Loading...
HomeMy WebLinkAbout* ad - RFQ May Creek Trail Bank StabilizationMay Creek Trail Bank Stabilization Project: A/E Professional Services REQUEST FOR QUALIFICATIONS Page 1 of 2 The City of Renton – Parks and Recreation Department, is soliciting Statements of Qualifications (SOQs) from interdisciplinary teams to provide professional services for the May Creek Trail Bank Stabilization Project. The site is owned by the City and is located at approximately 4260 Lake Washington Blvd. N., Renton, WA 98056. An approximately 30-ft length of the northern creek bank along May Creek adjacent to the May Creek Trail experienced erosion during a February 2020 flood event and remains unstable. The instability threatens the May Creek Trail and nearby park infrastructure. May Creek supports multiple fish species and is classified as a Type S – Shoreline of the State. The project area is subject to shoreline, floodplain, and sensitive area regulations. The trail is currently open to the public. The City is pursuing FEMA Public Assistance funding to support design and construction of bank stabilization improvements. Improvement Objectives: •Identify the causes and extent of erosion and instability along the May Creek bank and assess risks to the trail and adjacent park infrastructure. •Develop and evaluate bank stabilization alternatives that address slope stability, habitat protection, regulatory constraints, constructability, and cost, and recommend a preferred solution. •Design and implement a permitted, constructible bank stabilization project that protects public infrastructure, supports ecological function, and meets FEMA funding requirements, with an emphasis on long-term resilience and regulatory compliance. The interdisciplinary team should comprise consultants with demonstrated expertise in site investigation and surveying, permitting, design and engineering, and construction administration, with the capacity to support the project through all phases of delivery. Statement of Qualifications Due Date: Proposals are due by May 19, 2026 at 12:00 PM (Noon). SOQs shall be submitted via email in a PDF format to the Project Representative, listed below. Contact Information: Betsy Severtsen, Capital Projects Manager bsevertsen@rentonwa.gov ____________________ Jason Seth, MMC City Clerk CITY OF RENTON Coulon Park Swim Beach Improvements: Design, Permitting, and Construction Administration Services REQUEST FOR QUALIFICATIONS Page 2 of 2 Date of publication in the Seattle Daily Journal of Commerce: April 22, 2026