HomeMy WebLinkAboutD-4030093
X
u)
N
N
0
0
0
0
z
LU
0
U
LU
W
LU
LU
0
U
0
0
0
N
0
rn
0
0
0
F_
z
W
c�
m
LL
U
mr-
F0,C)
UU
00 m
2�
Q�
oLp
N_
N N
� N
� V
0000
6CU
�o
0
o>
0-�
ABBREVIATIONS
APPROX APPROXIMATE
BLDG BUILDING
BOT BOTTOM
CB
CATCH BASIN
CCTV
CLOSED CIRCUIT TV
CIPP
CURED IN -PLACE PIPE
CPE
CORRUGATED POLYETHYLENE PIPE
q
CENTER LINE
CMP
CORRUGATED METAL PIPE
COM
COMMON
COMP
COMPACTED
CONIC
CONCRETE
CTRL
CONTROL
CSBC
CRUSHED SURFACING BASE COURSE
DEPT.
DEPARTMENT
DIA
DIAMETER
DWG
DRAWING
E EAST
ELEV/EL ELEVATION
EOP EDGE OF PAVEMENT
ESC EROSION AND SEDIMENTATION CONTROL
EXIST/EX EXISTING
FH FIRE HYDRANT
FT FEET
GV GATE VALVE
HORIZ HORIZONTAL
ID
INSIDE DIAMETER
I E
INVERT ELEVATION
I NT
INTERNAL
LF
LINEAL FOOT
LT
LEFT, LIGHTING JUNCTION BOX
MAX
MAXIMUM
MH
MANHOLE
MIN
MINIMUM
MISC.
MISCELLANEOUS
N NORTH
NGVD NATIONAL GEODETIC VERTICAL DATUM
NO. NUMBER
NTS NOT TO SCALE
P POWER
PROP PROPOSED
R RADIUS
REF REFERENCE
REINF REINFORCEMENT
ROW RIGHT OF WAY
RT RIGHT
S
SOUTH/SLOPE
SD
STORM DRAIN
SDCB
STORM DRAIN CATCH BASIN
SDMH
STORM DRAIN MANHOLE
SS
SANITARY SEWER
STD
STANDARD
S/W
SIDEWALK
TEL
TELEPHONE JUNCTION BOX
TESC
TEMPORARY EROSION AND SEDIMENT
CONTROL
TYP
TYPICAL
UTI L UTI LITY
UC UNDERGROUND CONDUIT
UG/UNDGND UNDERGROUND
VERT VERTICAL
W WATER LINE/WEST
WM WATER METER
WSDOT WASHINGTON STATE DEPT. OF
TRANSPORTATION
WV WATER VALVE
REFERENCE SYMBOLS
DETAIL REFERENCED BY
LETTER OR NUMBER
A DETAIL
SHEET ON WHICH 7 SCALE
REFERENCE TO FIGURE /
APPEARS
® CONSTRUCTION KEYNOTE
EXISTING
•
■
x
0
G)
P
FT
T
SP
0
P
LEGEND
PROPOSED DESCRIPTION
FOUND CASED MONUMENT
SET HUB & MAG NAIL
SET MAG NAIL
SIGN
TRAFFIC SIGNAL POLE WITH LIGHT
DECIDUOUS TREE (DIAMETER AT BREAST HEIGHT
IN INCHES -DIAMETER OF DRIP IN FEET)
GENERAL NOTES
CONIFER TREE (DIAMETER AT BREAST HEIGHT
IN INCHES -DIAMETER OF DRIP IN FEET)
PINE TREE (DIAMETER AT BREAST HEIGHT
IN INCHES -DIAMETER OF DRIP IN FEET)
CATCH BASIN TYPE II
POWER JUNCTION BOX
POWER VAULT
POWER PANEL
POWER TRANSFORMER
TELEPHONE RISER
TELEPHONE MANHOLE
STAND PIPE
FIRE HYDRANT
WATER VALVE
BOLLARD
GAS LINE
STORM LINE
POWER LINE
COMMUNICATION LINE
EDGE OF ASPHALT
GUARD RAIL
EDGE OF LANDSCAPE
WATER LINES
ROW LINE
PROPERTY LINE
ROAD CENTERLINE
CURB AND GUTTER
TEMPORARY CONSTRUCTION EASEMENT
SILT FENCING
CIPP LINER
COUPLING
1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH STATE, LOCAL AND FEDERAL PERMITS.
2. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF RENTON STANDARDS AND
SPECIFICATIONS AND WASHINGTON STATE DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS
FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION," 2022 AND AS AMENDED BY CITY OF RENTON
SUPPLEMENTAL SPECIFICATIONS AND THE CONTRACT SPECIAL PROVISIONS.
3. ALL WORK WITHIN THE SITE SHALL BE SUBJECT TO THE INSPECTION OF THE CITY ENGINEER OR
DESIGNATED REPRESENTATIVE.
4. PRIOR TO BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL MEET WITH THE CITY ENGINEER FOR A
PRE -CONSTRUCTION MEETING.
5. A COPY OF THESE APPROVED PLANS AND PROJECT SPECIFICATIONS MUST BE ON THE SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
6. PUBLIC STREETS SHALL BE CLEANED ONCE PER DAY OR AS DIRECTED BY THE CITY. FLUSHING STREETS
WITH WATER WILL NOT BE ALLOWED.
7. LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING THE LOCATIONS OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. UTILITIES SHOWN ARE FOR
THE PURPOSE OF ASSISTING THE CONTRACTOR IN LOCATING SAID UTILITIES. CONTRACTOR SHALL CONTACT
UNDERGROUND UTILITIES LOCATION CENTER (1-800-424-5555) 48 HOURS PRIOR TO BEGINNING OF
CONSTRUCTION AND OBTAIN ON -SITE UTILITY LOCATIONS.
8. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF TRAFFIC CONTROL PLANS. CONTRACTOR
SHALL SUBMIT PLANS TO ENGINEER FOR REVIEW AND APPROVAL AT LEAST 10 WORKING DAYS PRIOR TO
IMPLEMENTATION.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF BYPASS PLANS. CONTRACTOR SHALL SUBMIT
PLANS TO ENGINEER FOR REVIEW AND APPROVAL AT LEAST 10 WORKING DAYS PRIOR TO IMPLEMENTATION
10. DRAINAGE STRUCTURES AND RELATED DETAILS SHALL CONFORM TO CITY OF RENTON STANDARD DETAILS.
11. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING AND REPAIRING ANY EXISTING ASPHALT, CONCRETE
PAVEMENT, IRRIGATION SYSTEM, LANDSCAPING, ELECTRICAL WIRES, ETC. LOCATED ON THE TEMPORARY
CONSTRUCTION EASEMENT PREMISES IN KIND AT ITS SOLE COST AND EXPENSE WHEN THEY ARE DAMAGED
OR MOVED DURING PROJECT CONSTRUCTION.
12. CONTRACTOR SHALL, UPON COMPLETION OF WORK, REMOVE DEBRIS AND RESTORE THE SURFACE OF THE
TEMPORARY CONSTRUCTION EASEMENT PREMISES THAT HAVE BEEN DISTURBED OR DESTROYED DURING
PROJECT CONSTRUCTION AS CLOSE AS PRACTICAL TO MATCH THE EXISTING CONDITIONS OR BETTER AND
TO THE CITY'S REASONABLE SATISFACTION.
13. SITE CONSTRUCTION LIMITS SHALL COINCIDE WITH CITY ROW UNLESS SHOWN OTHERWISE.
14. NO STAGING AREA IS PROVIDED TO THE CONTRACTOR. IF A STAGING AREA IS REQUIRED, IT SHALL BE
SECURED BY THE CONTRACTOR. ALL TESC REQUIREMENTS APPLY TO THE CONTRACTOR'S OBTAINED
STAGING AREA. USE OF CITY ROW FOR STAGING MAY BE APPROVED AS PART OF THE CONTRACTOR'S
TRAFFIC CONTROL PLAN. STAGING EXPENSES SHALL BE INCIDENTAL TO MOBILIZATION.
EROSION AND SEDIMENT CONTROL (ESC)
STANDARD PLAN NOTES
Ese) PEAN SET. AEE TI IE N&FEs eN TI 1E EIST MA", sdeT PERTAIN T(9 EVERY PRCME&F. TI IE APPIlemd:F e R UWNER, I 'EREBY
REFERRED
TE AS PP eANT MAY STR+<E & iT !RRE rein pp�ieAB r Te THE nnE i��T'U'WE ER Ti it
IAEE BE nBBrE) AFTER TI ITEs sTnnir)nRrn ni nIsi sieTrS
cTnQnn�ninT�Qso„Er\i�Qni o�Qr`niT
`lrOTROTO Tl'T'G I^�r
3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE
FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC
REQUIREMENTS.
4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION
PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND
PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL
(RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE
BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE
APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR
THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH
PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF
WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL
BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO
PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE.
6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS
ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES.
ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR
CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT
PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING
AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE
REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR
ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL
OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT.
8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED
OF PROPERLY.
9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE
CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT
SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE
PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL
ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND
WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
1 G. APPRGVA� GF THIS P�AN IS FGR ESG GNI=*. IT DGES NGT GGHSTITHTE AN APPRGVA� GF ST-GRIV DRAINAGE DESIGN, SIZE
NGR I G nTIGN GIF PIPES,REST-RIGT-GRC /`LJnNNE C GR ST-GI]f`AW TER FAGII ITIE
11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE
CITY FOR REVIEW AND APPROVAL.
12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS
DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST
THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G.,
SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM.
13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS
OTHERWISE APPROVED BY THE CITY.
14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN
SEVEN (7) DAYS.
15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN
24 HOURS FOLLOWING A STORM EVENT.
INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.
30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR
CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR
TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY
FUNCTIONING CONDITION.
17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH
BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH
SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE
NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO
ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH
GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT
FACILITY.
19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS,
BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID
SEDIMENTATION AND COMPACTION DURING CONSTRUCTION.
20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO
IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS
SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE
AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR
REVIEW.
21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN
WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS,
FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS
OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS
SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL
APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
HE GGNSTRUGTED TG SERVE AS RETAINING WALLS. ALL RGGI<ERIES IN GITY RGAF) RIGHTS GF WAY SHALL BE
CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE
(`GNSTR GTE9 IN AGGGIRDANGE WITH THE INTERN TIGNAI R III PING (`(1f1C
D-403009
APPROVED FOR COSTRUCTION
•
•
Knowwhers below. 07/20/23
Cell before you dig. BY Troy Solly DATE
Project Manager
� Q
® O
DAVID EVANS
ANDASSOCIATES INC.
U
LU
w
a.
H
Z
LU
2
LU
O
w
a
2
H
W
LU
J
V
U)
H
N
07
� Y
a- U
W
W m
w
Q
0
C0
a_
U
W Z
W 0
r (1)
m
w o
LU 0-1
ww
> Q
w o
BF
14432 SE Eastgate Way
Suite 400
Bellevue, WA 98007
425.519.6500
C)
W
F_
O
Z
J
a
0
z
W
Z
W
z
W
W
LL
O
"J
Cl)
F_
Z
FJpz
p
a
a
W
m
m
a
�I
Z
O
F_
w
W
FOR CONSTRUCTION
�ER CN
WAS
p
v ArM
51063
RFG/STERk
�SS/ONAL ENG
CHECKED BY: CFCH/EH
DESIGNED BY: CFCH/EH
DRAWN BY: SYS/CFCH
FIRST SUBMITTAL DATE: 05/05/22
PROJECT NO.
RENT00001902
SHEET NO. TO F 3
2