Loading...
HomeMy WebLinkAboutApproved Civil - 566 Bronson.pdfBRONSON WAY NE G R A N D E Y W A Y N E S89°27'29"E 106.30' S2 0 ° 2 4 ' 2 0 " W 13 7 . 1 9 ' S2 ° 0 4 ' 0 5 " W 11 9 . 9 5 ' R=154.70' A=59.98' D= 22°12' 5 3 " R=124.70' A=147.83' D= 67°55'30" N88°22'57"E 74.18' 68.25' 30 . 0 6 ' 30 ' 30 ' PAR C E L N O . 9476 7 0 - 0 1 3 0 PAR C E L N O . 9476 7 0 - 0 1 3 1 PAR C E L N O . 9476 7 0 - 0 6 4 0 11 . 7 ' 9.0' 10 . 1 ' 16 3 . 7 15 5 . 3 15 6 . 3 15 4 . 1 15 1 . 5 14 9 . 1 14 7 . 6 14 8 . 0 14 8 . 1 14 8 . 2 14 8 . 5 14 8 . 1 14 8 . 7 149 . 1 14 9 . 3 14 9 . 6 14 9 . 2 149 . 4 14 9 . 4 14 9 . 5 14 9 . 8 15 0 . 5 14 9 . 7 150 . 5 15 0 . 9 15 0 . 5 15 1 . 3 15 2 . 7 15 2 . 8 15 2 . 7 15 2 . 5 15 3 . 4 153 . 7 154 . 3 155 . 3 155 . 8 155 . 4 15 5 . 6 BO T = 1 5 5 . 8 TO P = 1 5 9 . 6 BO T = 1 5 5 . 7 15 5 . 3 155 . 7 TO P = 1 5 9 . 3 15 3 . 7 15 4 . 3 15 4 . 7 154 . 3 15 5 . 3 155 . 9 BO T E L E V = 1 5 7 . 3 TO P E L E V = 1 6 1 . 0 15 6 . 2 15 6 . 0 15 6 . 0 16 0 . 0 16 0 . 6 15 6 . 4 15 6 . 7 15 6 . 8 157 . 0 15 6 . 6 15 6 . 6156 . 6 15 6 . 7 15 6 . 7 156 . 5 15 6 . 4 15 6 . 1 15 5 . 8 155 . 8 15 5 . 5 15 5 . 9 15 4 . 8 15 4 . 9 15 3 . 5 15 6 . 0 15 6 . 0 155 . 9 15 5 . 9 15 5 . 4 15 5 . 3 15 5 . 2 153 . 6 15 5 . 4 15 5 . 3 155 . 3 150 . 6 155 . 4 15 5 . 0 15 2 . 9 150 . 4 15 5 . 1 15 6 . 1 155 . 7 156 . 9 155 . 7 155 . 8 15 5 . 9 15 6 . 9 15 7 . 3 157 . 3 15 7 . 7 15 7 . 5 15 7 . 5 157 . 5 15 6 . 2 15 6 . 4 15 6 . 0 15 5 . 9 15 5 . 9 15 8 . 1 15 8 . 1 15 8 . 2 15 8 . 1 15 8 . 1 15 7 . 7 158 . 5 16 0 . 0 16 2 . 0 16 2 . 3 16 1 . 8 161 . 8 16 1 . 8 16 1 . 9 16 2 . 2 160 . 1 15 8 . 8 15 9 . 1 159 . 4 BO T = 1 5 9 . 6 16 0 . 3 BOT = 1 6 2 . 7 TO P = 1 6 3 . 1 163 . 2 TO P = 1 6 3 . 2 16 3 . 2 16 2 . 5 16 2 . 4 162 . 3 16 2 . 3 16 1 . 2 157 . 0 16 0 . 3 16 1 . 8 16 2 . 5 16 0 . 2 160 . 6 16 4 . 4 TO P = 1 6 4 . 5 BO T = 1 6 0 . 7 16 0 . 7 16 4 . 5 165 . 3 DS1 2 * 15 7 . 6 BOT = 1 6 3 . 8 TO P = 1 6 4 . 5 16 4 . 5 167 . 8 SP 1 2 16 6 . 7 16 9 . 6 DF 1 6 170 . 7 17 2 . 0 166 . 8 16 4 . 1 16 3 . 2 AP 6 16 3 . 3 16 2 . 8 TOP = 1 6 3 . 0 TO P = 1 6 3 . 2 16 3 . 2 16 2 . 5 163 . 2 TOP = 1 6 3 . 2 163 . 3 TO P = 1 6 2 . 6 BOT . = 1 6 0 . 4 16 0 . 0 BO T . = 1 6 0 . 2 15 9 . 8 BO T = 1 5 9 . 7 160 . 0 BO T = 1 6 2 . 9 163 . 4 15 9 . 3 DS1 6 158 . 8 15 9 . 1 158 . 3 DS 1 6 * 15 7 . 9 16 1 . 5 160 . 6 15 9 . 3 15 8 . 5 159 . 4 159 . 6 15 8 . 1 15 8 . 7 15 9 . 1 159 . 4 164 . 9 16 4 . 0 16 2 . 8 16 8 . 0 16 8 . 7 17 2 . 2 17 6 . 5 17 5 . 5 15 8 . 8 171 . 8 155 . 1 14 9 . 4 ROOF OVERHANG 2.5' 65 . 1 ' BLDG 0.7' W BLDG 2.3' W 0.3' W 0.4' E 0.1' W 0.5' E 0. 7 ' N 0. 5 ' N 0. 4 ' N 0.2' E FENCE 0.0' ROOF 0.3' W ROOF 2.1' W WALL 0.3' W ONE STORY HOUSE FOUND 2" BRASS DISK IN CASE 0.5' DOWN 5.93' 17 4 17 2 17 0 16 8 16 6 16 4 16 2 16 0 1 5 6 1 5 8 16 0 16 2 16 4 16 6 16 8 17 0 17 2 156 1 5 6 15 8 15 8 154 15 215 0 152 154 1 5 0 15 6 1 6 0 1 6 0 158 16 0 SET REBAR & CAP (38964) OFFSET 1.00' N SET REBAR & CAP (38964) SET MAG NAIL & WASHER (38964) OFFSET 7.00' S SET MAG NAIL & WASHER (38964) OFFSET 7.00' S S88°22'57"W 4.00' DS 4 * CHAINLINE FENCE 0.7' N & 0.60' E CHAINLINE FENCE 0.1' N & 0.20' E 26 6 8 D R WALL 3.0' OFFSET R/W BO T . E L E V = 1 5 2 . 0 0 TO P . E L E V = 1 5 3 . 5 0 BOT . E L E V = 1 5 3 . 8 0 TOP . E L E V = 1 5 6 . 8 0 158 . 1 1 5 0 15 4 156 1 5 6 1 5 8 1 6 4 1 6 6 SSMH RIM = 153.23 I.E.=142.9' 15 8 156 NEW CONCRETE PLANTING STRIP ROCK WALL KEY 15 4 156 15 2 LOT INFO. LOT AREA = 10504 SQ.FT. BUILDING COVERAGE =3462 SQ.FT. PAVEMENT COVERAGE = 1390.23 SQ.FT. WALKWAY = 80.00SQ.FT. TOTAL COVERAGE = 4932.23 SQ.FT. OR 47 % APPROX. BUILDING & PAVEMENT COVERAGE RE V I S I O N S NO . JO B N O . DR A W I N G N O . DESIGNED: DRAWN BY: CHECKED BY: JOB NO.: SCALE: DATE: 35 1 0 9 P A C I F I C H I W A Y S FE D E R A L W A Y W A 9 8 0 0 3 (2 5 3 ) 5 8 3 - 4 4 1 4 * F A X : ( 2 5 3 ) 8 3 5 - 1 5 2 8 JO S H U A K A L E B U , P . E . Em a i l : j k a l e b u @ y a h o o . c o m LI A N G R E S I D E N C E J.KALEBU J.N. J.K. 24EP21 1:20 12.22.25 01 7DAVID LIANG RENTON WASHINGTON CO V E R S H E E T 154 154 BRONSON WAY NE S89°27'29"E 106.30' S2 0 ° 2 4 ' 2 0 " W 13 7 . 1 9 ' S2 ° 0 4 ' 0 5 " W 11 9 . 9 5 ' R=154.70' A=59.98' D= 22°12' 5 3 " R=124.70' A=147.83' D= 67°55'30" 30 . 0 6 ' 30 ' 30 ' PAR C E L N O . 9476 7 0 - 0 1 3 0 PAR C E L N O . 9476 7 0 - 0 1 3 1 PAR C E L N O . 9476 7 0 - 0 6 4 0 11 . 7 ' 9.0' 10 . 1 ' DS 1 2 * SP 1 2 DF 1 6 AP6 16 5 . 5 DS1 6 DS1 6 * ROOF OVERHANG 2.5' 65 . 1 ' BLDG 0.7' W BLDG 2.3' W 0.3' W 0.4' E 0.1' W 0.5' E 0. 7 ' N 0. 5 ' N 0. 4 ' N 0.2' E FENCE 0.0' ROOF 0.3' W ROOF 2.1' W WALL 0.3' W ONE STORY HOUSE FOUND 2" BRASS DISK IN CASE 0.5' DOWN 5.93' 17 4 17 2 17 0 16 8 16 6 16 4 16 2 16 0 1 5 6 1 5 8 16 0 16 2 16 4 16 6 16 8 17 0 17 2 156 1 5 6 15 8 15 8 154 15 215 0 152 154 1 5 0 15 6 1 6 0 16 0 158 16 0 SET REBAR & CAP (38964) OFFSET 1.00' N SET REBAR & CAP (38964) SET MAG NAIL & WASHER (38964) OFFSET 7.00' S SET MAG NAIL & WASHER (38964) OFFSET 7.00' S S88°22'57"W 4.00' DS 4 * CENTERLINE STREAM CHAINLINE FENCE 0.7' N & 0.60' E CHAINLINE FENCE 0.1' N & 0.20' E 26 6 8 D R EL E 1 6 0 ' WALL 3.0' OFFSET R/W 1 5 0 15 4 156 1 5 6 1 5 8 1 6 4 1 6 6 15 8 156 NEW CONCRETE PLANTING STRIP ROCK WALL KEY 156 15 2 RE V I S I O N S NO . JO B N O . DR A W I N G N O . DESIGNED: DRAWN BY: CHECKED BY: JOB NO.: SCALE: DATE: 35 1 0 9 P A C I F I C H I W A Y S FE D E R A L W A Y W A 9 8 0 0 3 (2 5 3 ) 5 8 3 - 4 4 1 4 * F A X : ( 2 5 3 ) 8 3 5 - 1 5 2 8 JO S H U A K A L E B U , P . E . Em a i l : j k a l e b u @ y a h o o . c o m LI A N G R E S I D E N C E J.KALEBU J.N. J.K. 24EP21 1:10 12.22.25 02 7DAVID LIANG RENTON WASHINGTON SI T E P L A N GENERAL NOTES (1) All design and construction shall be in accordance with permit conditions, the RENTON MUNICIPAL CODE (RMC) Standard Specifications and the conditions of preliminary approval. It shall be the sole responsibility of the applicant and the professional civil engineer to correct any error, omission, or variation from the above requirements found in these plans. All corrections shall be at no additional cost or liability to CITY OF RENTON. (2) The design elements within these plans have been reviewed according to the CITY OF RENTON Department of Development and CITY OF RENTON STANDARD DETAILS. Some elements may have been overlooked or missed by the CITY OF RENTON plan reviewer. Any variance from adopted standards is not allowed unless specifically approved by CITY OF RENTON prior to construction. (3) Approval of this road, grading, parking and drainage plan does not constitute an approval of any other construction (e.g. domestic water conveyance, sewer conveyance, gas, electrical, etc.) (4) A copy of these approved plans must be on the job site whenever construction is in progress. (5) Grading activities (site alteration) are limited to the hours of 7 a.m. to 7 p.m. Monday through Saturday and 10 a.m. to 5 p.m. on Sunday, unless otherwise approved with a written decision by the Reviewing Agency. (6) It shall be the applicant's/contractor's responsibility to obtain all construction easements necessary before initiating off-site work. Easements require review and approval prior to construction. (7) Datum shall be KCAS unless otherwise approved by CITY OF RENTON. (8) All utility trenches and roadway subgrade shall be backfilled and compacted to 95 percent density, standard proctor. (11) Open cutting of existing roadways for non-franchised utility or storm work is not allowed unless specifically approved by CITY OF RENTON and noted on these approved plans. Any open cut shall be restored in accordance with CITY OF RENTON RESTORATION STANDARD. (12) The Contractor shall be responsible for providing adequate safeguards, safety devices, protective equipment, flaggers, and any other needed actions to protect the life, health, and safety of the public, and to protect property in connection with the performance of work covered by the contractor. Any work within the traveled right-of-way that may interrupt normal traffic flow shall require at least one flagger for each lane of traffic affected. Manual on Uniform Traffic Control Devices (MUTCD) shall apply. Work in right-of-way is not authorized until a traffic control plan is approved by CITY OF RENTON. BRONSON WAY NE G R A N D E Y W A Y N E S89°27'29"E 106.30' S2 0 ° 2 4 ' 2 0 " W 13 7 . 1 9 ' S2 ° 0 4 ' 0 5 " W 11 9 . 9 5 ' R=154.70' A=59.98' D= 22°12' 5 3 " R=124.70' A=147.83' D= 67°55'30" N88°22'57"E 74.18' 68.25' 30 . 0 6 ' 30 ' 30 ' PAR C E L N O . 9476 7 0 - 0 1 3 0 PARC E L N O . 9476 7 0 - 0 1 3 1 PARC E L N O . 9476 7 0 - 0 6 4 0 11 . 7 ' 9.0' 10 . 1 ' 15 5 . 5 163 . 7 155 . 3 15 6 . 3 154 . 1 15 1 . 5 149 . 1 147 . 6 14 8 . 0 148 . 1 14 8 . 2 148 . 5 14 8 . 1 148 . 7 149 . 1 14 9 . 3 14 9 . 6 149 . 2 149 . 4 149 . 4 14 9 . 5 149 . 8 15 0 . 5 14 9 . 7 150 . 5 150 . 9 15 0 . 5 151 . 3 15 2 . 7 15 2 . 8 152 . 7 15 2 . 5 15 3 . 4 15 3 . 7 15 4 . 3 155 . 3 15 5 . 8 155 . 4 15 5 . 6 BOT = 1 5 5 . 8 TO P = 1 5 9 . 6 BOT = 1 5 5 . 7 155 . 3 15 5 . 7 TOP = 1 5 9 . 3 15 3 . 7 15 4 . 3 15 4 . 7 154 . 3 15 5 . 3 155 . 9 BO T E L E V = 1 5 7 . 3 TOP E L E V = 1 6 1 . 0 15 6 . 2 156 . 0 15 6 . 0 160 . 0 160 . 6 156 . 4 15 6 . 7 156 . 8 15 7 . 0 156 . 6 156 . 6156 . 6 15 6 . 7 156 . 7 156 . 5 15 6 . 4 15 6 . 1 15 5 . 8 155 . 8 155 . 5 155 . 9 154 . 8 154 . 9 153 . 5 156 . 0 15 6 . 0 155 . 9 15 5 . 9 155 . 4 15 5 . 3 15 5 . 2 15 3 . 6 155 . 4 15 5 . 3 155 . 3 15 0 . 6 155 . 4 155 . 0 15 2 . 9 15 0 . 4 15 5 . 1 156 . 1 15 5 . 7 15 6 . 9 155 . 7 15 5 . 8 155 . 9 156 . 9 157 . 3 157 . 3 15 7 . 7 15 7 . 5 157 . 5 15 7 . 5 15 6 . 2 156 . 4 15 6 . 0 155 . 9 155 . 9 15 8 . 1 158 . 1 15 8 . 2 15 8 . 1 158 . 1 157 . 7 158 . 5 160 . 0 162 . 0 162 . 3 161 . 8 161 . 8 161 . 8 161 . 9 162 . 2 16 0 . 1 158 . 8 15 9 . 1 15 9 . 4 BO T = 1 5 9 . 6 160 . 3 BOT = 1 6 2 . 7 TO P = 1 6 3 . 1 16 3 . 2 TO P = 1 6 3 . 2 16 3 . 2 162 . 5 16 2 . 4 162 . 3 162 . 3 161 . 2 15 7 . 0 160 . 3 16 1 . 8 16 2 . 5 16 0 . 2 16 0 . 6 16 4 . 4 TOP = 1 6 4 . 5 BO T = 1 6 0 . 7 160 . 7 16 4 . 5 165 . 3 DS 1 2 * 15 7 . 6 BO T = 1 6 3 . 8 TOP = 1 6 4 . 5 16 4 . 5 16 7 . 8 SP 1 2 166 . 7 16 9 . 6 DF1 6 170 . 7 172 . 0 16 6 . 8 16 4 . 1 163 . 2 AP6 16 3 . 3 16 2 . 8 TO P = 1 6 3 . 0 TOP = 1 6 3 . 2 163 . 2 162 . 5 16 3 . 2 TOP = 1 6 3 . 2 163 . 3 TO P = 1 6 2 . 6 BOT . = 1 6 0 . 4 16 0 . 0 BO T . = 1 6 0 . 2 15 9 . 8 BO T = 1 5 9 . 7 160 . 0 BO T = 1 6 2 . 9 16 3 . 4 15 9 . 3 DS 1 6 158 . 8 15 9 . 1 15 8 . 3 DS1 6 * 15 7 . 9 161 . 5 16 0 . 6 159 . 3 15 8 . 5 159 . 4 159 . 6 15 8 . 1 158 . 7 15 9 . 1 159 . 4 164 . 9 16 4 . 0 162 . 8 16 6 . 9 16 8 . 0 168 . 7 172 . 2 17 2 . 0 176 . 5 175 . 5 158 . 8 17 1 . 8 155 . 1 149 . 4 ROOF OVERHANG 2.5' 65 . 1 ' BLDG 0.7' W BLDG 2.3' W 0.3' W 0.4' E 0.1' W 0.5' E 0. 7 ' N 0. 5 ' N 0. 4 ' N 0.2' E FENCE 0.0' ROOF 0.3' W ROOF 2.1' W WALL 0.3' W ONE STORY HOUSE FOUND 2" BRASS DISK IN CASE 0.5' DOWN 5.93' 17 4 17 2 17 0 16 8 16 6 16 4 16 2 16 0 1 5 6 15 8 16 0 16 2 16 4 16 6 16 8 17 0 17 2 156 1 5 6 15 8 15 8 154 15 215 0 152 154 1 5 0 15 6 1 6 0 16 0 158 16 0 SET REBAR & CAP (38964) OFFSET 1.00' N SET REBAR & CAP (38964) SET MAG NAIL & WASHER (38964) OFFSET 7.00' S SET MAG NAIL & WASHER (38964) OFFSET 7.00' S S88°22'57"W 4.00' DS4 * CENTERLINE STREAM CHAINLINE FENCE 0.7' N & 0.60' E CHAINLINE FENCE 0.1' N & 0.20' E 26 6 8 D R WALL 3.0' OFFSET R/W BOT . E L E V = 1 5 2 . 0 0 TOP . E L E V = 1 5 3 . 5 0 BO T . E L E V = 1 5 3 . 8 0 TOP . E L E V = 1 5 6 . 8 0 158 . 1 1 5 0 15 4 156 1 5 6 1 5 8 1 6 4 1 6 6 158 156 15 4 156 15 2 Construction Sequence: Flag or fence clearing limits. Install catch basin protection, if required. Grade and install construction entrance(s). Install perimeter protection (silt fence, brush barrier, etc.). Construct surface water controls (interceptor dikes, pipe slope drains, etc.) simultaneously with clearing and grading for project development. Maintain TESC measures in accordance with City standards and manufacturer's recommendations. Relocate surface water controls or TESC measures, or install new measures so that as site conditions change, the TESC is always in accordance with the City of Renton Temporary Erosion and Sedimentation Control Requirements. Cover all areas that will be un-worked for more than two days during the wet season (Oct. 1 to April 30) or seven days during the dry season (May 1 to Sept. 30) with straw, wood fiber mulch, compost, plastic sheeting, or equivalent. Stabilize all areas within seven days of reaching final grade. Seed or sod any areas to remain un-worked for more than 30 days. Upon completion of the project, stabilize all disturbed areas and remove TESC measures if appropriate. RE V I S I O N S NO . JO B N O . DR A W I N G N O . DESIGNED: DRAWN BY: CHECKED BY: JOB NO.: SCALE: DATE: 35 1 0 9 P A C I F I C H I W A Y S FE D E R A L W A Y W A 9 8 0 0 3 (2 5 3 ) 5 8 3 - 4 4 1 4 * F A X : ( 2 5 3 ) 8 3 5 - 1 5 2 8 JO S H U A K A L E B U , P . E . Em a i l : j k a l e b u @ y a h o o . c o m LI A N G R E S I D E N C E J.KALEBU J.N. J.K. 24EP21 1:20 12.22.25 03 7DAVID LIANG RENTON WASHINGTON ER O S I O N A N D S E D I M E N T A T I O N C O N T R O L P L A N BRONSON WAY NE G R A N D E Y W A Y N E S89°27'29"E 106.30' S2 0 ° 2 4 ' 2 0 " W 13 7 . 1 9 ' S2 ° 0 4 ' 0 5 " W 11 9 . 9 5 ' R=154.70' A=59.98' D= 22°12' 5 3 " R=124.70' A=147.83' D= 67°55'30" N88°22'57"E 74.18' 68.25' 30 . 0 6 ' 30 ' 30 ' PAR C E L N O . 9476 7 0 - 0 1 3 0 PAR C E L N O . 9476 7 0 - 0 1 3 1 PAR C E L N O . 9476 7 0 - 0 6 4 0 11 . 7 ' 9.0' 10 . 1 ' 16 3 . 7 15 5 . 3 15 6 . 3 15 4 . 1 151 . 5 14 9 . 1 14 7 . 6 14 8 . 0 148 . 1 148 . 2 14 8 . 5 148 . 1 14 8 . 7 149 . 1 14 9 . 3 149 . 6 14 9 . 2 14 9 . 4 14 9 . 4 14 9 . 5 149 . 8 15 0 . 5 14 9 . 7 15 0 . 5 150 . 9 15 0 . 5 15 1 . 3 152 . 7 15 2 . 8 15 2 . 7 152 . 5 15 3 . 4 15 3 . 7 15 4 . 3 15 5 . 3 15 5 . 8 155 . 4 15 5 . 6 BO T = 1 5 5 . 8 TO P = 1 5 9 . 6 BOT = 1 5 5 . 7 15 5 . 3 155 . 7 TO P = 1 5 9 . 3 15 3 . 7 154 . 3 154 . 7 15 4 . 3 15 5 . 3 15 5 . 9 BO T E L E V = 1 5 7 . 3 TO P E L E V = 1 6 1 . 0 15 6 . 2 15 6 . 0 15 6 . 0 16 0 . 0 16 0 . 6 15 6 . 4 15 6 . 7 15 6 . 8 15 7 . 0 15 6 . 6 15 6 . 6 15 6 . 6 15 6 . 7 156 . 7 15 6 . 5 156 . 4 156 . 1 155 . 8 155 . 8 15 5 . 5 15 5 . 9 15 4 . 8 15 4 . 9 15 3 . 5 15 6 . 0 15 6 . 0 15 5 . 9 15 5 . 9 155 . 4 15 5 . 3 15 5 . 2 15 3 . 6 15 5 . 4 15 5 . 3 15 5 . 3 15 0 . 6 15 5 . 4 15 5 . 0 152 . 9 15 0 . 4 15 5 . 1 15 6 . 1 15 5 . 7 15 6 . 9 15 5 . 7 15 5 . 8 155 . 9 15 6 . 9 157 . 3 15 7 . 3 15 7 . 7 15 7 . 5 157 . 5 157 . 5 15 6 . 2 156 . 4 15 6 . 0 15 5 . 9 155 . 9 158 . 1 15 8 . 1 158 . 2 158 . 1 15 8 . 1 15 7 . 7 15 8 . 5 16 0 . 0 162 . 0 16 2 . 3 161 . 8 161 . 8 161 . 8 16 1 . 9 162 . 2 160 . 1 15 8 . 8 15 9 . 1 159 . 4 BOT = 1 5 9 . 6 160 . 3 BO T = 1 6 2 . 7 TO P = 1 6 3 . 1 163 . 2 TO P = 1 6 3 . 2 16 3 . 2 16 2 . 5 16 2 . 4 16 2 . 3 16 2 . 3 16 1 . 2 15 7 . 0 16 0 . 3 16 1 . 8 16 2 . 5 16 0 . 2 16 0 . 6 16 4 . 4 TO P = 1 6 4 . 5 BO T = 1 6 0 . 7 16 0 . 7 16 4 . 5 16 5 . 3 DS 1 2 * 15 7 . 6 BO T = 1 6 3 . 8 TO P = 1 6 4 . 5 16 4 . 5 16 7 . 8 SP 1 2 16 6 . 7 16 9 . 6 DF 1 6 170 . 7 172 . 0 16 6 . 8 16 4 . 1 163 . 2 AP 6 16 3 . 3 16 2 . 8 TOP = 1 6 3 . 0 TOP = 1 6 3 . 2 16 3 . 2 16 2 . 5 16 3 . 2 TO P = 1 6 3 . 2 16 3 . 3 TOP = 1 6 2 . 6 BO T . = 1 6 0 . 4 16 0 . 0 BO T . = 1 6 0 . 2 15 9 . 8 BOT = 1 5 9 . 7 16 0 . 0 BOT = 1 6 2 . 9 16 3 . 4 15 9 . 3 DS 1 6 158 . 8 159 . 1 158 . 3 DS 1 6 * 157 . 9 16 1 . 5 160 . 6 159 . 3 15 8 . 5 15 9 . 4 15 9 . 6 15 8 . 1 15 8 . 7 15 9 . 1 15 9 . 4 16 4 . 9 16 4 . 0 16 2 . 8 16 6 . 9 168 . 0 168 . 7 17 2 . 2 172 . 0 17 6 . 5 17 5 . 5 158 . 8 171 . 8 15 5 . 1 14 9 . 4 ROOF OVERHANG 2.5' 65 . 1 ' BLDG 0.7' W BLDG 2.3' W 0.3' W 0.4' E 0.1' W 0.5' E 0. 7 ' N 0. 5 ' N 0. 4 ' N 0.2' E FENCE 0.0' ROOF 0.3' W ROOF 2.1' W WALL 0.3' W ONE STORY HOUSE FOUND 2" BRASS DISK IN CASE 0.5' DOWN 5.93' 17 4 17 2 17 0 16 8 16 6 16 4 16 2 16 0 1 5 6 1 5 8 16 0 16 2 16 4 16 6 16 8 17 0 17 2 156 1 5 6 15 8 15 8 154 15 215 0 152 154 1 5 0 15 6 1 6 0 16 0 158 16 0 SET REBAR & CAP (38964) OFFSET 1.00' N SET REBAR & CAP (38964) SET MAG NAIL & WASHER (38964) OFFSET 7.00' S SET MAG NAIL & WASHER (38964) OFFSET 7.00' S S88°22'57"W 4.00' DS4 * CENTERLINE STREAM CHAINLINE FENCE 0.7' N & 0.60' E CHAINLINE FENCE 0.1' N & 0.20' E 26 6 8 D R WALL 3.0' OFFSET R/W BOT . E L E V = 1 5 2 . 0 0 TOP . E L E V = 1 5 3 . 5 0 BO T . E L E V = 1 5 3 . 8 0 TO P . E L E V = 1 5 6 . 8 0 15 8 . 1 1 5 0 15 4 156 1 5 6 1 5 8 1 6 4 1 6 6 SSMH RIM = 153.23 I.E.=142.9' 15 8 156 15 4 156 15 2 RE V I S I O N S NO . JO B N O . DR A W I N G N O . DESIGNED: DRAWN BY: CHECKED BY: JOB NO.: SCALE: DATE: 35 1 0 9 P A C I F I C H I W A Y S FE D E R A L W A Y W A 9 8 0 0 3 (2 5 3 ) 5 8 3 - 4 4 1 4 * F A X : ( 2 5 3 ) 8 3 5 - 1 5 2 8 JO S H U A K A L E B U , P . E . Em a i l : j k a l e b u @ y a h o o . c o m LI A N G R E S I D E N C E J.KALEBU J.N. J.K. 24EP21 1:20 12.22.25 04 7DAVID LIANG RENTON WASHINGTON DR A I N A G E P L A N BRONSON WAY NE G R A N D E Y W A Y N E S89°27'29"E 106.30' S2 0 ° 2 4 ' 2 0 " W 13 7 . 1 9 ' S2 ° 0 4 ' 0 5 " W 11 9 . 9 5 ' R=154.70' A=59.98' D= 22°12' 5 3 " R=124.70' A=147.83' D= 67°55'30" N88°22'57"E 74.18' 68.25' 30 . 0 6 ' 30 ' 30 ' PAR C E L N O . 9476 7 0 - 0 1 3 0 PAR C E L N O . 9476 7 0 - 0 1 3 1 PAR C E L N O . 9476 7 0 - 0 6 4 0 11 . 7 ' 9.0' 10 . 1 ' 163 . 7 15 5 . 3 15 6 . 3 154 . 1 151 . 5 14 9 . 1 14 7 . 6 14 8 . 0 14 8 . 1 148 . 2 14 8 . 5 14 8 . 1 14 8 . 7 149 . 1 14 9 . 3 14 9 . 6 149 . 2 14 9 . 4 14 9 . 4 14 9 . 5 149 . 8 15 0 . 5 14 9 . 7 15 0 . 5 15 0 . 9 15 0 . 5 15 1 . 3 15 2 . 7 15 2 . 8 15 2 . 7 152 . 5 15 3 . 4 15 3 . 7 15 4 . 3 15 5 . 3 15 5 . 8 155 . 4 15 5 . 6 BO T = 1 5 5 . 8 TOP = 1 5 9 . 6 BOT = 1 5 5 . 7 15 5 . 3 15 5 . 7 TO P = 1 5 9 . 3 15 3 . 7 15 4 . 3 154 . 7 154 . 3 15 5 . 3 15 5 . 9 BO T E L E V = 1 5 7 . 3 TO P E L E V = 1 6 1 . 0 15 6 . 2 15 6 . 0 15 6 . 0 16 0 . 0 160 . 6 15 6 . 4 15 6 . 7 15 6 . 8 15 7 . 0 15 6 . 6 15 6 . 6 15 6 . 6 156 . 7 156 . 7 15 6 . 5 156 . 4 156 . 1 15 5 . 8 155 . 8 15 5 . 5 15 5 . 9 15 4 . 8 15 4 . 9 15 3 . 5 15 6 . 0 156 . 0 155 . 9 155 . 9 15 5 . 4 15 5 . 3 15 5 . 2 15 3 . 6 15 5 . 4 15 5 . 3 15 5 . 3 150 . 6 155 . 4 155 . 0 15 2 . 9 15 0 . 4 15 5 . 1 156 . 1 155 . 7 156 . 9 15 5 . 7 15 5 . 8 15 5 . 9 15 6 . 9 15 7 . 3 157 . 3 15 7 . 7 15 7 . 5 15 7 . 5 15 7 . 5 15 6 . 2 156 . 4 15 6 . 0 15 5 . 9 155 . 9 158 . 1 15 8 . 1 158 . 2 15 8 . 1 15 8 . 1 15 7 . 7 15 8 . 5 160 . 0 162 . 0 16 2 . 3 16 1 . 8 16 1 . 8 16 1 . 8 161 . 9 16 2 . 2 160 . 1 15 8 . 8 15 9 . 1 15 9 . 4 BO T = 1 5 9 . 6 160 . 3 BO T = 1 6 2 . 7 TOP = 1 6 3 . 1 163 . 2 TO P = 1 6 3 . 2 163 . 2 16 2 . 5 16 2 . 4 16 2 . 3 162 . 3 161 . 2 15 7 . 0 16 0 . 3 161 . 8 16 2 . 5 16 0 . 2 16 0 . 6 16 4 . 4 TO P = 1 6 4 . 5 BO T = 1 6 0 . 7 160 . 7 16 4 . 5 16 5 . 3 DS 1 2 * 15 7 . 6 BOT = 1 6 3 . 8 TO P = 1 6 4 . 5 16 4 . 5 16 7 . 8 SP 1 2 16 6 . 7 169 . 6 DF 1 6 170 . 7 172 . 0 16 6 . 8 16 4 . 1 163 . 2 AP6 16 3 . 3 16 2 . 8 TO P = 1 6 3 . 0 TO P = 1 6 3 . 2 16 3 . 2 16 2 . 5 16 3 . 2 TOP = 1 6 3 . 2 163 . 3 TOP = 1 6 2 . 6 BOT . = 1 6 0 . 4 16 0 . 0 BO T . = 1 6 0 . 2 15 9 . 8 BO T = 1 5 9 . 7 160 . 0 BO T = 1 6 2 . 9 16 3 . 4 15 9 . 3 DS1 6 158 . 8 159 . 1 158 . 3 DS 1 6 * 15 7 . 9 161 . 5 16 0 . 6 15 9 . 3 15 8 . 5 15 9 . 4 15 9 . 6 15 8 . 1 15 8 . 7 159 . 1 159 . 4 164 . 9 16 4 . 0 162 . 8 16 6 . 9 16 8 . 0 16 8 . 7 17 2 . 2 172 . 0 176 . 5 17 5 . 5 15 8 . 8 171 . 8 15 5 . 1 149 . 4 ROOF OVERHANG 2.5' 65 . 1 ' BLDG 0.7' W BLDG 2.3' W 0.3' W 0.4' E 0.1' W 0.5' E 0. 7 ' N 0. 5 ' N 0. 4 ' N 0.2' E FENCE 0.0' ROOF 0.3' W ROOF 2.1' W WALL 0.3' W ONE STORY HOUSE FOUND 2" BRASS DISK IN CASE 0.5' DOWN 5.93' 17 0 16 0 16 0 17 0 15 8 15 8 15 0 1 5 0 1 6 0 16 0 16 0 SET REBAR & CAP (38964) OFFSET 1.00' N SET REBAR & CAP (38964) SET MAG NAIL & WASHER (38964) OFFSET 7.00' S SET MAG NAIL & WASHER (38964) OFFSET 7.00' S S88°22'57"W 4.00' DS 4 * CENTERLINE STREAM CHAINLINE FENCE 0.7' N & 0.60' E CHAINLINE FENCE 0.1' N & 0.20' E 26 6 8 D R WALL 3.0' OFFSET R/W BO T . E L E V = 1 5 2 . 0 0 TO P . E L E V = 1 5 3 . 5 0 BOT . E L E V = 1 5 3 . 8 0 TOP . E L E V = 1 5 6 . 8 0 15 8 . 1 1 5 0 15 4 156 1 5 6 1 5 8 1 6 4 1 6 6 158 156 15 4 156 15 2 RE V I S I O N S NO . JO B N O . DR A W I N G N O . DESIGNED: DRAWN BY: CHECKED BY: JOB NO.: SCALE: DATE: 35 1 0 9 P A C I F I C H I W A Y S FE D E R A L W A Y W A 9 8 0 0 3 (2 5 3 ) 5 8 3 - 4 4 1 4 * F A X : ( 2 5 3 ) 8 3 5 - 1 5 2 8 JO S H U A K A L E B U , P . E . Em a i l : j k a l e b u @ y a h o o . c o m LI A N G R E S I D E N C E J.KALEBU J.N. J.K. 24EP21 1:20 12.22.25 05 7DAVID LIANG RENTON WASHINGTON WA T E R A N D S A N . S E W E R P L A N BRONSON WAY NE S89°27'29"E 106.30' S2 0 ° 2 4 ' 2 0 " W 13 7 . 1 9 ' S2 ° 0 4 ' 0 5 " W 11 9 . 9 5 ' R=154.70' A=59.98' D= 22°12' 5 3 " R=124.70' A=147.83' D= 67°55'30" N88°22'57"E 74.18' 68.25' 30 . 0 6 ' 30 ' 30 ' PAR C E L N O . 9476 7 0 - 0 1 3 0 PAR C E L N O . 9476 7 0 - 0 1 3 1 PAR C E L N O . 9476 7 0 - 0 6 4 0 11 . 7 ' 9.0' 10 . 1 ' 16 3 . 7 155 . 3 15 6 . 3 15 4 . 1 15 1 . 5 14 9 . 1 14 7 . 6 14 8 . 0 14 8 . 1 14 8 . 2 14 8 . 5 148 . 1 14 8 . 7 14 9 . 1 149 . 3 14 9 . 6 14 9 . 2 14 9 . 4 149 . 4 14 9 . 5 14 9 . 8 15 0 . 5 14 9 . 7 150 . 5 15 0 . 9 15 0 . 5 15 1 . 3 15 2 . 7 15 2 . 8 152 . 7 15 2 . 5 15 3 . 4 15 3 . 7 154 . 3 15 5 . 3 15 5 . 8 15 5 . 4 15 5 . 6 BO T = 1 5 5 . 8 TO P = 1 5 9 . 6 BO T = 1 5 5 . 7 15 5 . 3 155 . 7 TO P = 1 5 9 . 3 15 3 . 7 15 4 . 3 15 4 . 7 15 4 . 3 15 5 . 3 15 5 . 9 BO T E L E V = 1 5 7 . 3 TO P E L E V = 1 6 1 . 0 15 6 . 2 156 . 0 15 6 . 0 16 0 . 0 160 . 6 156 . 4 15 6 . 7 15 6 . 8 15 7 . 0 15 6 . 6 15 6 . 6 15 6 . 6 15 6 . 7 15 6 . 7 156 . 5 15 6 . 4 15 6 . 1 15 5 . 8 15 5 . 8 15 5 . 5 15 5 . 9 15 4 . 8 15 4 . 9 15 3 . 5 15 6 . 0 15 6 . 0 15 5 . 9 15 5 . 9 15 5 . 4 155 . 3 15 5 . 2 15 3 . 6 155 . 4 15 5 . 3 15 5 . 3 15 0 . 6 155 . 4 155 . 0 15 2 . 9 15 0 . 4 15 5 . 1 15 6 . 1 15 5 . 7 15 6 . 9 15 5 . 7 15 5 . 8 155 . 9 156 . 9 157 . 3 157 . 3 157 . 7 15 7 . 5 15 7 . 5 15 7 . 5 156 . 2 15 6 . 4 15 6 . 0 15 5 . 9 15 5 . 9 15 8 . 1 15 8 . 1 15 8 . 2 158 . 1 15 8 . 1 15 7 . 7 15 8 . 5 160 . 0 16 2 . 0 16 2 . 3 161 . 8 16 1 . 8 16 1 . 8 161 . 9 162 . 2 16 0 . 1 158 . 8 15 9 . 1 15 9 . 4 BO T = 1 5 9 . 6 16 0 . 3 BOT = 1 6 2 . 7 TOP = 1 6 3 . 1 16 3 . 2 TO P = 1 6 3 . 2 163 . 2 16 2 . 5 16 2 . 4 162 . 3 16 2 . 3 16 1 . 2 15 7 . 0 16 0 . 3 16 1 . 8 16 2 . 5 160 . 2 16 0 . 6 16 4 . 4 TOP = 1 6 4 . 5 BO T = 1 6 0 . 7 16 0 . 7 16 4 . 5 16 5 . 3 DS 1 2 * 15 7 . 6 BOT = 1 6 3 . 8 TO P = 1 6 4 . 5 16 4 . 5 16 7 . 8 SP 1 2 16 6 . 7 16 9 . 6 DF 1 6 17 0 . 7 17 2 . 0 16 6 . 8 16 4 . 1 16 3 . 2 AP 6 16 3 . 3 16 2 . 8 TOP = 1 6 3 . 0 TO P = 1 6 3 . 2 163 . 2 162 . 5 16 3 . 2 TO P = 1 6 3 . 2 16 3 . 3 TOP = 1 6 2 . 6 BOT . = 1 6 0 . 4 16 0 . 0 BOT . = 1 6 0 . 2 15 9 . 8 BOT = 1 5 9 . 7 160 . 0 BO T = 1 6 2 . 9 16 3 . 4 15 9 . 3 DS1 6 15 8 . 8 15 9 . 1 158 . 3 DS 1 6 * 157 . 9 161 . 5 16 0 . 6 159 . 3 15 8 . 5 15 9 . 4 15 9 . 6 15 8 . 1 15 8 . 7 15 9 . 1 159 . 4 164 . 9 16 4 . 0 16 2 . 8 16 6 . 9 16 8 . 0 168 . 7 172 . 2 17 2 . 0 17 6 . 5 175 . 5 158 . 8 17 1 . 8 15 5 . 1 14 9 . 4 ROOF OVERHANG 2.5' 65 . 1 ' BLDG 0.7' W BLDG 2.3' W 0.3' W 0.4' E 0.1' W 0.5' E 0. 7 ' N 0. 5 ' N 0. 4 ' N 0.2' E FENCE 0.0' ROOF 0.3' W ROOF 2.1' W WALL 0.3' W ONE STORY HOUSE FOUND 2" BRASS DISK IN CASE 0.5' DOWN 5.93' 17 4 17 2 17 0 16 8 16 6 16 4 16 2 16 0 1 5 6 1 5 8 16 0 16 2 16 4 16 6 16 8 17 0 17 2 156 1 5 6 15 8 15 8 154 15 215 0 152 154 1 5 0 15 6 1 6 0 16 0 158 16 0 SET REBAR & CAP (38964) OFFSET 1.00' N SET REBAR & CAP (38964) SET MAG NAIL & WASHER (38964) OFFSET 7.00' S SET MAG NAIL & WASHER (38964) OFFSET 7.00' S S88°22'57"W 4.00' DS4 * CENTERLINE STREAM CHAINLINE FENCE 0.7' N & 0.60' E CHAINLINE FENCE 0.1' N & 0.20' E WALL 3.0' OFFSET R/W BO T . E L E V = 1 5 2 . 0 0 TO P . E L E V = 1 5 3 . 5 0 BOT . E L E V = 1 5 3 . 8 0 TOP . E L E V = 1 5 6 . 8 0 15 8 . 1 1 5 0 15 4 156 1 5 6 1 5 8 1 6 4 1 6 6 15 8 156 NEW CONCRETE PLANTING STRIP ROCK WALL KEY 15 4 156 15 2 RE V I S I O N S NO . JO B N O . DR A W I N G N O . DESIGNED: DRAWN BY: CHECKED BY: JOB NO.: SCALE: DATE: 35 1 0 9 P A C I F I C H I W A Y S FE D E R A L W A Y W A 9 8 0 0 3 (2 5 3 ) 5 8 3 - 4 4 1 4 * F A X : ( 2 5 3 ) 8 3 5 - 1 5 2 8 JO S H U A K A L E B U , P . E . Em a i l : j k a l e b u @ y a h o o . c o m LI A N G R E S I D E N C E J.KALEBU J.N. J.K. 24EP21 1:10 12.22.25 06 7DAVID LIANG RENTON WASHINGTON FR O N T A G E I M P R O V E M E N T S GENERAL NOTES (1) All design and construction shall be in accordance with permit conditions, the CITY OF RENTON Code (KCC), Road Standards (KCRS), Washington State DOT (WSDOT) Standard Specifications and the conditions of preliminary approval. It shall be the sole responsibility of the applicant and the professional civil engineer to correct any error, omission, or variation from the above requirements found in these plans. All corrections shall be at no additional cost or liability to CITY OF RENTON. (2) The design elements within these plans have been reviewed according to the CITY OF RENTON Department of Development and CITY OF RENTON STANDARD DETAILS. Some elements may have been overlooked or missed by the CITY OF RENTON plan reviewer. Any variance from adopted standards is not allowed unless specifically approved by CITY OF RENTON prior to construction. (3) Approval of this road, grading, parking and drainage plan does not constitute an approval of any other construction (e.g. domestic water conveyance, sewer conveyance, gas, electrical, etc.) (4) A copy of these approved plans must be on the job site whenever construction is in progress. (5) Grading activities (site alteration) are limited to the hours of 7 a.m. to 7 p.m. Monday through Saturday and 10 a.m. to 5 p.m. on Sunday, unless otherwise approved with a written decision by the Reviewing Agency. (6) It shall be the applicant's/contractor's responsibility to obtain all construction easements necessary before initiating off-site work. Easements require review and approval prior to construction. (7) Datum shall be KCAS unless otherwise approved by CITY OF RENTON. (8) All utility trenches and roadway subgrade shall be backfilled and compacted to 95 percent density, standard proctor. (11) Open cutting of existing roadways for non-franchised utility or storm work is not allowed unless specifically approved by CITY OF RENTON and noted on these approved plans. Any open cut shall be restored in accordance with CITY OF RENTON RESTORATION STANDARD. (12) The Contractor shall be responsible for providing adequate safeguards, safety devices, protective equipment, flaggers, and any other needed actions to protect the life, health, and safety of the public, and to protect property in connection with the performance of work covered by the contractor. Any work within the traveled right-of-way that may interrupt normal traffic flow shall require at least one flagger for each lane of traffic affected. Manual on Uniform Traffic Control Devices (MUTCD) shall apply. Work in right-of-way is not authorized until a traffic control plan is approved by CITY OF RENTON. RE V I S I O N S NO . JO B N O . DR A W I N G N O . DESIGNED: DRAWN BY: CHECKED BY: JOB NO.: SCALE: DATE: 35 1 0 9 P A C I F I C H I W A Y S FE D E R A L W A Y W A 9 8 0 0 3 (2 5 3 ) 5 8 3 - 4 4 1 4 * F A X : ( 2 5 3 ) 8 3 5 - 1 5 2 8 JO S H U A K A L E B U , P . E . Em a i l : j k a l e b u @ y a h o o . c o m LI A N G R E S I D E N C E J.KALEBU J.N. J.K. 16EP17 1:10 12.22.25 07 7DAVID LIANG RENTON WASHINGTON NO T E S A N D D E T A I L S