HomeMy WebLinkAboutS-404604W
Q
Z
F--
U
W
O
D_
a_
z
O
F--I
z
Lu
L1J
Lu
z
H-1
L.L.
Lu
Lu
�I
VI
Z
N
M
r�
1
�O
V /
2"x2" 14 GAUGE WIRE, OR
EQUIVALENT, IF STANDARD
STRENGTH FABRIC USED
FILTER FABRIC
8' MAX.
POST SPACING MAY BE INCREASED I I \- 4"x4" MIN. TRENCH
TO W IF WIRE BACKING IS USED
BACKFILL TRENCH WITH NATIVE SOIL
OR 3/4" TO 1-1/2' WASHED GRAVEL
2"x4' WOOD POSTS. STEEL FENCE POSTS, OR EQUIVALENT
_NOTES:
1_CONDITIONS OF USE
1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
1.2 SIL I FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FI
FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE
ADS (ASTM D4751)
30-100 SIEVE SIZE (0.60-0.I S= FOR SILT FILM
50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS
WATER PERMITTIVITY (ASTM D4491)
0.02 SEC' MINIMUM
GRAB TENSILE STRENGTH (ASTM D4632)
180 LBS. MIN. FOR EXTRA STRENGTH FABRIC
100 LBS. MIN. FOR STANDARD STRENGTH FABRIC
GRAB TENSILE ELONGATION (ASTM D4632)
30% MAX. (WOVEN)
ULTRAVIOLET RESISTANCE (ASTM D4355)
70 % MIN.
2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SP,
FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3 WHERE THE FENCE IS INSTALLED. THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V
2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4' TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE I
SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE.
2 5 FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.
3.2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE. THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POI
3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND
CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS. REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT.
3.4. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
2' MIN.
12" MIN.
ANY CONCENTRATED
ON SITE,
MAY BE REQUIRED
IS WELL BURIED AND
CAUSING
UNLESS OTHERWISE NOTED, RAWING IS NOT TO SCALE IN I S)
STD. PLAN - 214.00
URIUBLIC WORKS SILT FENCE PR 9/28/2018 1
DEPARTMENT GAZ
lowA,ei,. w.. AK,,.,M DATE
EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES:
THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) PLAN SET. ALL THE NOTES ON THE
LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT
APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE I IEEDED FOR SPECIFIC
ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES.
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF R NTON, HEREBY
REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR.
2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMV IATER GENERAL
PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED I D ECOLOGY
ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT,
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION
COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS. SENSITIVE AREAS AND THEIR BUFFERS. AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS
PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX OF THE CITY OF
RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIO . NO DISTURBANCE
BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANTIESC SUPERVISOR Foi I THE DURATION OF
CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION DF THE PROJECT.
ADDITIONAL MEASURES. SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVEDAREAS ARE KEPT
CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT, IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL
BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING
WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE
TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE
WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF
SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTOR I CONDITION UNTIL
SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHAI L BE REMOVED AFTER
CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IN PLEMENTATION.
MAINTENANCE, REPLACEMENT, ENHANCEMENT. AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8, ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY,
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS C NSTRUCTION
PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE. THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BENECESSARY TO ENSURE
COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RES ONSIBILITY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER A NO ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED. TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES. RESTRICTORS,
CHANNELS, OR STORMWATER FACILITIES.
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REV EW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SE ON (OCTOBER 1ST
THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED
ESC COVER METHODS (E.G., SEEDING, MULCHING. PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APP ROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT,
INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY
I& BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIC ED FOR ALL STORM
DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA. UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED
TO A SEDIMENT POND OR TRAP ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING
CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYICE LINES SHALL BE
CLEANED PRIOR TO PAVING- THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
18 ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY E BMPS AND SHALL
PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE
TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT
FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT,
ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR
SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON.
AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21, PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAV NG THE PROJECT SITE,
ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY
FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED.AT A MINIMUM,
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH
WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTEql TO SERVE AS
RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROC RIES OUTSIDE OF
ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE.
UNLESS OTHERWISE NOTED DRAWING IS NOT TO SCALE (NTS)
AdmilSTD. PLAN - 268.00
•� PUBLIC WORKS EROSION AND SEDIMENT CONTROL PPRilk D:
1- DEPARTMENT STANDARD PLAN NOTES GAZ 9/28/2018 1
,%air [ -PUGII[ WmA, AbAirisi,not DATE
LARSON and ASSOCIATES
. amj
9027 PACIFIC AVENUE. SUITE 4
TACOMA, WA 98444 (253) 474-3404
PUBLIC SANITARY SEWER EXTENSION
W (SEE NOTE 7) -��- LIMITS OF PIPE ZONE
1" 0"
BEDDING MATERIAL FOR I
SANITARY SEWER PIPE /
(SEE NOTE 5) O.D. OF PIPE
FOUNDATION LEVEL
6"
BEDDING FOR SANITARY SEWER PIPE
NOTES,
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER HAUNCHES.
3. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY
OVER PIPE. HAND TAMP ONLY.
4. PIPE INSTALLATION SHALL BE PER SECTION 7-08 OF THE
STANDARD SPECIFICATIONS.
5. PIPE ZONE MATERIAL SHALL BE PER SECTION 9-03.12(3)'
OF THE STANDARD SPECIFICATIONS OR PEA GRAVEL.
6. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW
LINE IS MAINTAINED.
7. TRENCH WIDTH SHALL BE PER SECTION 2-09.4 OF THE
STANDARD SPECIFICATIONS.
STD. PLAN - 40S
Fil
PUBLIC WORKS PIPE BEDDINGRl DEPARTMENT FOR SANITARY SEWERSN4W 1/ a
Aa - A7 DATE r.ee we,..
SEEDING N 0 TES
1. SEED MIXTURE SHALL BE 107.RED TOP, 40% ANNUAL RYE, 40% CHEWING FESCUE, 10%
WHITE DUTCH CLOVER, AND SHALL BE APPLIED AT THE RATE OF 225 LBS. PER ACRE.
2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION
AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT
STRUCTURE.
3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF
THE SEED BED WILL BE NECESSARY. (E.G., GEOTEXTILES, JUTE MAT, CLEAR
PLASTIC COVERING)
4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH
AS GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS AND
SEDIMENT BASINS.
5. THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE, FOLLOWING
SURFACE ROUGHENING. PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES
TO THE SLOPE.
6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS.
AMOUNTS USED SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES
AND WETLANDS.
MULCHING NOTES
1. MULCH MATERIALS USED SHALL BE HAY OR STRAW AND SHALL BE APPLIED AT
THE RATE OF 1.5 TO 2.5 TONS/AC.
2. MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER
THAN 2: 1.
3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH
CANNOT BE SEEDED BECAUSE OF THE SEASON.
4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1.
�•� S.MID.D�
i OF �`45'.jr
ti
4
XO AL ESC' •r
NO.
REVISION
LENGTH FT
w 0
a 50
100
150
200
0
250
300
Z 350
°0 400
4so
LENGTH FT
a 0
a 50
100
150
200
a 250
z 300
350
400
450
LENGTH FT`
a 0
d 50
100
w 150
< 200
0 250
Z 300
N 350
400
450
a
a
w
w
a
0
z
n
LENGTH FT
0
50
100
150
200
250
300
350
400
450
6 IN. DIAMETER PIPE
0
50
100
150
200
250
300
350
400
450
500
0
80
160
236
316
396
476
556
632
680
680
140
220
300
380
456
536
616
696
712
708
708
280
360
440
520
600
676
748
744
736
732
728
424
500
580
660
740
780
772
764
756
748
744
564
644
720
1 800
808
1 796
788
780
772
764
760
704
784
856
836
820
808
800
792
784
776
772
844
880
860
844
832
820
808
800
792
788
780
908
884
868
852
840
828
820
808
1 804
796
788
908
888
872
856
844
836
824
816
1 808
804
796
908
888
876
860
852
840
832
824
816
808
804
TIME SECONDS
6 IN. DIAMETER PIPE
0
50
100
150
200
250
300
350
400
450
500
0
80
160
236
316
396
476
556
632
680
680
220
300
380
456
536
616
696
768
760
752
744
440
520
600
676
756
836
840
828
812
804
792
660
740
820
896
932
908
888
868
856
840
832
880
960
1028
1 992
964
940
1 920
900
1 888
872
860
1100
1084
1044
1012
988
964
944
928
912
900
888
1132
1092
1056
1028
1004
984
964
948
932
920
1 908
1132
1096
1068
1040
1016
996
980
964
948
936
924
1132
1100
1076
1052
1028
1008
992
976
964
952
940
1132
1104
1080
1056
1036
1020
1004
988
976
1 964
952
TIME SECONDS
6 IN. DIAMETER PIPE
0
50
100
150
200
250
300
350
400
450
500
0
80
160
236
316
396
476
556
632
680
680
316
396
476
556
632
712
832
816
804
804
792
632
712
792
872
952
984
952
928
908
888
876
952
1028
1108
1132
1088
1052
1020
992
972
952
936
1268
1284
1224
1176
1132
1100
1068
1044
1020
1000
984
1360
11300 11248
1204
1 1164
1 1132
1104
1080
1056
1036
11020
1360
11308
11264
1224
1192
1160
1132
11108
1088
1068
11052
1360
11316 11276
1240
1208
1180
1156
11132
1112
1096
1076
1360
11320
11284
1252
1224
11200
1176
1152
1132
1116
1 1100
1360
I 1324
1 1292
1264
1236
1212
1192
1168
1152
1132
1116
TIME SECONDS
6 IN. DIAMETER PIPE
0
50
100
150
200
250
300
350
400
450
1 500
0
80
160
236
316
396
476
556
632
680
680
496
576
652
732
812
892
972
948
924
900
884
988
1068
1148
1228
1248
1192
1144
1104
1072
1044
1020
1484
1564
1484
1408
1344
1292
1248
1208
1172
1144
1116
1700
1608
1532
1464
1408
1360
1316
1280
1248
1216
1192
1700
11624
11560
11504
11452
11408
11368
11332
11304
1272
1248
1700
1636
1580
1532
1484
1444
1408
1376
1344
1 1316
11292
1700
1644
11596
11552
1512
1472
1440
1408
1380
11352
1328
1700
1652
11608
11568
1532
1496
1464
1436
1408
11384
11360
1700
1656
11616
11580
1548
1516
1484
1460
1432
11408
11388
TIME SECONDS
PROCEDURE:
SLOWLY PRESSURIZE THE PIPE TO 4.0 P.S.LG. ALL SEWER PIPE SHALL MEET A MINIMUM AIR
ALLOW 2 MINUTES FOR STABILIZATION, ADDING PRESSURE TEST OF 4.0 P.S.I.G. FOR 5 MINUTES
AIR AS REQUIRED TO STABILIZE THE PRESSURE WITH NO LOSS OF PRESSURE. IF THERE IS A LOSS
AT 4.0 P.S.I.G. OF PRESSURE, THEN THE TIME OF THE DROP FROM
3.5 P.S.I.G. TO 2.5 P.S.I.G. SHALL NOT BE LESS
THAN THE T1ME SHOWN ON THE ABOVE TABLES.
PUBLIC WORKS AIR TEST TABLE STD. PLAN - 410
DEPARTMENT ( LOW PRESSURE)
e �o< FOR SANITARY SEWERS MARCH 2008
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
WASTEWATER UTILITY
dchristen 04/02/201 9 O
DEVELOPMENT ENGINEERING
jchavez 03/29/2019
S-404602
5" MAX.
DRAINAGE GRATE TRIM
GRATE FRAME _
C- OVERFLOW BYPASS
7 '
BELOW INLET GRATE DEVICE
SEDIMENT AND DEBRIS
FILTERED
WATER
SECTION VIEW
DRAINAGE GRATE
(RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.)
OVERFLOW BYPASS (TYP.)
BELOW INLET GRATE DEVICE
ISOMETRIC VIEW
NOTES:
1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR
CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
2. INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM.
3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE.
4 SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE.
5, THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS).
6. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL.
7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15).
B. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE
STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY.
UNLESS OTHERWISE NOTED, DRAWING 15 NOT TO SCALE (NTS)
STD. PLAN - 216.30
PRIPUBLIC WORKS APPR Eo:
DEPARTMENT CATCH BASIN INSERT GAZ 9/28/2018 1
1„e1, work. Ad.-Ii DATE
TOE IN
4"x4'1
NOTES:
1. CONDITIONS OF USE
1.1. PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS.
1.2. PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES.
1.3. CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY -SEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH.
CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS.
1.4. THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF. SUCH AREAS INCLUDE STEEP AND
UNSTABLE SLOPES.
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS.
2.2. IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE
OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF.
2.3. TIRES, SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC.
2.4. SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12 INCHES AND BE WEIGHTED OR TAPED.
3. MAINTENANCE STANDARDS
3.1. TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED.
3.2. IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST BE COMPLETELY REMOVED AND REPLACED
3.3. WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED.
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
Aoft STD. PLAN - 213.30
PRIPUBLIC WORKS PRO
DEPARTMENT PLASTIC COVERING GAZ 9/28/2018 1
PoWK work, Aamro v iot DATE
LARSON_AND_ASSOCIATES scnLE. 1 "=40' HORIZONTAL- NASD 1988991 DATE:
3/27/19
DESIGNED: GJM SOUTH 132N D_STREET BOOK
FlELDBOOK:
DRAWN: PAGE: PAGE
JHD ONE INCH DATUM SEWER_ LINE _EXTENSION DRAWING N0:
CHECKED: AT FULL SCALE 8681 BASE 8681
GJM IF NOT ONE INCH
DATE APPR APPROVED: SCALE ACCORDINGLY SHEET: OF:
APPROVED
As-Builts 4 4
::
CITY OF
�
RENTON
Planning/Building/Public Works Dept.
AHNNNNAA