Date: March 23, 2026
Project Manager: Anousheh Nawaz
Wastewater Utility Manager: Joe Stowell
Kennydale Lakeline Sewer
System Improvement Project
Construction Management & Inspection Contract – Consor
Quick Recap
•Background: Wastewater system originally constructed in 1972 - multiple improvement phases since 2018
•Challenges: Aging, unreliable system posing many risks, limited access, complex maintenance,
environmentally sensitive conditions, dependent on dual pump stations to maintain flow, failures impact all
properties
•Current Update:
- New upland grinder pump system redirects wastewater away from lake
- Independent power supply with backup generator for system & existing pump station
- Improved reliability, cost-effectiveness, and long-term sustainability
•Key Benefits: Isolates failures to individual properties, eliminates in-lake sewer infrastructure, Enhances
maintenance access and system resilience
•Additional Improvements: Roadway drainage upgrades, new paving, and landscape restoration
March 23, 2026 1
Since we last met
•Established communication & solid relationships with all homeowners
•97% of private blanket easements signed
•Design reached 90% milestone
•95% of permitting complete
•Coordination underway with King County on Temporary Construction Easement and permanent
easement
•Envision verification process initiated – Pathway A
•$1,092,000 in federal grant funding secured - Community Project Funding
March 23, 2026 2
Moving Forward
•Final design nearing completion – Spring 2026
•Permitting nearing completion
•Envision verification submittal nearing completion
•Project is preparing to enter the bid & construction phase - Summer
•Next step: Construction Management & Inspection contract
March 23, 2026 3
Role of Construction Management &
Inspection Team
Act as City’s representative during construction
•Protect:
•Schedule
•Budget
•Quality
•Coordinate between:
•Contractor
•Design engineer (Carollo)
•City staff
•Ensure compliance with:
•Contract documents
•Federal funding requirements
•ENVISION Certification
March 23, 2026 4
Competitive Selection Process
•Request for Qualifications published
•5 Statement of Qualifications received – Rubric Rating System
•2 interviews held - Rubric Rating System
•Final Choice: CONSOR inc.
March 23, 2026 5
Consor - Scope Overview
•Project Management: Schedule, budget, risk tracking, reporting, and coordination
•Pre-Construction: Constructability review, bid support, risk identification
•Construction Administration: Meetings, contractor coordination, schedule & budget control, change
orders, RFIs, submittals, pay estimates, documentation
•Inspection: Daily field oversight, compliance verification, quantity tracking
•Compliance & Support: Federal funding compliance, labor standards, and reporting, third-party
testing (materials, compaction, asphalt), Envision sustainability certification support
•Closeout: Punch list, as-builts, final documentation, project records
March 23, 2026 6
Contract Fee Summary
•Construction Management & Inspection Cost
•Total not-to-exceed fee: $1,240,033
•CM & Inspection: $1,218,033
•Third-party testing allowance: $22,000
•Time and expense based
•Based on 2026 rates with escalation
•Fee reflects:
•Multi-year duration
•High coordination needs
•Site-specific construction complexity
March 23, 2026 7
Recommendation
Authorize the Mayor and City Clerk to execute the agreement with Consor North America , Inc. in the
amount of $1,240,033 for construction management and inspection services for the Kennydale Lake line
Sewer system improvement project.
March 23, 2026 8