HomeMy WebLinkAboutChange Order - 1"!#
$
CAG-25-290, CO #1-26
Approved by Cheryl Beyer via email 4/8/2026
Change Order No. 01
Contract Title: Renton Sidewalk Rehabilitation Project
Contract No. CAG-25-290
Page 2 of 4
Change Order Form Revised 12/23/2025
A45-1. Pay Item: Structure Excavation Class A incl Haul
Description of Change: 4USVDUVSF&YDBWBUJPO$MBTT"JODM)BVMis added to install nine (9)
Type 1 and one (1) Type 2 Catch Basin structures.
BProposal Schedule of Prices (add rows as needed):
Item
No.
Spec.
Section Description Quantity Unit Unit
Price Amount
A45-1 2-09 4USVDUVSF&YDBWBUJPO
$MBTT"JODM)BVM
65 z Ψϴϯ͘ϭϱ $5,404.90
b. Specification and/or Special Provision: SS 2-09
i.Description: SS 2-09.1
ii. Construction Requirements: SS 2-09.3(1)
iii.Measurement: SS 2-09.4
iv.Payment: SS 2-09.5
c.Plans: No Plan Changes
2. Reason for Change: This change order adds a pay item for an activity which was not
identified by the original contract at bid time.
3. Equitable Adjustment: This Change Order does include an equitable adjustment per
Section 1-09.4 of the 2025 WSDOT/APWA Standard Specifications. See attached.
Estimated Cost, Pay Item: $5,404.90
Extended Overhead: $2,316.66
Force Account Time related damages per
1-09.6, 6.d.:
$0
Total $7,721.56
* Type dollar amounts in right-hand column for each of the 1st 3 rows, then right click dollar amount on fourth row
4. Critical Path Extension of Time: The Time for Completion is not extended any Working Days.
"!#
Change Order No. 01
Contract Title: Renton Sidewalk Rehabilitation Project
Contract No. CAG-25-290
Page 3 of 4
Change Order Form Revised 12/23/2025
A46-1. Pay Item: Sawcutting
1. Description of Change: Sawcutting is added to demo tie-ins to existing hardscape at 500lf of
tie-in at roadway, curb, sidewalk and driveway.
a. Proposal Schedule of Prices (add rows as needed):
Item
No.
Spec.
Section Description Quantity Unit Unit
Price Amount
A46-1 2-02.1 SĂǁĐƵƚƚŝŶŐϮϬϬϬ In-ft $1͘ϬϬ $2,000
b. Specification and/or Special Provision: SS 2-02.1
i. Measurement: SS 2-02.4
ii.Payment: SS 2-02.5
c.Plans: No Plan Changes
2. Reason for Change: This change order adds a pay item for an activity which was defined but
not accounted for by the original contract at bid time.
3. Equitable Adjustment: This Change Order does not include an equitable adjustment per
Section 1-09.4 of the 2025 WSDOT/APWA Standard Specifications. See attached.
Estimated Cost, Pay Item: $2,000.00
Extended Overhead: $
Force Account Time related damages per
1-09.6, 6.d.:
$
Total $2,000.00
* Type dollar amounts in right-hand column for each of the 1st 3 rows, then right click dollar amount on fourth row
4. Critical Path Extension of Time: The Time for Completion is not extended any working Days.
"!#
Change Order No. 01
Contract Title: Renton Sidewalk Rehabilitation Project
Contract No. CAG-25-290
Page 4 of 4
Change Order Form Revised 12/23/2025
5. Sections 1-04.4 and 1-04.5 of the 2025 WSDOT/APWA Standard Specifications shall
govern this Change Order. The Work of the referenced Contract is modified to include the
changes detailed herein. The payment provided for herein shall constitute the complete
and final settlement for all costs of labor, equipment, materials, overhead, profit, permit
fees, and all other claims that may be made by the Contractor as a result of this change.
6. To be attached to Change Order:
a. Field Directive/Request For Information Response
b. Estimated Change Order Cost
c.
d. Plans
e. Equitable Adjustment Determination
f. Additional Working Days Calculation
g. Project Labor List
h. Equipment Rate List including Equipment Rate Requests (DOT Form 422-010 EF)
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#
"!#