CONTRACT: CAG-25-044
CITY OF RENTON
Community and Economic Development
CONTRACT CHANGE ORDER AGREEMENT
CONTRACTOR: Active Construction Inc.
CHANGE ORDER: 18
SUMMARY OF PROPOSED CHANGE:
3/9/2026
Existing pef poles at Gateway Park were not acceptable for reinstall in current condition. Reuse of the existing poles was part of the
intended project scope. Existing ped poles were brought up to standard at the direction of the city to ensure install. This work
included adding ground lugs inside poles, removal of various bolts and screws, drilling and retapping for proper connections, opening
of all fixtures to adjust lens, clean and reclose for proper globe alignment, replacement of (4) fixture fuses, replacement of old wire
nute with waterproof type. This work was completed in 2025 and falls under the 2025 tax rate of 10.3%.
DESCRIPTION:
Item Qty. Description Amount Amount
No. w/outWSST w/WSST
1 1 Existing Light Pole Repairs (CP #016) $ 1,404.49 $ 1,549.15
$ -
$ -
Total this Change Order: $ 1,404.49 $ 1,549.15
ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT
AMOUNT (W/OUT WSST) AMOUNT (W/OUT WSST) THIS ORDER (W/OUT WSST) TOTAL AFTER CHANGE (W/OUT WSST)
$ 1,501,501.00 $ 1,691,690.90 $ 1,404.49 $ 1,693,095.39
ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT
AMOUNT AMOUNT (W/ WSST) THIS ORDER (W/ WSST) TOTAL AFTER CHANGE
$ 1,501,501.00 $ 1,711,056.16 $ 1,549.15 $ 1,712,605.31
Additional Calendar Days:
None.
The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment
with respect to the work described in this change order. The work covered by this change order must be performed under
the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement
remain in effect.
SIGNATURES:
Contractor:
Project Engineer:
Approved By:
Approved By:
Approved By:
Attest:
_,.
Codey Ayres
Codey Ayres, ct1ve onstruction Inc.
Justin Johnson
Justin Johnson, eve oj)ment Engineering Director _,.
Gina Estep
Gina Es ,�ator
Approved via email 3/12/2026
Cheryl Beyer, Senior Assistant City Attorney
NIA
Jason Seth, City Clerk
Date: 3/27/2026 I 10:33 AM PDT
3/19/2026 I 1:51 PM PDT Date
Date: 3/20/2026 I 7:20 AM PDT
Date: 3/23/2026 I 11:40 AM PDT
Date
Date:
CAG-25-044, CO #18-26