HomeMy WebLinkAbout2026-02-27 LONGACRES MASTER PLAN_TIR_Body_CPL responses (2)Draft – for Internal Review Longacres Master Plan Project EIS PEER REVIEW COMMENT AND STATUS OF RESPONSE FORM Deliverable: Peer Review of Drainage Reports Reviewed: 11/14/25 Peer Review Team Member: Richard Price Comment Response Provided: (date) Comments Due: (EA to provide date) Comment Response Accepted: (date) Item # Reviewer Report Reviewed Page Line(s) Review Comment Level of Comment1 Status of Response Explanation Drainage Report All Add page numbers 3 Drainage Report All Document needs significant editing—both grammatical/spelling and technical. In many places the grammatical errors change the technical meaning (e.g., “discharge to a series of BioPods and Bioscapes.” Vs. “discharge to a BioPod or Bioscape”), or are grammatically incorrect and make the sentence non-sensical. Some of these are listed specifically in comments below, but not all. 1,2,3 CPL Response: Typos have been removed and discrepancies in terminology resolved. PDF 4 Both “Drainage Plan” and “Temporary Erosion and Sedimentation Control Plan” are defined by the acronym (TESC)? 3 CPL Response: TESC removed from PDF 4 where Drainage Plan is referenced. TESC is only TESC as suggested. PDF 4 “This project proposes to construct a drainage system with a new network of underground pipes and catch basins to collect surface water runoff throughout the site and direct it to a water quality treatment facilities.” Not a true statement 1 CPL Response: That intent is for all new and disturbed existing areas. We will clarify as needed as we believe the statement to be correct in the context of the plans. PDF 5 “This project proposes to construct a drainage system with a new network of underground pipes and catch basins, to collect the drainage from the roofs and roadways as well as the surface water 1 CPL Response: Multiple facilities make up the water quality treatment system. CPL Response: We will Draft – for Internal Review runoff throughout the walkways and other areas adjacent to the buildings within the project site. This system will direct runoff from the roadways to the water quality treatment system.” There are multiple water quality treatment systems and techniques described, not one. clarify in the language of the TIR. PDF 5 All water quality on site will be provided in a treatment system Reword 3 CPL Response: Updated per comment. PDF 7 “These pipes are designed to carry stormwater runoff…” Change “pipes” to “Conveyances” 2 CPL Response: Updated per comment. PDF 8 #8 Correct “Bioops” 3 CPL Response: Updated per comment. PDF 8 Master Drainage Plan: Does this plan “govern” or provide context”? 1 CPL Response: Context only, have updated wording. PDF 9 “we will provide fine mesh screens on all discharge pipes.” Address maintenance/flooding issues 1 CPL Response: The mesh is sized per previous agreement with City, to allow flooding to enter system mitigation but not allow any errant fishes into the system. Maintenance should be moderate, as all drainage is routed first through water quality facilities, unlike old Boeing site operations. PDF 12 “conveyed to a series of BioPods and Bioscapes” Is this a treatment train in series? Mentioned twice. 1 CPL Response: Changed “and” to “or”. Final decision will occur prior to Civil permit submittal after EIS. Treatment levels are equivalent. PDF 13 Table 1: Longacre areas Pervious + Impervious does not equal Total ? 2 CPL Response: We have updated the Tables to explain the totals more Draft – for Internal Review clearly, and confirmed the summations are accurate. Appe ndice s Add Title sheet between each appendix and add title on each sheet 3 CPL Response: Updated per comment. Figur es Numerous figures not referenced in text. 3 CPL Response: Updated per comment. Figur es “Figures” include several documents/exhibits. Suggest separate or rename Appendix A-1, A-2, A-3 with appropriate titles 3 CPL Response: Updated per comment. Figur es “Figures” include several documents/exhibits. Suggest rename or separate. 3 CPL Response: Updated per comment. Fig 5C Text illegible CPL Response: Updated per comment. 1Comment Level Codes: 1 = Critical Issue - Address; 2 = Factual Issue – Check; 3 = Editorial – Consider.