HomeMy WebLinkAboutAddendum - 4AMENDMENT NO. 4 TO AGREEMENT FOR 2022-2023 TRAFFIC
CALMING LOCATIONS CAG-22-121
THIS AMENDMENT, dated for reference purposes only as January 13, 2026 is by and between
the City of Renton (the “City”), a Washington municipal corporation, and Perteet Inc.
(“Consultant”), a Washington Corporation. The City and the Consultant are referred to
collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this
Amendment is effective as of the last date signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-22-121, dated
April 25, 2022, to provide necessary services for the 2022-2023 Traffic Calming Locations
(referred to herein as the “Agreement”);
Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the
compensation in order to complete final construction plans, project specifications and opinion of
cost for additional/similar Project Site 9: S Langston Rd/SW Langston Rd between S 132nd St and
Earlington Ave SW, and Project Site 10: NE 12th St between Olympia Ave NE and Union Ave NE.
NOW THEREFORE, It is mutually agreed upon that CAG-22-121 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit
A-4, which is attached and incorporated herein.
2. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased by $70,607.00 from $222,366.00 to
$292,973.00, including any applicable state and local sales taxes. The additional
compensation shall be paid based upon Work actuallyperformed according to the rate(s)
or amounts specified in Exhibit B-4, which is attached and incorporated herein.
3.All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
CAG-22- 121, Adden #4-26
PAGE 2 OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Armando Pavone
Mayor
Peter De Boldt
Principal/Vice President
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By: __________________________
Cheryl Beyer
Senior Assistant City Attorney
Contract Template Updated 06/17/2021
1/20/2026
Peter De Boldt
Digitally signed by Peter De Boldt
DN: C=US,
E=peter.deboldt@perteet.com,
O="Perteet, Inc.", CN=Peter De Boldt
Date: 2026.01.20 14:10:20-08'00'
3/11/2026
Approved by Cheryl Beyer via email 2/13/2026
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Project: 2022-2023 Traffic Calming - Amendment 4: 2026 Traffic Calming
Client: City of Renton
Consultant: Perteet
Perteet Project No. 20220053.0000
Date: 01/13/2026
Classification Hours Rate Amount
Principal 2 $458.40 $916.80
Sr. Engineer / Mgr 84 $240.00 $20,160.32
Engineer III 179 $188.03 $33,656.64
Civil Designer I 180 $129.66 $23,338.82
Lead Technician/Designer 182 $157.83 $28,724.95
Planner III 4 $200.54 $802.15
Director 14 $330.76 $4,630.61
Clerical 6 $135.22 $811.32
Accountant 5 $208.52 $1,042.61
Labor Total 656 $114,084.22
Expenses Cost Markup Amount
Mileage $650.00 1.0 $650
Reproduction $500.00 1.0 $500
Total Expenses $1,150
CONTRACT TOTAL $115,234
EXHIBIT B-4
Consultant Fee Determination Summary
2707 Colby Avenue, Suite 900, Everett, WA 98201 P 425-252-7700 F 425-339-6018
Rates shown reflect the typical compensation rate of employees assigned to the billing category listed. Each category may
have multiple employees assigned to that billing category and each employee may have a different hourly rate of pay.
Perteet's Hourly Rates are subject to change each year on January 1st.
HOURLY COSTS
REIMBURSABLES
Remaining (as of Invoice #26 - through December 31, 2025) $44,627.30
Supplement #4 Request $70,607
Round to $44,627
Overhead: Fixed Fee:
185.52% 30.00%
Job Classification
Direct Labor
(DL)
Overhead
(OH x DL)
Fixed Fee %
(Fee x DL)
All Inclusive Hourly
Billing Rate
Principal 148.56 275.61 44.57 468.74
Director 126.93 235.48 38.08 400.49
Senior Associate 125.00 231.90 37.50 394.40
Senior Engineer/ Manager 90.39 167.69 27.12 285.20
Lead Engineer/ Manager 69.70 129.31 20.91 219.92
Cultural Resources Manager 69.40 128.75 20.82 218.97
Cultural Resources Specialist III 53.72 99.66 16.12 169.50
Cultural Resources Specialist II 47.25 87.66 14.18 149.08
Cultural Resources Specialist I 41.80 77.55 12.54 131.89
Senior Ecologist/ Senior Environmental Scientist 74.82 138.81 22.45 236.07
Engineer III 70.76 131.27 21.23 223.26
Civil Designer II 55.09 102.20 16.53 173.82
Civil Designer I 41.49 76.97 12.45 130.91
Lead Environmental Scientist 64.43 119.53 19.33 203.29
Environmental Scientist III 45.11 83.69 13.53 142.33
Environmental Scientist II 42.90 79.59 12.87 135.36
Environmental Scientist I 38.50 71.43 11.55 121.48
Senior Planner 69.40 128.75 20.82 218.97
Lead Planner 63.56 117.92 19.07 200.54
Planner III 63.56 117.92 19.07 200.54
Planner II 49.50 91.83 14.85 156.18
Planner I 35.20 65.30 10.56 111.06
Lead Tech/ Designer 75.40 139.88 22.62 237.90
Technician III 42.18 78.25 12.65 133.09
Technician II 35.00 64.93 10.50 110.43
Technician I 29.00 53.80 8.70 91.50
Senior Construction Technician 63.62 118.03 19.09 200.73
Construction Tech III 56.24 104.34 16.87 177.45
Construction Tech II 42.30 78.47 12.69 133.46
Construction Tech I 39.74 73.73 11.92 125.39
Construction Engineer III 66.00 122.44 19.80 208.24
Construction Specialist II 53.32 98.92 16.00 168.24
Construction Specialist I 46.20 85.71 13.86 145.77
Senior Construction Observer 79.20 146.93 23.76 249.89
Construction Observer III 71.12 131.94 21.34 224.40
Construction Observer II 49.85 92.48 14.96 157.29
Construction Observer I 45.24 83.93 13.57 142.74
Electrical Construction Observer 82.50 153.05 24.75 260.30
Senior Construction Manager 89.92 166.82 26.98 283.72
Construction Engineering Manager 93.50 173.46 28.05 295.01
Construction Supervisor 118.84 220.47 35.65 374.96
Network Specialist 52.43 97.27 15.73 165.43
Controller 80.16 148.71 24.05 252.92
Contract Administrator 81.00 150.27 24.30 255.57
Project Assistant 53.23 98.75 15.97 167.95
Accountant 66.09 122.61 19.83 208.53
Clerical 42.86 79.51 12.86 135.23
Marketing Director 79.72 147.90 23.92 251.53
Graphics Specialist 55.73 103.39 16.72 175.84
Direct (Non-Salary) Reimbursable Expenses
Mileage @ current Federal Rate
Travel Related Expenses At Cost
Other Direct Expenses At Cost
Authorized Subconsultants At Cost
EXHIBIT C
Perteet, Inc.
2707 Colby Avenue, Suite 900
Everett, WA 98201
Negotiated Hourly Rate Sheet
City of Renton
2022-2023 Traffic Calming Locations CAG 22-121 (20220053)
Invoiced direct labor may be less than the maximum rate shown per job classification but will
not exceed the maximum rate. Rates are subject to renegotiation annually from the
anniversary of contract execution, unless otherwise specified.
June 18, 2025
Perteet, Inc
2707 Colby Avenue, Suite 900
Everett, WA 98201
Subject: Acceptance FYE 2024 ICR – CPA Report
Dear Denice M. Moan:
We have accepted your firm’s FYE 2024 Indirect Cost Rate (ICR) of 185.52% of direct labor (rate
includes 0.38% Facilities Capital Cost of Money) based on the “Independent CPA Report”
prepared by Stambaugh Ness, Inc. This rate will be applicable for WSDOT Agreements and Local
Agency Contracts in Washington only. This rate may be subject to additional review if considered
necessary by WSDOT. Your ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms
and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with the firm is responsible for
determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 704-6397 or via email
consultantrates@wsdot.wa.gov.
Regards,
SCHATZIE HARVEY, CPA
Contract Services Manager