Loading...
HomeMy WebLinkAboutInspection DocN SEE C1 FOR TESC Scale: 1" = 10' Drainage Site Plan C3 Interlaken Engineering and Design, PLLC Seattle, WA | (206) 470-9572 www.interlakenengineering.com Revisions: 1"=10' 20 10 0 2023-11-30: Updated for City of Renton Comments dated 11/17/23 Christelle Ridge - Lot 12 Interlaken Project No.: SEA-22-150 Site Address: 4413 NE 26th Pl Jurisdiction: Renton Parcel No.: 157108-0120 Applicant: Jaswinder Singh Permit No.: B23005484 2024-02-05: Updated for City of Renton Comments dated 1/4/24 B2 3 0 0 5 4 8 4 _ V 4 INSTALL 4" PERFORATED FOOTING DRAIN ALONG ALL BUILDING FOOTINGS. 03/10/26 FOOTING DRAIN MARKUP ONLY INSTALL MIN. 22" DIA. FOOTING DRAIN STORAGE STRUCTURE AND INSTALL HARD WIRED 1/2 ZOELLER SUBMERSIBLE SUMP PUMP OR APPROVED EQUAL. RIM EL = 396.25' IE 4" FOOTING DRAIN (S) = 392.25' IE 1.5" DISCHARGE (W) = 395.0' INSTALL 1.5" CHECK VALVE ON THE DISCHARGE LINE CONNECT ALL FOOTING DRAINS TO 4" PVC (N), MIN. 1% SLOPE AND 1' COVER 1.5" FOOTING DRAIN FORCEMAIN CONNECT FOOTING DRAIN FORCEMAIN TO CB #10. IE 1.5" (NE) = 403.0' REPLANT TREE(S) REMOVED FOR FOOTING DRAIN DISCHARGE LINE INSTALLATION REVISION Received: 03/30/2026 / striplett BUILDING DIVISION DEVELOPMENT ENGINEERING HHuynh 04/10/2026