 5'9" 5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 CO HH PROPE R T Y LINE, T Y P 24 CO COCOCOCOCOCOCOCO COCOCO CO CO CO CONC S R - 1 6 7 N B ASPH ASPH CB2.2' X 1. 9 ' C O N C RIM=25.6 1 IE 12" D I S W = 2 2 . 7 WAT=22. 7 B O T = 2 1 . 0 INLET RIM=25.3 7 CBRIM=27. 6 4 UNABLE T O ACCESS SDMH 60"Ø CO N C RIM=26.6 2 12" CPP N E = U N A B L E T O S E E IE 30" C O N C N E = 1 9 . 1 IE 30" C O N C W = 1 9 . 4 WAT=20. 4 B O T = 1 8 . 7 CB1.7' X 2.2 ' C O N C RIM=25.2 1 IE 12" C P P S W = 2 3 . 0 WAT=23.0 B O T = 2 2 . 6 SD 8" VC D R W 35MPH C & G E 3W V W V HH H H HH HH 2I R R G WM GV 2VLTS W W W C C C C C C C C C C C C C SD SD ASPH SIGN ON CONC B A S E SIGN ON CONC B A S E CBRIM=25. 7 1 SIGN ON CONC B A S E CBRIM=25.5 3 BLDG CB60" CON C RIM EL= 2 4 . 3 7 IE 24" C P P N = 2 0 . 7 IE 12" C P P N E = 2 0 . 5 IE 6" PV C S = 2 1 . 2 IE 24" C P P S = 2 0 . 1 WAT=20 . 4 B O T = 1 8 . 2 RIM EL= 2 4 . 3 7 INLET 60" CON C RIM EL= 2 5 . 3 4 IE 24" C P P N = 2 0 . 1 IE 12" C P P E = 2 0 . 7 IE 6" P V C S = 2 2 . 2 IE 24" C P P S = 2 3 . 0 WAT=20 . 4 B O T = 1 8 . 0 1.9' X 2 . 4 ' C O N C RIM EL= 2 5 . 6 3 IE 6" D I W / P L U G W = 2 4 . 4 WAT=23 . 9 B O T = 2 0 . 9 SD 2 4 " C P P FO FO FO FO FO FO FO FO FO EE E E E E E E E E FO F O FO FO FO FO F O FO S S S S S S S S S S S S P S E PS E HH C C C W 2' DP 5' 1 0 " D P 2'2" DP BROADB A N D VAULT MWEL=27.0 4 MWEL=26.07 MWEL=27.58 MWEL=26.71 MWEL=26.87 MWEL=27.59 10'0" 10'7" SS SS SS SS SS SS RAILAKDW 716+00 28 27 26 25 25 2 8 28 3 0 30 26 27 25 S F CO FACILITY. SEE DRAWING BT120-CTD103 FOR DETAILS. 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINK FENCE WITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO. 8 CONSTRUCTION ENTRANCE PER COR STD PLAN 215.10. SEE DRAWING BT120-CTD101 FOR DETAILS. 11 INSTALL ENTRANCE/EXIT GATE. 12 INSTALL WHEEL WASH AND PAVED CONSTRUCTION ENTRANCE PER COR STD PLAN 215.00.SEE DRAWINGBT120-CTD103 FOR DETAILS. KEY NOTES: 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 04/05/2024 J. ALTCHECH 10/22/2024 04/05/2024 CIVIL TESC PLAN S RENTON TRANSIT CENTER BT120-CTP203 BT120 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 9 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 2 0 1 - 2 0 5 . D W G S1-BT120-CTP201-205 FACILITY ID: Xrefs: xS1-BT120-VSF100 xS1-BTP120-CPP001 xBRT-CUD05-TB22x34 xS1-BT120-GZK010 xS1-BTP120-CAP001 xS1-BT120-CGP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 xS1-BT120-VRX001 OSBORNCONSULTINGINCORPORATED 2 8 11 1 2 7 1 2 7 5 102 103 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 107 106 MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 2 0 4 MATCHLINE:SEE DWG BT120-CTP205 MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 1 0 2 M A T C H L I N E : S E E D W G B T 1 2 0 - C T P 1 0 1 MATCHLINE:SEE DWG BT120-CTP201 2 2 2 2 3 2 2 2 2 22 2 2 2 2 2 4 12 01-20-2025 0058 RTA/CN 0205-24 Stormwater Flow Direction GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUST TEMPORARY EROSION AND SEDIMENT CONTROL(TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, AND BT120-CSP201-205.3. PROTECT EXISTING DRAINAGE STRUCTURES SUCH AS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGSBT120-CDP101-106, AND BT120-CDP201-205. 5. CLEARING LIMITS IN LANDSCAPING AREAS WITHINTHE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS. 6. AT A MINIMUM, DISTURBED AREAS SHALL BESODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED.8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THE NPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING IS REQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. INLET PROTECTION SILT FENCE COMPOST SOCK CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA KEY NOTES: 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEEDRAWING BT120-CTD102 FOR DETAILS. 13 EXISTING SD PIPE TO REMAIN CONC CONC CONC SIGN DEBRIS SIGNSIGN SIGN CONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH UT UT UT UT H H H H H VLT VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTERTRASHBINBUSSIGN TRASHBINBUS SIGNPOWERCABINET SW SW SWSWDRWDRWYIELD RAISED MARKE R S RAISED MARKERS RAISED MARK E R S RAISED MARK E R S RAISED MARKERS DOUBLE RAISED M A R K E R S RAISED MARKERSDOUBLE RAISED MARKERS BUSSIGN BUS SHELTERTRASHBIN YIELD TRAFFICCONTROLCABINET RAISED MARKERSDOUBLE RAISED MARKERSDOUBLE RAISED MARKERSDOUBLE RAISED MARKERS DOUBLE RAISED MA R K E R S RAISED MARKERSRAISED MARKERS RAISED MARK E R S RAISED MAR K E R S DOUBLE RAISE D M A R K E R S DOUBLE RAISE D M A R K E R S DOUBLE RAISED MARKERSDOUBLE RAISED MARKERSSW SW SW DRW DRW SW SW DRW SW SW SW SW DRW CONC WALL 36" CMP 36" DI 30" CONC 30" CONC 27" CONC 27" CONC 27" CONC 24" CMP 12" CONC 4" CONC6" DI 12" CPP 12" CPP 12" CONC 6" CONC 6" CONC 6" CONC6" PVC 12" DI 12" CONC 12" CONC 6" CONC 15" CMP 15" CMP 6" CONC 8" VC 8" CONC 18" CONC HH TTTETRAFFICVLTTS SLHHTMHGV2WVFOFO2FOMHGVGVGVITSVLT2TS LTVLT WV4WV LTVLT TC SLHH LTHHCENTURYLINKVLTWV ELECVLTWVGVTS LTHH TS LTVLTELECVLT2 MISCMH TS-LTVLT GVGVSLHHHHLTHHTCHH FOFOMH FOFOMHFOFOMHTS LTHHMW LTHHTMHICVICV 2WV TMH GV WVWVWV BROADBANDVLTLTHHICVICVICVICVICVHHWV WV ELECVLTHH ICVICV 2HHWM ELECVLTLT HHWVELEC VLT2WM WV LT HH ELECVLTLTHHWMICV GV CW SW SW YIELDFH CONCBENCH YIELD RAISED MARKERSDOUBLE RAISED MARKERS RAISED MARKERSRAISED MARKERS RAISED MARKERS ASPH USECROSSWALK CW SW CO N C B E N C H CONC BENCH YIELD ART W O R K CONC DRW 35MPH DRW RAISED MARKERS RAISED MARKERSRAISED MARKERS RAISED MARK E R S RAISED MARK E R S SW ASPH ASPH ASPHCONC SEAMS (TYP) ASPH SW SW SW DRW DRW E COEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWV WV HH HH HH HH HH HH HH HHHH HH HH HHHH HH HHHH HHHH HH HH HH 3HH HH HH HH HHHH HH HHHHHH HH HH HH HHHH HH 2 HH HH ELEC VLT ELECVLT ELEC VLT 4ELEC VLTELECVLTELECVLT 2ELEC VLT ELECVLT 3IRRG2IRRG 2IRRG GV GV GV WM WMELECVLT E HH 2WV HHELECVLT HH HH WM 3TRAFFIC CONTROLCABINETS CO GV GV GM WM WMWM WM WVWV 3WV WV WM W VLT 2VLTS HH TTSHHHH HH HHHH HHTMH VLTTS VLTHH VLT 2" DROP 2" DROP HH GM DETECTORLOOP (TYP) DETECTORLOOP (TYP) 6" CONC HH HH 12" RCP X X SOUNDCOLLISIONCENTER ASPH ASPH ASPH X PP PP PP SIGN LOADLIMIT USECROSSWALK SW PARK &RIDE USECROSSWALK ASPH BLDGEQUIP GAZEBO CONCELECEQUIP SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SIGN ONCONC BASE SOUNDCOLLISIONCENTER SW SW SW SW SW DASHED Y E L L O WSOLID WHITE MAZDASIGN SW SW SW SIGN ONCONC BASE SIGN ONCONC BASE CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRDPM WELCOME TOTRUCK CITY SIGN SIGN 2 BLRD / / / /// / / / // / //// /// / /// / // /// 3 BLRDCHAN SIGN ONCONC BASE BLDEQUIP SIGN POST ONCONC BASE DETECTORLOOP (TYP)DETECTORLOOP (TYP) RAISED MA R K E R S RAISED MARKE R S RAISED MA R K E R S SIGN PIV STORAGESHED MISCVALV SHELTERCANOPY EOP EOP EOP EOP 15 MPHSIGN BLDG BLDG BLDG BLDG INLETRIM EL=24.52NEEDS TRAFFIC CONTROL CBRIM=25.13NEEDS TRAFFIC CONTROL 12" RCP 8" CONC 8" CONC4" CONC 30" CPP 24" CPP 18" DI 18" DI 12" CPP 12" CPP 12" CPP SS METAL POLEMETAL POLEMETAL POLE //// SL SL FOFO W SD S S SS CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYLIN K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT F O 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO UTIL VLT HH HH HH UNKNOWN UTILITY FOVLT HH HH HHELECVAULT HH2WM HH GV IRRG MWEL=25.08 MWGWMW-3EL=26.16MWGWMW-1EL=26.60 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP 2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 4'10" DP 5'9" DP 4'7" DP1'11" DP1'11" DP2'6" DP5' DP1'4" DP2'6" DP2'2" DP3'1" DP2'6" DP 1'7" DP1'9" DP 1'8" DP1'6" DP1'6" DP1'7" DP 1'6" DP 1'9" DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 8'5" DP 8'11" DP8'10" DP 9' DP3'3" DP3'1" DP3'2" DP2'10" DP1'6" DP1'3" DP1'9" DP1'7" DP2'5" DP1'7" DP1'7" DP1'4" DP1'5" DP1'10" DP3'1" DP1' DP 1'10" DP 1'11" DP 2' DP 3'1" DP3'1" DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6"DP 3'6" DP3'9" DP3'10" DP4'3" DP 2'3" DP1'7" DP 1'7" DP 2'9" DP 2'1" DP1'9" DP1'6" DP 2'1" DP 2'3" DP 2'1" DP 2'3" DP 1'11" DP 1'11" DP 1'11" DP 2'5" DP 1'8" DP 2'1" DP 1'11" DP 2'5" DP 2' DP 2'4"DP 2'10" DP 2'5" DP 2' DP 2'4"DP2'5" DP5'4" DP5' DP5'5" DP4'8" DP4'DP3'7"DP2' DP 4'11" DP5'2" DP 4'6"DP3'5"DP 1'9" DP 2' DP 4' DP 1'9" DP5'7" DP 2'7"DP2'4"DP2'4" DP 2' DP 1'10" DP 2'1" DP 5'8" DP 3' DP3'9" DP3'6"DP4'11" DP 6'7" DP 3'9" DP2'2" DP2'4" DP5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP6'3" DP8' DP2'2" DP1'3"DP 2'5" DP 1'10" DP 2'3" DP 4'11" DP3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP 4'4" DP 5'3" DP 4' DP1'9" DP2'8" DP 2' DP1'11" DP4'4" DP 6' DP 5' DP2'8" DP 3'8" DP 3'10" DP 2'8" DP 2' DP 3'7" DP2'2" DP 2'4" DP3'8" DP 3' DP 3' DP 3'11" DP 3'9" DP 3'7" DP1'8" DP4' DP5'11" DP 3' DP 1'10" DP 1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 2'4" DP 5'4" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 2'4" DP1'6" DP1'4"DP1'8" DP 1'5" DP 1'1" DP1'4" DP1'3" DP1'6" DP1'8" DP1'5" DP1'5" DP1'4" DP1'5" DP1'8" DP1'7" DP2'3" DP 1'7" DP 4' DP 2'6" DP3' DP 1'5" DP 1'6" DP 1'7" DP2'2" DP 2'5" DP 4' DP2'5" DP2'2" DP1'11" DP 2' DP2'1" DP 2'2" DP 1'11" DP 1'6" DP 2'4" DP 2'4" DP2'4" DP 1'8" DP 4' DP 5'4" DP4'11"DP1'10" DP 2' DP2'8" DP2'4" DP3' DP 3'8" DP1'9" DP 4' DP4' DP3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 2'2" DP 2' DP2' DP 2'6" DP 2'2" DP 1'9" DP1' DP 3' DP3' DP 3' DP 2'5" DP 2'6" DP 2'2" DP 2'6" DP 2'5" DP 2'7" DP 2'8" DP 2'5" DP2'7" DP2'6" DP 2'4" DP 2'6" DP' 3'4" DP 2'9" DP 5' DP2'8" DP3' DP 2' DP 2'10" DP 4'8" DP 5' DP 5'9" DP5'10" DP 5'8" DP 5'10" DP 2'8" DP 3' DP 6'9" DP6' DP 7'6" DP 2'1" DP 5'6" DP4' DP2'4" DP2'5" DP2'5" DP2'8" DP 2'3" DP 1' DP 2'5" DP2'5" DP 1'6" DP1'5" DP 2'6" DP2'DP4'DP4'DP 1'9" DP2'5" DP 2'DP PSE 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W12"W12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP)DASHED WHITE WV WV DASHED WHITE SOLID WHITEDASHED WHITE CO 2 BLRDFH 2'4' HH 3'11" DP4'11" DP 3'5" DP 5'5" DP2'6" DP1'3" DP1'11" DP3'9" DP1' DP3' DP 2' DP 4' DP3'10" DP 2'5" DP 2'3" DP2'2" DP 2'2" DP 2' DP1'11" DP1'5" DPBROADBANDVAULT2'11" DP 5'11" DP3'8" DP 1' DP2'8" DP 2' DP 2' DP 3' DP2'3" DP 1'11" DP 3' DP 1' 11" DP 2'3" DP3'11" DP1'8" DP1'10" DP 4'11" DP 5'2" DP4'4" DP 1'7" DP 1'8" DP 4'5" DP5'6" DP 3'1"DP 3'3" DP1' 8" DP3'2" DP 2'5" DP 1'9" DP1' DP 1'11" DP 1'5" DP 1'5" DP3'8" DP4'9" DP 1'4" DP 3' DP5'8" DP 5'10" DP6'2" DP5'5" DP 6' DP4' DP1'7" DP 1'9" DP3' DP 1'5" DP1'7" DP 2'8" DP2'4" DP2' DP 1'9" DP1'5" DP 1'5" DP2'6" DP1'4" DP 1'5" DP1'9" DP 2'4" DP2'4" DP2'6" DP3'10" DP 2' DP2' DP5'5"DP6'7" DP3'5" DP1'8" DP 4'2" DP2'4" DP12' DP 2'4" DP 1' DP 1' DP 6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 1'1" 1'5"1'4"1'7" 1'10" 1'7" 1'11" 2'2"1'0'11" 6'9"4'5" 1' 2'10" 1'9"1' 3' ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 1'2"1'10" 2'9"2'3" 2' 2' 3'3'4"1'3"4'3'2"3'4'2'6" 2'3' 3' 1'8"1'2"1'2" 2'7" 2'5"2'7"3'8"2'2" 1'7" 2'9" 4'2' 3'3'3'3' 3'10" 4'1"4'9"7"4'1" 3'11"5'9" 2'1" 1'11" 1'9" 2'1"1'8" 4'3"3'9"4'7"3'11"3'7"3'11" 10" 1'9"1'7" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11" 3'5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4" 3'9"2'10" 2'2" 2'11"1'9" 1'5" 1'7" 1'7"1'10" 1'8" 1'7"2'11"2'1"2'2'3"1'9" 1'6" 1'8"1'7"1'11"2'1" 1'7" 1'6"1'6"1'2" 1'4"1'5" 2'3" 2'1"2'7"3'1"3'1"2'3'4"3'3"1'11"3'5"2'1"2'3" 2'9" 2'1" 2'4" 1'4"1'5"1'4"1'3"1'6"1'6"1'11"1'5"2'3'10"1'3"1'6"1'4"3'9"1'5"1'11" 3'11"3'9"1'7" 3'10"4'10"4'9" 4'10"1'3" 1'8" 4'1"4'9"4'9"2'7"2'10"4'1"6'6"5'7"2'9"1'1" 2'7" 3'4" 2'10" 2'3"1'10"8"10" 2'9" 2'6" 2'1"1'8"1'11" 2'5"2'3" 2'7" 2'11" 1'7"1'9"2'2"2'2"1'7" 4'9"4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11"6'8"6'11"3'10" 1'6" 4'1"4'2"4'7" 5'9" 5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 4' 1' HH HHHHHHELEC VLT 2 WMELEC VLT HHHH SLHHSOUTHRENTON RULES &REGULATIONSLOADLIMITLP W / SPEEDLIMIT SIGNSLHH HANDICAPGUIDELINES PERMITPRKGBIKESTORAGEHANDICAPNO PARKFIRE LANE WV ELECPEDGROUNDRODSTOPSIGN BUSINFO STOPSIGN STOPSIGNBUSINFO SOLID YELLOWSOLID WHITE SOLID WHITE SOLIDYELLOW HANDICAPSOUTHRENTONSOUTHRENTONSOUTHRENTON PERMITPRKG PERMITPRKG 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0" 6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" CO 2 WV ELECVLT HH HH PROPE R T Y LINE, T Y P 24 S GRADY WAY LAKE A V E S RAINIER AVE S S 7TH ST HARDIE A V E S W S GRADY WAY RAINIER AVE S RAINIER A V E S SW GRADY WAY S GRADY WAY SW 7TH ST CO COCOCOCOCOCOCOCO COCOCO CO CO CO X X CONC CONC ASPH SSMHRIM=27.27UNABLE TO OPEN SSMH48"Ø CONCRIM=25.79IE 8" CONC NE=17.1IE 6" CONC E=18.5IE 8" DI SE=21.8IE 8" VC SW=18.2 RIM=27.64UNABLE TOACCESS SDMH60"Ø CONCRIM=26.6212" CPP NE=UNABLE TO SEEIE 30" CONC NE=19.1IE 30" CONC W=19.4WAT=20.4 BOT=18.7 CB1.7' X 2.2' CONCRIM=25.21IE 12" CPP SW=23.0WAT=23.0 BOT=22.6 SDMH60"Ø CONCRIM=26.13IE 12" CPP NE=21.5IE 27" CONC E=19.7IE 30" CONC SW=19.2WAT=20.4 BOT=17.6 CB2.1' X 1.6' CONCRIM=25.47IE 8" CONC N=24.1IE 12" CPP SW=24.0WAT=24.0 BOT=23.6 CB2.1' X 1.8' CONCRIM=26.15IE 12" CONC N=20.3IE 12" UNK S=19.9WAT=20.6 BOT=18.8 SDMHRIM=26.16UNABLE TO OPEN CB1.6' X 2.1' CONCRIM=25.82IE 4" CONC S=24.1IE 12" CPP NW=24.1WAT=23.9 BOT=23.2 CB1.4' X 1.4' CONCRIM=26.93N PIPE NOT VISIBLEIE 6" DI W=26.0WAT=26.4 BOT=24.5 SDMH60"Ø CONCRIM=27.40IE 27" CONC W=19.8IE 27" CONC NE=19.4WAT=19.6 BOT=18.9 SS SD 6" CONC SW 2VLTS FO FO FO FO FO FO FO FO FO FO FO ASPH LA N D S C A P I N G SW OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE SIGN POST ONCONC BASE OE OE OE EO P EO P CB2.2' X 1.9' CONCRIM EL=25.02IE 12" RCP E=21.8WAT=21.9 BOT=20.4 SD SS SS SS SS SS COMCAST C O M C A S T CO M C A S T 2-PSE 2-PSE W W W 1'7" DP 1'6" DP 1'9" DP 1'5" DP 1'7" DP SS SS SS SS SS SS SS 2'1" 2'9" MWEL=26.43 MWEL=27.18 MWEL=27.18 8'0" 8'2" 8'6" 10'0" SS SS SS SS SS CB1.6' X 2.1' CON C RIM EL=26.01 IE 6" PVC SE = 2 4 . 7 WAT=24.8 BOT = 2 2 . 6 S D S D LAKE 400+00 LAK E 4 0 1 + 0 0 GRADY 159+ 0 0 LAKE STA 400+00.05= GRADY STA 158+70.91 RAILAKDW 717+00 RAILAKDW 718+00 RAILAKDW 719+00 RAILAK D W 7 2 0 + 0 0 RAILA K D W 7 2 1 + 0 0 27 27 28 29 29 30 30 28 28 29 27 28 26 28 2626 27 26 28 2 8 29 28 29 27 IE (OUT) 23.20 SF SF SF SF SF SF SF CO 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 04/05/2024 J. ALTCHECH 10/22/2024 04/05/2024 CIVIL TESC PLAN S RENTON TRANSIT CENTER BT120-CTP204 BT120 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 9 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 2 0 1 - 2 0 5 . D W G S1-BT120-CTP201-205 FACILITY ID: Xrefs: xS1-BT120-VSF100 xS1-BTP120-CPP001 xBRT-CUD05-TB22x34 xS1-BT120-GZK010 xS1-BTP120-CAP001 xS1-BT120-CGP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 xS1-BT120-VRX001 OSBORNCONSULTINGINCORPORATED 2 2 2 102 103 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 107 106 MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 2 0 3 MAT C H L I N E : SEE D W G B T 1 2 0 - C T P 2 0 5 MATCHLINE:SEE DWG BT120-CTP202 MATCHLINE: SEE DWG BT 1 2 0 - C T P 1 0 4 MATCHLINE: SEE DWG BT 1 2 0 - C T P 1 0 5 MA T C H L I N E : SE E D W G B T 1 2 0 - C T P 1 0 6 2 2 13 01-20-2025 0059 RTA/CN 0205-24 Stormwater Flow Direction Asphalt Berm GENERAL NOTES: 1. CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL (TESC), AS NEEDED.2. PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATIONPLANS, SEE DRAWINGS BT120-CSP101-106, ANDBT120-CSP201-205. 3. PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGSBT120-CSP101-106, AND BT120-CSP201-205.4. FOR DRAINAGE PLANS, SEE DRAWINGS BT120-CDP101-106, AND BT120-CDP201-205.5. CLEARING LIMITS IN LANDSCAPING AREAS WITHIN THE PROJECT LIMITS SHALL BE DELINEATED WITHSILT FENCE INSTALLED AT A 2-FOOT OFFSET FROMTHE INSIDE OF THE CHAIN LINK FENCE EXCEPT ATDRIVEWAY AND SIDEWALK LOCATIONS.6. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL.7. USE WSDOT STANDARD SPECIFICATIONS UNLESSOTHERWISE NOTED. 8. AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT. STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. INLET PROTECTION SILT FENCE COMPOST SOCK CONSTRUCTION FENCE LEGEND: SFSF STABILIZED CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREA KEY NOTES: 2 INSTALL INLET PROTECTION PER COR STD PLAN 216.30. SEEDRAWING BT120-CTD102 FOR DETAILS. 3 INSTALL SILT FENCE PER COR STD PLAN 214.00. 4 INSTALL COMPOST SOCK PER WSDOT STD PLAN I-30.40-02. WHENCOMPOST SOCKS ARE USED ON PAVEMENT, HEAVY CONCRETEBLOCKS SHALL BE USED TO PREVENT THE COMPOST SOCKFROM MOVING DURING RAINFALL/RUNOFF EVENTS. 7 INSTALL CONSTRUCTION FENCE - 6 FOOT HIGH CHAIN LINKFENCE WITH BLUE FABRIC MESH AND SOUND TRANSIT LOGO. CONC CONC CONC SIGN DEBRIS SIGNSIGN SIGN CONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH UT UT UT UT H H H H H VLT VLT VLT VLT VLT HH VLTS VLT BUS SHELTERTRASHBIN TRASHBINSW SW SW SW DRW DRW BUS SHELTERTRASHBIN TRAFFICCONTROLCABINET C&G C&G C&G C&G C&G C&G C&G C&G SW SW SW DRW DRW SW SW DRW SW SW SW SW DRW EXTR CONC CUR B EXTR CONC C U R B EXTR CONCCURB CONC WALL 6" CONC 8" VC 8" CONC 18" CONC TTTETRAFFICVLTTMHGV2WVFOFOGVGVGVWV4WV WVWVGV 2 MISCMH GVGV FO FOFOMW TMHICVICV 2WV TMH GV WVWVWV ICVICVICVICVICV WV WV ICVICV WMWV 2WMWV WMICV GV GATE CW SW SW FH CONCBENCH ASPH 4' WOOD F N C CW SW CO N C B E N C H CONC BENC HARTWORKCONC DRW DRW SW ASPH ASPH ASPHCONC SEAMS (TYP) C&G C&G C&G C&G C&G ASPH SW SW SW DRW DRW E COEE E E E E E E W E EE EEEE WV WV 3WV WV WV 3WV WV WV WV WV3WVWVWV WV3IRRG 2IRRG 2IRRG GV GV GV WM WM E 2WV WM 3TRAFFIC CONTROLCABINETS GV GV GM WM WMWM WM WVWV 3WV WV WM W VLT 2VLTS HH TTMH GM DETECTORLOOP (TYP) DETECTORLOOP (TYP) 6' CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMP CLEF 6' TEMPCLEF 8' CLEF ASPH ASPH ASPH 5.5' CLEF SW 2' FNC C&G C&G C&G GATE 6' CLEFASPH 5.5' CLEF 6' CLEF BLDGEQUIP GAZEBO CONC SW SW SW SW SW C&G SW SW SWC&G CONC BASEREMOVED LT 4 BLRD 3 BLRD 3 BLRD 2 BLRD 6' TEMP C L E F 6' CLEF 2 BLRD / / / /// / / / // / //// /// / /// / // /// 3 BLRD WHEEL STOPS (TYP) WHEEL ST O P S ( T Y P ) 6' TEMP CLEF SIGN POST ONCONC BASE WHEELSTOPS (TYP) 6' CLEF DETECTORLOOP (TYP)DETECTORLOOP (TYP) PIVGATE STORAGESHED MISCVALV SHELTERCANOPY EOP EOP EOP EOP BLDG BLDG BLDG BLDG SS METAL POLE METAL POLEMETAL POLE //// SL SL FOFO W SD SS CENTURYLINK CENTURYLINK FO CENTURYLINK FO CENTURYLINK FOCENTURYLINK FO CENTURYLINK FO CENTURYLINK FO CENTURYLIN K F O PSE 2-PSE 2-PSE 3-PSE PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE 2-PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE PSE RENTONRENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTON RENTONRENTON RENTON RENTON RENTONRENTON WSDOT FO WSDOT F O 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FO 2-ZAYO FOPSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GAS PSE GA S PSE GAS PSE GAS PSE GAS FOVLT 2WM HH GV IRRG BOREHOLEGA-10EL=26.31 BOREHOLESB-1EL=27.17 BOREHOLEGA-14EL=26.36 BOREHOLEP-14EL=25.43 BOREHOLEP-12EL=25.14 BOREHOLEGA-1EL=25.09 BOREHOLEGA-2EL=25.98 MWEL=25.08 BOREHOLERW10EL=25.30 MWGWMW-3EL=26.16 BOREHOLEGA-3EL=25.97 MWGWMW-1EL=26.60 BOREHOLEGA-4EL=26.06BOREHOLESH-5EL=26.22 BOREHOLEGA-8EL=26.69 BOREHOLEGA-5EL=27.71 BOREHOLEGA-7EL=27.67 BOREHOLEGA-6EL=27.90 BOREHOLEGA12EL=26.45 BOREHOLEGA-13EL=26.06 BOREHOLEP-15EL=25.66 5'4" DP6'8" DP5' DP 4' DP4' DP 3' DP3'9" DP3'4" DP 2'11" DP6'9" DP1'DP1'11" DP 2'3"DP 2' DP2' DP3'11" DP 3'6" DP 5'9" DP 7'2" DP6'11" DP 7' DP6'6" DP 4'4" DP4'3" DP 3'7" DP 2' DP 7'11" DP11' DP4'9" DP4'9" DP13'6" DP6'3" DP5'8" DP 4'1" DP 3'6" DP 4'8" DP 12'6" DP13'6" DP11'6"DP10' DP 8'5" DP 8'11" DP8'10" DP 9' DP 2'2" DP 2'8" DP2'7" DP 2'8" DP 3'6" DP3'9" DP3'10" DP4'3" DP 2'3" DP1'7" DP 5'4" DP4'DP3'7"DP 4'11" DP5'2" DP 4'6"DP3'5"DP 5'7" DP 2'7"DP2'4"DP 5'8" DP 3' DP3'9" DP3'6"DP4'11" DP 6'7" DP 3'9" DP 2'2" DP2'4" DP5'8" DP 8'6" DP 9'11" DP 10' DP 2'DP5'10" DP10' DP 3'8" DP3'11"DP 5'1" DP5'3" DP5'2" DP6'4" DP6'3" DP6'7" DP 2' DP3'2"DP2'6" DP 1'4" DP2'1" DP 7' DP 7' DP 2'8" DP 4'11" DP6'3" DP8' DP2'2" DP1'3"DP 2'5" DP 1'10" DP 2'3" DP 4'11" DP3'11" DP 2'8" DP 3'6"DP 3'10" DP 2'7" DP2'4" DP3'4" DP3'10" DP3'5" DP 3'2" DP 3'11" DP3'9" DP2'4" DP 3'3" DP 5'5"DP 4'10" DP 4'4" DP 5'3" DP 1'10" DP 1'2" DP1'6" DP 1'8" DP 2'3" DP 5'6" DP 4'8" DP5'8" DP3'11" DP6'1" DP 6'4" DP6'1" DP5'4" DP 4' DP 5'4" DP4'11"DP 4' DP 3'6" DP 5' DP 5'11" DP 6'9" DP5'4" DP7'11" DP6'7" DP4'5" DP 2'8" DP 6'9" DP6' DP 7'6" DP 5'6" DP 1'9" DP2'5" DP 2'DP 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"W 12"WABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W ABAN-W 12"W 12"W 12"W 12"W 12"W 12"W 400 404 418 CONC SEAMS (TYP) C&G WV WV EXTRUDED CURB CO 2 BLRDFH EXTR CONCCURB EXTR CONCCURB 4'11" DP5'5" DP2'6" DP1'3" DP1'11" DP 2'2" DP 2'2" DPBROADBANDVAULT2'11" DP 3' DP2'3" DP 1'11" DP 2'3" DP3'11" DP 4'11" DP 5'2" DP4'4" DP 4'5" DP5'6" DP 6' DP4' DP 5'5"DP6'7" DP 4'2" DP2'4" DP12' DP6'11" 3'6" 4'8" 8'11" 1'7" 2' 3'9" 4'10" 6'9"4'5" ED(TYP.) ED(TYP.) ED(TYP.) ED(TYP.) 2'5"2'7"3'8"2'2" 3'10" 4'1"4'9"7"4'1" 3'11"5'9" 5" 2'1" 1'11" 9"2'4"3'1"2'11"3'3" 3'11"3'5'2" 4'1" 4'7"2'11"2'9"1'4"1'7" 2'9" 2'1"2'7"2'11" 3'4" 3'9"2'10" 4'9"4'11"2'8"2'1"2'8"2'7"2'5" 7"1'1"1'4"2'2'1"2'9" 6'3" 5'4" 5'3"4'9" 5'7"3'10" 4'11" 5'11" 6'8"6'11"3'10" 1'6" 4'1"4'2"4'7" 5'9" 5'8"4'8"5'11" 3'11" 4'1" 3'9" 4'5" 2'11"3'1" 5'2" 4'11" 4'7"4'1"4'6" 4'8"4'6"5'3"4'6"4'9"4'11" 3'7" 2 WM BIKESTORAGE WV 6" TREE30' DLN 1.5' RET WALLPLANTER 1.5' RET WALLPLANTER MWEL=26.43MWEL=27.18 MWEL=27.18 MWEL=27.04 MWEL=27.17 MWEL=26.07 MWEL=27.58MWEL=26.71 MWEL=26.87 MWEL=27.59 MWEL=27.00 MWEL=26.12 MWEL=26.25 MW RTN001-13EL=26.03 MWEL=26.11 MW RTN002-05EL=26.32MW RTN002-06EL=26.35 2'10" 3'10"3'0" 4'0"4'3"4'6"4'11"5'0" 5'5" 6'0"6'3"6'6"7'0"7'2" 7'9" 8'0"8'2"8'6"10'0" 10'7" CO 2 WV HH PROPE R T Y LINE, T Y P 24 CO COCOCOCOCOCOCOCO COCOCO CO CO CO X X X X X X X X X X X X X X R A I N I E R A V E S N B R A I N I E R A V E S S B GRADY W A Y E B ASPH ASPH ASPH SSMH 36"Ø CO N C RIM=27. 9 7 IE 8" VC N E = 1 4 . 5 IE 8" CO N C S = 1 3 . 9 2.3' X 2. 0 ' C O N C CB2.1' X 1. 9 ' C O N C RIM=26. 6 1 IE 12" D I S E = 2 2 . 7 IE 12" D I W = 2 2 . 7 WAT=22.6 B O T = 1 9 . 8 INLET RIM=26.8 8 CB2.1' X 1. 8 ' C O N C RIM=26.4 2 IE 12" C P P N W = 2 3 . 6 WAT=23. 2 B O T = 2 1 . 8 INLET RIM=28.7 5 SDMH 48"Ø BR I C K RIM=28.8 9 IE 30" C O N C E = 1 9 . 9 IE 24" C O N C W = 1 9 . 8 WAT=20. 4 B O T = 1 9 . 5 CBRIM=26. 7 8 IE 8" DI S = 2 5 . 5 WAT=25.3 B O T = 2 2 . 9 CBRIM=25.9 0 CB2.3' X 2. 2 ' C O N C RIM=25.6 5 IE 6" DI S = 2 4 . 5 WAT=24. 4 B O T = 2 1 . 3 SD SD S S S S S S S S S S S S S D 30" CO N C 8 " C O N C HH 12" TRE E 28' DLN 11" STU M P CONC B E N C H LANDSCAPI N G C O N C 5" TREE 8' DLN 5" TREE 11' DLN RAISED M A R K E R S RAISED M A R K E R S R A I S E D M A R K E R S R A I S E D M A R K E R S S W MULTIPL E 6" TREE S 35' DLN A S P H OE OE OE SWL A N D S C A P I N G D R W E E E ERIM= 28. 6 6 WV WV HH HH HH 3HH HH 2 HH HH 4ELEC V L T WM 3TRAFF I C C O N T R O L CABINET S W E EE FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO SD SD SD FO FO FO FO FO FO FOFO S D S D SS SS SS SS SS E FOF O FO CONC B A S E REMOVE D L T OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE INLET RIM EL= 2 6 . 7 8 UNABLE T O O P E N CB60" CON C RIM EL= 2 8 . 3 5 IE 24" C P P N = 1 9 . 4 IE 30" C P P N E = 1 9 . 8 IE 12" C P P S = 2 1 . 7 IE 36" C P P S W = 1 9 . 6 BOT=17 . 8 SDMH 48" CON C RIM EL= 2 8 . 7 1 IE 12" D I N = 2 2 . 6 IE 12" D I S = 2 2 . 8 WAT=22 . 6 B O T = 2 0 . 6 CB1.6' X 2. 1 ' C O N C RIM EL= 2 6 . 9 IE 12" R C P N E = 2 3 . 2 IE 8" DI S W = 2 3 . 2 IE 8" D I N W = 2 3 . 6 WAT=23. 2 B O T = 2 2 . 0 0 CB1.7' X 2 . 2 ' C O N C RIM EL= 2 6 . 5 5 IE 4" CO N C W = 2 5 . 2 WAT=25 . 2 B O T = 2 4 . 9 SD4" CON C 3 0 " C P P COMCA S T COMCA S T 2-PSE 2-PSE 2-PSE 2-ZAYO F O UTIL VL T HH BOREHO L E GA12 EL=26.4 5 BOREHO L E GA-13 EL=26.06 BOREHO L E EL=25.66 5'9" DP 7'2" D P 6'11" D P 7' DP 6'6" DP 4'10" D P 5'9" DP 4'7" DP 1'6" D P 1'3" DP 1'9" DP 1'7" DP 2'5" DP 1'7" DP 1'7" DP 1'4" DP 1'5" DP 1'10" D P 2 ' 1 " D P 1 ' 1 1 " D P 2 ' 5 " D P 2 ' D P 2 ' 4 " D P 2' 1 0 " D P 2 ' 5 " D P 2 ' D P 4'11" DP 5 ' 2 " D P 1 2 " W 1 2 " W 1 2 " W SOLID W H I T E DASHE D W H I T E SD SD SD SD 3' DP 2'3" DP 1'11" DP 1' 11" DP 1'7" DP 3'8" DP 4'9" DP 3' DP5'8" DP 5'10" DP 6'2" DP5'5" DP 6'11" ED(TYP. ) MWEL=27.17 SD SD SD SD SD SD SD HH GRAD Y 1 5 3 + 0 0 GRAD Y 1 5 4 + 0 0 R A I N I E R 2 0 2 + 0 0 S GR A D Y W A Y R A I N I E R A V E S 28 29 29 27 28 28 27 26 25 24 28 SF SF SF SF SF SF SF SF SF S F S F S F S F S F 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 04/05/2024 J. ALTCHECH 10/22/2024 04/05/2024 CIVIL TESC PLAN S RENTON TRANSIT CENTER BT120-CTP205 BT120 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN 1"=20' N SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 01 / 1 7 / 2 5 | 3 : 0 9 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C T P 2 0 1 - 2 0 5 . D W G S1-BT120-CTP201-205 FACILITY ID: Xrefs: xS1-BT120-VSF100 xS1-BTP120-CPP001 xBRT-CUD05-TB22x34 xS1-BT120-GZK010 xS1-BTP120-CAP001 xS1-BT120-CGP001 xS1-BT120-CMP001 xS1-BT120-CTP001 xS1-BT120-CTN101 GB-SEAL-SS56324 xS1-BT120-CDP001 xS1-BT120-RPP001 xS1-BT120-VRX001 OSBORNCONSULTINGINCORPORATED M A T C H L I N E S E E D W G B T 1 2 0 - C T P 1 0 1 MATCHLINESEE DWG BT120-CTP203 3 2 2 2 102 103 201 202 203 204 205 SW 7TH ST RAIN I E R AVE S HA R D I E AV E S W SR - 1 6 7 KEY MAP SW GRADY WAY 101 104 105 107 106 MATC H L I N E SEE D W G B T 1 2 0 - C T P 1 0 4 4 7 3 2 01-20-2025 0060 RTA/CN 0205-24 Stormwater Flow Direction Sewer Flow Direction N 20 40 SCALE IN FEET 01020 (1" = 20') SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LIN E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 06 / 0 4 / 2 5 | 1 2 : 0 9 P M | S A K S H I G C:\ P W W O R K I N G \ J A C O B S _ B & I \ S A K S H I G @ O S B O R N C O N S U L T I N G . C O M \ D 0 4 7 1 7 8 9 \ S 1 - B T 1 2 0 - C T P 7 0 2 . D W G S1-BT120-CTP702 FACILITY ID: Xrefs: xBRT-CUD2-TB22x34 xS1-BTSL1-VRX101 xS1-BT120-CAP701 xS1-BT120-GZK701 xS1BT120-CDP101 xS1-BT120-CSP701 xS1-BT120-CPP701 xS1-BT120-VSF700 xS1-BT120-CTP701 GB-SEAL-SS56324 xS1-BT120-CTN701 OSBORNCONSULTINGINCORPORATED MA T C H L I N E : N O T U S E D T H I S S E R I E S MA T C H L I N E : N O T U S E D T H I S S E R I E S 2 2 WSDOT LIMITED ACCESS PROPERTY LINE 1 1 1 1 2 FLOODPLAIN EXCAVATION AREA STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER RDWY IMP BT120 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL EROSION AND SEDIMENT CONTROL PLAN SR167 STA. 1002+50.00 TO STA. 1008+00.00 BT120-CTP702 BT120 661 1 S. SRIDHARAN H. ONG R. PARISH S. SRIDHARAN RTA/CN 0205-24 1"=20' 1 X X X X X X X X X X SR-167 SB SR-167 NB SR-167 SB SR-167 NB SR-167 SB SR-167 NB SR-167 SB O N - R A M P I-405 W B O N - R A M P AS P H AS P H UTUT B R I D G E E D G E BR D G CO L U M N EX I T EOP EOP OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE FO FO FO FO FO FO FO FO FO FO FO FO SD SD SDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD OE OE OE OE OEFO FO FO FO FO FO FO SD SD SD CO M C A S T CO M C A S T HH PO T H O L E 0 8 GN D E L = 2 5 . 9 6 3- 2 " P W R C N D TO P O F C N D E L = 2 4 . 3 3 HH UT I L VL T HH CBRI M = 2 3 . 9 4 DU G 6 ' D I D N O T F I N D ///////////////////// ///////////////////////////////////////////////////// / /////////////////////////// SR167DL LINE 84+05 SR167 D L L I N E 8 5 + 0 0 DL LINE 86+00 SR167AL_NB LINE 2+00 SR167 A L _ N B L I N E 3 + 0 0 SR1 6 7 A L _ N B L I N E 3 + 5 4 SR167 LINE 1004+00 SR167 LINE 1006+00 SR167 LINE 1008+00 SB WA-167 NB WA-167 BT1 2 0 - C - S R 1 6 7 D L L I N E BT120-C-S R 1 6 7 A L _ N B L I N E BT120-C-SR167 LINE HVS HVS HVS HVS HVS HVS HVS HVS HVS HVS HVS HVS HVS HV S HV S HVSHVSHVS HVS GENERAL NOTES: 1.CONTRACTOR SHALL MAINTAIN AND ADJUSTTEMPORARY EROSION AND SEDIMENT CONTROL(TESC), AS NEEDED. 2.PROTECT EXISTING TREES AND SHRUBS UNLESSNOTED FOR REMOVAL. FOR SITE PREPARATION PLANS, SEE DRAWINGS BT120-CXP701-703.3.PROTECT EXISTING DRAINAGE STRUCTURES SUCHAS CATCH BASINS, MANHOLES AND PIPES UNLESSNOTED FOR REMOVAL. SEE DRAWINGSBT120-CXP701-703. 4.REFER TO COR STD PLAN 220.20 FOR TRENCHINGAND SAWCUT LIMITS 5.AT A MINIMUM, DISTURBED AREAS SHALL BESODDED OR SEEDED AND MULCHED TO ENSURETHAT SUFFICIENT COVER WILL DEVELOP SHORTLYAFTER FINAL APPROVAL.6.SEE SITE PREPARATION PLANS, DRAWINGS BT120-CXP701-703, FOR FLOODPLAIN EXCAVATIONAREA INFORMATION. 7.AN ADMINISTRATIVE ORDER WAS ISSUED WITH THENPDES CONSTRUCTION PERMIT FOR THE PROJECT.STORMWATER TREATMENT AND SAMPLING ISREQUIRED AS PART OF THE PERMIT. SEE NPDESPERMIT WAR314062 FOR DETAILS. EROSION AND SEDIMENT CONTROL NOTES: 1 INSTALL HIGH VISIBILITY SILT FENCE PER WSDOT STD PLANI-30.17-01 SEE SHEET BT120-CTD701, HVF SHALL BE PLACEDAROUND THE TRENCH AREA WHILE MAINTAINING PUBLIC ACCESS PER WSDOT STANDARD PLAN I-10.10-01. 2 INSTALL INLET PROTECTION PER WSDOT STD PLAN I-40.20-00 SEE SHEET BT120-CTD702. FOR ADDITIONAL INLETPROTECTION, A SANDBAG BARRIER SHALL BE PLACEDUPSTREAM OF CATCH BASIN PER CITY OF RENTONSTANDARD PLAN 216.50 SEE SHEET BT120-CTD703. INLET PROTECTION HIGH VISIBILITY SILT FENCE RIGHT-OF-WAY LINE WSDOT LIMITED ACCESS PROPERTY LINE REMOVE ASPHALT PAVEMENT CLEARING AND GRUBBING LEGEND: HVSHVS 6-9-2025 Stormwater Flow Direction