Loading...
HomeMy WebLinkAboutCOR_Package 089 - 26 56 19-1 (REV-01) - LED EXTERIOR LIGHTING - Metrix ReviewedNE – No Exceptions RJ – Rejected RR – Revise and Resubmit NM – Note Markings (No Resubmittal Required) SUB – Submit 227 Williams Avenue South, Renton, WA 98057 Office: 425 336 2822 Fax: 425 336 2802 SUBMITTAL COMMENT SHEET Project Name: Hazen High School Modernization Date Received: 10/13/2025 Date Reviewed: 10/23/2025 Reviewed By: Ben Prehoda Submittal #: SUB_26 56 19-1-REV-01 Submittal Name: LED EXTERIOR LIGHTING – OFFSITE LIGHTING Items italicized were reviewed for a previous submittal and are included for a complete overview of electrical submittals. The date of the previously reviewed items is in the comments column. Items in BOLD are reviewed in this Re-Submittal. Spec Section: Product: Action: Comments: General NM Submit Offsite lighting to City of Renton for approved equal to BOD. 8/21/25 Luminaire NE 8/21/25 Mast Arm NE Pole NE 8/21/25 Pole Base NE 8/21/25 Anchor Bolts NE 8/21/25 Base Plate NE 8/21/25 ***** END OF COMMENTS This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with the requirements of the plans and specifications. Approval of a specific item shall not include approval of an assembly of which the item is a component. Contractor is responsible for dimensions to be confirmed and correlated at the jobsite; information that pertains solely to the fabrication process or to the means, methods, techniques, sequences and procedures of construction, coordination of the Work of all trades, and for performing all work in a safe and satisfactory manner. 1 ☒☒☐ ☐☐☐ ☐☐☐ ☐☐☐ ☐ ☐☒☐ 2 This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents.Corrections or comments made during this review do not relieve contractor fromcompliance with the requirements of the plans and specifications. Approval of a specific item shall not include approval of an assembly of which the item is a component. Contractor is responsible for dimensions to be confirmed and correlated at the jobsite, information that pertains solely to the fabrication process or to the means, methods, techniques, sequences and procedures of construction, coordination of the Work of all trades, and for performing all work in a safe andsatisfactory manner. METRIX ENGINEERS LLC SUBMITTAL REVIEW REFER TO SUBMITTAL REVIEW SHEET FOR COMMENTS 10/23/2025