Loading...
HomeMy WebLinkAbout03-19-2026 - RFP Questions and Answers3/19/2026 The following questions were submitted prior to the deadline stated in the RFP of 3:00 PM PST on March 18, 2026. No further answers or clarifications will be provided prior to the Proposal due date of April 1, 2026, at 3:00 pm. The responses provided are accurate to best of City of Renton staff’s knowledge. Several of the questions below reference either “the Pavilion” or “Renton Market”. The Pavilion is the common name of a city-owned facility immediately south of the property for which the City is seeking development proposals; “Renton Market” is the leaseholder of the Pavilion facility. Responses provided below use the terms “Pavilion” and “Renton Market” interchangeably. 1. Are there any existing easements on the property? STAFF RESPONSE: Yes, there is one easement for Puget Sound Energy. The recorded easement is enclosed as Exhibit A. To the best of staff’s abilities and based on staff’s reading of the easement language, we have attempted to illustrate the easement in the image below. 2. Can the access road (at the north) be abandoned? STAFF RESPONSE: The “access road” is presumed to be the “transit street,” as referenced in the Civic Core Vision and Action Plan. The entirety of the property (King County Parcel: 5696000070), minus the PSE easement, would be eligible for development. 3. Can the surface parking lot (at the south) be abandoned? STAFF RESPONSE: To the extent a modification to the existing parking area is proposed, and since the parking area is at least partially on the subject property, the City will consider modifications that eliminate or modify the parking area to the extent such a modification meets City development standards. 4. Where is loading/access for the Renton Pavilion/Farmer’s Market? If it’s through the lots at the south of this RFP, will there be an easement? Or access agreement of some sort? 3/19/2026 STAFF RESPONSE: The drive aisle immediately north of The Pavilion will need to remain for deliveries and for refuse storage and collection needs of The Pavilion (the future “Renton Market”). Within requirements of the City’s development regulations, the City may consider reducing the width of the drive aisle, which is reflected in Attachment B of the RFP. In the alternative, or if necessary according to proposed development, the City may also consider an easement to maintain access for the drive aisle for deliveries, refuse storage and collection, and other City or public access requirements of the City and its tenants. 5. Are the proposed street and frontage improvements associated with the Civic Core Vision and Action Plan anticipated to be the financial responsibility of the site developer? STAFF RESPONSE: Generally, frontage improvements are required upon the development of an abutting parcel(s), and the cost of those improvements is borne by the developer. “Frontage” is generally considered to be the area between the closest edge of a vehicle driving lane and the subject property (e.g., curb, landscape strip, sidewalk). Frontage standards vary across the city, and while the standards shown in the Civic Core Vision and Action Plan are conceptual, they reflect the improvements anticipated to be made. Any parties interested in developing the subject property should anticipate paying for and constructing frontage improvements. 6. Has a market study been completed for this parcel? The Civic Core Vision and Action Plan references a conceptual planning study and market analysis, are these available for review? STAFF RESPONSE: The Civic Core Vision and Action Plan proposed (PF 6) a conceptual planning study and market analysis of potential development of the subject parcel, but no such study or analysis has been conducted. 7. Are there any existing surveys of this property or adjacent properties that can be shared? The lot line relationships shown in GIS are somewhat unclear, and we would like to confirm whether any adjacent structures encroach onto the subject site. For example, is there a survey associated with permit B010633 (parking garage) that could be shared? STAFF RESPONSE: Yes, a survey was recently completed. The survey is enclosed as Exhibit B. 8. Would it be possible for the project to utilize the existing parking garage through a shared access or parking agreement to satisfy parking requirements? STAFF RESPONSE: The City does not anticipate a no-fee consideration of parking garage spaces to satisfy parking requirements for any development proposed under this RFP. The parking garage is open to the public, but it subject to rules and fees that may change: City Center Parking Garage | City of Renton It is possible, via development agreement negotiations and/or land use entitlements, that a limited number of parking stalls in the garage could be leased by the proprietor of a future business located on the subject property. 3/19/2026 The City anticipates more parking being available in the parking garage once the new Renton Transit Center becomes operational and King County Metro bus layovers and most routes converge at that site. 9. Can the City provide additional information regarding frontage requirements and/or required site improvements associated with the "Renton Connector” and the "Festival Street"? Are these anticipated to occur within the existing right-of-way? STAFF RESPONSE: The potential “Renton Connector” or “Festival Street” would be Capital Improvement Projects that would occur within public rights-of way (i.e., improvements would not occur on private property); however, as indicated in Attachment B of the RFP, the existing rights-of-way of Logan Avenue S and/or Burnett Avenue S may be affected by a potential lot line adjustment, which would be determined during development agreement negotiations and/or land use entitlements. City staff are engaged in early conceptual discussions for portions of the Renton Connector and Festival Street that may occur along this parcel, but no formal designs are underway. It is possible that the City makes frontage improvements within Logan Avenue South and/or Burnett Avenue South as part of one or more Capital Improvement Projects (e.g., as was recently done for the Rainier Avenue South Phase 4 project). 10. What is the City’s intent regarding ownership and maintenance of public amenities such as restrooms or other public-serving features? Would these be implemented through easements, dedication, or other ownership structures? STAFF RESPONSE: The answer depends on the public-serving feature. For example, if restrooms were provided as a public benefit, the most likely scenario is that the developer would lease the restrooms to the City at no cost during the lifespan of the building. The restrooms would be accessible from public right-of-way or from City-owned property (e.g., the drive aisle immediately north of The Pavilion). The City would maintain the restrooms as part of the lease agreement. A lease and/or easement for the public restrooms would be recorded to ensure the City’s needs are met during the lifespan of the building. 11. What is happening [to] the bus routes that ran through here, are they being closed, relocated, or something else? STAFF RESPONSE: According to King County Metro staff, at least two bus routes (RapidRide F and I Lines) will continue to serve the downtown, although those routes may not have stops on Burnett Avenue following the relocation of the Renton Transit Center (aka, the “transit street”). EXHIBIT A BU R N E T T A V E S • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • LO G A N A V E S • • • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME Z9REN010300SURV.dwg SHT OFKPG PROJ. No. DATE DATE DATE DATE DATE Approved By Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 TOPOGRAPHIC SURVEY RENTON MARKET PLAN 08/13/2024 EXHIBIT B •••••••••••••••• •••••••••••• NOTES HORIZONTAL DATUM VERTICAL DATUM DATENO.BY APPR. DESIGNED BY CHECKED BY ENGINEERING MANAGER PROJECT MANAGER PROJECT ENGINEER REVISIONS DRAWN BY DATE FILENAME Z9REN010300SURV.dwg SHT OFKPG PROJ. No. DATE DATE DATE DATE DATE Approved By Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 TOPOGRAPHIC SURVEY RENTON MARKET