Loading...
HomeMy WebLinkAboutAddendum - 2         CAG-24-068, Adden #2-26           4/1/2026 EXHIBIT A-2 – SCOPE OF WORK The following Scope of Work identifies tasks to be performed for the City of Renton’s 2026 Water, Wastewater and Surface Water Revenue Requirement and SDC Study Update for the 2027/2028 budget cycle and planning period through 2032. Task 1 | Project Management Perform administrative / management procedures for efficient study performance. Submit monthly invoices and progress reports describing recent and forthcoming efforts, potential challenges and/or needs from the City, and a status report, schedule, and budget adherence. Maintain regular communication with the City’s project manager to address any issues as they arise. Task 2 | Data Collection and Review Provide a data request list identifying financial and operational documents, and customer data pertinent to the performance of the study update. Review, analyze, and validate such information as necessary for use in formulating the technical analyses. Follow up with additional data needs and/or clarifications, as necessary. Due to the City’s need for a preliminary rate run, there will be an initial data collection effort with some of the data needing to be replaced later by the final numbers. Task 3 | Revenue Requirements Update the 2024 revenue requirement models for each utility for the current year (2026) and six-year planning horizon (2027-2032). Determine annual rate revenue needs to fund capital programs, operating and maintenance costs, fiscal policy achievement, and other financial obligations of each utility over the study period. Rate adjustments will focus on proposed rates for adoption for the 2027/2028 budget cycle with future rate adjustments provided for planning purposes. a | Baseline Analysis –Prepare a baseline revenue requirement analysis incorporating the following updated information: x Financial policies consistent with the 2024 Comprehensive Rate Study x Economic assumptions for inflation, customer growth, and funds earnings rate           PAGE 2 OF 8 x Assumptions for SPU purchased water costs and King County wastewater treatment costs x Cash balances for each fund and depreciation expense as of December 31, 2025 x Historical customer growth and rate revenues x Adopted 2026 budget, draft and final 2027/2028 budgeted revenues and expenses x Capital projects (“capitalized”and “expensed”) and associated annual costs for the current year (2026) and six-year planning horizon (2027-2032) x Capital funding sources including grants, cash reserves, SDCs, and rates Compare revenue requirements for each utility against projected revenue under existing rate structures and update the rate adjustment strategy across-the-board to existing rate structures over the planning period. Rate revenue projections will take into consideration the projections derived for each utility from the 2023 customer billing data set used for the cost of service/alternative rate structure tasks completed for the 2024 Comprehensive Rate Study. Refer to optional Task 11 below, for potential additional services for the water and surface water utility relating to the potential implementation of the water cost of service findings/ alternative rate structures and the surface water alternative rate structure prepared for the 2024 Comprehensive Rate Study. b | Scenario Development – Prepare multiple “what if” scenarios to evaluate impacts of incremental costs associated with potential additional staffing, new programs, equipment needs, and/or other non-budgeted costs. The City will provide the desired set of scenarios for each utility. Sensitivity analyses will be performed to assess customer impacts and revenue risk for all policy implications. It is anticipated that up to six (6) scenarios will be prepared for each utility. c | Residential Bill Impacts – Summarize the proposed six-year rate revenue adjustments and typical single-family residential bill impacts for each utility and on a combined basis for all utilities. Task 4| System Development Charges (SDCs) Update the 2024 SDC models for each utility based on the existing methodology to reflect current and planned capacity for the current year (2026) and six-year planning horizon (2027-2032). SDCs will be determined for the 2027/2028 adoption cycle.           PAGE 3 OF 8 a | Baseline Analysis –Prepare a baseline SDC analysis including the schedule of eligible capital projects, costs, and associated capacity (consistent with the approach used for the current adopted SDCs). Incorporate the following updated information: x Actual data as of December 31, 2025, for plant-in-service, construction-work-in- progress, contributed assets, customer data, cash balances and outstanding debt principal. (Note that this effort will require adjustments to the City’s plant-in- service records for contribution assets, similar to the work performed in past rate studies) x Identified eligible capital projects and costs for the planning period (2026-2032) x Review/update the assignment of capital projects to “major maintenance” (replacement) or “upgrades/expansions” x Growth projections from system plans and/or current customer data b | Scenario Development –Depending on the level of SDC increases, phase-in strategies may be developed to achieve the proposed maximum calculated SDCs over the two-year budget cycle. c | Residential Bill Impacts –Summarize the proposed SDCs for each utility and on a combined basis for all utilities for a typical single-family residential customer. Task 5 | Wholesale Water Rates Review and update the 2024 wholesale water rate model worksheets and calculate proposed wholesale rates for the 2027/2028 budget cycle based on the existing methodology and updated data. a | System Demand Factors – Update historical and projected system demand factors for the total water system and wholesale customer to determine wholesale share of total system demands (e.g., accounts, water usage, average day demand, max day demand). b | O&M Rate Component – Incorporate 2027/2028 draft and final budget detail, review O&M allocation factors established in the previous study, and update as warranted. Calculate resulting O&M rate component for 2027/2028. c | Capital Rate Component – Review detail plant asset data and allocation factors established in the previous study and update as warranted. Major efforts include:           PAGE 4 OF 8 x Review and update water system infrastructure and the allocation of applicable assets to wholesale customer (e.g., pump stations, reservoirs, source, and transmission/distribution pipes) x Review and update the allocation of original cost of total plant-in-service to wholesale customer based on updated infrastructure allocation factors. x Review and update the allocation of total system capital-related costs to wholesale customer (e.g., “expensed”capital outlay and rate-funded capital contribution). Note that outstanding water utility debt will be paid off in 2027 using existing debt reserves. No new debt is anticipated. x Sum the capital-related components and derive the total capital rate component for 2027/2028. d | Total Wholesale Water Rate – Combine O&M and capital rate components to derive the total wholesale water rate for 2027/2028and summarize customer bill impacts. A phase-in strategy may be developed to smooth rate impacts over the two-year budget cycle. Task 6 | Cost of Service Analysis No additional services (see optionalTask 11below). Task 7 | Rate Structure Design Alternatives No additional services (see optional Task 11below). Task 8 | Meetings Prepare for and facilitate virtual meetings to review interim findings and final results. The following meetings are anticipated: a | Initial Project Meeting – One (1) meeting with City staff to discuss study objectives and major milestones. b | Revenue Requirement Results – Up to four (4) meetings to review baseline results and “what-if” scenarios under draft and final budget numbers, and final review of proposed results. c| SDC Results– Up to two (2) meetings to review draft and final SDC results.           PAGE 5 OF 8 d |Wholesale Water Rate Results – Up to two (2) meetings to review draft and final wholesale results. e | Wholesale Rate Meeting with Skyway –At Skyway’s request, attend one (1) meeting to review 2027/2028 wholesale results. f | Cost of Service/Rate Structure Alternatives – No additional services (see optional Task 11 below). g | Committee/Council Meeting – At the City’s request, attend up to two(2) meetings to review study outcomes and direction. Task 9 | Rate Model Training and User Guide Conduct virtual training sessions with utility managers to review model inputs and functionality for updating the revenue requirement portion of the rate model. The following sessions are anticipated: a | Utility Manager’s Training – One (1) meeting with utility manager’s and the study project manager to provide an overview of model data inputs, model operations / functionality and testing of “what if” scenarios and results. b | Project Manager Training – One (1) additional meeting with the study project manager to review each section of the models in more depth. c | User Guide – Update the City’s current user guide as necessary for in-house updates of the revenue requirement portion of the models. There is no charge for this task. Task 10 | Documentation and Study Deliverables Document final results of the study update in technical memorandums describing major assumptions, findings, and proposed rates and SDCs. Submit electronic versions of documentation and updated models. Two (2) separate memorandums will be submitted covering the following topics: x Revenue Requirements and SDCs x Wholesale Water Rates           PAGE 6 OF 8 [Optional] Task 11–Cost of Service / Alternative Rate Design Modifications The 2024 Comprehensive Rate Study introduced significant modifications to the water and surface water rate structures. Comparisons were prepared for rates and customer bill impacts under adopted 2026 rates and projected 2027 rates under the alternative rate structures. The results of those findings are pending discussion with City Council. These findings may be shared with Council either before or at the same time as the proposed rate adjustments prepared as part of the forthcoming 2026 Revenue Requirement and SDC Study Update for the 2027/2028 budget cycle. Further analysis may be necessary to revise the findings of the alternative rate structure evaluations, ensuring alignment with the most current information, the updated proposed rate adjustments under existing rates for the 2027/2028 budget cycle, and any additional policy directives provided by Council. a | Water Utility – Potential tasks may include: x Reconcile customer growth and rate revenues projected between the 2023-2026 withactual customer billing data for years 2024-2025 x Incorporate proposed revised rate structure and phase-in strategy for 2027/2028 or anychanges directed by Council x Update calculation of customer bill impacts to align with the updated revenue requirement results for the 2027/2028 budget cycle and any changes to the proposed rate structure directed by Council b | Surface Water Utility –Potential tasks may include: x Reconcile customer growth and rate revenues projected between the 2023-2026 with actual customer billing data for years 2024-2025 x Incorporate proposed revised rate structure for 2027 or any changes directed by Council x Update calculation of customer bill impacts to align with the updated revenue requirement results for the 2027/2028 budget cycle and any changes to the proposed rate structure Due to the uncertainty regarding the extent of potential requested modifications, a planning allocation of 32hours for the water utility and 24 hours for the surface water utility has been included in the cost estimate presented in Exhibit B-2 – Compensation.           PAGE 7 OF 8 EXHIBIT B-2 –COMPENSATION The exhibit below presents estimated hours by task, hourly billing rates, and total fees for the Scope of Work described in Exhibit A-2. The unused budget allocated to specific tasks from the 2024 Comprehensive Rate Study has been transferred to fund the hours required for those tasks in the 2026 Revenue Requirement / SDC Study update. This approach lowers the net additional costs for Amendment 2 to $88,377.00 2024 Comprehensive Rate Study Hourly Rate $215.00 $215.00 Net Amendment #2 Amendment 2 2026 Revenue Requirement / SDC Update EST. EST. USE OF USE OF EST. Sub-Task: HOURS COST HOURS COST COST Task 1 - Project Management 22.50 4,837.50$ - -$ 4,837.50$ Task 2 - Data Collection/Review 32.00 6,880.00$ - -$ 6,880.00$ Task 3 - Revenue Requirements 138.00 29,670.00$ - -$ 29,670.00$ Task 4 -System Development Charges 60.00 12,900.00$ - -$ 12,900.00$ Task 5 - Wholesale Water Rate 20.00 4,300.00$ - -$ 4,300.00$ Task 6 - Cost of Service (a) Water - -$ - -$ -$ (b) Wastewater - -$ - -$ -$ (c) Surface Water - -$ - -$ -$ Task 7 -Rate Structure Design Alternatives (a) Water - -$ - -$ -$ (b) Wastewater (Survey only) - -$ - -$ -$ (c) Surface Water - -$ - -$ -$ Task 8 - Meetings (a) Initial Project Meeting [1] 3.50 752.50$ - -$ 752.50$ (b) Revenue Requirement Results [4] 18.00 3,870.00$ - -$ 3,870.00$ (c) SDC Results [2] 9.00 1,935.00$ - -$ 1,935.00$ (d) Wholesale Water Rate Results [2] 4.00 860.00$ - -$ 860.00$ (e) Wholesale Rate Meeting with Skyway [1] 3.00 645.00$ (3.00) (645.00)$ -$ (f) Cost of Service/Rate Structure Results [4] - -$ - -$ -$ (g) Committee / Council Meeting [2] 24.00 5,160.00$ (12.00) (2,580.00)$ 2,580.00$ Task 9 - Rate Model Training (a) Utility Manager's Training 3.00 645.00$ (3.00) (645.00)$ -$ (b) Project Manager's Training 3.00 645.00$ (3.00) (645.00)$ -$ (c) User Guide (no charge) - -$ - -$ -$ Task 10 - Documentation / Study Results (a) Revenue Requirements and SDCs 30.00 6,450.00$ - -$ 6,450.00$ (b) Wholesale Water Rates 6.00 1,290.00$ - -$ 1,290.00$ (c) Retail Cost of Service / Rate Structure Alternatives (1) Water - -$ - -$ -$ (2) Wastewater - -$ - -$ -$ (3) Surface Water - -$ - -$ -$ Subtotal 376.00 80,840.00$ (21.00) (4,515.00)$ 76,325.00$ Optional Tasks Task 11 - Cost of Service/Rate Design Modifications (a) Water 32.00 6,880.00$ - -$ 6,880.00$ (b) Surface Water 24.00 5,160.00$ - -$ 5,160.00$ Subtotal Optional Tasks 56.00 12,040.00$ - -$ 12,040.00$ Mileage 157.00$ (145.00)$ 12.00$ Total 432.00 93,037.00$ (21.00) (4,515.00)$ 88,377.00$ Amendment 2 Use of Original Budget           PAGE 8 OF 8 EXHIBIT C-2 –SCHEDULE Based on the discussion with City staff, the proposed schedule for completion of major task milestones is outlined below: x Remaining Deliverables from 2024 Comprehensive Rate Study: February - mid-April 2026 o Technical memorandum –Revenue Requirements and SDCs o Technical memorandum – Wholesale Water Rates o Technical memorandum – Water Cost of Service / Alternative Rate Design (one (1) meeting to review results) o Technical memorandum – Surface Water Alternative Rate Design o Technical memorandum – Wastewater Cost of Service o Electronic version of final rate models – All Utilities x Notice to Proceed / Data Collection for 2026 Revenue Requirement and SDC Study Update: on or about March 20, 2026 x Kickoff Meeting –first week of April 2026 x Committee/Council Meeting: May 2026(review cost of service/rate structures) x Revenue RequirementDraft Results:mid-May to early June 2026 (to assist City with budget recommendations) x SDC Draft Results:July 2026 x Wholesale Water Draft Results:July 2026 x Revenue Requirement Final Results: mid-August 2026 x SDC Final Results: mid-August 2026 x Wholesale Final Results: mid-August 2026: x Committee/Council Meeting: October 2026 (review final results) x Rate Model Training: October -November 2026 x Final Results and Study Deliverables: December 18, 2026