Loading...
HomeMy WebLinkAboutCOR_TSI #2 Crosswalk PedestalPE Appr'l Code Date Project Engineer Distribution State Materials Engineer Distrubution Contractor General File Signing Inpsection Region Operations Engineer Other __________________________________ Fabrication Inspection M/S 47365 Revised 03/2018 Region Materials State Materials Lab DOT Form 350-071 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: 5. Acceptance Criteria: Only 'Approved for Shipment' or 'WSDOT Inspected' or 'Fabrication Approved Decal' material shall be used. 6. Acceptance Criteria: Submit Materials Certificate of Origin to Project Engineer. 7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action. 8. Source Approved: ______________________________________________________________________________________ 9. Approval Withheld: Submit samples for preliminary evaluation. Approval Action Codes for use by Project Engineer and state Materials Laboratory 1. Acceptance Criteria: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. 2. Acceptance Criteria: Submit Mfg. Cert of Compliance for 'Acceptance' prior to use of material 3. Acceptance Criteria: Catalog Cuts for 'Acceptance' prior to use of material. Catalog Cut Approved Yes No 4. Acceptance Criteria: Submit Shop Drawings for 'Approval' prior to fabrication of mateiral. Project Engineer/Representative Date State Materials Engineer 1 Crosswalk Pedestal - Push Button Post Frey Manufacturing - Seattle WA 9-29 This shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. For WSDOT Use Only RAM # Bid Item No. Material or Manufacturer's Product/Type Name and Location of Fabricator, Manufacturer or Pit Number Specification Reference Hdqtr. Appr'l Code Hazen High School Pedestrian SignalsContractor Subcontractor Sare Electric Transportation Systems Inc TSI#2 2/18/2026 Section / Title of Project County Request for Approval of Material Contract Number FA Number SR Date Washington State Department of Transportation