Loading...
HomeMy WebLinkAboutPresentation_Agreement with PSERainier Ave S Pump Station Improvement Project UTILITIES COMMITTEE, APRIL 6, 2026 CASEY JESZECK, SURFACE WATER UTILITY ENGINEER JOE FARAH, SURFACE WATER UTILITY ENGINEERING MANAGER Contract Agreement CAG-26-047 for Rainier Ave S Gas Main Extension with Puget Sound Energy Area Maps Vicinity Map Project Area Map Project Background The Rainier Ave S Stormwater Pump Station (RSWPS) is a critical stormwater facility built in the 1960s by WSDOT. Loss of power to Pump Station results in significant flooding along Rainier Ave S and impact on city resources during emergencies. Project initiated in January 2020 to provide backup power generator and electrical upgrades to pump station. Alternatives analysis 2020-2022. Design 2022-2025 (Replacement of pumps added to scope in 2025) Project prioritized in the 2025-2030 CIP following the November 2024 "Bomb Cyclone" Proposed Improvements Rendering Project Background Natural gas-powered generator is the only feasible back- up power solution. Requires extension of PSE gas main on Rainier Ave S. Diesel generator was not feasible as an easement from adjacent property would be required due to size and clearance requirements between diesel tank and generator. Bid solicitation for Generator and Pump Station Upgrades is planned in April 2026. Construction anticipated to begin in late July 2026.Existing PSE Gas Infrastructure Scope of Work for PSE Construction Services 320 LF of PSE Gas Main to be extended within Rainier Ave S via directional boring Gas service and meter installation by PSE for proposed generator Trenching, backfill and restoration work to be completed by city Contractor PSE Gas Main Extension Funding & Recommendation to Committee Staff Recommendation Authorize the Mayor and City Clerk to execute Contract Agreement CAG-26-047 with Puget Sound Energy in the amount of $276,971.60 for construction services associated with the Gas Main Extension required in support of the Rainier Ave S Pump Station Upgrade Project. Contract Agreement: $276,971.60 Project budget carried forward to 2026: $2,152,194