Loading...
HomeMy WebLinkAboutAdditionalDocuments DATE: March 6, 2026 TO: Martin Pastucha, Administrator FROM: Jim Seitz, Transportation Director STAFF CONTACT: Hebe Barnardo, Transportation Project Manager SUBJECT: Change Order No. 28 to CAG-22-265 with Olson Brothers Excavating, Inc. for the North Park Avenue Extension project Attached for your signature is Change Order No. 2 8 to CAG-22-265 with Olson Brothers Excavating, Inc. in the amount of $1,078.85. During construction, temporary channelization eliminated the southbound left turn and shifted the southbound lanes westward. In response to safety concerns and at Boeing’s request, the City directed the Contractor to install signal heads B2 and B3 in alignment with the temporary configuration. As construction neared completion and permanent pavement markings were applied, the Contractor was required to realign the signal heads to match the final channelization layout. The table below provides a summary of project encumbrances. Park Avenue North Project Contractual Encumbrance Description Amount Totals Preliminary Engineering Design - CAG-17-082 $159,665.00 Previous Supplements: 16 $892,170.00 This Supplement No. __ Total $1,051,835.00 Environmental Services Agmt: CAG-20-032 $34,970.00 Previous Supplements: 4 $153,227.34 This Supplement No. Docusign Envelope ID: 3C2D70F1-2899-41EC-95C6-1A3FF90F8CF0 Martin Pastucha Page 2 of 2 March 6, 2026 Total $188,197.34 Right of Way BNSF $2,172,219.00 Boeing $2,401,284.28 Total $4,573,503.28 Construction Management Agmt: $0.00 Previous Supplements: 17 $538,957.00 This Supplement No. __ Total: $538,957.00 Project Construction -CAG-22-265 $3,636,341.81 Previous Change Orders $494,458.85 This Change Order No. 28 $1,078.85 $4,131,879.51 Encumbrance Grand Total $10,484,372.13 Project Revenue $11,070,827.27 Remaining Budget $586,455.14 Docusign Envelope ID: 3C2D70F1-2899-41EC-95C6-1A3FF90F8CF0