HomeMy WebLinkAboutChange Order - 5Change Order No. 5 Contract Title: Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation Project Contract No. CAG-25-013 Page 1 of 2 Change Order No. 5 Contract Title:Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation Project Contractor:Westwater Construction Company Contract No. : CAG-25-013 Federal Aid No. : Ordered by Engineer Proposed by the Contractor (VECP) Unilateral Amount Notice to Proceed Date 05/14/2025 Original Contract: 2,404,287.41 Original Working Days 66 Current Contract: 2,632,025.98 Previous Substantial Completion Date 09/3/2025 Estimated Net Change This Order: 35,607.42 Revised Calendar Days (This Change Order) 0 New Contract: 2,667,633.41 Total Revised Calendar Days to Date 9 Revised Substantial Completion Date 11/30/2025 Prepared By: Reviewed By: City of Renton Principal Engineer - Airport Date Airport Director Date Endorsed By: Endorsed By: Contractor Date Date Reviewed By: Executed By: City Attorney Date City of Renton Public Works Administrator / Mayor Date 3/9/2026 3/10/2026 CAG-25-013, CO #5-26 Approved by Cheryl Beyer via email 3/5/2026 Change Order No. 5 Contract Title: Windsock & 243 Bldg. GA Apron & Parking Lot Rehabilitation Project Contract No. CAG-25-013 Page 2 of 2 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: Adding Change Order Proposal 5. Reason for Change: (COP 5) This COP 5 covers the extra rock and asphalt tickets that were delivered to site during the paving of both the 243 and windsock aprons. These quantities were above the design amounts by approximately 3%. COP 5 = $32,223.91 + Sales Tax (10.5%) = $32,223.91 + $3,383.51= $35,607.42 Materials: See the attached price breakdown for the lump sum materials. Plans: N/A Equitable Adjustment: N/A Extension of Time: The Time for Completion is extended 0 Working Days. Sections 1-04.4 and 1-04.5 of the 2018 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. Attachments: Forms to be attached to Change Order Plans Field Directive Change Order Quotation Estimated Change Order Cost Project Labor List Force Account Equipment Rate Request (DOT Form 422-010 EF) Equitable Adjustment Determination