HomeMy WebLinkAboutChange Order - 09Docusign Envelope ID: 2356C6C4-4F72-453D-A1C8-8C047CE7EA30 CITY OF RENTON Community and Economic Development CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-25-257 3/6/2026 CONTRACTOR: Andersen Construction Company of Washington, LLC CHANGE ORDER: 9 SUMMARY OF PROPOSED CHANGE: As proposed by Mithun's AV consultant, these water-resistant speakers will be substituted for speakers listed in Specification 27-41-16 due to the outdoor mounting location. Item Qty. Description Unit Price Amount No. w/WSST 1 1 Loudspeaker Revision N/A $ 3,945.00 2 1 Cost of Work Add-Ons N/A $ 331.00 Total this Change Order: $4,276.00 DESCRIPTION: ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE THIS ORDER REVISED CONTRACT AMOUNT (W/ WSST) AMOUNT (W/ WSST) (W/WSST) TOTAL AFTER CHANGE $1,248,000 $1,647,318.94 $4,276.00 $1,651,594.94 Additional Calendar Days: None. SIGNATURES: r;;-""' Date: 3/10/2026 I 4: 37 PM PDT Contractor: L,!ogdan Tishchenko Bogdan Tishchenko.:"Ar\'cfersen Construction Company of WA, LLC r;;-""' Project Manager: l.:aul Hintz Paul Hintz, Project Manager .... _ - by: Approved By: n Johnson Justin Johnson, D 'i'ffl!ht Engineering Director Approved By: Gina Estep �- by: Gina Estep, CED A �m:or Approved By: Approved by via email 3/6/2026 Cheryl Beyer, Senior Assistant City Attorney Attest: N/A Jason Seth, City Clerk Date 3/11/2026 I 9: 51 AM PDT Date: 3/11/2026 I 10:32 AM PDT Date: 3/13/2026 I 6: 09 PM PDT Date: Date: CAG-25-257, CO #9-26 Docusign Envelope ID: 2356C6C4-4F72-453D-A1C8-8C047CE7EA30 A � 11111a. ANDERSEN CONSTRUCTION Job Name: Legacy Square Phase 2 Subject: Loudspeaker Revision Change Request CR-012 This change request is submitted, as required, for your review and approval. Amount: $4,276.00 Time Extension Requested: Scope Description: February 11, 2026 Job Number: AWA25SP016 Date Initiated: 2026-02-11 Reference: Per Submittal comments, Loudspeakers are changed from Fulcrum CX1277 and CS212L to CX1277WR and CS212LWR speakers. Direct Cost of Work Loudspeaker Revision Cost of Work Add-Ons Change Request Cost Breakdown Vendor Cochran Inc Volume Driven Liability Insurance (1.25%) Bonding (1.00%) Overhead/ Profit up to the first $50,000 (16%) Overhead/ Profit up to the first $50,000 for each subcontractor (6%) Payroll Driven Liability Insurance (1.25%) Total Change Request Amount Supporting documentation and detailed cost of work is attached as required. Qty Unit LS Subtotal Amount $3,945.00 $3,945.00 $52.00 $42.00 $0.00 $237.00 $0.00 $4,276.00 Please indicate your approval of this Change R equest by signing below and returning one (1) copy of this transmittal letter to Andersen Construction. The Change Request will be incorporated in a subsequent Contra ct Change Order. By executing of this Change Order, contractor acknowledges and agrees that it has been fully compensated for all change in the Contract Sum an d Contract Time effected through a written change order, satisfaction for all costs in curr ed, labor performed, and material and equipment furnished. Contractor: Andersen Constructi on Company of V\lashington LLC Bogdan Tishchenko Owner: City of Renton BUILDER OF CHOICE legacy Square Phase 2 -C0-1 Submittal Comments 1 2/10/2026 Attn: Bogdan Tishchenko Subject: Legacy Square Phase 2 -Renton CO-01 Bogdan, Thanks for the opportunity on this Project. Please see the following Change order driven by the Submittal comments, which detailed an alteration of the Bill of Materials. Per the City comments: t..:..J REQUIRES. (1) OEDICATEO 120 VAC 20 AMP CIRCUITSfOUAD ouner [LSTN, DB] Bid RFI response from LSTN was for the CX1277 (clip below) Netoea, a-s� Q-S,s Q-S,s 0-Svs Fulcrum Aoousb 1.44250-�F-PoE+ AV LIN M .c, Swil:ch CX12 L...,_,.,,..:lkor VERlfY COVERAGE ANGLE 2 MOUNT C ounET HEIGHT UNLESS OTHERWISE NOTED VERIFY EXACT MOUNTING LOCATION ON SITE LOUDSPEAKER LOC IO (FUlCRUM ACOUST CX12&5 LOUDSPEAKER) REQUIRES: SURF AC f , OKE 2 -we·w/◄·1111&·so. X 3-1W DEEP BOX (FLUSH) CABLE PATHWAY AS SHOWN MOUNT -we· 0 23'·2· 0 C. MOUNT SPEAKER YOKE O 22' &-1/4. O.C. (1) DEDICATED 120VAC 20 AMP C DUPLEX ADJ, TO 'WB" CABLE PASS THRU LOCATION (PROVIDED BY OTHERS) REQUIRES: a· HOLE IN WALL C HEIGHT SHOWN 0.C. Please let me know if you have any questions. I am available to discuss this Change order at your convenience. Sincerely, Parker Gilbertson Project Manager PGilbertson@cochraninc.com Cochran, Inc. 206-348-2482 Docusign Envelope ID: 2356C6C4-4F72-453D-A1C8-8C047CE7EA30 (cichranl legacy Square Phase 2 -C0-1 Submittal Comments Change Order Value: $3,945 Remove the Following -2 CX1277 $ 5,368 -2 CS212L $ 7,355 Credit: $ 12,723 Add the Following 2 CX1277WR $ 7,033 2 CS212LWR $ 9,635 Cost: $ 16,668 CO Value $ 3,945.00 Scope change: -2 -2 Fulcrum cou tic Ful rum c u tic 1277 Black p ak r 212L Bla k ubw 0£ r dd th foll ing it m : 2 2 2 Ful rum ou ti Fulcrum 1277WR W ath r R i tant Bla k p ak r 212LWR \ ath r R i tant Black ub oon r Notes: Per Dimensional: The only information about these speakers that we can find is in the AV equipment list. The part of the list associated with the speakers is pasted below. AVC 2 Main Loudspeaker Fulcrum CX12000 AVC 2 Subwoofer, Stage Stack Fulcrum CS212L ,. \ ,,...., � •-----..L II""\ __ ,_"""----• ,,..., ,.,. f""'\"",-........ --.L ----........ - J. ---- There is no mention of the requirement for the speakers to be weather proof in either the part number (a "WR" in the part number signifies weatherproof), or in the description of the speakers.