Loading...
HomeMy WebLinkAboutChange Order - 03Docusign Envelope ID: 8735E96E-B4B8-4CE4-A479-4F6A3B280792 CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CAG-25-346 CONTRACTOR: NW Playground, Inc. CHANGE ORDER: # 3 SUMMARY OF PROPOSED CHANGE: Sonotubes and other additional items including additional NPEI discount DESCRIPTION: Item Qty. Description No. 1 1 Adjustment to hand digging amount from CO #2 (from $1050 to $540) 2 1 Repour sunken curb 3 1 Core drill concrete for ADA table install 4 1 Sonotube material & labor for 79 holes due to sand 5 1 NPEI Discount Unit Price without/WSST $ (510.00) $ 1,200.00 $ 520.00 $ 8,058.00 $ (4,029.00) Total this Change Order: 03/11/2026 Amount w/WSST $ (563.55) $ 1,326.00 $ 574.60 $ 8,904.09 $ (4,452.05) $ 5,789.10 ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/ WSST} AMOUNT THIS ORDER (W / WSST} TOTAL AFTER CHANGE $ 379,889.97 $388,636.17 $ 5,789.10 $ 394,425.27 Additional Calendar Days: None The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. SIGNATURES: Contractor: Chris McGarvey, President Date: 3/12/26 Digitally signed by Mark L. Richardson ProjectManager: Mark L. Richardson ON: C=US, E=mrichardson@rentonwa.gov, O=City of Renton, OU=Parks and �ecreation, CN�M�rk L..,Bi�t!ardson Date. 2026.03.12 16.25.27-cJi:ltlli[e I l�i:;;jane Van Cleave Approved By: L 3/17/2026 I 1:03 PM PDT Date: (Parks and Recreation Administrator) CAG-25-346, CO #3-26