Loading...
HomeMy WebLinkAboutMFP26001127.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Major Franchise Permit: MFP26001127 IVR Number: 26001127 Permit Information Permit Name: Puget Sound Energy Gas Permits 109167313Address/Location:03/05/2026Application Date:3343301143Parcel Number: 1705 NE 44TH ST Permit Type:03/19/2026Issue Date:Franchise Permit Work Class:03/19/2027Expiration Date:Major Utility Job Number: 109167313Franchise Type:Natural Gas Description: PSE Gas Used closest address. Work site location is NE 44th St, east of NB I 405 on/off ramps. Crew to deactivate in place EX 2 in PE IP main. Install new 2 in MPE. All restoration to be completed to city standards. Contacts Name Address PhoneTypeBilling Katie Zimmerman Puget Sound Energy 1660 Park Lane Burlington, WA 98233 B: (425) 620-6742 C: (425) 620-6742 ApplicantX Permits Central 355 110th Ave NE Bellevue, WA 98004 B: (425) 620-6742 H: (425) 620-6742 C: (425) 620-6742 Applicant Devin Boblitt INFRASOURCE SERVICES 14103 Steward Rd Sumner, WA 98390 C: (206) 550-3293Contact INFRASOURCE SVCS B: (206) 949-5846Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Katie Zimmerman Puget Sound Energy 1660 Park Lane Burlington, WA 98233 B: (425) 620-6742 C: (425) 620-6742 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES 1/12/26Scott Warlick CED 3/19/2026 MFP26001127 Monday Friday 8:00am 3:00pm MFP26001127 MFP26001127 ped detour shown in blue dashed line MFP26001127 MFP26001127 MFP26001127 NE 44TH ST NB I - 4 0 5 O F F R A M P PARCEL NUMBER 334330-1143 PARCEL NUMBER 334330-1145 PARCEL NUMBER 334330-1142 PARCEL NUMBER 334330-1141 PARCEL NUMBER 334330-1140 PARCEL NUMBER 334330-1150 PARCEL NUMBER 334330-1120 PARCEL NUMBER 334330-1125 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 12504140 109167313 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 108662301 GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service/Meter Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter HOLE HOG TABLE CALLOUT LOCATION DEPTH LENGTH BP1 START BP2 END BP3 START BP4 END BP5 START BP6 END BP7 START BP8 END BP9 START BP10 END BP11 START BP12 END BP13 START BP14 END BP15 START BP16 END BP17 START BP18 END BP19 START BP20 END PLOT PLAN - A (SEE PAGE 2) NTS DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL A.CASTANEDA 253-268-6896 NASH KIRIKA 425-306-1755 NASH KIRIKA 425-306-1755 ... ... N/A RENTON NE 44TH ST 2in PE IP RELOCATION NE 44TH ST, RENTON WA 109167313 N/A AS NOTED 1 / 2 KING 488 CSPSKEPI SW-29-24-5 200.080 201.1083 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Cell Phone: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager: Project Manager Contact Information: Alec Castaneda 253-243-4165 Alec.Castaneda@pse.com STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 02/18 TEST RESULTS / / / / / / Verify Testing Requirements, Chart vs Gauge GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5 GASSED UP PIPELINE PIPE SEGMENT FOREMAN'SDATENAME 60 IP488-60 SAP BATCH YEAR & FOOTAGE ACTUAL LENGTH OF RETIREMENT MATERIAL RETIRED ORIGINAL JOB ORIGINAL YEAR PROPOSED LENGTH OF RETIREMENT SIZE OF RETIRED MAIN STANDARD GAS CONSTRUCTION NOTES: 1.FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 2.NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS). 3.ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. 4.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. 5.NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. 6.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 7.COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST LEAD) INSTALLATION. 8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. 9.INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. 10.TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 11.SYSTEM MAOP DENOTED BY: SYSTEM MAOP = PSIG 12.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED. 13.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. 14.PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400. 15.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. 16.IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. ___________________________, PHONE______________. 17.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES FOOTAGE BETWEEN FITTINGS. 18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) E.O.C. END OF CONDUIT No. LOCATION (N-S-E-W) C1 ___' __ C/L C2 ___' __ C/L C3 ___' __ C/L C4 ___' __ C/L C5 ___' __ C/L C6 ___' __ C/L C7 ___' __ C/L C8 ___' __ C/L C9 ___' __ C/L C10 ___' __ C/L STANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES 1.NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED OUTAGE. 2.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS OPERATING STANDARD 2525.2300. 3.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. 4.INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. 5.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER PSE GAS OPERATING STANDARD 2550.1600. 6.REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. 7.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400 AND PSE GAS FIELD PROCEDURE 4700.1500. 8.PROJECT MANAGER TO MAKE AN ACTIVE SERVICE RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. 9.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARD 2525.2100. 10.PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING STANDARDS 2525.2100 AND 2525.3600. 11.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. 12.INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. 13.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. 14.REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. 15.ACTIVE SERVICES TO BE REPLACED DENOTED BY: 16.MAINS AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 2525.1200. 17. PIPE SQUEEZING SHALL BE DONE IN ACCORDANCE WITH GOS 2525.1200 AND GAS FIELD PROCEDURES 4700.1300 AND 4700.1310. 18.WHEN INSTALLING, DEACTIVATING, REPAIRING, OR OTHERWISE MODIFYING A PIPELINE THAT IS LOCATED WITHIN 200 FEET OF ANY ACTIVE REGULATING STATION, PRESSURE RELIEF AND LIMITING DEVICE, OR SINGLE SERVICE FARM TAP WHERE GAS SYSTEM ENGINEERING REVIEW AND APPROVAL IS REQUIRED PER GAS OPERATING STANDARDS. SEE REVIEW DOCUMENTS, PROVIDED BY ENGINEERING. 19.FIELD TO VERIFY THAT ALL PROPER SERVICE ACTIONS (FOLLOWING THE KEY TO SERVICE ACTION LEGEND) HAVE BEEN ACCOUNTED FOR PER THE "SERVICE CHECKLIST". IF A RISER IS FOUND IN THE FIELD AND WASN'T ACCOUNTED FOR, FIELD PERSONNEL SHALL CONFIRM WHETHER THE RISER IS AN ABANDONED OR IDLE RISER: 19.1 IF IT IS AN ABANDONED RISER, CONTACT THE POINT DESK TO REQUEST GFR TO REMOVE IT. 19.2 IF IT IS AN IDLE RISER, REPORT THE RISER TO THE PROJECT MANAGER SO THAT THE PROJECT MANAGER MAY CONFIRM WITH THE CUSTOMER WHETHER THEY WOULD LIKE TO KEEP THE SERVICE AND RISER. THE PROJECT MANAGER MAY INSTRUCT TO TEST AND TIE THE SERVICE IF THE CUSTOMER WANTS GAS OR DOESN'T PROVIDE PSE A RESPONSE IN A TIMELY MANNER. ### 2 1 REV# 3 DATE DESCRIPTIONBY 10 9 1 6 7 3 1 3 INSTALL 2"MPE 110' RETIRMENT PE 97'2" Owner / Developer Contact Info PUBLIC IMPROVEMENT WSDOT FRANCHISE RELOCATION x x KEANG LIM 206-475-5503 02/23/26 02/23/26 02/23/26 02/24/26 Alec Castaneda 253-268-6896 02/24/2026 45 MFP26001127 This permit is for Major construction work in the ROW and will be billed at an additional $158/HR for inspections. After hours and weekend work will be billed at $175/HR CULVERT 24" CMP S IE 29.5 CULVERT 18" CMP SE IE 31.3 CULVERT 6" PVC E IE 30.8 CULVERT CULVERT CB TYPE II RIM 38.87 BOTTOM STRC=30.5 WATER LVL=34.5 FULL OF MUD NO VISIBLE PIPES CB TYPE II 36" CMP NE IE 33.2 24" CMP E DI IE 33.5 LADDER W CULVERT 24" CMP E IE 31.3 24" CMP NW IE 29.6 8" CMP NW IE 30.9 CB RIM 42.90 8" CMP N IE 40.2 SDMH RIM 43.88 NO VISIBLE PIPES WATER LEVEL EL 39.1 BOTTOM EL 37.2 12" CMP W IE 44.0 RIM 48.38 SDMH 39 ' S , 3 0 ' E - W P / L RENTON R/W 334330-1150 PARCEL NUMBER 334330-1140 PARCEL NUMBER "1800""1700" NE 44TH ST "1705" McDonald's "1717" "1785" "1795" 1 1/4 " P E I P 1 9 8 ' E 2960 9 2 6 2 0 - 1 9 8 8 IP G A S F L O W 2" M P E - 9 I P 3 0 ' E - E P L 10 9 1 3 9 0 0 2 - 2 0 2 4 36'S 38'S195'E 59'S 2" P E IP W A N D E R S W - E D G E S / W 9 2 3 5 5 3 1 1/4" PE 1988 5/8 " PE 1988 5/8 " PE 1988 5/8 " PE 1988 5/8 " PE 1988 5/8 " PE 1988 1 1/4" MPEI 2008 4 2 ' S 525'E IP G A S F L O W R E N T O N R / W REN T O N R / W DR I V E W A Y NE 44TH ST N E 4 4 T H S T 10 9 1 6 7 3 1 3 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL A.CASTANEDA 253-268-6896 NASH KIRIKA 425-306-1755 NASH KIRIKA 425-306-1755 ... ... NE 44TH ST 2in PE IP RELOCATION NE 44TH ST, RENTON WA 109167313 N/A AS NOTED 2 / 2 KING 488 CSPSKEPI SW-29-24-5 200.080 201.1083 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2 1 REV# 3 DATE DESCRIPTIONBY Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: __________________________ Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 KEANG LIM SITE PLAN SCALE: 1" = 30' OK TO RELOCATE WITH 2" PE IP 2" HVTT'S APPROVED FOR MAIN TIE IN B.WAGNER 425-424-7835 ELBOW 2"X90° MPE 27' E of W-PL & 34'S of NE 44TH ST C/L ____'E P/L & ____'S C/L ELBOW 2"X90° MPE 125' E of W-P/L & 34'S of NE 44TH ST C/L ____'E C/L & ____'S C/L ELBOW 2"X90° MPE 27' E of W-PL & 34'S of NE 44TH ST C/L ____'E P/L & ____'S C/L ELBOW 2"X90° MPE 125' E of W-P/L & 34'S of NE 44TH ST C/L ____'E C/L & ____'S C/L TIE IN TEE HV 2"X2" MPE 27' E of W-PL & 37'S of NE 44TH ST C/L ____'E P/L & ____'S C/L TIE IN TEE HV 2"X2" MPE 125' E of W-P/L & 37'S of NE 44TH ST C/L ____'E C/L & ____'S C/L DEACTIVATE EXISTING 2" PE IP MAIN CURRENTLY 24" - 30" OF COVER PROPOSED PIPE 2" MPE IP MAIN 34'S of NE 44TH ST C/L ____'E P/L & ____'S C/L TO BE 1' BELOW EXISTING PIPE CUT & CAP CAP 2" MPE 30' E of W-PL & 37'S of NE 44TH ST C/L ____'E P/L & ____'S C/L CUT & CAP CAP 2" MPE 122' E of W-P/L & 37'S of NE 44TH ST C/L ____'E C/L & ____'S C/L TYPICAL GAS MAIN LINE TRENCH DETAIL Excavated Dirt Pile 24" Min NOTE: Install 12" shading if the backfill contains rocks greater than 6" dia. 36" Min Cover Gas Main Line SIDE ACCESS VEHICLE Final Grade 4" Sand Bedding 12" Min. of Acceptable Backfill (See Definition Above) 6" Sand Shading 12"-18" Min Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent impedence of gas system maintenance. Not to scale PROPOSED PIPE 2" MPE IP MAIN (_____') DEACTIVATE IN PLACE EXISTING 2" PE IP MAIN 206-475-5503 RENTON 1 2 SCALE: NTS TIE IN DETAIL1 2 TIE IN TEE HV 2"X2" MPE 125' E of W-P/L & 37'S of NE 44TH ST C/L ____'E C/L & ____'S C/L TIE IN TEE HV 2"X2" MPE 27' E of W-PL & 37'S of NE 44TH ST C/L ____'E P/L & ____'S C/L ALTHOUGH 2-WAY FEED ON THE MAIN, THE GAS FEED IS STRONGEST COMING FORM THE NORTH & VERY WEAK COMING FROM THE SOUTH. 2" HVTT'S WILL BE SUFFICIENT, NO BYPASS NEEDED. IF THE WORK IS GOING TO BE DONE WHEN TEMPERATURES ARE @ OR ABOVE 48F THEN THE MAIN CAN BE TAKEN DOWN TO 1-WAY FEED, CUT OUT & THE RELOCATION WILL NOT NEED BYPASSING B.WAGNER 425-424-7835 02/23/26 02/23/26 02/23/26 02/24/26 Alec Castaneda 253-268-6896 02/24/2026 MFP26001127 RESTORATION PER CITY OF RENTON STANDARDS