Permit Name: Puget Sound Energy Gas Permits
109167313Address/Location:03/05/2026Application Date:3343301143Parcel Number: 1705 NE 44TH ST
Permit Type:03/19/2026Issue Date:Franchise
Permit Work Class:03/19/2027Expiration Date:Major Utility
Job Number: 109167313Franchise Type:Natural Gas
Description: PSE Gas Used closest address. Work site location is NE 44th St, east of NB I 405 on/off ramps. Crew to deactivate
in place EX 2 in PE IP main. Install new 2 in MPE. All restoration to be completed to city standards.
Contacts
Name Address PhoneTypeBilling
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
ApplicantX
Permits Central 355 110th Ave NE
Bellevue, WA 98004
B: (425) 620-6742
H: (425) 620-6742
C: (425) 620-6742
Applicant
Devin Boblitt
INFRASOURCE SERVICES
14103 Steward Rd
Sumner, WA 98390
C: (206) 550-3293Contact
INFRASOURCE SVCS B: (206) 949-5846Contractor
Business License Number: 36742Construction Contractor: INFRASL871C2
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Katie Zimmerman
Puget Sound Energy
1660 Park Lane
Burlington, WA 98233
B: (425) 620-6742
C: (425) 620-6742
Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
1/12/26Scott Warlick CED 3/19/2026
MFP26001127
Monday Friday 8:00am 3:00pm
MFP26001127
MFP26001127
ped detour shown in
blue dashed line
MFP26001127
MFP26001127
MFP26001127
NE 44TH ST
NB I
-
4
0
5
O
F
F
R
A
M
P
PARCEL NUMBER
334330-1143
PARCEL NUMBER
334330-1145
PARCEL NUMBER
334330-1142
PARCEL NUMBER
334330-1141
PARCEL NUMBER
334330-1140
PARCEL NUMBER
334330-1150 PARCEL NUMBER
334330-1120
PARCEL NUMBER
334330-1125
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
4680 06/11
12504140 109167313
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A 108662301
GAS
PROJECT PHASE Notification #Order #
Retirement
Relocate
SAP Superior
Service/Meter
Service/Meter
HP Svc/MSA
Dis. Reg. / FT
Ind. MSA
Ind. Service
Service/Meter
Service/Meter
HOLE HOG TABLE
CALLOUT LOCATION DEPTH LENGTH
BP1 START
BP2 END
BP3 START
BP4 END
BP5 START
BP6 END
BP7 START
BP8 END
BP9 START
BP10 END
BP11 START
BP12 END
BP13 START
BP14 END
BP15 START
BP16 END
BP17 START
BP18 END
BP19 START
BP20 END
PLOT PLAN - A (SEE PAGE 2)
NTS
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
CONTACT PHONE NO DATE
Drawing Number
SAP Sup Order Nbr
PC APPROVAL
A.CASTANEDA 253-268-6896
NASH KIRIKA 425-306-1755
NASH KIRIKA 425-306-1755
...
...
N/A RENTON
NE 44TH ST
2in PE IP RELOCATION
NE 44TH ST, RENTON WA
109167313
N/A
AS NOTED 1 / 2
KING 488 CSPSKEPI
SW-29-24-5 200.080 201.1083
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Cell Phone:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:
Project Manager Contact Information:
Alec Castaneda
253-243-4165
Alec.Castaneda@pse.com
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
GAS MAIN INSTALLATION/RETIREMENT
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 02/18
TEST RESULTS
/ /
/ /
/ /
Verify Testing Requirements, Chart vs Gauge
GOS 2525.3300 sec. 5, Table 5-1 and sec. 5.5
GASSED UP PIPELINE
PIPE
SEGMENT
FOREMAN'SDATENAME
60 IP488-60
SAP BATCH YEAR & FOOTAGE
ACTUAL
LENGTH OF
RETIREMENT
MATERIAL
RETIRED
ORIGINAL
JOB
ORIGINAL
YEAR
PROPOSED
LENGTH OF
RETIREMENT
SIZE OF
RETIRED
MAIN
STANDARD GAS CONSTRUCTION NOTES:
1.FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO
CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
2.NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).
3.ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
4.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
5.NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND DELIVER
FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT THE
OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS
OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
6.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY THE
APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
7.COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE BOX (TEST
LEAD) INSTALLATION.
8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
OPERATING STANDARD 2525.2500.
9.INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS NOT READILY
ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
10.TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
11.SYSTEM MAOP DENOTED BY: SYSTEM MAOP = PSIG
12.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.
13.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
14.PURGE POINTS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3400.
15.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
16.IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.
___________________________, PHONE______________.
17.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES FOOTAGE
BETWEEN FITTINGS.
18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
INFORMATION ON D-4 CARD)
E.O.C.
END OF
CONDUIT No.
LOCATION
(N-S-E-W)
C1 ___' __ C/L
C2 ___' __ C/L
C3 ___' __ C/L
C4 ___' __ C/L
C5 ___' __ C/L
C6 ___' __ C/L
C7 ___' __ C/L
C8 ___' __ C/L
C9 ___' __ C/L
C10 ___' __ C/L
STANDARD IP & LP GAS
REPLACEMENT CONSTRUCTION NOTES
1.NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED
OUTAGE.
2.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE GAS
OPERATING STANDARD 2525.2300.
3.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED
BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.
4.INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND
PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.
5.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES PER
PSE GAS OPERATING STANDARD 2550.1600.
6.REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.
7.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400
AND PSE GAS FIELD PROCEDURE 4700.1500.
8.PROJECT MANAGER TO MAKE AN ACTIVE SERVICE RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.
9.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARD 2525.2100.
10.PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING
STANDARDS 2525.2100 AND 2525.3600.
11.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.
12.INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER
PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.
13.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.
14.REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.
15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:
16.MAINS AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH 2525.1200.
17. PIPE SQUEEZING SHALL BE DONE IN ACCORDANCE WITH GOS 2525.1200 AND GAS FIELD PROCEDURES 4700.1300 AND
4700.1310.
18.WHEN INSTALLING, DEACTIVATING, REPAIRING, OR OTHERWISE MODIFYING A PIPELINE THAT IS LOCATED WITHIN 200
FEET OF ANY ACTIVE REGULATING STATION, PRESSURE RELIEF AND LIMITING DEVICE, OR SINGLE SERVICE FARM TAP
WHERE GAS SYSTEM ENGINEERING REVIEW AND APPROVAL IS REQUIRED PER GAS OPERATING STANDARDS. SEE
REVIEW DOCUMENTS, PROVIDED BY ENGINEERING.
19.FIELD TO VERIFY THAT ALL PROPER SERVICE ACTIONS (FOLLOWING THE KEY TO SERVICE ACTION LEGEND) HAVE BEEN
ACCOUNTED FOR PER THE "SERVICE CHECKLIST". IF A RISER IS FOUND IN THE FIELD AND WASN'T ACCOUNTED FOR,
FIELD PERSONNEL SHALL CONFIRM WHETHER THE RISER IS AN ABANDONED OR IDLE RISER:
19.1 IF IT IS AN ABANDONED RISER, CONTACT THE POINT DESK TO REQUEST GFR TO REMOVE IT.
19.2 IF IT IS AN IDLE RISER, REPORT THE RISER TO THE PROJECT MANAGER SO THAT THE PROJECT MANAGER MAY
CONFIRM WITH THE CUSTOMER WHETHER THEY WOULD LIKE TO KEEP THE SERVICE AND RISER. THE PROJECT
MANAGER MAY INSTRUCT TO TEST AND TIE THE SERVICE IF THE CUSTOMER WANTS GAS OR DOESN'T PROVIDE
PSE A RESPONSE IN A TIMELY MANNER.
###
2
1
REV#
3
DATE DESCRIPTIONBY
10
9
1
6
7
3
1
3
INSTALL 2"MPE 110'
RETIRMENT PE 97'2"
Owner / Developer Contact Info
PUBLIC IMPROVEMENT WSDOT
FRANCHISE RELOCATION
x
x
KEANG LIM 206-475-5503
02/23/26
02/23/26
02/23/26
02/24/26
Alec Castaneda 253-268-6896 02/24/2026
45
MFP26001127
This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR
CULVERT
24" CMP S IE 29.5
CULVERT
18" CMP SE IE 31.3
CULVERT
6" PVC E IE 30.8
CULVERT
CULVERT
CB TYPE II
RIM 38.87
BOTTOM STRC=30.5
WATER LVL=34.5
FULL OF MUD
NO VISIBLE PIPES
CB TYPE II
36" CMP NE IE 33.2
24" CMP E DI IE 33.5
LADDER W
CULVERT
24" CMP E IE 31.3
24" CMP NW IE 29.6
8" CMP NW IE 30.9
CB
RIM 42.90
8" CMP N IE 40.2
SDMH
RIM 43.88
NO VISIBLE PIPES
WATER LEVEL EL 39.1
BOTTOM EL 37.2
12" CMP W IE 44.0
RIM 48.38
SDMH
39
'
S
,
3
0
'
E
-
W
P
/
L
RENTON R/W
334330-1150
PARCEL NUMBER 334330-1140
PARCEL NUMBER
"1800""1700"
NE 44TH ST
"1705"
McDonald's
"1717"
"1785"
"1795"
1 1/4
"
P
E
I
P
1
9
8
'
E
2960
9
2
6
2
0
-
1
9
8
8
IP
G
A
S
F
L
O
W
2"
M
P
E
-
9
I
P
3
0
'
E
-
E
P
L
10
9
1
3
9
0
0
2
-
2
0
2
4
36'S
38'S195'E
59'S
2" P
E IP
W
A
N
D
E
R
S
W
-
E
D
G
E
S
/
W
9
2
3
5
5
3
1 1/4" PE
1988
5/8 " PE
1988 5/8 " PE
1988
5/8 " PE
1988
5/8 " PE
1988
5/8 " PE
1988
1 1/4" MPEI
2008
4
2
'
S
525'E
IP
G
A
S
F
L
O
W
R
E
N
T
O
N
R
/
W
REN
T
O
N
R
/
W
DR
I
V
E
W
A
Y
NE 44TH ST
N
E
4
4
T
H
S
T
10
9
1
6
7
3
1
3
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
CONTACT PHONE NO DATE
Drawing Number
SAP Sup Order Nbr
PC APPROVAL
A.CASTANEDA 253-268-6896
NASH KIRIKA 425-306-1755
NASH KIRIKA 425-306-1755
...
...
NE 44TH ST
2in PE IP RELOCATION
NE 44TH ST, RENTON WA
109167313
N/A
AS NOTED 2 / 2
KING 488 CSPSKEPI
SW-29-24-5 200.080 201.1083
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2
1
REV#
3
DATE DESCRIPTIONBY
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: __________________________ Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
4680 06/11
KEANG LIM
SITE PLAN
SCALE: 1" = 30'
OK TO RELOCATE WITH 2" PE IP
2" HVTT'S APPROVED FOR MAIN TIE IN
B.WAGNER 425-424-7835
ELBOW 2"X90° MPE
27' E of W-PL
& 34'S of NE 44TH ST C/L
____'E P/L & ____'S C/L
ELBOW 2"X90° MPE
125' E of W-P/L & 34'S of NE 44TH ST C/L
____'E C/L & ____'S C/L
ELBOW 2"X90° MPE
27' E of W-PL
& 34'S of NE 44TH ST C/L
____'E P/L & ____'S C/L
ELBOW 2"X90° MPE
125' E of W-P/L
& 34'S of NE 44TH ST C/L
____'E C/L & ____'S C/L
TIE IN
TEE HV 2"X2" MPE
27' E of W-PL & 37'S of NE 44TH ST C/L
____'E P/L & ____'S C/L
TIE IN
TEE HV 2"X2" MPE
125' E of W-P/L
& 37'S of NE 44TH ST C/L
____'E C/L & ____'S C/L
DEACTIVATE EXISTING
2" PE IP MAIN
CURRENTLY 24" - 30" OF COVER
PROPOSED PIPE 2" MPE IP MAIN
34'S of NE 44TH ST C/L
____'E P/L & ____'S C/L
TO BE 1' BELOW EXISTING PIPE
CUT & CAP
CAP 2" MPE
30' E of W-PL & 37'S of NE 44TH ST C/L
____'E P/L & ____'S C/L
CUT & CAP
CAP 2" MPE
122' E of W-P/L & 37'S of NE 44TH ST C/L
____'E C/L & ____'S C/L
TYPICAL GAS MAIN LINE TRENCH DETAIL
Excavated Dirt Pile
24" Min
NOTE: Install 12" shading
if the backfill contains rocks
greater than 6" dia.
36"
Min
Cover
Gas Main Line
SIDE
ACCESS
VEHICLE
Final Grade
4" Sand Bedding
12" Min. of
Acceptable Backfill
(See Definition Above)
6" Sand Shading
12"-18"
Min
Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but
free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent
impedence of gas system maintenance.
Not to scale
PROPOSED PIPE 2" MPE IP MAIN
(_____')
DEACTIVATE IN PLACE
EXISTING 2" PE IP MAIN
206-475-5503
RENTON
1
2
SCALE: NTS
TIE IN DETAIL1
2
TIE IN
TEE HV 2"X2" MPE
125' E of W-P/L & 37'S of NE 44TH ST C/L
____'E C/L & ____'S C/L
TIE IN
TEE HV 2"X2" MPE
27' E of W-PL & 37'S of NE 44TH ST C/L
____'E P/L & ____'S C/L
ALTHOUGH 2-WAY FEED ON THE MAIN, THE GAS
FEED IS STRONGEST COMING FORM THE NORTH &
VERY WEAK COMING FROM THE SOUTH.
2" HVTT'S WILL BE SUFFICIENT, NO BYPASS NEEDED.
IF THE WORK IS GOING TO BE DONE WHEN
TEMPERATURES ARE @ OR ABOVE 48F THEN THE
MAIN CAN BE TAKEN DOWN TO 1-WAY FEED, CUT
OUT & THE RELOCATION WILL NOT NEED BYPASSING
B.WAGNER 425-424-7835
02/23/26
02/23/26
02/23/26
02/24/26
Alec Castaneda 253-268-6896 02/24/2026
MFP26001127
RESTORATION PER CITY OF RENTON STANDARDS