HomeMy WebLinkAboutChange Order - 664/1/2026 "!#           $   CAG-22-163, CO #66-26 Approved by Cheryl Beyer via email April 8, 2026 Change Order No. 66 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 2 of 19 Change Order Form – Revised 12/23/2025 66-A244. Pay Item: Cement Concrete Fill Wall STA 16+65, 53’ RT 1. Description of Change: This Change addresses revisions to the grading of the walkway to the entrance to Wendy's. This work includes exploratory excavation and construction of a cement concrete fill wall. a. Proposal Schedule of Prices (add rows as needed): Item No. Spec. Section Description Qty Unit Unit Price Amount 66-A244 6-11 Cement Concrete Fill Wall STA 16+65, 53’ RT 1 LS $3,500.00 $3,500.00 Net $3,500.00 b. Specification and/or Special Provision: i. Description: Special Provision 6-11 ii. Materials: Special Provision 6-11.2 iii. Construction Requirements: Special Provisions 6-11.3 is supplemented with the following: The Contractor shall construct the cement concrete fill wall at STA 16+65, 53.00’ RT as shown in the response to RFI #528. iv. Measurement: Section 6-11.4 is supplemented with the following: No unit of measurement shall apply to the lump sum item “Cement Concrete Fill Wall STA 16+65, 53’ RT.” v. Payment: Section 6-11.5 is supplemented with the following: Payment for "Cement Concrete Fill Wall STA 16+65, 53’ RT" shall be full compensation for all labor, materials, equipment, and incidentals required to complete the work as specified, including, but not limited to exploratory excavation, furnishing and removing temporary traffic control measures, and any additional work necessary to comply with access requirements. c. Plans: RFI 528 Response 2. Reason for Change: "!#          Change Order No. 66 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 3 of 19 Change Order Form – Revised 12/23/2025 The Contract plans required the proposed asphalt driveway at Wendy's be constructed in a way which would force the proposed walkway between the sidewalk and the Wendy's building to either be significantly below the driveway grade without anything to support the grade difference, or for the proposed cross slope of the walkway to be toward the Wendy's building, which would result in drainage sheeting toward the structure. Construction of the walkway with the revised cross slope while maintaining compliant grades required construction of a cement concrete fill wall to support the elevation difference between the driveway and the walkway into the building. Because the cement concrete fill wall was not part of the original scope, no existing underground utilities were identified in the plans. The Contractor needed to perform exploratory excavation to determine the feasibility of constructing the cement concrete fill wall. This Change is needed to create an item to compensate the Contractor for the work required to excavate and install the cement concrete fill wall at the Wendy’s entrance. 2. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Estimated Cost, Pay Item: $3,500.00 Extended Overhead: $0.00 Force Account Time related damages per 1-09.6, 6.d.: $0.00 Total $3,500.00 * Type dollar amounts in right-hand column for each of the 1st 3 rows, then right click dollar amount on fourth row and select “update Field”. 66-A244 – Cement Concrete Fill Wall STA 16+65, 53’ RT An independent estimate was prepared for the cost of installation of a cement concrete fill wall. The cost was calculated to be $3,493.73 and has been rounded to an estimated cost of $3,500.00. Affects DBE Work: No. 4. Critical Path Extension of Time: The time for Completion is extended 0 Working Days. "!#          Change Order No. 66 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 4 of 19 Change Order Form – Revised 12/23/2025 66-A245. Pay Item: Added Stairs and Handrail at Wendy's Entrance STA 16+65 RT 3. Description of Change: This Change addresses revisions to the grading of the walkway to the entrance to Wendy's. This work includes construction of stairs within the proposed sidewalk area and installation of a pedestrian handrail. a. Proposal Schedule of Prices (add rows as needed): Item No. Spec. Section Description Qty Unit Unit Price Amount 66-A245 6-02 6-32 Added Stairs and Handrail at Wendy's Entrance STA 16+65 RT 1 LS $4,500.00 $4,500.00 Net $4,500.00 b. Specification and/or Special Provision: i. Description: Standard Specification 6-02 and Special Provision 6-32 ii. Materials: Standard Specifications 9-01, 9-03, 9-06 and 9-07 iii. Construction Requirements: Special Provisions 8-14.3 is supplemented with the following: The Contractor shall construct the walkway with stairs and a pedestrian railing at STA 16+65, 53.00’ RT as shown in the response to RFI #528. iv. Measurement: Section 8-14.4 is supplemented with the following: No unit of measurement shall apply to the lump sum item “Added Stairs and Handrail at Wendy's Entrance STA 16+65 RT.” v. Payment: Section 8-14.5 is supplemented with the following: The lump sum payment for "Added Stairs and Handrail at Wendy's Entrance STA 16+65 RT" shall be full compensation for all labor, materials, equipment, and incidentals required to complete the work as specified, including, but not limited to, excavation, grading, installation of handrail, and any additional work necessary to comply with construction requirements. c. Plans: RFI 528 Response "!#          Change Order No. 66 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 5 of 19 Change Order Form – Revised 12/23/2025 2. Reason for Change: The Contract plans required the proposed asphalt driveway at Wendy's be constructed in a way which would force the proposed walkway between the sidewalk and the Wendy's building to either be significantly below the driveway grade without anything to support the grade difference, or for the proposed cross slope of the walkway to be toward the Wendy's building, which would result in drainage sheeting toward the structure. Construction of the walkway with the revised cross slope while maintaining compliant running slopes and cross slopes required the construction of stairs and installation of a pedestrian handrail to accommodate the grade differential. This Change is needed to create an item to compensate the Contractor for the work required to construct stairs and add a pedestrian handrail at the Wendy’s entrance and walkway. 4. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. Estimated Cost, Pay Item: $4,500.00 Extended Overhead: $0.00 Force Account Time related damages per 1-09.6, 6.d.: $0.00 Total $4,500.00 * Type dollar amounts in right-hand column for each of the 1st 3 rows, then right click dollar amount on fourth row and select “update Field”. 66-A245 – Added Stairs and Handrail at Wendy's Entrance STA 16+65 RT An independent estimate was prepared for the cost to construct stairs and install a pedestrian handrail at the Wendy’s walkway entrance. The cost was calculated to be $4,371.70 and has been rounded to an estimated cost of $4,500.00. Affects DBE Work: No. 4. Critical Path Extension of Time: The time for Completion is extended 0 Working Days. "!#          Change Order No. 66 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 6 of 19 Change Order Form – Revised 12/23/2025 66-A246. Pay Item: Remove and Replace Driveway Wings and Sidewalks to Establish Landings in the Sidewalk at Ramps and Stairs to Wendy's and Connection to Existing Roof Drains 1. Description of Change: This Change addresses revisions to the grading of the sidewalk, driveway entrance, and walkway to the entrance to Wendy's. This work includes removal and replacement of previously installed sidewalk, curb and gutter, and driveway panels. This work includes the installation of two trench drains connecting to the existing roof drains. a. Proposal Schedule of Prices (add rows as needed): Item No. Spec. Section Description Qty Unit Unit Price Amount 66-A221 8-06 1-Day High Early Cement Conc. curb and Gutter at Driveway Entrances 28 LF $58.00 $1,624.00 66-A222 8-06 1-Day High Early Cement Conc. for Driveway Entrance 18 SY $131.00 $2,358.00 66-A246 8-14 Remove and Replace Driveway Wings and Sidewalks to Establish Landings in the Sidewalk at Ramps and Stairs to Wendy's and Connection to Existing Roof Drains 1 LS $19,000.00 $19,000.00 Net $22,982.00 b. Specification and/or Special Provision: i. Description: No change. ii. Materials: Trench Drain 9-05.1 Add the following to Special Provisions 9-05.1: Trench drain shall be Polycast 625N or approved equal. iii. Construction Requirements: Special Provisions 8-14.3 is supplemented with the following: The Contractor shall remove and replace the installed driveway wing and sidewalk on the north side of driveway D2 and the installed driveway wing and sidewalk on the south side of driveway D4 and replace them with revised wings which establishes a landing per the response to RFI #528. "!#          Change Order No. 66 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 7 of 19 Change Order Form – Revised 12/23/2025 iv. Measurement: Section 8-14.4 is supplemented with the following: No unit of measurement shall apply to the lump sum item “Remove and Replace Driveway Wings and Sidewalks to Establish Landings in the Sidewalk at Ramps and Stairs to Wendy's and Connection to Existing Roof Drains.” v. Payment: Section 8-14.5 is supplemented with the following: Payment for “Remove and Replace Driveway Wings and Sidewalks to Establish Landings in the Sidewalk at Ramps and Stairs to Wendy's and Connection to Existing Roof Drains” shall be full compensation for all labor, materials, equipment, and incidentals required to complete the work as specified, including, but not limited to removal of existing sidewalk and driveway panels, regrading of surfaces, connecting roof drains, and any additional work necessary to comply with construction requirements. c. Plans: RFI 528 Response 2. Reason for Change: The Contract plans required the proposed asphalt driveway at Wendy's be constructed in a way which would force the proposed walkway between the sidewalk and the Wendy's building to either be significantly below the driveway grade without anything to support the grade difference, or for the proposed cross slope of the walkway to be toward the Wendy's building, which would result in drainage sheeting toward the structure. Construction of the walkway with the revised cross slope while maintaining compliant grades required removal and regrading of the installed driveway wings and some sidewalk to create space for extended wings which were flat enough to establish a landing at the top of the stairs and the walkway to the south entrance of Wendy’s to meet PROWAG requirements. The revised grading also required the installation of two trench drains connecting the roof drains to direct the flow of water away from the building. This Change is needed to create an item to compensate the Contractor for the work required to revise the sidewalk, driveway, and landing ramps, and connect the roof drains at the Wendy’s entrance and walkway. 2. Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT/APWA Standard Specifications. See attached. "!#          Change Order No. 66 Contract Title: Rainier Ave S. Corridor Improvements – Phase 4 Contract No. CAG-22-163 Page 8 of 19 Change Order Form – Revised 12/23/2025 Estimated Cost, Pay Item: $19,000.00 Extended Overhead: $0.00 Force Account Time related damages per 1-09.6, 6.d.: $0.00 Total $19,000.00 * Type dollar amounts in right-hand column for each of the 1st 3 rows, then right click dollar amount on fourth row and select “update Field”. 66-A246 – Remove and Replace Driveway Wings and Sidewalks to Establish Landings in the Sidewalk at Ramps and Stairs to Wendy's and Connection to Existing Roof Drains An independent estimate was prepared for the cost to remove and regrade the landings in the sidewalk at ramps and stairs to Wendy’s and to connect the existing roof drains. The cost was calculated to be $18,733.20 and has been rounded to an estimated cost of $19,000.00. Affects DBE Work: No. 4. Critical Path Extension of Time: The time for Completion is extended 0 Working Days. 5. Sections 1-04.4 and 1-04.5 of the 2022 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change. 6. To be attached to Change Order: ܈ a. Field Directive/Request For Information Response ܈ b. Estimated Change Order Cost Ч c. Contractor’s Quote ܈ d. Plans Ч e. Equitable Adjustment Determination Ч f. Additional Working Days Calculation Ч g. Project Labor List ܆ h. Equipment Rate List including Equipment Rate Requests (DOT Form 422-010 EF) "!#          ^dWh>Ͳϭϲϭϱ;ϬϬϱͿ LJ͗ WĞƌƚĞĞƚ ĂƚĞ͗ /ƚĞŵEŽ͘YƵĂŶƚŝƚLJ hŶŝƚWƌŝĐĞ ƐƚŝŵĂƚĞĚŽƐƚ ϲϲͲϮϰϰ Ϯ ϭϬϴ͘ϬϬΨ  Ϯϭϲ͘ϬϬΨ  ϰ ϭϬϰ͘ϬϬΨ  ϰϭϲ͘ϬϬΨ  Ϯ ϳϳ͘ϬϬΨ  ϭϱϰ͘ϬϬΨ  ϳϴϲ͘ϬϬΨ  Ϭ͘ϯϭΨ  Ϯϰϯ͘ϲϲΨ  Ϯ Ϯϵ͘ϬϬΨ  ϱϴ͘ϬϬΨ  ϰ ϭϭϭ͘ϬϬΨ  ϰϰϰ͘ϬϬΨ  Ϯ ϯϬ͘ϬϬΨ  ϲϬ͘ϬϬΨ  ϱϲϮ͘ϬϬΨ  Ϭ͘ϮϭΨ  ϭϭϴ͘ϬϮΨ  ϭϬ ϵϮ͘ϱϬΨ  ϵϮϱ͘ϬϬΨ  ϵϮϱ͘ϬϬΨ  Ϭ͘ϯϭΨ  Ϯϴϲ͘ϳϱΨ  ϱ ϯϬ͘ϬϬΨ  ϭϱϬ͘ϬϬΨ  ϭϱϬ͘ϬϬΨ  Ϭ͘ϮϭΨ  ϯϭ͘ϱϬΨ  ϭ ϭϲϱ͘ϬϬΨ  ϭϲϱ͘ϬϬΨ  ϭϲϱ͘ϬϬΨ  Ϭ͘ϮϭΨ  ϯϰ͘ϲϱΨ  ϭ͕ϱϵϮ͘ϵϬΨ Ϭ͘ϭϮΨ  ϭϵϭ͘ϭϱΨ  ϯ͕ϰϵϯ͘ϳϯΨ  ϯ͕ϱϬϬ͘ϬϬΨ  ϲϲͲϮϰϱ Ϯ ϭϬϴ͘ϬϬΨ  Ϯϭϲ͘ϬϬΨ  ϰ ϭϬϰ͘ϬϬΨ  ϰϭϲ͘ϬϬΨ  Ϯ ϳϳ͘ϬϬΨ  ϭϱϰ͘ϬϬΨ  ϳϴϲ͘ϬϬΨ  Ϭ͘ϯϭΨ  Ϯϰϯ͘ϲϲΨ  Ϯ Ϯϵ͘ϬϬΨ  ϱϴ͘ϬϬΨ  Ϯ ϭϭϭ͘ϬϬΨ  ϮϮϮ͘ϬϬΨ  Ϯ ϵϵ͘ϬϬΨ  ϭϵϴ͘ϬϬΨ  ϰϳϴ͘ϬϬΨ  Ϭ͘ϮϭΨ  ϭϬϬ͘ϯϴΨ  ϭϬ ϵϮ͘ϱϬΨ  ϵϮϱ͘ϬϬΨ  ϵϮϱ͘ϬϬΨ  Ϭ͘ϯϭΨ  Ϯϴϲ͘ϳϱΨ  ϱ ϯϬ͘ϬϬΨ  ϭϱϬ͘ϬϬΨ  ϭϱϬ͘ϬϬΨ  Ϭ͘ϮϭΨ  ϯϭ͘ϱϬΨ  Ϯ ϭϲϱ͘ϬϬΨ  ϯϯϬ͘ϬϬΨ  ϯϯϬ͘ϬϬΨ  Ϭ͘ϮϭΨ  ϲϵ͘ϯϬΨ  ϭ͕ϳϵϮ͘ϱϱΨ Ϭ͘ϭϮΨ  Ϯϭϱ͘ϭϭΨ  ϯ͕ϲϭϱ͘ϳϬΨ  ϰ ϭϴϵ͘ϬϬΨ  ϳϱϲ͘ϬϬΨ  ϰ͕ϯϳϭ͘ϳϬΨ  ϰ͕ϱϬϬ͘ϬϬΨ  ĚĚĞĚŽŶĐƌĞƚĞ&ŝůůtĂůů^dϭϲнϲϱ͕ϱϯ͛Zd >ĂďŽƌͲWŝǀĞƚƚĂ;&ŽƌĞŵĂŶͿ ,ŽƵƌƐ ŽŶƚƌĂĐƚEŽ͗'ͲϮϮͲϭϲϯ &ĞĚĞƌĂůŝĚEŽ͗^ŚĂŶŶŽŶdƌĞŵƉĞƌ ŽŶƐƚƌƵĐƚŝŽŶDĂŶĂŐĞƌ͗ϯͬϯϬͬϮϬϮϲ ŚĂŶŐĞKƌĚĞƌŽƐƚ;ƋƵŝƚĂďůĞĚũƵƐƚŵĞŶƚͿ ŚĂŶŐĞKƌĚĞƌEŽ͘ϲϲ WƌŽũĞĐƚEĂŵĞ͗ZĂŝŶŝĞƌǀĞ^ŽƌƌŝĚŽƌ/ŵƉƌŽǀĞŵĞŶƚƐͲWŚĂƐĞϰ ŽŶƚƌĂĐƚŽƌ͗WŝǀĞƚƚĂƌŽƚŚĞƌƐŽŶƐƚƌƵĐƚŝŽŶ͕/ŶĐ͘ /ŶĚĞƉĞŶĚĞŶƚŽƐƚƐƚŝŵĂƚĞ ĞƐĐƌŝƉƚŝŽŶ hŶŝƚ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;ƌĞĂŬĞƌͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;KƉĞƌĂƚŽƌdžϮͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;>ĂďŽƌĞƌͿ ,ŽƵƌƐ >ĂďŽƌDĂƌŬƵƉͲWŝǀĞƚƚĂ ĞŶƚƐͬŽůůĂƌ ƋƵŝƉŵĞŶƚͲtŝůƐŽŶŽŶĐƌĞƚĞ;dƌƵĐŬͿ ,Z ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;&ŽƌĞŵĂŶdƌƵĐŬͿ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;džĐĂǀĂƚŽƌͿ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ DĂƚĞƌŝĂůƐͲtŝůƐŽŶŽŶĐƌĞƚĞ;ŽŶĐƌĞƚĞͿ z ƋƵŝƉŵĞŶƚDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ >ĂďŽƌͲtŝůƐŽŶŽŶĐƌĞƚĞͲ>ĂďŽƌĞƌdžϮ ,ŽƵƌƐ >ĂďŽƌDĂƌŬƵƉͲtŝůƐŽŶŽŶĐƌĞƚĞ ĞŶƚƐͬŽůůĂƌ DĂƚĞƌŝĂůƐDĂƌŬƵƉ;tŝůƐŽŶŽŶĐƌĞƚĞͿ ĞŶƚƐͬŽůůĂƌ ^ƵďĐŽŶƚƌĂĐƚŽƌDĂƌŬƵƉ͕tŝůƐŽŶфΨϮϱ͕ϬϬϬ ĞŶƚƐͬŽůůĂƌ >h>ddKd>͗ ^d/DddKd>͗ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;džĐĂǀĂƚŽƌͿ ,ŽƵƌƐ ĚĚĞĚ^ƚĂŝƌƐĂŶĚ,ĂŶĚƌĂŝůĂƚtĞŶĚLJΖƐŶƚƌĂŶĐĞ^dϭϲнϲϱZd >ĂďŽƌͲtŝůƐŽŶŽŶĐƌĞƚĞͲ>ĂďŽƌĞƌdžϮ ,ŽƵƌƐ ,ŽƵƌƐ >ĂďŽƌDĂƌŬƵƉͲWŝǀĞƚƚĂ ĞŶƚƐͬŽůůĂƌ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;&ŽƌĞŵĂŶdƌƵĐŬͿ DĂƚĞƌŝĂůƐͲtŝůƐŽŶŽŶĐƌĞƚĞ;ŽŶĐƌĞƚĞͿ z DĂƚĞƌŝĂůƐDĂƌŬƵƉ;tŝůƐŽŶŽŶĐƌĞƚĞͿ ĞŶƚƐͬŽůůĂƌ ^ƵďĐŽŶƚƌĂĐƚŽƌDĂƌŬƵƉ͕tŝůƐŽŶфΨϮϱ͕ϬϬϬ ĞŶƚƐͬŽůůĂƌ >ĂďŽƌͲWŝǀĞƚƚĂ;&ŽƌĞŵĂŶͿ >h>ddKd>͗ ,ĂŶĚƌĂŝů >& >h>ddKd>͗ ^d/DddKd>͗ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;KƉĞƌĂƚŽƌdžϮͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;>ĂďŽƌĞƌͿ >ĂďŽƌDĂƌŬƵƉͲtŝůƐŽŶŽŶĐƌĞƚĞ ĞŶƚƐͬŽůůĂƌ ƋƵŝƉŵĞŶƚͲtŝůƐŽŶŽŶĐƌĞƚĞ;dƌƵĐŬͿ ,Z ƋƵŝƉŵĞŶƚDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;ƵŵƉdƌƵĐŬͿ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚDĂƌŬƵƉ ĞŶƚƐͬŽůůĂƌ Wendy's Driveway Entrance - Estimated Change Order Cost CO #66, Page 9 of 19 "!#          ^dWh>Ͳϭϲϭϱ;ϬϬϱͿ LJ͗ WĞƌƚĞĞƚ ĂƚĞ͗ /ƚĞŵEŽ͘YƵĂŶƚŝƚLJ hŶŝƚWƌŝĐĞ ƐƚŝŵĂƚĞĚŽƐƚ ŽŶƚƌĂĐƚEŽ͗'ͲϮϮͲϭϲϯ &ĞĚĞƌĂůŝĚEŽ͗^ŚĂŶŶŽŶdƌĞŵƉĞƌ ŽŶƐƚƌƵĐƚŝŽŶDĂŶĂŐĞƌ͗ϯͬϯϬͬϮϬϮϲ ŚĂŶŐĞKƌĚĞƌŽƐƚ;ƋƵŝƚĂďůĞĚũƵƐƚŵĞŶƚͿ ŚĂŶŐĞKƌĚĞƌEŽ͘ϲϲ WƌŽũĞĐƚEĂŵĞ͗ZĂŝŶŝĞƌǀĞ^ŽƌƌŝĚŽƌ/ŵƉƌŽǀĞŵĞŶƚƐͲWŚĂƐĞϰ ŽŶƚƌĂĐƚŽƌ͗WŝǀĞƚƚĂƌŽƚŚĞƌƐŽŶƐƚƌƵĐƚŝŽŶ͕/ŶĐ͘ /ŶĚĞƉĞŶĚĞŶƚŽƐƚƐƚŝŵĂƚĞ ĞƐĐƌŝƉƚŝŽŶ hŶŝƚ ϲϲͲϮϰϲ ϭϲ ϭϬϴ͘ϬϬΨϭ͕ϳϮϴ͘ϬϬΨ ϭϬ ϭϰϴ͘ϬϬΨϭ͕ϰϴϬ͘ϬϬΨ ϭϲ ϭϬϰ͘ϬϬΨϭ͕ϲϲϰ͘ϬϬΨ ϭϬ ϭϰϬ͘ϬϬΨϭ͕ϰϬϬ͘ϬϬΨ ϭϲ ϳϳ͘ϬϬΨϭ͕ϮϯϮ͘ϬϬΨ ϭϬ ϭϬϲ͘ϬϬΨϭ͕ϬϲϬ͘ϬϬΨ ϴ͕ϱϲϰ͘ϬϬΨ Ϭ͘ϯϭΨ Ϯ͕ϲϱϰ͘ϴϰΨ ϭϲ Ϯϵ͘ϬϬΨϰϲϰ͘ϬϬΨ ϭϲ ϭϭϭ͘ϬϬΨϭ͕ϳϳϲ͘ϬϬΨ ϴ ϯϬ͘ϬϬΨϮϰϬ͘ϬϬΨ ϴ ϳϭ͘ϬϬΨϱϲϴ͘ϬϬΨ ϴ ϵϵ͘ϬϬΨϳϵϮ͘ϬϬΨ ϰ ϭϵ͘ϬϬΨ ϳϲ͘ϬϬΨ ϯ͕ϵϭϲ͘ϬϬΨ Ϭ͘ϮϭΨϴϮϮ͘ϯϲΨ Ϯ ϴϬϬ͘ϬϬΨ ϭ͕ϲϬϬ͘ϬϬΨ ϭ͕ϲϬϬ͘ϬϬΨ Ϭ͘ϮϭΨ ϯϯϲ͘ϬϬΨ ϭ ϳϱϬ͘ϬϬΨϳϱϬ͘ϬϬΨ ϳϱϬ͘ϬϬΨ Ϭ͘ϭϮΨ ϵϬ͘ϬϬΨ ϭϴ͕ϳϯϯ͘ϮϬΨ ϭϵ͕ϬϬϬ͘ϬϬΨ ϲϲͲϮϮϭ ϭϴ Ψϭϯϭ͘ϬϬ ΨϮ͕ϯϱϴ͘ϬϬ ϲϲͲϮϮϮ Ϯϴ Ψϱϴ͘ϬϬ Ψϭ͕ϲϮϰ͘ϬϬ ϲϲͲϮϰϰ ϭ Ψϯ͕ϱϬϬ͘ϬϬ Ψϯ͕ϱϬϬ͘ϬϬ ϲϲͲϮϰϱ ϭ Ψϰ͕ϱϬϬ͘ϬϬ Ψϰ͕ϱϬϬ͘ϬϬ ϲϲͲϮϰϲ ϭ Ψϭϵ͕ϬϬϬ͘ϬϬ Ψϭϵ͕ϬϬϬ͘ϬϬ ϯϬ͕ϵϴϮ͘ϬϬΨ ^ƵŵŵĂƌLJŽĨŽŶƚƌĂĐƚŽƌƐYƵŽƚĞƐ͗ /ƚĞŵ YƵŽƚĞ>ŽĐĂƚŝŽŶ ^>Ϭϱϲ dŽƚĂůYƵŽƚĞĚĚĚĞĚŽƐƚ͗ ZĞŵŽǀĞĂŶĚZĞƉůĂĐĞƌŝǀĞǁĂLJtŝŶŐƐĂŶĚ^ŝĚĞǁĂůŬƐƚŽƐƚĂďůŝƐŚ >ĂŶĚŝŶŐƐŝŶƚŚĞ^ŝĚĞǁĂůŬĂƚZĂŵƉƐĂŶĚ^ƚĂŝƌƐƚŽtĞŶĚLJΖƐĂŶĚ ŽŶŶĞĐƚŝŽŶƚŽdžŝƐƚŝŶŐZŽŽĨƌĂŝŶƐ ĞŶƚƐͬŽůůĂƌ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;'W^Ϳ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚDĂƌŬƵƉ;WŝǀĞƚƚĂͿ Eͬ /ƚĞŵŚĂŶŐĞ ^ƵďĐŽŶƚƌĂĐƚŽƌDĂƌŬƵƉͲǀĞƌŐƌĞĞŶŽŶĐƌĞƚĞƵƚƚŝŶŐ >^ >h>ddKd>͗ ^ƵďĐŽŶƚƌĂĐƚŽƌͲǀĞƌŐƌĞĞŶŽŶĐƌĞƚĞƵƚƚŝŶŐ;ƐĂǁĐƵƚƉƌĞǀŝŽƵƐůLJŝŶƐƚĂůůĞĚƐŝĚĞǁĂůŬͿ >^ ĞŶƚƐͬŽůůĂƌ DĂƚĞƌŝĂůƐͲWŝǀĞƚƚĂ;dƌĞŶĐŚƌĂŝŶƐͿ  ϭͲĂLJ,ŝŐŚĂƌůLJĞŵĞŶƚŽŶĐ͘dƌĂĨĨŝĐƵƌďĂŶĚ'ƵƚƚĞƌĂƚƌŝǀĞǁĂLJ ŶƚƌĂŶĐĞƐ ^z ϭͲĂLJ,ŝŐŚĂƌůLJĞŵĞŶƚŽŶĐ͘ĨŽƌƌŝǀĞǁĂLJŶƚƌĂŶĐĞ >& ZĞŵŽǀĞĂŶĚZĞƉůĂĐĞƌŝǀĞǁĂLJtŝŶŐƐĂŶĚ^ŝĚĞǁĂůŬƐƚŽƐƚĂďůŝƐŚ >ĂŶĚŝŶŐƐŝŶƚŚĞ^ŝĚĞǁĂůŬĂƚZĂŵƉƐĂŶĚ^ƚĂŝƌƐƚŽtĞŶĚLJΖƐĂŶĚ ŽŶŶĞĐƚŝŽŶƚŽdžŝƐƚŝŶŐZŽŽĨƌĂŝŶƐ >^ dKd>,E'KZZK^d YƵŽƚĞĚŽƐƚ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;ƌĞĂŬĞƌͿ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;>ŽĂĚĞƌͿ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;ƵŵƉdƌƵĐŬͿ ,ŽƵƌƐ >ĂďŽƌDĂƌŬƵƉͲWŝǀĞƚƚĂ ĞŶƚƐͬŽůůĂƌ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;&ŽƌĞŵĂŶdƌƵĐŬͿ ĚĚĞĚ^ƚĂŝƌƐĂŶĚ,ĂŶĚƌĂŝůĂƚtĞŶĚLJΖƐŶƚƌĂŶĐĞ^dϭϲнϲϱZd >^ ĚĚĞĚŽŶĐƌĞƚĞ&ŝůůtĂůů^dϭϲнϲϱ͕ϱϯ͛Zd >^ ^d/DddKd>͗ ,ŽƵƌƐ ƋƵŝƉŵĞŶƚͲWŝǀĞƚƚĂ;džĐĂǀĂƚŽƌͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;KƉĞƌĂƚŽƌKdͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;>ĂďŽƌĞƌͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;>ĂďŽƌĞƌKdͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;&ŽƌĞŵĂŶͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;&ŽƌĞŵĂŶKdͿ ,ŽƵƌƐ >ĂďŽƌͲWŝǀĞƚƚĂ;KƉĞƌĂƚŽƌͿ ,ŽƵƌƐ DĂƚĞƌŝĂůƐDĂƌŬƵƉ;WŝǀĞƚƚĂͿ Wendy's Driveway Entrance - Estimated Change Order Cost CO #66, Page 10 of 19 "!#          Pivetta Brothers Construction, Inc. 1812 Pease Avenue, Sumner, Washington 98390 P: (800) 748-3882 Project: 2022-148 Rainier Ave S Phase 4 Renton, Washington RFI #528: Wendy Driveway D4 Profile Status Open To Jordan Howe (Perteet)From Russell Owen (Pivetta Brothers Construction, Inc.) 201 S 3rd St Renton, Washington 98057 Date Initiated May 22, 2025 Due Date May 27, 2025 Location Project Stage Course of Construction Cost Impact TBD Schedule Impact TBD Spec Section Cost Code Drawing Number 59, 186 Reference Linked Drawings 186,59 Received From Matt June Copies To Bill Adams (Pivetta Brothers Construction, Inc.), Ben Fiscus (Pivetta Brothers Construction, Inc.), Jordan Howe (Perteet), Matt June , Chris McKinnon (Perteet), Joe Nerlfi (City of Renton), Russell Owen (Pivetta Brothers Construction, Inc.), William Schroeder (Pivetta Brothers Construction, Inc.) Activity Question Question from Russell Owen Pivetta Brothers Construction, Inc.on Thursday, May 22, 2025 at 07:18 AM PDT Pivetta noticed proposed Wendys driveway D4 profile/grading will result in the sidewalk adjacent to building at Wendys sloping back towards the building if built per plan leading to potential grading/drainage issues. Attached is plan/photos demonstrating that existing conditions sidewalk adjacent to building sloping away from building. Once the new driveway is constructed, it will raise the front of walk grade. The back of walk grade is fixed on the building (unless raising sidewalk on building is acceptable). This will results in sidewalk sloping back towards the building. A wall for grade separation may be needed between proposed driveway and the sidewalk adjacent to building. Changing driveway approach from type 1 with 1.5% slope towards road to a type 3 with 1.5% slope away(or more) from curb may be necessary. If the driveway cross slope changes then the wing lengths may change. Pivetta is pouring curb and gutter on 5/22/2025 so if any curb needs to be left out through this driveway due to potential for change in wing lengths, please provide direction ASAP. Please provide direction regarding this potential grading/drainage conflict whether to build per plan or if additional design is necessary. Attachments Wendys driveway RFI.pdf Awaiting an Official Response Pivetta Brothers Construction, Inc. Page 1 of 1 Printed On: May 23, 2025 06:17 PM EDT Wendy's Driveway Entrance - RFI 528 CO #66, Page 11 of 19 Response from Nadine Stock, Psomas, Inc. on 06/09/25: SEE ATTACHED SKETCHES FOR REVISED GRADING ON DRIVEWAYS D2 & D4. "!#          RF I 1 3 2 We n d y ' s D r i v e w a y E n t r a n c e - R F I 5 2 8 P l a n s CO # 6 6 , P a g e 1 2 o f 1 9 si d e w a l k c u r r e n t l y sh e e t s a w a y f r o m bu i l d i n g i n t o p a r k i n g l o t ne w d r i v e w a y g r a d e w i l l re s u l t i n s i d e w a l k sh e e t i n g t o w a r d s bu i l d i n g . c a n ' t r a i s e BO W o n b u i l d i n g st r i n g l i n e s h o w i n g n e w FG , r a i s e s D W a n d w i l l re s u l t i n r a i s e F O W o r ne e d a w a l l f o r g r a d e se p e r a t i o n as p h a l t D W co n c D W e n t r a n c e   " !       #                                 We n d y ' s D r i v e w a y E n t r a n c e - R F I 5 2 8 P l a n s CO # 6 6 , P a g e 1 3 o f 1 9   " !       #                                 We n d y ' s D r i v e w a y E n t r a n c e - R F I 5 2 8 P l a n s CO # 6 6 , P a g e 1 4 o f 1 9   " !       #                                 Wendy's Driveway Entrance - RFI 528 Plans CO #66, Page 15 of 19 FG 33.71 DWY 33.45 BEGIN PED CURB TOP OF CURB 33.95 TOP 33.42 BOT 32.84 STEP TOP 33.53 BOT 32.95 EG 32.32 MATCH EXISTING DWY 32.59 TOP OF WALL 33.09 STEP TOP 32.95 BOT 32.36 TOP 32.84 BOT 32.25 CEMENT CONCRETE FILL WALL PER ATTACHED DETAIL SAWCUT EXISTING WALKWAY TO INSTALL EXISTING CONCRETE WALKWAY TO REMAIN FG 33.69 DWY 31.84 MATCH EXISTING TOP OF WALL 32.15 EG 31.79 MATCH EXISTING CEMENT CONCRETE STAIRS TREAD=12" RISERS=7" SEE STAIR DETAIL NEXT PAGE SURFACE MOUNTED HANDRAIL SEE STAIR DETAIL NEXT PAGE FG 32.34 FG 32.34 EG 32.19 MATCH EXISTING 5' 10 ' 6' 2. 4 0 ' 0. 8 3 ' 5' FFE 32.31 DWY 33.10 END PED CURB TOP OF CURB 33.92 BEGIN CONC FILL WALL TOP OF WALL 33.60 DWY 33.04 TOP OF WALL 33.54 EG 32.15 MATCH EXISTING INSTALL TRENCH DRAIN, LOCATE AND CONNECT TO ONSITE DRAINAGE SYSTEM DWY 32.09 TOP OF WALL 32.59 5' 7. 9 ' + / - 7. 1 ' + / - EG 32.14 MATCH EXISTING INSTALL TRENCH DRAIN, LOCATE AND CONNECT TO ONSITE DRAINAGE SYSTEM PROPOSED WALKWAY AND STAIR GRADE TO DRAIN TO EXIST CB "!#          We n d y ' s D r i v e w a y E n t r a n c e - R F I 5 2 8 P l a n s CO # 6 6 , P a g e 1 6 o f 1 9 PR O P O S E D DR I V E W A Y G R A D E TO P P R O P O S E D C E M E N T CO N C R E T E F I L L W A L L G R A D E EX I S T I N G W A L K W A Y TR A N S I T I O N T O P CO N C F I L L W A L L RE V E A L 6 " T O 0 "   " !       #                                 We n d y ' s D r i v e w a y E n t r a n c e - R F I 5 2 8 P l a n s CO # 6 6 , P a g e 1 7 o f 1 9 AS P H A L T DR I V E W A Y 16 7 PR O P O S E D O R EX I S T I N G W A L K W A Y 0" M I N 18 " M A X   " !       #                                 Wendy's Driveway Entrance - RFI 528 Plans CO #66, Page 18 of 19 EXISTING CONCRETE LANDING TO REMAIN MATCH EXISTING EG 32.25 MATCH EXISTING EG 32.22 1.5% 1.3% 6'6' 6.7% 1.5%1.5% 1.3% 6.7% SAWCUT AT NEAREST JOINT 5' FG 32.82 FG 32.75 "!#          We n d y ' s D r i v e w a y E n t r a n c e - R F I 5 2 8 P l a n s CO # 6 6 , P a g e 1 9 o f 1 9   " !       #