1. Project Overview
Address: 3XX Toledo Ave SE/154th Ave SE; Renton, WA 98059
Project Description: 4 Lot Short Plat
Owner: Scott Roberts
2. Site Screening
The perimeter of the site facing the Public ROW will be screened using a
perimeter fence to hide the construction activities from public view. Please
refer to the attached site plan for further clarification.
3. On Site Parking
The workers will be encouraged to car-pool to the site, and everyone will be
informed that under no circumstances are they to use the neighboring 156th
Ave SE for street parking. We anticipate having adequate parking along the
private access road north of the proposed lots.
4. Construction Communication
Contact Person: TBD, Superintendent, xxx-xxx-xxxx
[Construction Company Name] can be contacted anytime during business
hours. All after hour emails and voicemails left outside of business hours
will be responded to the following day.
Construction Notification List:
[Construction Company Name] will put together a list of all neighbors who
will be contacted and informed of any major activity or closures in advance.
The list and all procedures will be shared with the Renton Building
Department for review and approval.
2
Communication methods: The following mediums will be used to
notify the contacts on the Construction Notification list:
Phone calls and email where possible.
Visit.
Door hangers.
Postings in the neighborhoods where allowed.
Communicate everything with the subcontractor and suppliers’ offices.
Inform all workers on site, especially the foremen, of upcoming events or
other notices.
5. Development Guidelines and Regulations RMC 4-4-030
All activities on site shall adhere to the requirements of Renton’s
RMC 4-4-030 Development Guidelines and Regulations - General.
The [Construction Company Name] team will also be in contact with
the Renton Building Department. The following are the work hours
that we are aware of at this time:
ONSITE:
• 7:00AM – 10:00PM (M-F)
• 9:00AM – 10:00PM (SAT & SUN)
HAUL HOURS:
• 8:30AM – 3:30PM (M-F ONLY)
[Construction Company Name] will provide prior notification to
neighbors prior to any approved work outside typical construction
work hours listed in the RMC.
3
6. Truck Haul Routes, Staging, and Traffic Impact
The source of imported structural fill and the destination for our
earthwork export have not been determined at this time. Please refer
to the Truck Haul Route map below.
Truck Traffic:
We will reach out to the Renton Department of Transportation to
ensure that our trucking would not impact the traffic in the area during
peak hours.
Truck Staging Areas:
The private access road onsite will provide adequate space for trucks
to be staged at any given time. Please refer to the attached site plan
for further clarification.
HAUL ROUTE
TBD