HomeMy WebLinkAboutPRE26-000078_1709 Edmonds Ave NE_Meeting SummaryDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 |www.rentonwa.gov
PREAPPLICATION MEETING FOR
1709 Edmonds Ave NE Townhomes
1709 Edmonds Ave NE (APN 3343900245)
PRE26-000078
April 9, 2026
Contact Information:
Planner: Ashley Wragge, 425-430-7314, awragge@rentonwa.gov
Public Works Plan Reviewer: Heather Bray, 425-430-7383, hbray@rentonwa.gov
Fire Prevention Reviewer: Hugo Sotelo, 425.276.9587, hsotelo@RentonRFA.org
Building Department Reviewer: Rob Shuey, 206.550.8523, rshuey@rentonwa.gov
Please retain this packet throughout the course of your project as a reference. Consider giving
copies to engineers, architects, and contractors who will work on the project. You will need to
submit an PDF copy of this packet when you apply for land use and/or environmental permits.
When the project application is ready for submittal, you may email the project planner to start
the prescreen process. Similarly, you may contact the assigned planner if there are any
questions regarding submittal requirements.
The pre-application meeting is informal and non-binding. The comments provided on the
proposal are based on the codes and policies in effect at the time of review. The applicant is
cautioned that the development regulations are regularly amended and the proposal will be
formally reviewed under the regulations in effect at the time of project submittal. The
information contained in this summary is subject to modification and/or concurrence by
official decision-makers (e.g., Hearing Examiner, Planning Director, Development Services
Director, Development Engineering Director, Department of Community & Economic
Development Administrator, Public Works Administrator and City Council).
M E M O R A N D U M
DATE: 3/23/26
TO: Ashley Wragge, Associate Planner
FROM: Hugo Sotelo, DFM
SUBJECT: 1709 Edmonds Ave NE Pre26-78
Comments based on the assumption that these units will be built under the International
Residential Code. As of February 1st, 2021, townhomes over 4 units will require sprinklers
per Washington State building code amendment.
FIRE FLOW
The fire flow requirement for the proposed building is 3,750 gpm. Four new fire hydrants
are required, one within 150 feet and three within 300 feet from each of the proposed
buildings. A looped water main is required for 2,500 gpm and larger. There appears to be
only one fire hydrant within the 150ft requirement.
If automatic sprinklers are to be installed a reduction in fire flow would be 2,500 gpm. This
will also decrease the number of fire hydrants to 3 one within 150ft and two within 300 ft.
Additionally it will also eliminate the looped water main.
IMPACT FEES
The fire impact fees are applicable at the rate of $1099.68 per multifamily home. This fee is
paid at building permit issuance. Credit will be provided for any homes removed or
retained.
FIRE DEPARTMENT ACCESS
Fire Dept. access is accessible from Edmonds Ave NE.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: April 9th, 2026
June 20, 2011
TO: Ashley Wragge, Assistant Planner
FROM: Heather Bray, Civil Plan Reviewer
SUBJECT: 1709 Edmonds Ave NE Townhomes
1709 Edmonds Ave NE
PRE26-000078
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official city decision-makers.
Review comments may also need to be revised based on site planning and other design changes
required by City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at 1709 Edmonds
Ave NE. The following comments are based on the pre-application submitted to the City of Renton
by the applicant.
EXISTING CONDITIONS
The site is approximately 0.20 acres in size and is rectangular in shape. There is one existing single-
family residence on-site with accessory paving.
Water Water service is provided by the City of Renton. The site is in the Highlands service area in
the 435 hydraulic pressure zone. There is an existing 12-inch City water main located in
Edmonds Ave NE (see Water plan no. W-028408) that can deliver a maximum total flow
capacity of 4,600 gallons per minute (gpm). The approximate static water pressure is 39
psi at ground elevation of 345 feet. There is an existing ¾-inch water service to the existing
single-family home (Facility ID No. MTR-010870). The site is located inside the Wellhead
Protection Area Zone 2. There is one fire hydrant within 300 feet of the site (HYD-NE-00777)
located in front of 1708 Edmonds Ave NE.
Sewer Wastewater service is provided by the City of Renton. There is an existing 8-inch non-
reinforced concrete gravity wastewater main located in Edmonds Ave NE (see City plan
no. S-196105). In addition, there is an existing 8-inch PVC gravity wastewater main located
in NE 17th Place (see City plan no. S-219102). There are also two private side sewers
available for this project. A 6-inch PVC stub at the NW corner of the site and a 6-inch
concrete stub at the SE corner of the site.
1709 Edmonds Ave NE Townhomes PRE25-000078 Page 2 of 6
April 9th, 2026
2
Storm There is an existing 15-inch stormwater main in Edmonds Ave NE (see City plan no. R-
147604). This main collects drainage from the May Creek drainage basin, which is a
separate basin than the project site is located in. There is also an existing 12-inch
stormwater main in NE 16th St (see City plan no. R-209504) which collects drainage in the
same basin as the site. The existing property does not contain stormwater facilities. Based
on the current site topography, the site appears to drain stormwater run-off towards the
west property line.
Streets Edmonds Ave NE is a Minor Arterial Street with an existing right of way (ROW) width of 60.0-
ft as measured using the King County Assessor’s Map and approximately 44.0-ft of asphalt
paving.
WATER COMMENTS
1. To provide domestic and fire protection service to the development, improvements include
but are not limited to:
a. All residential domestic water meters shall have a double check valve assembly
(DCVA) installed behind the meter on private property per City Standards if a fire
sprinkler system is required or for buildings 3-stories and higher. The DCVA may be
located inside the building if the location is pre-approved by the City Plan Reviewer
and City Water Utility Department.
b. The existing domestic water service of the demolished house shall be cut, capped,
and abandoned by City forces.
c. Installation of a landscape irrigation meter with a backflow prevention assembly
(DCVA) if applicable.
d. Based on the review of the project information submitted for the pre-application
meeting, Renton Regional Fire Authority has determined that the preliminary fire flow
demand for the proposed development is 3,750 GPM.
i. A looped water main is required to meet the fire flow demand of 3,750 GPM
and four fire hydrants must be installed, three within 300 feet of each building
and one within 150 ft. There appears to be only one fire hydrant within 150ft.
The submitted site plan does not provide adequate spacing for a looped
water main around the building to meet minimum separations. A new site
plan would be required to be submitted.
ii. Alternatively, a fire sprinkler system may be installed to reduce the
preliminary fire flow demand for the proposed development to 2,500 GPM,
eliminating the looped water main requirement and reducing the required fire
hydrants to three, two within 200 ft and one within 150 ft.
e. In accordance with current development regulations (RMC 4-6-080D), a separate
water service connection and meter is required for each residential and/or
commercial building served by City water.
f. Installation of a separate 1-inch water service and meter for each townhouse unit is
required per City Standard 320.1.
2. See the Residential Utility Service Guidelines for water service requirements.
3. A conceptual utility plan will be required as part of the land use application for the subject
development.
1709 Edmonds Ave NE Townhomes PRE25-000078 Page 3 of 6
April 9th, 2026
3
4. Civil plans for the water main improvements will be required and must be prepared by a
Professional Engineer registered in the State of Washington. Please refer to City of Renton
General Design and Construction Standards for water main extensions as shown in Appendix
K of the City’s 2021 Water System Plan. Adequate horizontal and vertical separations
between the new water main and other utilities (storm sewer pipes and vaults, sanitary
sewer, power, gas, electrical) shall be provided for the operation and maintenance of the
water main. Retaining walls, rockeries or similar structural cannot be installed over the water
main unless the water main is installed inside a steel casing.
5. The development is subject to applicable water system development charges (SDC’s) and
meter installation fees based on the number and size of the meters for domestic uses and
for fire sprinkler use. The development is also subject to fees for water connections, cut and
caps, and purity tests. Current fees can be found on the City’s website. Current fees will be
charged at the time of construction permit issuance.
a. The SDC fee for water is based on the size of the new domestic water to serve the
project. The current water fee for a single 1-inch meter is $5,025.00 per meter.
b. The SDC fee for fire service is based on the size of the fire service line to serve the
project.
c. Water service installation charges for each proposed domestic water service is
applicable. Water Service installation for a 1-inch water service line is $2,875.00 per
service line.
d. Drop-in meter fee is $460.00 per meter for a 1-inch meter. This is payable at issuance
of the building.
e. Fire sprinkler service fee is $671.00, if applicable.
f. Credit will be applied for the existing ¾-inch meter being removed.
g. Final determination of applicable fees will be made after the water meter size has
been determined. SDC fees are assessed and payable at construction permit
issuance. The full fee schedule can be found here.
SEWER COMMENTS
1. All new sewer stubs shall be a minimum of 6-inch and shall run at a slope of at least 2.0% to
the main. All new side sewers and sewer stubs shall conform to the standards in RMC 4-6-
040 and City of Renton Standard Details.
2. If the project wishes to reuse a stub, it must demonstrate through CCTV’ing that the pipe is
in good condition and a minimum of 6-inches. If the existing pipe material is not PVC, it must
be lined. The CCTV footage must be submitted to the City for determination of pipe condition.
3. If making a new connection to the sewer main in NE 17th Place, the sewer must be extended
at least 15 feet east and a manhole must be installed at the termination point of the main.
4. Existing side sewers that are not reused must be cut and capped at the property line in
Edmonds Ave NE, or at the main in NE 17th Place.
a. According to the plat that was provided with the submittal documents, it appears that
the City of Renton has a utility easement (KC Recording #9509220835) that spans
edge to edge on the asphalt pavement of NE 17th Place. It is up to the applicant to
verify all necessary easements for the project prior to Building Permit or Civil
Construction Permit Submittal.
5. See the Residential Utility Service Guidelines for sewer stub requirements.
6. A conceptual utility plan will be required as part of the land use application for the subject
development.
1709 Edmonds Ave NE Townhomes PRE25-000078 Page 4 of 6
April 9th, 2026
4
7. The development is subject to a wastewater system development charge (SDC) fee. SDC fee
for sewer is based on the size of the new domestic water to serve the project. Current fees
can be found in the 2026 Development Fees Document on the City’s website.
a. The current sewer fee for a 1-inch meter install is $4,025.00 per meter.
b. Fees will be charged based on the rate at the time of construction permit issuance.
c. Credit will be applied for the existing sewer if abandoned.
d. The full fee schedule can be found here.
SURFACE WATER COMMENTS
1. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface
Water Design Manual (RSWDM) will be required. Refer to Figure 1.1.2.A – Flow Chart in the
2022 RSWDM to determine what type of drainage review is required for this site. The site falls
within the City’s Peak Rate Flow Control Standard (matching existing site conditions). The
site falls within the East Lake Washington basin.
2. A 12-inch storm main extension of approximately 596 linear feet from the catch basin at the
intersection of Dayton Ct NE and NE 16th Street (Facility ID 136162) may be required. If the
project wishes to connect into the 18-inch storm main within Edmonds Ave NE, a drainage
adjustment meeting the requirements of Section 1.4 of the 2022 RSWDM must be submitted
for review prior to Land-use Application.
a. A condition of this drainage adjustment may include meeting the Flow Control
Duration Standard matching forested site conditions.
3. Drainage report and drainage plans based on 2022 RSWDM are required to be provided.
4. Storm drainage improvements along all public street frontages are required to conform to
the City’s Street and stormwater conveyance standards. Any new storm conveyance
installed on or off-site shall be designed and sized in accordance with standards found in
Chapter 4 of the 2022 RSWDM. New storm drains shall be designed to account for the total
upstream tributary area, assuming developed conditions for onsite tributary areas and
existing conditions for any offsite tributary areas.
5. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the
applicant will be required to provide enhanced basic water quality treatment. All proposed
stormwater facilities shall be designed in accordance with the current RSWDM at the time of
civil construction permit application. Separate structural plans will be required to be
submitted for review and approval under a separate building permit for all proposed
detention and/or water quality vaults.
6. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate
the new runoff created by this development to the maximum extent feasible. On-site BMPs
shall be evaluated as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage
plan, including the application of on-site BMPs, shall be included with the land use
application, as appliable to the project. The final drainage plan and drainage report must be
submitted with the utility construction permit construction.
7. A geotechnical soils report for the site is required per the 2022 Renton Surface Water Design
Manual Section C.1.3. Information on the water table and soil permeability (measured
infiltration rates), with recommendations of appropriate on-site BMPs per Core Requirement
#9 and Appendix C shall be included in the report. The report should also include information
concerning the soils, geology, drainage patterns and vegetation present shall be presented
to evaluate the drainage, erosion control and slope stability for site development of the
1709 Edmonds Ave NE Townhomes PRE25-000078 Page 5 of 6
April 9th, 2026
5
proposed plat. The applicant must demonstrate the development will not result in soil
erosion and sedimentation, landslide, slippage, or excess surface water runoff.
8. Critical areas that may affect storm drainage design include the following: Aquifer Protection
Area 2. Therefore, stormwater open conveyance systems, such as ditches and channels, and
water quality facilities may require a liner per Section 6.2.4 and 1.2.4.3 of the 2022 RSWDM.
9. Erosion control measures to meet the City requirements shall be provided.
10. The current City of Renton Surface Water Standard Plans that shall be used in all drainage
submittals. The current City of Renton Standard details are available online at the City of
Renton website here.
11. The development is subject to a surface water system development charge (SDC) fee. Fees
will be charged based on the rate at the time of construction permit issuance.
a. The 2026 Surface water system development fee is $0.94 per square foot of new
impervious surface, but not less than $2,350.
b. Credit will be applied for the existing single-family house being demolished.
c. The full schedule can be found here.
TRANSPORTATION COMMENTS
1. In accordance with RMC 4-6-060, if the site improvements and/or proposed building
additions exceed an overall valuation of $175,000, the project site(s) shall be required to
meet the City’s Complete Streets Standards:
a. Edmonds Ave NE is classified as a Minor Arterial Street. Per RMC 4-6-060, the
minimum right of way (ROW) width for a Minor Arterial Street is 91-ft. Half street
improvements as taken from the ROW centerline will be required and include a
minimum 27-foot paved road, 0.5 feet of cub and gutter, an 8-foot planting strip, and
8-foot sidewalk, street trees and storm drainage improvements. Approximately 15.5
feet of dedication will be required pending final survey.
i. A modification to the current street standards would be supported. The
modification would require a minimum half street paved width of 22-feet, a
0.5-foot curb, an 8-foot planting strip, an 8-foot sidewalk, 2-feet of clear
space behind the sidewalk, street trees and storm drainage improvements.
Approximately 10.5-feet of dedication will be required pending final survey.
2. If a shared driveway is proposed as part of this development, it shall meet the design
standards found in RMC 4-6-060. Shared driveways may be allowed for access to four (4) or
fewer residential lots. Shared driveways shall be wholly in a tract. Shared driveways shall not
be more than 200-ft in length. The paved surface shall be a minimum of 20-ft to meet Renton
Regional Fire Authority standards. The maximum grade of the shared driveway shall not
exceed 15%. Drainage improvements per City standards are required along the shared
driveway. An access easement shall cover the entirety of the tract.
3. On-site and off-site curb ramps, sidewalk improvements will be reviewed in conjunction with
the civil construction permit and will require a grading plan consisting of spot elevations and
slopes showing that ADA and City specifications are being met.
4. Refer to City code 4-4-080 regarding driveway regulations.
5. Undergrounding of all existing and proposed utilities is required on all frontages per RMC 4-
6-090.
6. Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay
Requirements.
1709 Edmonds Ave NE Townhomes PRE25-000078 Page 6 of 6
April 9th, 2026
6
7. Street lighting per City standards is required along Edmonds Ave NE if the proposed
development is larger than 4 residential units.
8. The transportation impact fee is based on the type of land use. The 2026 transportation
impact fee is $6,987.79 for each townhouse unit. Transportation impact fees are subject to
change based on the calendar year the building permit is issued.
a. Credit will be given to the single-family dwelling that will be demolished.
GENERAL COMMENTS
1. All existing and proposed utility lines (i.e. electrical, phone, and cable services, etc.) along
property frontage or within the site must be underground. The construction of these
franchise utilities must be inspected and approved by a City of Renton inspector.
2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from
the right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls. a. Show
all retaining walls on profile view. No walls shall be greater than 6’.
3. Retaining walls that are 4’ or taller from bottom of footing and stormwater detention vaults
will require a separate building permit. Structural calculations and plans prepared by a
licensed engineer will be required as part of the building permit review.
4. Adequate separation between utilities as well as other features shall be provided in
accordance with code requirements:
a. Provide rim and invert elevations on all drainage and sewer structures.
b. 7-ft minimum horizontal and 1-ft vertical separation between storm and other
utilities is required except for water lines which require 10-ft horizontal and 1.5-ft
vertical.
c. The stormwater line should be minimum 5 feet away from any other structure or wall
or building.
d. Trench of any utility should not be in the zone of influence of the retaining wall or of
the building.
5. All civil construction permits for utility and street improvements will require separate plan
submittals. All utility plans shall conform to the Renton Drafting Standards. A licensed Civil
Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page
for the most up-to-date plan submittal requirements.
6. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on
separate sheets.
7. A demo permit is required for the demolition of the existing building. The demo permit shall
be acquired through the building department.
8. Fees quoted in this document reflect the fees applicable in the year 2026 only and will be
assessed based on the fee that is current at the time of the permit application or issuance,
as applicable to the permit type. Please visit www.rentonwa.gov for the current development
fee schedule.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 3 | Published: 6/4/2025
Development Engineering Division | 1055 South Grady Way | Renton, WA 98057 | 425-430-7240
Website: rentonwa.gov
ENGINEERING IMPROVEMENT DETERMINATION
RESULTS
Published : 6/4/2025
Project Address/Location: _____________________________ Parcel #(s): ________________________________
Determination results are based on the information provided by the Applicant. Deviations from the submitted information may require
that a new Determination Request form be submitted and result in additional requirements.
ROADWAY IMPROVEMENTS
Street Name(s): __________________________ Roadway Classification(s): ___________________________
NO Right of Way Dedication and NO Street Frontage Improvements Required as the project falls within
RMC 4-6-060 Street Standards exemption criteria.
Right of Way Dedication and/or Street Frontage Improvements Required per RMC 4-6-060.
Modified Right of Way Dedication and/or Street Frontage Improvements Recommended.
Fee-in-Lieu Allowed for Street Frontage Improvements (see City Fee Schedule for $/LF of frontage)
1709 EDMONDS AVE NE 3343900245
EDMONDS AVE NE MINOR ARTERIAL
4
4
EDMONDS AVE NE IS CLASSIFIED AS A MINOR ARTERIAL STREET WITH AN EXISTING
RIGHT-OF-WAY (ROW) WIDTH OF APPROXIMATELY 60 FEET PER THE KING COUNTY
ASSESSORS MAP.
TO MEET THE CITY’S COMPLETE STREET STANDARDS FOR A MINOR ARTERIAL STREET, A
MINIMUM ROW WIDTH OF 91 FEET IS REQUIRED. PER RMC 4-6-060 HALF OF STREET
IMPROVEMENTS AS TAKEN FROM THE ROW CENTERLINE ARE REQUIRED AND INCLUDE A
MINIMUM 54-FOOT PAVED ROAD (27 FEET FROM CENTERLINE), A 0.5-FOOT CURB, AN
8-FOOT PLANTING STRIP, AN 8-FOOT SIDEWALK, 2-FOOT CLEAR SPACE AT BACK OF
WALK, STREET TREES AND STORM DRAINAGE IMPROVEMENTS. APPROXIMATELY 15.5
FEET OF DEDICATION WILL BE REQUIRED PENDING FINAL SURVEY.
A MODIFICATION TO THE CURRENT STREET STANDARD WOULD BE SUPPORTED. THE
MODIFICATION WOULD REQUIRE A MINIMUM 44-FOOT PAVED ROAD (22 FEET FROM
CENTERLINE), A 0.5-FOOT CURB, AN 8-FOOT PLANTING STRIP, AN 8-FOOT SIDEWALK,
2-FOOT CLEAR SPACE AT BACK OF WALK, STREET TREES AND STORM DRAINAGE
IMPROVEMENTS. APPROXIMATELY 10.5 FEET OF DEDICATION WOULD BE REQUIRED
PENDING FINAL SURVEY.
ENGINEERING IMPROVEMENT DETERMINATION RESULTS (CONT’D)
Page 2 of 3 | Published: 6/4/2025
Project Address/Location: _____________________________ Parcel #(s): _________________________________
Determination results are based on the information provided by the Applicant. Deviations from the submitted information may
require that a new Determination Request form be submitted and result in additional requirements.
STORM DRAINAGE REVIEW TYPE (See City of Renton Surface Water Design Manual Figure 1.1.2.A for
Reference)
Basic Drainage Evaluation (Less than 2,000 Square Feet of New or Replaced Impervious Surface)
Simplified Drainage Review (Renton Surface Water Design Manual, Appendix C)
Targeted Drainage Review due to ____________________________________________________
Directed Drainage Review
For information on review type and submittal requirements, please see
ANTICIPATED SUBMITTAL ITEMS
Required Waived All Checklists/Studies/Reports Required Unless Waived by City Staff
_____ Civil Construction Permit Application
_____ Residential Drainage Application
_____ Deed of Dedication
_____ Real Estate Excise Tax Affidavit (REETA) – (See Example REETA Form)
_____ Modification Application and Supporting Documents
_____ Fee-in-Lieu of Street Improvements Application
_____ Soils Report (See Renton Surface Water Design Manual Appendix C, Section C.1.3)
_____ Written Drainage Assessment (See Example Simplified Drainage Review)
_____ Storm Drainage Covenant (See Example Storm Drainage Covenant)
_____ Water Availability from:
_____ Sewer Availability from:
RESULT PROVIDED BY:
Determination expires six (6) months following the date of the Determination Results provided that City codes have not
changed within this period that would affect this determination. A new Determination Request will need to be submitted
following this expiration. The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers.
RESOURCES
Definitions
Renton Surface Water Design Manual (RSWDM)
City of Renton Standard Details
City of Renton Forms
Electronic File Standards
1709 EDMONDS AVE NE 3343900245
X
X
X
X
X
X
X
X
X
X
X
HB
HB
HB
City of Renton
City of Renton
full drainage reviewX
**technical information report
2022 rswdm
*A full Civil construction permit application is
waived. However, frontage improvement plans meeting
the civil construction permit requirements (IE on City
of Renton Title block and prepared by an engineer)
shall be submitted along with the building permit
application. if it is determined during review that an
extension or relocation of the city's utilities is
needed, then a civil construction permit will be
required.
*
**
DEVELOPMENT ENGINEERING
HBray 09/30/2025
ENGINEERING IMPROVEMENT DETERMINATION RESULTS (CONT’D)
Note: This handout shall not be used as a substitute for code and regulations. The applicant is responsible for compliance with all codes and regulations,
whether or not described in this document.
Page 3 of 3 | Published: 6/4/2025
Project Address/Location: _____________________________ Parcel #(s): _________________________________
Determination results are based on the information provided by the Applicant. Deviations from the submitted information may
require that a new Determination Request form be submitted and result in additional requirements.
INFORMATION PROVIDED BY APPLICANT:
1709 EDMONDS AVE NE 3343900245
Engineering Improvement Determination Request Form
PROJECT POINT OF CONTACT
First Name*
Dante
Last Name*
Palmaffy
E-mail*
dpalmaffy@aol.com
Re-enter E-mail*
dpalmaffy@aol.com
Phone Number*
425-345-2530
Format: XXX-XXX-XXXX
PROPERTY INFORMATION
If you need assistance finding your property address and/or parcel number, please visit the City of Renton GIS Mapping
application. City of Renton Map Viewer (COR Maps) This mapping interface is flexible and should work on desktop, tablet and
phone devices.
Do you know your Address?
Yes No
PROJECT INFORMATION
Type of Project
Please select either New Single-Family Home, Home/Garage Addition or other site/building improvements and complete the
requested information accordingly.
What type of project are you applying for?*
Home/Garage Addition and/or other improvement
Provide a brief description of the addition and/or other improvement. Include type of addition, size (square footage), etc*
We are looking to demolish the existing residence and build a 4-unit townhouse project. Each unit is to be roughly2200sf with a two-car
garage in the rear.
Project Construction Cost/Valuation*
$2,000,000.00
i.e. labor, materials, etc
Proposed New Plus Replaced Impervious Surface (SF)*
4,200
i.e. structures, concrete, asphalt, pavers, gravel, decking, etc, See definitions section below for a complete description
Proposed Land Disturbing Activity (SF)*
4,200
Site Plan (Optional)
Proposed Site Layout.pdf 57.3KB
250994-T-24x36.pdf 674.77KB
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: April 9, 2026
TO: Pre-Application File No. PRE26-000078
FROM: Ashley Wragge, 425-430-7314, awragge@rentonwa.gov
SUBJECT: 1709 Edmonds Ave NE Townhomes (APN 3343900245)
General: We have completed a preliminary review of the pre-application for the above-
referenced development proposal. The following comments on development and
permitting issues are based on the pre-application submittals made to the City of
Renton by the applicant and the codes in effect on the date of review. The applicant is
cautioned that information contained in this summary may be subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Community & Economic
Development Administrator, Public Works Administrator, Planning Director, Development
Services Director, Development Engineering Director, and City Council). Review comments
may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant. The applicant is encouraged to review all applicable
sections of the Renton Municipal Code. The Development Regulations are available online
at https://www.codepublishing.com/WA/Renton.
Project Proposal: The subject property is located on a corner lot between NE 17th Pl, a
private shared driveway, and Edmonds Ave NE at 1709 Edmonds Ave NE (APN 3343900245).
The project site totals 8,876 square feet (0.20 acres) in area and is currently developed with
a single-family home. The site has a Comprehensive Plan Land Use Designation of
Residential Medium Density (RMD) and is located in the Residential-8 (R-8) zoning district.
The applicant is proposing to demolish the existing single-family residence and construct
three (3) or four (4) attached townhomes as a middle housing development. The proposal
includes a shared driveway accessed from Edmonds Ave NE that leads to the rear of the
property where the townhomes are accessed by a joint use driveway. According to City of
Renton (COR) Maps, the project is within the Wellhead Protection Area, Zone 2.
Current Use: The site is currently developed with an 1,810 square foot single family home
built in 1954.
1. Zoning /Land Use Designation, and Overlays: The subject property is located within the
Residential-8 (R-8) zoning classification and the Residential Medium Density (RMD) land
use designation and the property is within the 1/2 mile ADU walkshed. No off-street
parking required for ADUs located on lots within 1/2 mile walking distance from a major
transit stop. Development in the R-8 Zone is intended to create opportunities for new
single-family and middle housing, where there is opportunity to reinvest in existing
single-family residential neighborhoods through infill development or the development
of new residential plats.
1709 Edmonds Ave NE Townhomes
Page 2 of 8
April 9, 2026
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
2. Development Standards: The project would be subject to RMC 4-2-110F, “Development
Standards for Middle Housing” effective at the time of complete application (noted as
“Middle Housing” standards herein). Middle housing developments shall comply with
the standards applicable to single-family development, pursuant to RMC 4-2-110A,
“Development Standards for Residential Low Density and Medium Density Zones –
Primary Structures.”
Density – For all zones in which middle housing is applicable, lots are allowed up to four
units. Lots located within a quarter of a mile walking distance of a Major Transit Stop are
allowed up to six units. The applicant would be required to demonstrate compliance
with middle housing development standards at the time of formal application.
Minimum Lot Size, Width and Depth – The minimum lot size in the R-8 zone is 5,000 sq.
ft. The minimum lot width is 60 feet for corner lots and 50 feet for interior lots. The
minimum lot depth is 80 feet. Submitted plans would need to show compliance with
the required lot size and dimensional standard with the land use application.
Building Standards – The R-8 standards allow a maximum building coverage of 50% of
the lot area, a maximum impervious coverage of 65%, a maximum of two (2) stories, and
a maximum wall plate height of 24 feet (24’). Roofs with a pitch equal to or greater than
4:12 may project an additional six (6) vertical feet from the maximum wall plate height. If
the height of wall plates on a building are less than the stated maximum the roof may
project higher to account for the difference, yet the combined height of both features
shall not exceed the combined maximums (e.g., if the maximum wall plate height of a
zone is twenty-four feet (24') and the wall plates of a structure are no taller than twenty
feet (20'), the roof may project up to ten feet (10') instead of six feet (6')). Common rooftop
features, such as chimneys, may project an additional four (4) vertical feet from a roof
surface. The proposed building coverage potentially exceeds the maximum
impervious surface of 65%. The proposed three-story structure with an integrated
rooftop deck exceeds the allowed number of stories. Compliance with the
maximum building and impervious surface coverage and height requirements for
the R-8 zone would be verified at the time of formal building permit application.
Setbacks – Setbacks are the minimum required distance between the building footprint
and the property line. The required minimum setbacks for the R-8 zone are as follows:
Front yard: 20 feet for the primary structure, except when all vehicle access is taken from
an alley, then 15 ft; Rear yard: 25 feet; Side yards: 5 feet; and Secondary Front yard: 15
feet. Corner lots required to have a front yard and a secondary front yard are relieved of
the requirement to have a rear yard; in place of a rear yard setback, the side yard setback
of the zone shall apply. Compliance with the maximum setback requirements for the
proposed residences would be verified at the time of formal building permit
application.
Middle Housing Typologies – a) duplexes; b) triplexes; c) fourplexes; d) stacked flats; e)
townhouses; and f) courtyard apartments.
Maximum Number of Units per Building – A maximum of four (4) attached dwelling units
is allowed per building.
3. Residential Design and Open Space Standards: Middle housing developments shall
comply with the design standards applicable to single-family development, pursuant to
1709 Edmonds Ave NE Townhomes
Page 3 of 8
April 9, 2026
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
RMC 4-2-115, “Residential Design and Open Space Standards.” Residential design
review and the requirements related to garages, entries, modulation, windows/doors,
scale, bulk, and character, roof forms, eaves, architectural detailing, and materials/color
would be reviewed as part of the Building Permit Review.
In addition, middle housing developments shall comply with the following standards:
Entries – All ground-related dwelling units fronting a street and/or common open space
shall provide a covered porch with a minimum depth of five feet (5'). Dwelling units that
are accessed entirely from an internal common corridor are exempt from this
requirement provided the shared entry features a covered porch with a minimum depth
of five feet (5').
Pedestrian Access – A paved pedestrian connection at least three feet (3') wide is
required between each middle housing building and the sidewalk (or the street if there is
no sidewalk). Driveways may be used to meet this requirement. No building elevations
were provided for review. Application(s) subject to the Residential Design and Open
Space Standards must demonstrate compliance with the applicable standards at
the time of building permit submittal.
4. Landscaping: With the exception of critical areas, all portions of the development area
not covered by structures, required parking, access, circulation or service areas, must
be landscaped with native, drought-resistant vegetative cover. The minimum on-site
landscape width required along street frontages is 10 feet and shall contain trees,
shrubs, and landscaping. Street trees in the ROW planter will also be required.
Landscaping may include hardscape such as decorative paving, rock outcroppings,
fountains, plant containers, etc. Minimum planting strip widths between the curb and
sidewalk are established according to the street development standards of RMC 4-6-
060, Street Standards. Street trees and, at a minimum, groundcover are to be located in
this area when present. Street trees shall be planted in the center of the planting strip
between the curb and the sidewalk at the following intervals; provided, that, where right-
of-way is constrained, irregular intervals and slight increases or decreases may be
permitted or required. Additionally, trees shall be planted in locations that meet required
spacing distances from facilities located in the right-of-way including, but not limited to,
underground utilities, streetlights, utility poles, traffic signs, fire hydrants, and driveways;
such spacing standards are identified in the City’s Approved Tree List. Generally, the
following spacing is required: i. Small-sized maturing trees: thirty feet (30') on center; ii.
Medium-sized maturing trees: forty feet (40') on center; and iii. Large-sized maturing
trees: fifty feet (50') on center. A conceptual landscape plan shall be provided with the
formal land use application as prepared by a registered Landscape Architect or
other certified professional.
5. Significant Tree Retention: When significant trees (greater than 6-inch caliper or 8-
caliper inches for alders and cottonwoods) are proposed to be removed, a tree inventory
and a tree retention plan along with an arborist report, tree retention plan and tree
retention worksheet shall be provided with the formal land use application as defined in
RMC 4-8-120. The tree retention plan must show preservation of at least 30% of
significant trees. Please refer to RMC 4-4-130, Tree Retention and Land Clearing
Regulations for further general and specific tree retention and land clearing
requirements.
1709 Edmonds Ave NE Townhomes
Page 4 of 8
April 9, 2026
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
In addition to retaining a minimum of 30% of existing significant trees, properties subject
to an active land development permit shall comply with minimum tree credit retention
requirements of a minimum of 30 credits per net acre. Tree credits encourage retention
of existing significant trees with larger trees being worth more tree credits.
TREE SIZE TREE CREDITS
New small species tree 0.25
New medium species tree 1
New large species tree 2
Preserved tree 6 – 9 caliper inches 4
Preserved tree 10 – 12 caliper inches 5
Preserved tree 13 – 15 caliper inches 6
Preserved tree 16 – 18 caliper inches 7
Preserved tree 19 – 21 caliper inches 8
Preserved tree 22 – 24 caliper inches 9
Preserved tree 25 – 28 caliper inches 10
Preserved tree 29 – 32 caliper inches 11
Preserved tree 33 – 36 caliper inches 12
Preserved tree 37 caliper inches and greater 13
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant
trees on slopes greater than twenty percent (20%); significant trees adjacent to critical
areas and their associated buffers; significant trees over sixty feet (60') in height or
greater than eighteen inches (18") caliper; and trees that shelter interior trees or trees on
abutting properties from strong winds, which could otherwise allow such sheltered trees
to be blown down if removed.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved;
other significant native evergreen or deciduous trees; and other significant non-native
trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained unless the alders and/ or
cottonwoods are used as part of an approved enhancement project within a critical area
or its buffer.
1709 Edmonds Ave NE Townhomes
Page 5 of 8
April 9, 2026
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
The Administrator may require independent review of any land use application that
involves tree removal and land clearing at the City's discretion.
The Administrator may authorize the planting of replacement trees on the site if it can be
demonstrated to the Administrator's satisfaction that replacement requirements in RMC
4-4-130H1e can be met.
Tree retention standards shall be applied to the developable area, as defined in RMC
4-11-040, Definitions D, of a property. A formal tree retention plan and tree retention
worksheet, prepared by an arborist or landscape architect, would be reviewed at the
time of building permit application.
6. Screening: Screening is required for all surfaces-mounted and rooftop utility and
mechanical equipment as per RMC 4-4-095, Screening and Storage Height/Location
Limitations. The proposal should include elevations and details of the methods used for
screening any equipment if applicable. Screening measures should address visual
impact reduction for areas where vehicles or contractor equipment may be stored.
Compliance with screening requirements would be verified during the formal land
use review process.
7. Fences/Retaining Walls: Any fences or retaining walls included as part of this project
must be designated on the landscape plan and grading plan with top of the wall and
bottom of wall elevations. A fence and/or wall detail should also be included on the site
plan. A retaining wall that is four (4) feet or taller, as measured by the vertical distance
from the bottom of the footing to the finish grade at the top of the wall requires a building
permit. The maximum height of any fence or retaining wall is 72-inches subject to further
height limitations in setbacks and clear vision areas noted in RMC 4-4-040. A fence shall
not be constructed on top of a retaining wall unless the total combined height of the
retaining wall and the fence does not exceed the allowed height of a standalone fence.
Retaining walls shall be composed of brick, rock, textured or patterned concrete, or other
masonry product that complements the proposed building and site development. There
shall be a minimum three-foot (3') landscaped setback at the base of retaining walls
abutting public rights-of-way. The retaining wall depicted on the plans would be
reviewed at the time of building permit application.
8. Parking/Driveways/ Access: Middle housing developments shall comply with all
driveway and parking design standards applicable to single-family development,
pursuant to RMC 4-4-080, Parking, Loading and Driveway Regulations.
Along the street frontage, the maximum width of single-loaded garage driveways shall
not exceed nine feet (9'), and the maximum width of double-loaded garage driveways
shall not exceed sixteen feet (16'). Within the property boundary, the driveway may
expand beyond the maximum allowed width; provided, that the maximum driveway angle
between any driveway and the street roadway or curb line shall not be less than forty-five
degrees (45°), and the driveway width does not exceed forty percent (40%) of the street
frontage. There shall be no more than one (1) driveway for each one hundred sixty-five
feet (165') of street frontage serving any one (1) property or among properties under
unified ownership or control; for each one hundred sixty-five feet (165') of additional
street frontage another driveway may be permitted. Driveways shall not be closer than
five feet (5') to any property line except when used as a joint use driveway.
1709 Edmonds Ave NE Townhomes
Page 6 of 8
April 9, 2026
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
Middle housing developments are subject to the following off-street parking regulations:
Lots 6,000 sq. ft.
or Less
Lots greater than
6,000 sq. ft.
Lots located within 1/2 mile walking distance of
a Major Transit Stop
A minimum of
1.0 per dwelling
unit.
A minimum of
2.0 per dwelling
unit.
No off-street parking required. Developers that
provide off-street parking spaces, when not
required by this subsection, are eligible for
parking incentives pursuant to Parking Incentives
for Middle Housing Development Located Within
One-Half (1/2) Mile Walking Distance of a Major
Transit Stop.
Parking Incentives for Middle Housing Development Located Within One-Half (1/2) Mile
Walking Distance1 of a Major Transit Stop: Middle housing developments that provide off-
street parking spaces as shown in the following table, when not otherwise required by
this subsection, are eligible for the following parking incentives, provided the increase is
feasible and consistent with the Surface Water Design Manual. For each increase in
number of parking spaces provided, the applicant is eligible for an additional parking
incentive. For example, applicants that provide a minimum of 2.0 parking spaces per
dwelling unit are eligible for the incentives below.
Number of Off-Street Parking Stalls
Provided
Incentives
A minimum of 1.0 per dwelling unit.
10% Increase in Maximum Impervious
Surface Area permitted by the subject
zone, pursuant to RMC 4-2-110A; and
A minimum of 2.0 per dwelling unit.
5% Increase in Maximum Building
Coverage permitted by the subject zone,
pursuant to RMC 4-2-110A.
The proposed driveway does not meet the driveway standards. Compliance with the
driveway and parking standards would be verified at the time of building permit
review.
9. Unit Lot Subdivision: The creation of unit lots for townhomes and middle housing
developments establish review of development standards to the site as a whole rather
than to individual unit lots per RMC 4-7-090, Unit Lot Subdivision. Unit lot subdivisions
are intended for new middle housing in the R-8 zone. The whole parent site must comply
1 The lot’s proximity to a major transit stop, measured by walking distance, shall determine parking
requirements for middle housing and ADUs. The distance is measured through the creation of a
walkshed, which represents the collective spatial area within a defined walking distance from major
transit stops (e.g., one quarter (1/4) mile or one half (1/2) mile). Geospatial tools incorporating major
transit stop locations and mapped pedestrian networks are used to approximate and map the
walkshed boundary. Lots that partially intersect or partially fall within the walkshed shall be treated
as entirely within.
1709 Edmonds Ave NE Townhomes
Page 7 of 8
April 9, 2026
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
with all development standards as though it were a standalone lot. The following
standards and exceptions apply for townhomes and middle housing:
Access – The parent site must have direct vehicular access to a public street and each
unit lot must have direct vehicular access to either a public street or a unit lot drive, in
conformance with RMC 4-6-060K, Unit Lot Drives. Each unit lot drive shall be accessed
by a public street. The paved roadway shall be a minimum of sixteen feet (16') wide; the
Fire Department may require the paved roadway to be up to twenty feet (20') wide. Except
for points of ingress/egress, curb shall be installed along the perimeter of the roadway.
There shall be an eight foot (8') wide landscaping strip between the curb and a five foot
(5') wide sidewalk along one side of the unit lot drive.
Exceptions – Individual unit lots created for townhomes and middle housing are exempt
from the following standards of RMC 4-2-110A, Development Standards for Residential
Zoning Designations (Primary and Attached Accessory Structures): maximum net
density, minimum lot size, minimum lot width, minimum lot depth, yard setbacks,
maximum building coverage, and maximum impervious surface area. Townhomes are
exempt from the following landscaping criteria: street frontage landscaping, street trees
and landscaping within the Right of Way (ROW) on public streets, and front yard trees
required when street trees are not located within the ROW. The number of parking spaces
required for attached dwellings may be averaged and dispersed among unit lots or within
the parent site. Primary access for individual unit lots may be from a public alley. Middle
housing developments are exempt from the following landscaping criteria: front yard
trees required when street trees are not located within the ROW. The number of parking
spaces required may be averaged and dispersed among unit lots or within the parent site.
Vehicle access is only required for the parent site and not individual unit lots. Primary
access for individual unit lots may be from a public alley. Please refer to RMC 4-7-090F,
Unit Lot Subdivision Requirements for more specific requirements.
10. Critical Areas: According to the City of Renton (COR) Maps, the site is within Wellhead
Protection Area Zone 2. It is the applicant’s responsibility to determine whether any
other critical areas are present on the site prior to formal land use application.
11. Environmental Review: The proposed development would be categorically exempt from
SEPA review if the proposal contains less than nine (9) multifamily residential dwelling
units in accordance with RMC 4-9-070 and WAC 197-11-800. If the application proposal
contains more than nine (9) multifamily residential dwelling units, an environmental
checklist must be submitted with the land use application. An environmental
determination will be made by the Renton Environmental Review Committee.
12. Permit Requirements: Unit Lot Subdivisions of nine (9) or fewer unit lots are processed
as a preliminary short plat with approval at the administrative level. More information on
the short plat process can be found at RMC 4-7-070. The land use review would include
public notice and a two-week (14 day) public comment period. Once a complete
application is submitted and all fees are paid, a decision can be made in approximately
eight (8) weeks. The 2026 application fee for a preliminary short plat is $6,462.00, and the
2026 fee for a final short plat is $3,231.00. A 5% technology fee would also be assessed
at the time of land use application. Any modifications requested would incur an
additional $299 fee. All fees are subject to change. Detailed information regarding the
land use application submittal can be found on the City’s Permit Center website. The City
1709 Edmonds Ave NE Townhomes
Page 8 of 8
April 9, 2026
CityofRenton\Department Folders\Community and Economic Development (CED)\Current Planning\Pre-
Applications\2026\PRE26-000078
requires electronic plan submittal for all applications. Please refer to the City’s
Electronic File Standards.
Building Permits – A building permit must be obtained to build buildings and structures.
A Construction Permit must be obtained to install utility lines, transportation
improvements and undertake work in City rights-of-ways. Building and Construction
Permits are separate permits.
13. Impact Fees: In addition to the applicable building and construction fees, impact fees
would be required. Fees change periodically and the fees in effect at the time of building
permit issuance would apply. For informational purposes, the 2026 impact fees are as
follows:
• Fire Impact Fees are currently assessed at:
o $1,099.68 per dwelling unit for multi-family residential buildings;
• Transportation Impact Fees are currently assessed at $6,987.79 per townhouse;
• Renton School District Impact Fees are currently not being assessed.
• Parks Impact Fees are currently assessed at:
o $2,531.21 per dwelling unit for multi-family buildings with three or four units;
A handout listing all of the City’s Development related fees is available for your review at:
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=8217302&dbid=0&repo=City
ofRenton.
14. Expiration: Upon approval, the Short Plat is valid for five (5) years with a possible one-
year extension (RMC 4-7-070M). Building permits expire 18 months from issuance date.
Extensions are up to the discretion of the Building Official. Extensions must be applied
for prior to the permit expiring. For permits that have expired, a new permit must be
obtained and new fees paid. It is the applicant’s responsibility to monitor the
expiration dates.
15. Next Steps: For a Unit Lot Subdivision, the applicant shall have the complete set of
materials pre-screened prior to submitting the complete application package. Please
contact Ashley Wragge, Assistant Planner, at 425-430-7314 or awragge@rentonwa.gov
to submit prescreen materials and subsequent land use application. When the formal
building application materials are complete, the applicant shall contact the Permit
Center at permittech@rentonwa.gov in order to
apply.