ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for
the land use action.
Planning:
(Contact: Mariah Kerrihard, 425-430-7238, mkerrihard@rentonwa.gov)
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless
otherwise approved by the Development Services Division.
2. Commercial, multi-family, new single family and other nonresidential construction activities shall be
restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through
Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight
o’clock (8:00) p.m. No work shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where
no further construction work will occur within ninety (90) days. Alternative measures such as mulch,
sodding, or plastic covering as specified in the current King County Surface Water Management Design
Manual as adopted by the City of Renton may be proposed between the dates of November 1st and
March 31st of each year. The Development Services Division’s approval of this work is required prior to
final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is
being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or
fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the
area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around
the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be
placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on
each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups
of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the
applicant shall provide supervision whenever equipment or trucks are moving near trees.
7. This permit shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible
for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and
/or your U.S. Fish and Wildlife Service permit.
Development Engineering
(Contact: Huy Huynh, 425-430-7384, hhuynh@rentonwa.gov)
1. See Attached Development Engineering Memo dated August 15, 2025
Renton Regional Fire Authority
(Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org)
Environmental Impact Comments:
1. The fire impact fees are currently applicable at the rate of $421.98 per single family unit. This fee is
paid at building permit issuance. Credit will be granted for the one existing home that is removed or
EXHIBIT 17
Docusign Envelope ID: E902728E-F201-4BE5-890E-CDD551973362
ADVISORY NOTES TO APPLICANT
Page 2 of 6 LUA25-000195
retained.
Fire Code Comments:
1. The fire flow requirement for a single-family home is 1,000 gpm minimum for dwellings up to 3,600
square feet (including garage and basements). If the dwelling exceeds 3,600 square feet, a minimum
of 1,500 gpm fire flow would be required. A minimum of one fire hydrant is required within 300-feet
of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. Water is provided by
King County Water District 90. A water availability certificate is required from them. It appears at least
one new hydrant will be required.
2. Fire department apparatus access roadways are required to be a minimum of 20-feet wide fully paved,
with 25-feet inside and 45-feet outside turning radius. Fire access roadways shall be constructed to
support a 30-ton vehicle with 75-psi point loading. Access is required within 150-feet of all points on
the buildings. Dead end streets that exceed 150-feet in length require an approved turnaround. A
hammerhead type turnaround is allowed.
Technical Services:
(Contact: Stephanie Rary, 425-430-6592, srary@rentonwa.gov)
1. While there are no notable encumbrances against the property on the title report, they need to
include all Schedule B items on the final short plat.
2. The title report indicates that the property is owned by “The Heirs and Devisees of Binh Vuong,
deceased and Ha Tat Vuong, as her separate estate.” I am requesting that ownership of the property is
settled, and an updated title report shows ownership of the property vested in specific individuals.
3. The map shows fence encroachments on the north and east property boundaries. I am requesting that
the fence encroachments are resolved prior to submission for review of the final short plat.
Community Services:
(Contact: Jason Lederer, 425-430-6547, jlederer@rentonwa.gov)
1. No comments at this time.
Police:
(Contact: Sandra Havlik, 425-430-7520, shavlik@rentonwa.gov)
1. No comments at this time.
Building:
(Contact: Rob Shuey, 425-430-7235, rshuey@rentonwa.gov)
1. No comments at this time.
Docusign Envelope ID: E902728E-F201-4BE5-890E-CDD551973362
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: March 25th, 2025
TO: Mariah Kerrihard, Planner
FROM: Huy Huynh, Civil Engineer II
SUBJECT: Vuong Short Plat
12820 156th Ave SE
LUA25-000240
I have reviewed the above-referenced proposal located at parcel(s) 3664500165. The following comments
are based on the Land-Use submittal made to the City of Renton by the applicant.
EXISTING CONDITIONS
WATER: The project is within the King County Water District 90 service area.
SEWER: The project is within the City of Renton’s sanitary sewer service area. There is an 8-inch gravity
wastewater main located in 156th Ave SE (see record drawing S-399902). The existing structure is
connected to an on-site septic system.
STORM: There are existing public stormwater ditches and culverts on the east side of 156th Ave SE.
STREETS: The proposed development fronts 156th Ave SE on the western property line. 156th Ave SE is
classified as a minor arterial street with an existing right of way width of 60-feet.
Water
1. Applicant shall obtain a water availability certificate from the District and provide it with the civil
construction permit submittal.
i. A water availability certificate from Water District 90 was provided with the Land
Use Submittal.
2. Review of the water plans will be conducted by King County Water District 90 and the Renton
Regional Fire Authority.
3. Plans approved by King County Water District 90 shall be routed to the City for final review prior to
permit issuance.
Sanitary Sewer
1. A minimum 8-inch sewer main extension will be required to extend from the existing 8-inch main in
156th Ave SE to the northern most extents of the property. Sewer main extensions shall be in
accordance with RMC 4-6-060.
i. The sewer main location as shown is conceptually acceptable.
Docusign Envelope ID: E902728E-F201-4BE5-890E-CDD551973362
2. Individual sewer stubs from the new sewer main and individual side sewers are required for each
lot. All new sewer stubs shall conform to the standards in RMC 4-6-040 and City of Renton Standard
Details.
i. Applicant proposes two sewer stubs off of the new sewer main running in SE 130th
St. As part of the short plat, all lots, including the existing house shall be
connected to sewer.
3. The existing septic system shall be decommissioned in accordance with King County Department of
Health and City of Renton standards.
4. A conceptual utility plan will be required as part of the land use application for the subject
development.
5. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for sewer
is based on the size of the new domestic water to serve the project. Current fees can be found in the
2025 Development Fees Document on the City’s website. Fees will be charged based on the rate at
the time of construction permit issuance.
• The current sewer fee for is $4,025.00 per 1-inch meter.
• Final determination of applicable fees will be made after the water meter size has been
determined.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=9010319&dbid=0&repo=CityofR
enton
6. The development is within the Central Plateau Interceptor SAD boundary and is subject to SAD fees.
All lots are subject to the SAD fee. The SAD has reached its maximum value of $538.48 per lot.
Payment of these fees is required at time of building permit issuance.
Surface Water
1. A geotechnical report dated December 20, 2022, completed by Innovative Geo-Services, LLC, was
provided with the Land Use Application. Geotechnical recommendations presented in this report
support the use of infiltration at a rate of 4 in/hr.
2. A preliminary TIR dated July 5, 2024 was submitted by Tebaldi Engineering with the Land Use
Application. The site falls within the Flow Control Duration Standard Matching Forested Site
Conditions and falls within a flood problem flow control standard thus the report shall also meet the
requirements of the Flood Problem Flow Control Standard. The site falls within the Lower Cedar River
drainage basin. The report is based on a full drainage review and Core Requirements 1 through 9 and
the six Special Requirements have been discussed in the Technical Information Report.
a. Offsite Analysis, RSWDM Core Requirement #2: All proposed projects must submit an
offsite analysis report that assesses potential offsite drainage and water quality impacts
associated with development of the project site. The preliminary TIR submittal includes a
Level 1 Downstream Analysis.
b. Flow Control, RSWDM Core Requirement #3: Any proposed detention and/or water
quality vault shall be designed in accordance with the RSWDM that is current at the time
of civil construction permit application. The preliminary TIR claims an exemption from a
flow control facility requirement as the target surfaces generate less than 0.15 cfs
increase in the existing site conditions 100 years peak flow. Therefore, the project meets
the basic exemption from Core Requirement #3 in the 2022 RSWDM section 1.2.3.
i. Per the preliminary TIR, infiltration trenches will be utilized to fully infiltrate lot
run-off, thus, reduce the total run-off of the site to less than 0.15 CFS. Per the
Docusign Envelope ID: E902728E-F201-4BE5-890E-CDD551973362
geotechnical report, the underlying soil is silty, gravelly sand while full
infiltration is only feasible under coarse sand, cobbles, and medium sand soil
conditions. Additional infiltration calculation per section 5.2 of the 2022
RSWDM is required at the time of civil construction permit.
c. Conveyance, RSWDM Core Requirement #4: All new conveyance systems constructed as
part of the project must be sized to RSWDM standards for the total tributary area (onsite
and offsite) that the storm systems serve. The proposal indicates that an analysis will be
provided with final engineering.
i. A conveyance system and capacity analysis shall be provided with the TIR and
submit at time of civil construction permit application.
d. Construction Stormwater Pollution Prevention, Core Requirement #5
ii. A CSWPP shall be provided with the TIR and submit at the time of civil
construction permit application.
e. Maintenance and Operations, Core Requirement #6
iii. A maintenance and operation manual shall be provided with the TIR and submit
at the time of civil construction permit application.
f. Water Quality, RSWDM Core Requirement #8: All projects that add more than 5,000
square feet of pollution generating impervious surface (PGIS) that is not fully dispersed
and less than 0.75 acre of pollution generating pervious surface that is not fully dispersed
require water quality. The TIR indicates that all PGIS surfaces will be treated with a
Contech Storm filter.
i. A water quality analysis and system sizing shall be provided in the TIR and
submit at time of civil construction permit application.
g. Onsite BMPs, RSWDM Core Requirement #9: Appropriate on-site BMPs will be required
to help mitigate the new runoff created by this development. The proposal indicates that
BMP feasibilities will be evaluated with final engineering.
i. A discussion of the feasibility of BMPs in section 1.2.9.2.1 Small Lot BMP
requirements shall be provided at the time of civil construction permit
application.
3. Erosion control measures to meet the City requirements shall be provided.
i. Erosion control plans shall be submit at the time of civil construction permit
application.
4. The development falls within the R-4 zone which has a maximum impervious surface area of 50% per
lot, and maximum building coverage of 35% per lot.
5. The development is subject to a surface water system development charge (SDC) fees. Fees will be
charged based on the rate at the time of construction permit issuance.
• The current SDC fee for a single family residence is $2,350 per lot.
• The current property contains one single family home, the developer will receive a credit for
the existing home if it is demoed.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=10067864&dbid=1&repo=Cityof
Renton
Docusign Envelope ID: E902728E-F201-4BE5-890E-CDD551973362
Transportation
1. Per City code 4-6-060 frontage improvements are required for new construction in excess of
$175,000. The proposed project fronts 156th AVE SE to the west and an unimproved alley to the
north.
a. 156th Ave SE is classified as a Minor Arterial street. Existing right-of-way (ROW) width is
approximately 60 feet according to the King County Assessors Map with an existing paved
width of approximately 30 feet. To meet the City’s complete street standards for Minor
Arterial streets, minimum ROW is 91 feet. Per City code 4-6-060, half street improvements
shall include a pavement width of 54 feet (27 feet from centerline), a 0.5-foot curb, an 8-
foot planting strip, an 8-foot sidewalk, a 2-foot clear space at the back of walk, street trees
and storm drainage improvements.
i. However, the adopted Renton Trails and Bicycle Master Plan designates 156th Ave
SE for use with a designated bike lane. Therefore, a modified frontage along 156th
Ave SE will be required and shall consist of a 44 foot paved roadway (consisting
of two 11 foot travel lanes, a 12 foot turn lane, and two 5 foot bike lanes), a 0.5-
foot curb, an 8-foot planting strip, a 5-foot sidewalk, street trees and storm drain
improvements. A street modification will be required with the land use
application. Dedication of approximately 5.5 feet will be required.
1. City staff supports using the modified street section and dedication as listed
in the above paragraph, and as shown on the submitted plans.
2. For dead end roads in excess of 150 feet an approved fire access turnaround is required. See city
code 4-6-060 for types of turnaround allowed. The applicant has proposed a hammerhead
turnaround between lots 2 and 3 along with half street improvement for the interior access road SE
130th St
i. The applicant shall revise SE 130th Street in accordance with the City of
Renton’s half-street improvement standards. This shall include a right-of-way
(ROW) width of forty-two feet (42'), with twenty-six feet (26') of paved surface
comprising two (2) ten-foot (10') travel lanes and one (1) six-foot (6') parking
lane. A curb, planting strip, and sidewalk shall be installed on the
development side of the street, along with a six-inch (0.5') clear space behind
the sidewalk, consistent with the minimum design standards for public
streets. The opposite side of the street shall provide two feet (2') of clear
space behind the edge of pavement.
3. Refer to City code 4-4-080 regarding driveway regulations.
a. A minimum separation of 5 feet is required between driveway and the property line.
b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall provide
slotted drains.
c. The maximum width of single loaded garage driveway shall not exceed nine feet (9') and
double-loaded garage driveway shall not exceed sixteen feet (16').
4. Undergrounding of all existing and new utilities is required on all frontages per RMC 4-6-090.
5. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Trench
Restoration and Street Overlay Requirements.
6. The development is subject to transportation impact fees. Fees will be charged based on the rate at
the time of building permit issuance.
a. The 2025 transportation impact fee is $11,486 per single family home.
Docusign Envelope ID: E902728E-F201-4BE5-890E-CDD551973362
b. The current property contains one single family home, the developer will receive a credit
for the existing home if it is demoed.
c. The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=9010319&dbid=0&repo=CityofR
enton
General Comments
1. If frontage improvements are required, all existing and proposed utility lines (i.e. electrical, phone, and
cable services, etc.) along property frontage or within the site must be underground as outlined in
RMC 4-6-090 – UTILITY LINES - UNDERGROUND INSTALLATION. The construction of these franchise
utilities must be inspected and approved by a City of Renton inspector.
2. Adequate separation between utilities as well as other features shall be provided in accordance with
code requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is
required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or
building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the
building.
3. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer
shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-
to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
4. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate sheets.
5. Fees quoted in this document reflect the fees applicable in the year 2022 only and will be assessed
based on the fee that is current at the time of the permit application or issuance, as applicable to the
permit type. Please visit www.rentonwa.gov for the current development fee schedule.