HomeMy WebLinkAboutAttachment A-2This form must be submitted. by Apparent Low Bidder and
Second Apparent Low Bidder within 5 Business Days after Bid Opening
SUPPLEMENTAL RESPONSIBLE BIDDER CRITERIA FORM
PROJECT NAME: Highlands Reservoir Water Main lmorovements Proiect, WTR-27-03888
CONTRACTOR'S
COMPANY NAME: L -r�
DATE; 3-,X 5 a2 G-
ADRESSS•2d Box 2,1(01 TELEPHONE: qt. -f636 -45 g�
The bidder must document that the bidder meets the supplemental responsible bidder criteria.
The bidder should provide additional sheet to fully describe referenced projects and
experiences.
1. The Supplemental Responsible Bidder Criteria states that the Bidder must have
Successfully completed at least one (1) project of similar scope and magnitude to the
work within the five (S) years prior to bid opening. List the projects that show that the
Bidder meets these requirements.
Project Name
Year.
Owner
Location
Canstruetlen Cost Value ($)
]MayQ
+(evl m t
( bnficx&
Furnish references for information concerning.all work listed above.
Name
Title
Phone Number
Email Address
revi 0
ws (6ny-0kr't'
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
2. The Supplemental Responsible Bidder Criteria states that Bidder's Project manager
must have successfully completed the supervision of at least three (3) projects of similar
:scope and magnitude to the work within the ten (30) years prior to bid opening. List the
project manager's name and projects that show that he or she meets these
requirements.
Name: YY—WA t)�
Project Name
Year
owner Location
Construction Cost Var* ($)
Furnish references for information concerning all work listed above.
Name
Tittle
Phone Number
EmallAddress.
qa
T
3. The Supplemental Responsible Bidder Criteria states that Bidder's superintendent must
have successfully completed the supervision of at least three (3) projects of similar
scope .and magnitude to the work within the past ten (10) years prior to bid opening..
List the superintendent's name and projects that show that he or she meets these
requirements.
Name:.�1fY1 1rYl i S
Project Name
Year
Owner
Location
ConstructivnCost Value.($)
a�
e
a R
Ud
Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal
Furnish references for information concerning all work listed above.
Name Tittte Phone Number EmaltAddress
.e
4. The Supplemental Responsible Bidder Criteria states that Bidder's foreman must have
successfully completed the supervision at least three (3) projects of similar scope and
magnitude to the work within the ten (10) years prior to bid opening. List the foreman's
name and projects that show that he or she meets these requirements.
Name: -Fun A toA(2 2an,I �YIZ
Oroject Name Year Owner Location Construction CWValue.
f�}
Furnish references for information concerning all work listed above.
Name
Tlttle
Phone Number
Emall,Address
5.. Name and title of the person filing out the form.
NAME..E/ O W IAL c c TITLE: A,(-
Provided to Builders Exchange of WA, Inc For usage Conditions Agreement see www.bxwa.com - Always verify Scal
Fury Site Works Inc.
PREVIOUS CONTRACTS
Owner:
City of Mercer Island
Job Name:
Phase 1 PRV Station Replacement Project
Contact:
Clint Morris
9611 SE 36th St (206) 275-7807
Mercer Island, WA 98040
Contract Amount:
$1,351,633.03
Final Amount
$1,424,368.76
Award Date
2024
Year Completed:
2025
Demo/ abandonment and construction of 4 PRV Stations sites - 6-12" Water
Scope:
Main Connections, Water Services, Fire Hydrants, Timber Staircase, Rock Wall,
and Concrete/Asnhalt Restoration
Owner:
City of Bellevue
Job Name:
Crossroads Condos Water Main Replacement
Contact:
Salue Lek
Po Box 90012 (425) 452-4198
Bellevue, WA 98004
Contract Amount:
$1,172,063.91
Final Amount
$1,097,116.95
Award Date
2025
Year Completed:
2025
Water & Roadway Improvements - Installation of over 1700 LF of DI Pipe, 50+
Scope:
Water Services, 20+Gate Valves, Curb & Gutter, and Paving Removal of 160 LF
of Asbestos Cement Pipe
Owner:
City of Bellevue
Job Name:
Water Main Replacement 2024
Contact:
Salue Lek
Po Box 90012 (425) 452-4198
Contract Amount:
Final Amount
Award Date
Year Completed:
Bellevue, WA 98004
$6,509,508.58
$6,038,894.28
2024
2025
Scope:
Water & Roadway Improvements - Installation of over 8000 LF of DI Pipe, 2500
LF of Earthquake Resistant Pipe, 35+ PRV's,170+ Water Services,100+ Gate
Valves, Curb & Gutter, and Paving
Owner: City of Bellevue
Job Name:
Contact:
Contract Amount:
Final Amount
Award Date
Water Main Replacement 2023
Salue Lek
Po Box 90012
Bellevue, WA 98004
$8,699,436.63
$8,001,832.84
2024
(425) 452-4198
Year Completed: 2025
Water & Roadway Improvements - Installation of over 14,000 LF of DI Pipe,
Scope: 1200 LF of Earthquake Resistant Pipe, 200+ Water Services,125+ Gate Valves,
Curb & Gutter, and Paving
Owner: Town of Yarrow Point
Job Name: Town Wide Stormwater and UGC Project
Contact: G&O - Chris Bacon
3710168th Street NE Suite 210 (206)-284-0860
Arlington, WA 98223
Contract Amount: $2,119,872.67
Final Amount $2,112,716.41
Award Date 2024
Year Completed: 2025
Storm Improvements & Underground Conversion - Installation of 1500LF
Scope: Storm Sewer PVC, 20,000LF Utility Conduit replacement, & 7000LF Utility
Trenching
Owner: Department of Natural Resources
Job Name: Dahlgren Family Park - DNR 23-E20
Contact:
Contract Amount:
Final Amount
Award Date
Year Completed:
Scope:
Laura Cooper
1111 Washington St SE
Olympia, WA 98504-7030
$1,069,227.67
$1,375,770.95
2023
(253) 740-0008
2025
Construction of a new park including Restroom, Shelter, Playground
Sculptures and equipment, pathways, site furnishings and landscaping;
Owner: City of Bellevue
Job Name:
Contact:
Contract Amount:
Final Amount
Award Date
Year Completed:
Water Main Replacement 2022
Salue Lek
Po Box 90012
Bellevue, WA 98004
$6,059,761.61
$5,572,626.92
2023
2024
(425) 452-4198
Scope: Water & Roadway Improvements - Installation of over 10,000 LF of DI Pipe,
145+ Water Services,100+ Gate Valves, Curb & Gutter, and Paving
Owner: City of Bothell
Job Name: Valhalla Utility Improvements
Contact: Robert McCadden
18415101st Ave NE (425)-471-9300
Bothell, WA 98011
Contract Amount: $4,012,792.04
Final Amount $3,938,189.92
Award Date 2023
Year Completed: 2024
Water & Roadway Improvements - Installation of 5000LF DI Water main, 700LF
Scope: Storm Sewer PVC, 35+ Gate Valves, 80 Water Services, Curb & Gutter, and 4300
Ton Overlay
Owner:
Job Name
Contact:
Contract Amount:
Final Amount
Award Date
Year Completed:
Scope:
City of Issaquah
12th Ave NW and SR 900 / 17th Ave NW Improvement Project
Jim Jacobe
6701st Ave NE
Issaquah, WA 98027
$4,596,469.49
$5,111,605.19
(425)-837-3101
2023
2024
Water, Roadway, & Traffic Signal Improvements - Install Pump Station, Traffic
Signal systems, 650LF DI Water Main, Curb & Gutter, Sidewalks, and Paving
Owner: Snoqualmie Pass Utillity District
Job Name:
Water System Improvements - ERSTE Strasse
Contact:
HLA - Angie Ringer
2803 River Road (509)-966-7000
Yakima, WA 98902
Contract Amount:
$1,716,471.50
Final Amount
$1,742,088.85
Award Date
2023
Year Completed: 2024
Scope: Water & Roadway Improvements - Installation of over 4,200 LF of DI Pipe, 2
PRV Stations, and Paving
Owner: City of Snoqualmie
Job Name: Williams Addition Watermain Replacement
Contact:
Contract Amount:
Final Amount
Award Date
Year Completed:
Patrick Fry
38624 SE River St
Snoqualmie, WA 98065
$1,203,399.75
$1,168,451.14
2023
2023
(425)-681-4613
Scope: Water & Roadway Improvements - Installation of over 3,000 LF of DI Pipe, 50+
Water Services,l0+ Gate Valves, and Paving
Owner: City of Issaquah
Job Name: 2023 Watermain Replacement
Contact: Tony Nguyen
6701st Ave NE (425)-837-3437
Issaquah, WA 98027
Contract Amount: $1,274,091.11
Final Amount $1,290,056.12
Award Date 2023
Year Completed: 2023
Scope: Water & Roadway Improvements - Installation of over 3,000 LF of DI Pipe, 50+
Water Services,10+ Gate Valves, Curb & Gutter, and Paving
Owner: City of Bellevue
Job Name: AC Watermain Replacement 2020 - Phase 2
Contact: Robert Rudd
Contract Amount:
Final Amount
Award Date
Year Completed:
Po Box 90012
Bellevue, WA 98009
$5,446,967.16
$5,704,553.99
2020
2022
(425) 452-4242
Scope: Water & Roadway Improvements - Installation of over 15,000 LF of DI Pipe,
250+ Water Services,100+ Gate Valves, Curb & Gutter and 400 Ton Overlay
Fdl-qy
SITE WORKS INC Supplemental Responsible Bidder Criteria
Superintendent: Jim Mills
Years of Experience: 25+ years
Foreman:
Fernando Ramirez
Years of Experience:
25+ years
Project Mangaer:
Mike Day
Years of Experience:
10+ years
Experience
Owner:
City of Bellevue
Job Name:
Water Main Replacement 2023
Contact:
Salue Lek
Po Box 90012 (425) 452-4198
Bothell, WA 98011
Description:
Water & Roadway Improvements - Installation of over 14,000 LF of DI Pipe,1200
LF of Earthquake Resistant Pipe, 200+ Water Services,125+ Gate Valves, Curb &
Gutter, and Paving
Contract Amount:
$8,001,832.84
Year Completed:
2025
Owner:
City of Bellevue
Job Name:
Water Main Replacement 2024
Contact:
Salue Lek
Po Box 90012 (425) 452-4198
Bellevue, WA 98004
Description
Water & Roadway Improvements - Installation of over 8000 LF of DI Pipe, 2500
LF of Earthquake Resistant Pipe, 35+ PRV's, 170+ Water Services,100+ Gate
Valves, Curb & Gutter, and Paving
Contract Amount:
$6,038,894.28
Year Completed:
2025
Owner:
City of Bellevue
Job Name:
Water Main Replacement 2022
Contact:
Salue Lek
Po Box 90012 (425) 452-4198
Bellevue, WA 98004
Description:
Water & Roadway Improvements - Installation of over 10,000 LF of DI Pipe,145+
Water Services,100+ Gate Valves, Curb & Gutter, and Paving
Contract Amount: $5,572,626.92
Year Completed: 2024