HomeMy WebLinkAboutChange Order - 01CONTRACT:
::ON TRACTOR:
C�ANGE ORDER: U
CITY OF RENTON Parks and Recreation Department CONTRACT CHANGE ORDER AGREEMENT
CAG-26-087
Haotor Excavating and Contracting, LLC
SUMMARY OF PROPOSED CHANGE:
Chan�e from 1prc1f1ed gravel stabil11er to Technisod G3 Commercial Surface gravel stabili1er
DESCRIPTION:
Item
No
Qty Description Unit Price
w1lhour/WS.ST
s
s
$
Total this Change Order $ o.1/01/1026 Amount
3,509 16
3,509 16
ORIGINAL CONTRACT
AMOUNT (W/ WSST)
CURRENT CONTRACT
AMOUNT
NET CHANGE
THIS ORDER (W/ WSST)
REVISED CONTRACT
TOT AL AFTER CHANGE
$ 10,ss4.zs I s
Additional Calendar Days:
None
10,884.25 $ 3,509.16 $ 14,393.41
The payment specified and Jgreed to In this change order includes every claim by the contractor for any extra payment with respect to the work described m this change order The work covered by this change order must be
performed under the same terms and conditions as that included In the original agreement All of the other terms
oi the original aereement remain in effect.
SIGNATURES: ---7
Contractor: / Date
0/glt.JII' sign.a by hlod< L Rd1')tdM>n M k L R ·1chardson'· DN'C•US.E-mricliwd><>n@ren1onwogov,O=CityofRenlon,
Project Manager: a r , •� ��.:i�io7�;���1or L. Richardson
CAG-26-087, CO #1-26