TECHNICAL INFORMATION REPORT
_________________________________________________________________
SHERWIN WILLIAMS REMODEL
LOCATION:
206 Wells Avenue South
Renton, WA 98057
ISSUE DATE: April 3, 2026
PREPARED BY:
Terraforma Design Group, Inc.
5027 51st Avenue SW
Seattle, WA 98136
TDG No. 25030
4/3/26
DEVELOPMENT ENGINEERING
HBray 04/16/2026
Surface Water Enginering
jfarah 04/16/2026
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
TABLE OF CONTENTS
I. Project Overview 1
II. Conditions and Requirements Summary 14
III. Off-Site Analysis 19
IV. Flow Control and Water Quality Facility Design 22
V. Conveyance System Design 23
VI. Special Reports & Studies 23
VII. Other Permits 23
VIII. Erosion/Sedimentation Control Design 23
IX. Bond Quantities, Facilities Summaries, 23
and Declaration of Covenant
X. Operation and Maintenance Manual 23
APPENDIX A – SOIL MAPPING
APPENDIX B – STORM OPERATION & MAINTENANCE MANUAL
APPENDIX C – CIVIL PLANS
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
I. PROJECT OVERVIEW
The proposed development consists of a remodel to the existing Sherwin Williams site at 206 Wells
Avenue South in Renton, Washington. The subject property (Parcel #723150-1135) measures
11,513 sf (0.26 ac). The property is zoned CD – Commercial Downtown and within the jurisdiction
of the City of Renton.
The scope of work will include interior improvements to the existing building. The owner proposes
to install new onsite catch basins and regrade the existing asphalt parking lot to remedy previous
parking lot flooding.
The proposed commercial construction requires a building and civil permits with the City of Renton.
The total area is New + Replaced Impervious Surface is approximately 4985 sf. Full Drainage
Review will be required. This Technical Information Report and civil engineering plans have been
prepared in accordance with the 2022 City of Renton Surface Water Design Manual.
The existing building structure was originally developed as early as 1940 according to the King
County assessor data. The site consists of an existing 5639 sf building area , 5510 sf of paved
parking and a few small planters. 2135 sf, parking, drive-aisle and perimeter landscaping. The
existing site is approximately 97% impervious.
The site is relatively flat. The parking lot predominately sheets drains to South 2nd Street; there are
no onsite storm facilities. There are no areas of native vegetation. There are no wetlands or critical
areas onsite or in the immediate vicinity. The site is not within a floodplain.
The existing soils are mapped as Urban Land. See Appendix A.
The project will result in the following:
Net Impervious Area Increase= 0 sf
Onsite New & Replaced Impervious Area= 4985 sf
Onsite Pollution Generating Impervious Area= 4985 sf (Replaced)
1
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2022 City of Renton Surface Water Design Manual 6/22/2022
8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner _____________________________
Phone ___________________________________
Address __________________________________
_________________________________________
Project Engineer ___________________________
Company _________________________________
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
BPG Investments XI LLC
(206) 826-5787
206 Wells Avenue S
Renton, WA 98057
Pedro DeGuzman, PE
Terraforma Design Group, Inc.
(206) 795-9023
Sherwin Williams Remodel
206 Wells Avenue South
Renton, WA 98057
2/16/26
2/16/26
23N
5E
17 (SW1/4)
FIGURE 1 - TIR WORKSHEET
2
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
N/A
Lower Cedar River
Peak Rate Control, Basic Water Quality
FIGURE 1 - TIR WORKSHEET (CONT.)
3
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2022 City of Renton Surface Water Design Manual 6/22/2022
Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 9 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability Provided: Yes / No
Urban Land flat medium
ONSITE
1
2/13/26
Peak Rate Control
none
* Not Determined Yet
* Not Determined Yet
#1 (< 5000sf new + replaced impervious)
* To be provided with final permit
FIGURE 1 - TIR WORKSHEET (CONT.)
4
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. _______________________
On-site BMPs Describe:
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO / MDP / BP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes / No
Treatment BMP: _________________________________
Maintenance Agreement: Yes / No
with whom? _____________________________________
Other Drainage Structures
Describe:
#1 (<5000 sf PGIS)
N/A
N/A
N/A
N/A
None
commercial retail
general housekeeping
FIGURE 1 - TIR WORKSHEET (CONT.)
5
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2022 City of Renton Surface Water Design Manual 6/22/2022
Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Description Water Quality Description On-site BMPs Description
Detention
Infiltration
Regional
Facility
Shared
Facility
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
Vegetated
Flowpath
Wetpool
Filtration
Oil Control
Spill Control
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
Full Dispersion
Full Infiltration
Limited Infiltration
Rain Gardens
Bioretention
Permeable
Pavement
Basic Dispersion
Soil Amendment
Perforated Pipe
Connection
Other
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
_____________
* None Proposed * None Proposed * None Proposed
FIGURE 1 - TIR WORKSHEET (CONT.)
6
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
6/22/2022 2022 City of Renton Surface Water Design Manual 8-A-6
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4′ High
Structural on Steep Slope
Other _______________________________
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
____________________________________________________________________________________
Signed/Date
N/A N/A
2/16/26
FIGURE 1 - TIR WORKSHEET (CONT.)
7
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
FIGURE 2 - SITE LOCATION
8
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
AERIAL – EXISTING CONDITIONS
FIGURE 3A - AERIAL - EXISTING CONDITIONS
9
SOUTH 2ND STREET
WE
L
L
S
A
V
E
N
U
E
S
O
U
T
H
AL
L
E
Y
SHERWIN WILLIAMS
building
planter
paving
planter
pavin
g
SHERWIN WILLIAMS REMODEL DRAINAGE BASIN MAP
FIGURE 3B - DRAINAGE MAP - EXISTING CONDITIONS
10
SOUTH 2ND STREET
WE
L
L
S
A
V
E
N
U
E
S
O
U
T
H
AL
L
E
Y
SHERWIN WILLIAMS
pavin
g
planter
paving
planter
building
SHERWIN WILLIAMS REMODEL DRAINAGE BASIN MAP
11
Soil Map—King County Area, Washington
(SHERWIN WILLIAMS - RENTON)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/16/2026
Page 1 of 3
52
5
8
9
0
4
52
5
8
9
1
2
52
5
8
9
2
0
52
5
8
9
2
8
52
5
8
9
3
6
52
5
8
9
4
4
52
5
8
9
5
2
52
5
8
9
0
4
52
5
8
9
1
2
52
5
8
9
2
0
52
5
8
9
2
8
52
5
8
9
3
6
52
5
8
9
4
4
52
5
8
9
5
2
559849 559857 559865 559873 559881 559889 559897 559905 559913 559921 559929
559849 559857 559865 559873 559881 559889 559897 559905 559913 559921 559929
47° 28' 52'' N
12
2
°
1
2
'
2
0
'
'
W
47° 28' 52'' N
12
2
°
1
2
'
1
6
'
'
W
47° 28' 50'' N
12
2
°
1
2
'
2
0
'
'
W
47° 28' 50'' N
12
2
°
1
2
'
1
6
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 15 30 60 90
Feet
0 5 10 20 30
Meters
Map Scale: 1:375 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
FIGURE 3D - SOIL MAP
SEE APPENDIX A - SOIL MAPPING
FOR ADDITIONAL INFORMATION
12
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
LANDCOVER DATA
Project Name:SHERWIN WILLIAMS - RENTON
Project Number:25030
DRAINAGE CRITERIA:CITY OF RENTON
Step 1) Site Data
1) General characteristics:
Basin 1 Soil type Urban Land
Development type retail Soil Group C/D
Size (ac.) 0.26 Existing surface roof, paving, planter
Flow Control Criteria Peak Rate Flow Predev Cover existing
Water Quality Criteria Enhanced Basic Oil Control No
Redevelopment Yes
2) Existing onsite characteristics:
Landscape 351 sf = 0.01 acres
Roof 5639 sf = 0.13 acres
Paving 5510 sf = 0.13 acres
Total 11500 sf = 0.26 acres
3) Developed onsite characteristics:
Landscape 351 sf = 0.01 acres
Roof 5639 sf = 0.13 acres
Paving 5510 sf = 0.13 acres
Total 11500 sf = 0.26 acres
4) Total New + Replaced Hard Surface
New + Replaced Impervious 4985 sf = 0.11 acres
5) Total New + Replaced Pollution Generating Impervious
New + Replaced PGIS 4985 sf = 0.11 acres
Step 2) Drainage Improvement Criteria
1) Core Requirement 3: Flow Control Facilities
Basic Exemption since < 5000 sf of New + Replaced Impervious Surface
2) Core Requirement #8: Water Quality Facilities
Basin Exemption since < 5000 sf of New + Replaced Pollution Generating Impervious Surface
3) Core Requirement #9: On-Site BMPs
Applicable since > 2000 sf of New + Replaced Impervious Surface.
FIGURE 3E - LANDCOVER DATA
13
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
II. CONDITIONS AND REQUIREMENTS SUMMARY
This Technical Information Report and the proposed drainage plans have been prepared in
accordance with the 2022 City of Renton Surface Water Design Manual.
Full Drainage Review will be required. The project will be classified as a Redevelopment. This
Technical Information Report will address the 9 core and 6 special requirements of the manual,
including a Level 1 downstream analysis.
14
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
Core Requirement #1 - Discharge at the Natural Location
The project will continue to drain to the existing City of Renton storm drainage system in South 2nd
Street.
Core Requirement #2 - Off-site Analysis
A Level 1 Downstream Analysis is required for the project. The site drainage is part of the
Lower Cedar River drainage drainage basin. We do not know of any downstream drainage
problems. See Section 3 of this Report for additional information.
Core Requirement #3 - Flow Control
The property is within the City’s Peak Rate Flow Control map area. The project involves 0 sf of
New Impervious and approximately 4985 sf of Replaced Impervious Surface. The proposed
commercial development qualifies for a Basic Exemption from flow control since there will be less
than 5000 sf of New + Replaced Impervious Surface.
Core Requirement #4 - Conveyance System
New catch basins and 8-inch storm drains are proposed to convey runoff from the regraded
asphalt parking lot. See Section 5 of this report.
Core Requirement #5 - Erosion and Sediment Control
Erosion Control BMP’s will be provided for the project, including straw wattles and CB inlet
protection. Considering the limited area of site disturbance, measures such as silt fencing or
construction entrances are not warranted. See Section 8 of this report.
Core Requirement #6 - Maintenance and Operations
An Operations and Maintenance Manual for Storm Drainage Facilities is required. See Section
10 of this report.
Core Requirement #7 - Financial Guarantees and Liability
See Section 9 of this report.
15
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
Core Requirement #8 - Water Quality
The project is within the City’s Basic Treatment map area. The project qualifies for a Basic
Exemption since we will have less than 5000 sf of New + Replaced Pollution Generating
Impervious Surface.
Core Requirement #9 – On-Site BMPs
Since the project exceeds 2000 sf of New plus Replaced Impervious Surfaces, the project will
require Low Impact Development BMPs to the maximum extent possible in accordance with
Large Lot BMPs (for properties > 22,000 sf).
As required by the 2022 City of Renton SWDM, Section 1.2.9.2.1, the feasibility and applicability
of each BMP method must be evaluated. The following is an outline of our landcover area and
the viability of each Onsite Stormwater Management BMP (viability analysis noted in bold):
1. Full Dispersion The feasibility and applicability of full dispersion as detailed in Appendix C,
Section C.2.1 must be evaluated for all target impervious surfaces. If feasible and applicable,
full dispersion must be implemented as part of the proposed project. Typically, small lot full
dispersion will be applicable only in subdivisions where enough forest was preserved by tract,
easement, or covenant to meet the minimum design requirements for full dispersion in Appendix
C, Section C.2.1.1 ~ Not feasible since no native vegetated areas exist.
2. Full Infiltration Where full dispersion of target impervious roof areas is not feasible or
applicable, or will cause flooding or erosion impacts, the feasibility and applicability of full
infiltration as detailed in Appendix C, Section C.2.2 must be evaluated (note, this will require a
soils report for the site/lot). If feasible and applicable, full infiltration of roof runoff must be
implemented as part of the proposed project. ~ Not feasible due to the existing Urban Land
onsite soils. We would not have adequate vertical separation to the underlying densic
material.
3. Area Targeted BMPs All target impervious surfaces not mitigated by Requirements 1 and 2
above, must be mitigated to the maximum extent feasible using one or more BMPs from the
following list. Use of a given BMP is subject to evaluation of its feasibility and applicability as
detailed in Appendix C. Feasible BMPs are required to be implemented. The BMPs listed below
may be located anywhere on the site/lot subject to the limitations and design specifications for
each BMP. These BMPs must be implemented as part of the proposed project.
A. Full Infiltration per Appendix C, Section C.2.2, or per Section 5.2, whichever is
applicable. ~ Not feasible due to the existing Urban Land onsite soils. We would not
have adequate vertical separation to the underlying densic material.
B. Limited Infiltration per Appendix C, Section C.2.3, See 3A above.
C. Rain Gardens per Appendix C, Section C.2.12, sized as follows:
o Rain gardens have a maximum contributing area of 5,000 square feet.
o Rain gardens must have a minimum horizontal projected surface area below the overflow
that is at least 5% of the area draining to it.
16
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
~ Not feasible due to the existing Urban Land onsite soils. We would not have
adequate vertical separation to the underlying densic material.
D. Bioretention per Appendix C, Section C.2.6: ~ See Item 3C above.
E. Permeable Pavement per Appendix C, Section C.2.7 ~ Not feasible due to seasonal
high ground water or an underlying impermeable/low permeable layer would create
saturated conditions within one foot of the bottom of the lowest gravel base course or
sand layer.
4. All target impervious surfaces not mitigated by Requirements 1, 2 and 3 above, must be
mitigated to the maximum extent feasible using the Basic Dispersion BMP described below. Use
of Basic Dispersion is subject to evaluation of its feasibility and applicability as detailed in
Appendix C. Feasible BMPs are required to be implemented. Basic Dispersion BMPs may be
located anywhere on the site/lot subject to the limitations and design specifications cited in
Appendix C. The BMP must be implemented as part of the proposed project.
• Basic Dispersion per Appendix C, Section C.2.4, ~ Not feasible as we cannot meet the 50-
foot minimum vegetated flow path requirement.
5. BMPs must be implemented, at minimum, for an impervious area equal to at least 10% of the
site/lot for site/lot sizes up to 11,000 square feet and at least 20% of the site/lot for site/lot sizes
between 11,000 and 22,000 square feet. For projects located in Zone 1 of the Aquifer Protection
Area, these impervious area amounts must be doubled. Doubling of the minimum impervious
area required for BMP implementation in Zone 1 of the Aquifer Protection Area is not required
for projects located within 200 feet of a steep slope hazard area, landslide hazard, or erosion
hazard area. If these minimum areas are not mitigated using feasible BMPs from Requirements
1, 2, 3, and 4 above, one or more BMPs from the following list are required to be implemented
to achieve compliance. These BMPs must be implemented as part of the proposed project.
• Reduced Impervious Surface Credit per Appendix C, Section C.2.9,
• Native Growth Retention Credit per Appendix C, Section C.2.10.
• Tree Retention Credit per Appendix C, Section C.2.14
~ None of these conditions apply to this project.
6. The soil moisture holding capacity of new pervious surfaces (target pervious surfaces) must
be protected in accordance with the soil amendment BMP as detailed in Appendix C, Section
C.2.13. ~ The proposed project will be required to install Soil Amendment to the planter
beds (if disturbed) to provide adequate soil quality for the proposed landscape areas.
7. Any proposed connection of roof downspouts to the local drainage system must be via a
perforated pipe connection as detailed in Appendix C, Section C.2.11. ~ See Item 3C above.
17
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
Special Requirement #1 - Other Adopted Area Specific Requirements
We do not know of any area specific requirements for our immediate vicinity.
Special Requirement #2 – Flood Hazard Area Delineation
Not applicable. Site is not within a floodplain or floodway.
Special Requirement #3 - Flood Protection Facilities
Not applicable. Site is not within a floodplain or floodway.
Special Requirement #4 - Source Control
The proposed office building should not trigger any specific Source Control requirements.
Special Requirement #5 - Oil Control
Not applicable; the proposed use does not meet the definition of a high-use related to traffic.
Special Requirement #6 – Aquifer Protection Area
The site is within Aquifer Protection Zone 1. Infiltration is prohibited in this zone.
18
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
III. OFF-SITE ANALYSIS
A Level 1 Downstream Analysis is required for the development. The site drainage is part of the
Lower Cedar River drainage sub-basin.
Site runoff will continue to discharge to the storm drain system in South 2nd Street. The City
storm system turns northward at Logan Avenue South and northwesterly at East Perimeter
Drive before outfalling into the Cedar River.
We do not know of any downstream drainage problems.
See attached:
Downstream Drainage Map
Off-Site Analysis Drainage System Table
19
SITE
1
2
73' ~ 12"DI @ 0.1%
34
215' ~ 15"CONC @ 0.37%12"DI
6 5
76' ~ 15"CONC @ 0.37%298' ~ 18"CONC @ 1.12%
78
26' ~ 18"CONC @ 0.01%
308' ~ 21"CONC @ 0.29%
9
10' ~ 21"CONC @ 3.0%
10
61' ~ 24"CONC @ 0.87%
392' ~ 24"CONC
@ 0.61%
11
4' ~ 8"DI @
0.5%
S 2ND ST.
S 2ND ST.
WE
L
L
S
A
V
E
.
S
WI
L
L
I
A
M
S
A
V
E
.
S
BU
R
N
E
T
T
A
V
E
.
S
LO
G
A
N
A
V
E
.
S
SHERWIN WILLIAMS REMODEL DRAINAGE BASIN MAP
20
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
SITE ADDRESS: 206 WELLS AVE SOUTH, RENTON
BASIN:1 SUBBASIN NAME: SUBBASIN #: DATE: 2/13/2026
SYMBOL
DRAINAGE
COMPONENT TYPE,
NAME AND SIZE
DRAINAGE
COMPONENT
DESCRIPTION SLOPE
PIPE
LENGTH
DISTANCE
FROM SITE
DISCHARGE
EXISTING
PROBLEMS
POTENTIAL
PROBLEMS
OBSERVATIONS OF FIELD
INSPECTOR, RESOURCE
REVIEWER OR RESIDENT
see map Type: sheet flow, swale,
stream, channel, pipe,
pond, flow control/wq
BMP; Size: diameter,
surface area
drainage basin, vegetation,
cover, depth, type of
sensitive
area, volume
% 1/4 mi = 1320 ft tributary area, likelihood of problem,
overflow pathways, potential
impacts
1 CB storm connection - 0
2 8" ductile roadway 0.50% 4 4 none none none
3 12" conc roadway 0.1% 73 77 none none none
4 12" conc roadway 0.1% 8 85 none none none
5 15" conc roadway 0.37% 215 300 none none none
6 18" conc roadway 1.12% 76 376 none none none
7 18" conc roadway 0.10% 298 674 none none none
8 21" conc roadway 3.00% 10 684 none none none
9 21" conc roadway 0.29% 308 992 none none none
10 24" conc roadway 0.87% 61 1053 none none none
11 18" conc roadway 0.61% 392 1445 none none none
NO DOWNSTREAM DRAINAGE CONCERNS FOUND
OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE
constrictions, under capacity,
ponding, overtopping, flooding,
habitat or organism destruction,
scouring, bank sloughing,
sedimentation, incision, other
erosion
21
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
IV. FLOW CONTROL AND WATER QUALITY FACILITY DESIGN
PART A – EXISTING SITE HYDROLOGY
The site consists of an existing 5639 sf building area , 5510 sf of paved parking and a few small
planters. 2135 sf, parking, drive-aisle and perimeter landscaping. The existing site is
approximately 97% impervious. The site is relatively flat with the north parking lot predominately
sheet draining to South 2nd Street. There are no onsite storm facilities. The site has had parking lot
ponding due to minimal grade drop from the building entries to the South 2nd Street sidewalk. Refer
to the survey for additional information.
PART B – DEVELOPED SITE HYDROLOGY
The scope of work will include minor interior improvements to the existing building. The owner
proposes to regrade and repave the north parking lot and add two (2) new catch basins to address
the parking lot ponding issues. A new 8-inch storm drain will route the drainage to an existing catch
basin in South 2nd Street.
The project will result in the following:
Net Impervious Area Increase= 0 sf
Onsite New & Replaced Impervious Area= 4985 sf
Onsite Pollution Generating Impervious Area= 4985 sf (Replaced)
PART C – PERFORMANCE STANDARDS
The project is exempt from Core Requirement #3 – Flow Control and Core Requirements #9 –
Water Quality since our proposed New + Replace Impervious Surface area is less than 5000 sf.
No flow control or water quality treatment measures are proposed.
PART D – FLOW CONTROL SYSTEM
No flow control facilities are proposed.
PART E – WATER QUALITY SYSTEM
No water quality facilities are proposed.
22
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
V. CONVEYANCE SYSTEMS ANALYSIS AND DESIGN
Due to existing parking lot flooding issues, onsite catch basins are proposed with a new storm
drain connection to South 2nd Street.
VI. SPECIAL REPORTS AND STUDIES
No special report or studies were conducted.
VII. OTHER PERMITS
Not Applicable.
VIII. EROSION/SEDIMENTATION CONTROL DESIGN
Erosion Control BMP’s will be provided for the project, including straw wattles and CB inlet
protection. A Temporary Erosion and Sedimentation Control (TESC) Plan is included with the
sitework plans.
IX. BOND QUANTITIES, FACILITY SUMMARIES AND DECLARATION OF COVENANT
Bond Quantities Worksheet were included with the permit submittal.
No proposed flow control or water quality facilities are proposed.
Declaration of Covenant is not required since there are no on-site stormwater BMP's.
X OPERATIONS AND MAINTENANCE MANUAL
An Operations and Maintenance Manual is provided within Appendix B.
23
1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
•
•
Section I: Project Information
•
•
•
Section II: Bond Quantities Worksheets
•
• Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))
• Section II.b TRANSPORTATION (Street and Site Improvements)
• Section II.c DRAINAGE (Drainage and Stormwater Facilities):
• Section II.d WATER - ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON
• Section II.e SANITARY SEWER - ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON
•
•
•
•
•
•
Section III. Bond Worksheet
•
BOND QUANTITY WORKSHEET INSTRUCTIONS
This worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial
submittal to project close-out approval.
Submit this workbook, in its entirety, as follows:
The following forms are to be completed by the engineer/developer/applicant as applicable to the project:
The Bond Worksheet form will auto-calculate and auto-populate from the information provided in Section I and Section II.
This section includes all pertinent information for the project
Section II contains a separate spreadsheet TAB for each of the following specialties:
(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as
part of the Technical Information Report (TIR).
(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close-out submittal.
This section must be completed in its entirety
Information from this section auto-populates to all other relevant areas of the workbook
This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close-out
submittals to release the permit bond on a project.
All unit prices include labor, equipment, materials, overhead, profit, and taxes.
Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right-of-Way (ROW), Future Public Improvements and Private
Improvements.
The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the
project with the exception of the maintenance period reduction.
Excel will auto-calculate and auto-populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need
completing.
Additional items not included in the lists can be added under the "write-in" sections. Provide a complete description, cost estimate and unit of measure
for each write-in item.
Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the
form. Stormwater facilities (public and private) are required to be included in the bond amount.
Page 1 of 16
Ref 8-H Bond Quantity Worksheet INSTRUCTIONS
Version: 1/2/2026
Printed 4/3/2026
24
1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200
Date Prepared:
Name:
PE Registration No:
Firm Name:
Firm Address:
Phone No.
Email Address:
Project Name: Project Owner:
CED Plan # (LUA): Phone:
CED Permit # (C):Address:
Site Address:
Street Intersection: Addt'l Project Owner:
Parcel #(s): Phone:
Address:
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No:NO Water Service Provided by:
If Yes, Provide Forest Practice Permit #:Sewer Service Provided by:
Total Estimated Construction Costs E
A + B + C + D 53,970.96$
Estimated Civil Construction Permit - Construction Costs2
Stormwater (Drainage)C 12,182.63$
As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance.
Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees.
Roadway (Erosion Control + Transportation)D 41,788.34$
Water A -$
Wastewater (Sanitary Sewer)B -$
AddressAbbreviated Legal
Description:
Lots 1 & 2, Block 13, Town of Renton, accord to plat thereof, recorded
in Volume 1 of Plats, Page 35, records of King County City, State, Zip
206 Wells Avenue South, Renton 98057
206 Wells Avenue South
Additional Project OwnerC26001238
(206) 826-5787
4/3/2026
Prepared by:
FOR APPROVALProject Phase 1
pedro@terraformadesigngroup.com
Pedro DeGuzman, PE
35646
Terraforma Design Group, Inc.
5027 51st Avenue SW, Seattle, WA 98136
(206) 795-9023
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
CITY OF RENTON
CITY OF RENTON
Phone
Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)
Clearing and Grading Utility Providers
N/A
Project Location and Description Project Owner Information
SHERWIN WILLIAMS REMODEL
Renton, WA 98057
723150-1135
BPG INVESTMENTS XI LLC
Page 2 of 16
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Version 1/2/2026
Printed 4/3/2026
25
10.5%2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is:
1 Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
Page 3 of 16
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Version 1/2/2026
Printed 4/3/2026
26
CED Permit #:
Unit
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 7.50$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 90.00$ Each
Catch Basin Protection ESC-3 145.00$ Each 2 290.00
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)110.00$ CY
Ditching ESC-5 10.50$ CY
Excavation-bulk ESC-6 2.30$ CY
Fence, silt ESC-7 SWDM 5.4.3.1 5.00$ LF
Fence, Temporary (NGPE)ESC-8 1.75$ LF
Geotextile Fabric ESC-9 3.00$ SY
Hay Bale Silt Trap ESC-10 0.60$ Each
Hydroseeding ESC-11 SWDM 5.4.2.4 0.90$ SY
Interceptor Swale / Dike ESC-12 1.15$ LF
Jute Mesh ESC-13 SWDM 5.4.2.2 4.00$ SY
Level Spreader ESC-14 2.00$ LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.90$ SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.30$ SY
Piping, temporary, CPP, 6"ESC-17 13.75$ LF
Piping, temporary, CPP, 8"ESC-18 16.00$ LF
Piping, temporary, CPP, 12"ESC-19 20.50$ LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.60$ SY
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)51.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 2,050.00$ Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,675.00$ Each
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,525.00$ Each
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 22.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 80.00$ LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.15$ SY
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 9.20$ SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 11.50$ SY
TESC Supervisor ESC-30 125.00$ HR 4 500.00
Water truck, dust control ESC-31 SWDM 5.4.7 160.00$ HR
Unit
Reference #Price Unit Quantity Cost
4.00$ LF 140 560.00
EROSION/SEDIMENT SUBTOTAL:1,350.00
SALES TAX @ 10.5%141.75
EROSION/SEDIMENT TOTAL:1,491.75
(A)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
Description No.
(A)
Straw wattle
WRITE-IN-ITEMS
Page 4 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Version 1/2/2026
Printed 4/3/2026
27
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 7.00$ CY
Backfill & Compaction- trench GI-2 10.25$ CY
Clear/Remove Brush, by hand (SY)GI-3 1.15$ SY
Bollards - fixed GI-4 275.00$ Each
Bollards - removable GI-5 520.00$ Each
Clearing/Grubbing/Tree Removal GI-6 11,475.00$ Acre
Excavation - bulk GI-7 2.30$ CY
Excavation - Trench GI-8 5.75$ CY
Fencing, cedar, 6' high GI-9 23.00$ LF
Fencing, chain link, 4'GI-10 44.00$ LF
Fencing, chain link, vinyl coated, 6' high GI-11 23.00$ LF
Fencing, chain link, gate, vinyl coated, 20' GI-12 1,600.00$ Each
Fill & compact - common barrow GI-13 28.75$ CY
Fill & compact - gravel base GI-14 31.00$ CY
Fill & compact - screened topsoil GI-15 44.75$ CY
Gabion, 12" deep, stone filled mesh GI-16 74.50$ SY
Gabion, 18" deep, stone filled mesh GI-17 103.25$ SY
Gabion, 36" deep, stone filled mesh GI-18 172.00$ SY
Grading, fine, by hand GI-19 2.90$ SY
Grading, fine, with grader GI-20 2.30$ SY
Monuments, 3' Long GI-21 1,025.00$ Each
Sensitive Areas Sign GI-22 8.00$ Each
Sodding, 1" deep, sloped ground GI-23 9.25$ SY
Surveying, line & grade GI-24 975.00$ Day
Surveying, lot location/lines GI-25 2,050.00$ Acre
Topsoil Type A (imported)GI-26 32.75$ CY
Traffic control crew ( 2 flaggers )GI-27 137.75$ HR
Trail, 4" chipped wood GI-28 9.15$ SY
Trail, 4" crushed cinder GI-29 10.25$ SY
Trail, 4" top course GI-30 13.75$ SY
Conduit, 2"GI-31 5.75$ LF
Wall, retaining, concrete GI-32 63.00$ SF
Wall, rockery GI-33 17.25$ SF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 5 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Version 1/2/2026
Printed 4/3/2026
28
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 34.50$ SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 18.25$ SY
AC Grinding, 4' wide machine > 2000sy RI-3 11.50$ SY
AC Removal/Disposal RI-4 40.00$ SY 530 21,200.00
Barricade, Type III ( Permanent )RI-5 64.25$ LF
Guard Rail RI-6 34.50$ LF
Curb & Gutter, rolled RI-7 19.50$ LF
Curb & Gutter, vertical RI-8 14.25$ LF
Curb and Gutter, demolition and disposal RI-9 20.50$ LF
Curb, extruded asphalt RI-10 6.25$ LF
Curb, extruded concrete RI-11 8.00$ LF
Sawcut, asphalt, 3" depth RI-12 3.00$ LF 36 108.00
Sawcut, concrete, per 1" depth RI-13 5.00$ LF 16 80.00
Sealant, asphalt RI-14 2.25$ LF 36 81.00
Shoulder, gravel, 4" thick RI-15 17.25$ SY
Sidewalk, 4" thick RI-16 43.50$ SY 9 391.50 18 783.00
Sidewalk, 4" thick, demolition and disposal RI-17 37.00$ SY 9 333.00 18 666.00
Sidewalk, 5" thick RI-18 47.00$ SY
Sidewalk, 5" thick, demolition and disposal RI-19 46.00$ SY
Sign, Handicap RI-20 97.00$ Each 1 97.00
Striping, per stall RI-21 8.00$ Each 1 8.00
Striping, thermoplastic, ( for crosswalk )RI-22 3.50$ SF
Striping, 4" reflectorized line RI-23 0.55$ LF
Additional 2.5" Crushed Surfacing RI-24 4.15$ SY
HMA 1/2" Overlay 1.5" RI-25 16.00$ SY
HMA 1/2" Overlay 2"RI-26 20.75$ SY
HMA Road, 2", 4" rock, First 2500 SY RI-27 32.25$ SY
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 24.00$ SY
HMA Road, 4", 6" rock, First 2500 SY RI-29 51.75$ SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 42.50$ SY
HMA Road, 4", 4.5" ATB RI-31 43.50$ SY
Gravel Road, 4" rock, First 2500 SY RI-32 17.25$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 11.50$ SY
Thickened Edge RI-34 10.00$ LF
SUBTOTAL THIS PAGE:804.50 22,943.00
(B)(C)(D)(E)
Page 6 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Version 1/2/2026
Printed 4/3/2026
29
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 24.00$ SY 530 12,720.00
2" AC, 1.5" top course & 2.5" base course PL-2 32.00$ SY
4" select borrow PL-3 5.75$ SY
1.5" top course rock & 2.5" base course PL-4 16.00$ SY
SUBTOTAL PARKING LOT SURFACING:12,720.00
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1
Median Landscaping LA-2
Right-of-Way Landscaping LA-3
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1
Street Light System ( # of Poles)TR-2
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:
(B)(C)(D)(E)
WRITE-IN-ITEMS
SUBTOTAL WRITE-IN ITEMS:
STREET AND SITE IMPROVEMENTS SUBTOTAL:804.50 35,663.00
SALES TAX @ 10.5%84.47 3,744.62
STREET AND SITE IMPROVEMENTS TOTAL:888.97 39,407.62
(B)(C)(D)(E)
Page 7 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Version 1/2/2026
Printed 4/3/2026
30
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 30.00$ SY
* (CBs include frame and lid)
Beehive D-2 103.00$ Each
Through-curb Inlet Framework D-3 460.00$ Each
CB Type I D-4 1,725.00$ Each 2 3,450.00
CB Type IL D-5 2,000.00$ Each
CB Type II, 48" diameter D-6 3,500.00$ Each
for additional depth over 4' D-7 550.00$ FT
CB Type II, 54" diameter D-8 4,075.00$ Each
for additional depth over 4'D-9 570.00$ FT
CB Type II, 60" diameter D-10 4,225.00$ Each
for additional depth over 4'D-11 690.00$ FT
CB Type II, 72" diameter D-12 6,900.00$ Each
for additional depth over 4'D-13 975.00$ FT
CB Type II, 96" diameter D-14 16,000.00$ Each
for additional depth over 4'D-15 1,050.00$ FT
Trash Rack, 12"D-16 400.00$ Each
Trash Rack, 15"D-17 470.00$ Each
Trash Rack, 18"D-18 550.00$ Each
Trash Rack, 21"D-19 630.00$ Each
Cleanout, PVC, 4"D-20 170.00$ Each
Cleanout, PVC, 6"D-21 195.00$ Each
Cleanout, PVC, 8"D-22 230.00$ Each
Culvert, PVC, 4" D-23 11.50$ LF
Culvert, PVC, 6" D-24 15.00$ LF
Culvert, PVC, 8" D-25 17.00$ LF
Culvert, PVC, 12" D-26 26.00$ LF
Culvert, PVC, 15" D-27 40.00$ LF
Culvert, PVC, 18" D-28 47.00$ LF
Culvert, PVC, 24"D-29 65.00$ LF
Culvert, PVC, 30" D-30 90.00$ LF
Culvert, PVC, 36" D-31 150.00$ LF
Culvert, CMP, 8"D-32 22.00$ LF
Culvert, CMP, 12"D-33 33.00$ LF
SUBTOTAL THIS PAGE:3,450.00
(B)(C)(D)(E)
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Page 8 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Version 1/2/2026
Printed 4/3/2026
31
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 40.00$ LF
Culvert, CMP, 18"D-35 47.00$ LF
Culvert, CMP, 24"D-36 64.00$ LF
Culvert, CMP, 30"D-37 90.00$ LF
Culvert, CMP, 36"D-38 150.00$ LF
Culvert, CMP, 48"D-39 218.00$ LF
Culvert, CMP, 60"D-40 310.00$ LF
Culvert, CMP, 72"D-41 400.00$ LF
Culvert, Concrete, 8"D-42 48.00$ LF
Culvert, Concrete, 12"D-43 55.00$ LF
Culvert, Concrete, 15"D-44 89.00$ LF
Culvert, Concrete, 18"D-45 100.00$ LF
Culvert, Concrete, 24"D-46 120.00$ LF
Culvert, Concrete, 30"D-47 145.00$ LF
Culvert, Concrete, 36"D-48 175.00$ LF
Culvert, Concrete, 42"D-49 200.00$ LF
Culvert, Concrete, 48"D-50 235.00$ LF
Culvert, CPE Triple Wall, 6" D-51 16.00$ LF
Culvert, CPE Triple Wall, 8" D-52 18.00$ LF
Culvert, CPE Triple Wall, 12" D-53 27.00$ LF
Culvert, CPE Triple Wall, 15" D-54 40.00$ LF
Culvert, CPE Triple Wall, 18" D-55 47.00$ LF
Culvert, CPE Triple Wall, 24" D-56 64.00$ LF
Culvert, CPE Triple Wall, 30" D-57 90.00$ LF
Culvert, CPE Triple Wall, 36" D-58 149.00$ LF
Culvert, LCPE, 6"D-59 69.00$ LF
Culvert, LCPE, 8"D-60 83.00$ LF
Culvert, LCPE, 12"D-61 96.00$ LF
Culvert, LCPE, 15"D-62 110.00$ LF
Culvert, LCPE, 18"D-63 124.00$ LF
Culvert, LCPE, 24"D-64 138.00$ LF
Culvert, LCPE, 30"D-65 151.00$ LF
Culvert, LCPE, 36"D-66 165.00$ LF
Culvert, LCPE, 48"D-67 179.00$ LF
Culvert, LCPE, 54"D-68 193.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 9 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Version 1/2/2026
Printed 4/3/2026
32
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 206.00$ LF
Culvert, LCPE, 72"D-70 220.00$ LF
Culvert, HDPE, 6"D-71 48.00$ LF
Culvert, HDPE, 8"D-72 60.00$ LF
Culvert, HDPE, 12"D-73 85.00$ LF
Culvert, HDPE, 15"D-74 122.00$ LF
Culvert, HDPE, 18"D-75 158.00$ LF
Culvert, HDPE, 24"D-76 254.00$ LF
Culvert, HDPE, 30"D-77 317.00$ LF
Culvert, HDPE, 36"D-78 380.00$ LF
Culvert, HDPE, 48"D-79 443.00$ LF
Culvert, HDPE, 54"D-80 506.00$ LF
Culvert, HDPE, 60"D-81 570.00$ LF
Culvert, HDPE, 72"D-82 632.00$ LF
Pipe, Polypropylene, 6"D-83 96.00$ LF
Pipe, Polypropylene, 8"D-84 100.00$ LF
Pipe, Polypropylene, 12"D-85 100.00$ LF
Pipe, Polypropylene, 15"D-86 103.00$ LF
Pipe, Polypropylene, 18"D-87 106.00$ LF
Pipe, Polypropylene, 24"D-88 119.00$ LF
Pipe, Polypropylene, 30"D-89 136.00$ LF
Pipe, Polypropylene, 36"D-90 185.00$ LF
Pipe, Polypropylene, 48"D-91 260.00$ LF
Pipe, Polypropylene, 54"D-92 381.00$ LF
Pipe, Polypropylene, 60"D-93 504.00$ LF
Pipe, Polypropylene, 72"D-94 625.00$ LF
Culvert, DI, 6"D-95 70.00$ LF
Culvert, DI, 8"D-96 101.00$ LF 75 7,575.00
Culvert, DI, 12"D-97 121.00$ LF
Culvert, DI, 15"D-98 148.00$ LF
Culvert, DI, 18"D-99 175.00$ LF
Culvert, DI, 24"D-100 200.00$ LF
Culvert, DI, 30"D-101 227.00$ LF
Culvert, DI, 36"D-102 252.00$ LF
Culvert, DI, 48"D-103 279.00$ LF
Culvert, DI, 54"D-104 305.00$ LF
Culvert, DI, 60"D-105 331.00$ LF
Culvert, DI, 72"D-106 357.00$ LF
SUBTOTAL THIS PAGE:7,575.00
(B)(C)(D)(E)
Page 10 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Version 1/2/2026
Printed 4/3/2026
33
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Specialty Drainage Items
Ditching SD-1 10.90$ CY
Flow Dispersal Trench (1,436 base+)SD-3 32.00$ LF
French Drain (3' depth)SD-4 30.00$ LF
Geotextile, laid in trench, polypropylene SD-5 3.40$ SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,300.00$ Each
Pond Overflow Spillway SD-7 18.25$ SY
Restrictor/Oil Separator, 12"SD-8 1,320.00$ Each
Restrictor/Oil Separator, 15"SD-9 1,550.00$ Each
Restrictor/Oil Separator, 18"SD-10 1,950.00$ Each
Riprap, placed SD-11 48.20$ CY
Tank End Reducer (36" diameter)SD-12 1,375.00$ Each
Infiltration pond testing SD-13 143.00$ HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:
(B)(C)(D)(E)
STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 Each
Detention Vault SF-3 Each
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:
(B)(C)(D)(E)
Page 11 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Version 1/2/2026
Printed 4/3/2026
34
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
WI-1
WI-2
WI-3
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:11,025.00
SALES TAX @ 10.5%1,157.63
DRAINAGE AND STORMWATER FACILITIES TOTAL:12,182.63
(B) (C) (D) (E)
Page 12 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Version 1/2/2026
Printed 4/3/2026
35
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 3,400.00$ Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 58.00$ LF
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 65.00$ LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 75.00$ LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 80.00$ LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 145.00$ LF
Gate Valve, 4 inch Diameter W-7 1,225.00$ Each
Gate Valve, 6 inch Diameter W-8 1,350.00$ Each
Gate Valve, 8 Inch Diameter W-9 1,550.00$ Each
Gate Valve, 10 Inch Diameter W-10 2,100.00$ Each
Gate Valve, 12 Inch Diameter W-11 2,500.00$ Each
Fire Hydrant Assembly W-12 5,000.00$ Each
Permanent Blow-Off Assembly W-13 1,950.00$ Each
Air-Vac Assembly, 2-Inch Diameter W-14 3,050.00$ Each
Air-Vac Assembly, 1-Inch Diameter W-15 1,725.00$ Each
Compound Meter Assembly 3-inch Diameter W-16 9,200.00$ Each
Compound Meter Assembly 4-inch Diameter W-17 10,500.00$ Each
Compound Meter Assembly 6-inch Diameter W-18 11,500.00$ Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 23,000.00$ Each
WATER SUBTOTAL:
SALES TAX @ 10.5%
WATER TOTAL:
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 13 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Version 1/2/2026
Printed 4/3/2026
36
CED Permit #:
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 1,150.00$ Each
Grease Interceptor, 500 gallon SS-2 9,200.00$ Each
Grease Interceptor, 1000 gallon SS-3 11,500.00$ Each
Grease Interceptor, 1500 gallon SS-4 17,200.00$ Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 92.00$ LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 110.00$ LF
Sewer Pipe, PVC, 8 inch Diameter SS-7 120.00$ LF
Sewer Pipe, PVC, 12 Inch Diameter SS-8 144.00$ LF
Sewer Pipe, DI, 8 inch Diameter SS-9 130.00$ LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 150.00$ LF
Manhole, 48 Inch Diameter SS-11 6,900.00$ Each
Manhole, 54 Inch Diameter SS-13 6,800.00$ Each
Manhole, 60 Inch Diameter SS-15 7,600.00$ Each
Manhole, 72 Inch Diameter SS-17 10,600.00$ Each
Manhole, 96 Inch Diameter SS-19 16,000.00$ Each
Pipe, C-900, 12 Inch Diameter SS-21 205.00$ LF
Outside Drop SS-24 1,700.00$ LS
Inside Drop SS-25 1,150.00$ LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:
SALES TAX @ 10.5%
SANITARY SEWER TOTAL:
(B) (C) (D) (E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 14 of 16
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Version 1/2/2026
Printed 4/3/2026
37
1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date:
Name: Project Name:
PE Registration No: CED Plan # (LUA):
Firm Name:CED Permit # (C):
Firm Address: Site Address:
Phone No. Parcel #(s):
Email Address:Project Phase:
Site Restoration/Erosion Sediment Control Subtotal (a)
Existing Right-of-Way Improvements Subtotal (b) (b)888.97$
Future Public Improvements Subtotal (c)-$
Stormwater & Drainage Facilities (Public & Private) Subtotal (d) (d)12,182.63$
(e)
(f)
Site Restoration
Existing Right-of-Way and Storm Drainage Improvements
Maintenance Bond 2,614.32$
Bond Reduction 2
Construction Permit Bond Amount 3
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
EST1
((b) + (c) + (d)) x 20%
-$
MAINTENANCE BOND */**
(after final acceptance of construction)
1,491.75$
888.97$
13,516.08$
1,491.75$
-$
12,182.63$
-$
15,007.83$
P
(a) x 100%
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
4/3/2026
Pedro DeGuzman, PE
35646
Terraforma Design Group, Inc.
R
((b x 150%) + (d x 100%))
S
(e) x 150% + (f) x 100%
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2
T
(P +R - S)
Prepared by: Project Information
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
(206) 795-9023
pedro@terraformadesigngroup.com
SHERWIN WILLIAMS REMODEL
206 Wells Avenue South, Renton 98057
723150-1135
FOR APPROVAL
5027 51st Avenue SW, Seattle, WA 98136
Page 15 of 16
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Version 1/2/2026
Printed 4/3/2026
38
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead, profit, and taxes.
Page 16 of 16
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Version 1/2/2026
Printed 4/3/2026
39
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
APPENDIX A - SOIL MAPPING
A-1
Soil Map—King County Area, Washington
(SHERWIN WILLIAMS - RENTON)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/16/2026
Page 1 of 3
52
5
8
9
0
4
52
5
8
9
1
2
52
5
8
9
2
0
52
5
8
9
2
8
52
5
8
9
3
6
52
5
8
9
4
4
52
5
8
9
5
2
52
5
8
9
0
4
52
5
8
9
1
2
52
5
8
9
2
0
52
5
8
9
2
8
52
5
8
9
3
6
52
5
8
9
4
4
52
5
8
9
5
2
559849 559857 559865 559873 559881 559889 559897 559905 559913 559921 559929
559849 559857 559865 559873 559881 559889 559897 559905 559913 559921 559929
47° 28' 52'' N
12
2
°
1
2
'
2
0
'
'
W
47° 28' 52'' N
12
2
°
1
2
'
1
6
'
'
W
47° 28' 50'' N
12
2
°
1
2
'
2
0
'
'
W
47° 28' 50'' N
12
2
°
1
2
'
1
6
'
'
W
N
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 15 30 60 90
Feet
0 5 10 20 30
Meters
Map Scale: 1:375 if printed on A landscape (11" x 8.5") sheet.
Soil Map may not be valid at this scale.
A-2
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 21, Aug 28, 2025
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 31, 2022—Aug 8,
2022
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—King County Area, Washington
(SHERWIN WILLIAMS - RENTON)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/16/2026
Page 2 of 3
A-3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
Ur Urban land 0.7 100.0%
Totals for Area of Interest 0.7 100.0%
Soil Map—King County Area, Washington SHERWIN WILLIAMS - RENTON
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/16/2026
Page 3 of 3
A-4
King County Area, Washington
Ur—Urban land
Map Unit Composition
Urban land: 100 percent
Estimates are based on observations, descriptions, and transects of
the mapunit.
Description of Urban Land
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 8
Hydric soil rating: No
Data Source Information
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 21, Aug 28, 2025
Map Unit Description: Urban land---King County Area, Washington SHERWIN WILLIAMS - RENTON
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
2/16/2026
Page 1 of 1
A-5
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
APPENDIX B - STORMWATER OPERATION & MAINTENANCE MANUAL
B-1
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
STORM WATER OPERATION AND
MAINTENANCE MANUAL
_________________________________________________________________
SHERWIN WILLIAMS REMODEL
LOCATION:
206 Wells Avenue South
Renton, WA 98057
ISSUE DATE:
February 16, 2026
PREPARED BY:
Terraforma Design Group, Inc.
5027 51st Avenue SW
Seattle, WA 98136
TDG No. 25030
B-2
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
Introduction:
The proposed Sherwin Williams remodel requires compliance with the Renton drainage
requirements. These following guidelines represent the maintenance requirements for the
proposed on-site drainage facilities. These requirements shall be performed by the property owner,
or maintenance service in accordance with current City codes.
Plan Goal
The specific purpose for the storm water facility is to minimize pollution that is typically associated
with modern development. In general, pollution from motor vehicles and pollution generated from
erosion. Attached to this narrative is a maintenance manual, which offers guidelines to the owner
for storm water facility maintenance. Also included are practices to prevent pollution during normal
retail operations.
On-Site Stormwater Facility Maintenance Requirements
Regular inspections of the drainage facilities should be carried out twice per year, in the spring and
fall. The responsible party should keep records of these inspections available for review by the
City. Additional inspections may be required after severe seasonal storms.
Routine maintenance of the site will include mowing, care of landscaping and the removal of trash
and debris from the drainage system. The parking lots and driveways should be kept clean and in
repair. Events such as major storms or heavy winds will require immediate inspections for
damages.
The following is a list of the on-site storm drainage facilities and their function. Also attached are
the required maintenance requirements for these facilities.
Catch Basins - collects surface drainage
Conveyance Pipes - convey catch basin and roof drainage
Landscaping - prevent erosion of unpaved areas
B-3
SOUTH 2ND STREET
WE
L
L
S
A
V
E
N
U
E
S
O
U
T
H
AL
L
E
Y
SHERWIN WILLIAMS
SHERWIN WILLIAMS REMODEL DRAINAGE BASIN MAP
CB
CB
B-4
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
Responsible Organization:
BPG Investments XI LLC
206 Wells Avenue South
Renton, WA 98057
Required Best Management Practices for Commercial Properties
B-5
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
Storage of Solid Waste and Food Wastes
B-6
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
B-7
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
Landscaping Activities and Vegetation Management
B-8
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
B-9
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
LOCATION: 206 Wells Avenue South, Renton, WA 98057
INSPECTION/MAINTENANCE CHECKLIST
STRUCTURE
DATE OF INSPECTION/MAINTENANCE
Results/
Maintenance
Date
Comments
Catch Basins Inspection
Results
Maintenance
Done
Conveyance Pipes Inspection
Results
Maintenance
Done
Landscaping Inspection
Results
Maintenance
Done
Inspection
Results
Maintenance
Done
Inspection
Results
Maintenance
Done
Inspection
Results
Maintenance
Done
* A COPY OF THIS MAINTENANCE LOG SHALL BE COMPLETED BY A DESIGNATED
MAINTENANCE PERSON PER THE REQUIRED MAINTENANCE INTERVALS. THESE
MAINTENANCE LOGS SHALL BE KEPT ON-SITE.
INSPECTION / MAINTENANCE NOTES:
B-10
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
B-11
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
B-12
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
B-13
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
B-14
SHERWIN WILLIAMS REMODEL TECHNICAL INFORMATION REPORT
Terraforma Design Group, Inc.
APPENDIX C - CIVIL PLANS
LEGEND
CALL AT LEAST 2 WORKING
DAYS BEFORE YOU DIG
CALL '811'
DATUM: DATUM: DATUM:
GOVERNING AGENCIES
PROPERTY INFO
VICINITY MAP
PROJECT TEAMPROJECT DATA
SHEET INDEX
405
SITE
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
T ERRAFORMA
DESIGN GROUP, INC.
NW1/4 OF SW1/4, SEC. 17, T23N, R5E, W.M., CITY OF RENTON, KING COUNTY, WA
TDG JOB# 23015 4/3/26
SH
E
R
W
I
N
W
I
L
L
I
A
M
S
SHERWIN WILLIAMS REMODEL
206 WELLS AVENUE SOUTH, RENTON, WA 98057
6
R-4402
C2
6
0
0
1
2
3
8
TE
D
-
4
0
-
4
4
0
2
CIVIL COVER SHEET
C1.1
SHERWIN WILLIAMS REMODEL
206 WELLS AVENUE SOUTH, RENTON, WA 98057
SITEWORK PLANS
1
01
SOUTH 2ND STREET
WE
L
L
S
A
V
E
N
U
E
S
O
U
T
H
AL
L
E
Y
SHERWIN WILLIAMS
LEGEND
CALL AT LEAST 2 WORKING
DAYS BEFORE YOU DIG
CALL '811'
DATUM: DATUM: DATUM:
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
T ERRAFORMA
DESIGN GROUP, INC.
NW1/4 OF SW1/4, SEC. 17, T23N, R5E, W.M., CITY OF RENTON, KING COUNTY, WA
TDG JOB# 23015 4/3/26
SH
E
R
W
I
N
W
I
L
L
I
A
M
S
SHERWIN WILLIAMS REMODEL
206 WELLS AVENUE SOUTH, RENTON, WA 98057
6
R-4402
C2
6
0
0
1
2
3
8
TE
D
-
4
0
-
4
4
0
2
DEMO & TESC PLAN
C1.2
2
02
SOUTH 2ND STREET
WE
L
L
S
A
V
E
N
U
E
S
O
U
T
H
AL
L
E
Y
SHERWIN WILLIAMS
LEGEND
CALL AT LEAST 2 WORKING
DAYS BEFORE YOU DIG
CALL '811'
DATUM: DATUM: DATUM:
SITE NOTES
1 SAWCUT & SEAL EX. ASPHALT PAVING
2 REMOVE EX. A.C. PAVING
3 HOT-MIX ASPHALT PAVING PER DTL. 3/C1.5
4 REMOVE EX. CONCRETE ENTRY
CONCRETE PAVING - HVY. DUTY PER DTL. 4/C1.5
5 ADA PARKING STENCIL PER DTL. 5/C1.5
6 ADA PARKING SIGN PER DTL. 6/C1.5
7 CONCRETE WHEELSTOP PER DTL. 7/C1.5
8 4" WIDE WHITE PARKING STRIPE
9 EX. CONC. CURB TO REMAIN
10 SAWCUT & REMOVE EX. CONC. SIDEWALK TO NEAREST JOINT
FOR PROPOSED STORM CONNECTION
11 RESTORE CONC. SIDEWALK PER CITY STD. PLAN 102
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
T ERRAFORMA
DESIGN GROUP, INC.
NW1/4 OF SW1/4, SEC. 17, T23N, R5E, W.M., CITY OF RENTON, KING COUNTY, WA
TDG JOB# 23015 4/3/26
SH
E
R
W
I
N
W
I
L
L
I
A
M
S
SHERWIN WILLIAMS REMODEL
206 WELLS AVENUE SOUTH, RENTON, WA 98057
6
R-4402
C2
6
0
0
1
2
3
8
TE
D
-
4
0
-
4
4
0
2
SITE PLAN
C1.3
3
03
SOUTH 2ND STREET
WE
L
L
S
A
V
E
N
U
E
S
O
U
T
H
AL
L
E
Y
SHERWIN WILLIAMS
STORM NOTES
D1 EX. CB (COR# 511256)
RIM= 42.30
IE= 40.3± (EX. 8")
IE= 40.30 (NEW 8"SE)
D2 23' ~ 8" DI,CL50 @ 0.7% MIN.
D3 CATCH BASIN
TY. 1, GRATE
RIM= 42.50
IE= 40.46 (8"W,NW)
D4 52' ~ 8" DI,CL50 @ 0.66%
D5 CATCH BASIN
TY. 1, GRATE
RIM= 42.40
IE= 40.80 (8"E)
LEGEND
CALL AT LEAST 2 WORKING
DAYS BEFORE YOU DIG
CALL '811'
DATUM: DATUM: DATUM:
PROFILE - STORM DRAIN
D1
D2
D3
D4
D5
SOUTH 2ND STREET
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
T ERRAFORMA
DESIGN GROUP, INC.
NW1/4 OF SW1/4, SEC. 17, T23N, R5E, W.M., CITY OF RENTON, KING COUNTY, WA
TDG JOB# 23015 4/3/26
SH
E
R
W
I
N
W
I
L
L
I
A
M
S
SHERWIN WILLIAMS REMODEL
206 WELLS AVENUE SOUTH, RENTON, WA 98057
6
R-4402
C2
6
0
0
1
2
3
8
TE
D
-
4
0
-
4
4
0
2
GRADING & STORM PLAN
C1.4
4
04
ADA PARKING SIGN
ADA PARKING STENCIL
HOT-MIX ASPHALT PAVING CONC. PAVING - HEAVY DUTY
CONCRETE SLAB / WALK NOTES (ONSITE ONLY)
CONCRETE WHEELSTOP
CONCRETE HANDLING NOTES
EROSION CONTROL NOTES
A.MAY 1 TO SEPTEMBER 30 - DRY SEASON
AREAS LEFT UNWORKED FOR MORE THAN 7 DAYS MUST BE STABILIZED.
B.OCTOBER 1 TO APRIL 30 - WET SEASON
AREAS LEFT UNWORKED FOR MORE THAN 2 DAYS MUST BE STABILIZED.
C.INSPECTION SCHEDULE:
APPLICANT/CONTRACTOR SHALL INSPECT EROSION CONTROL FACILITIES DAILY AND
MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING. CONTRACTOR
SHALL PROVIDE NEEDED REPAIRS TO EROSION/SEDIMENT CONTROL FACILITIES WITHIN
24 HOURS.
11.
—
—
—
—
—
—
STRAW WATTLE
CATCH BASIN INSERT
SIGN TO BE WALL-MOUNTED
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
T ERRAFORMA
DESIGN GROUP, INC.
NW1/4 OF SW1/4, SEC. 17, T23N, R5E, W.M., CITY OF RENTON, KING COUNTY, WA
TDG JOB# 23015 4/3/26
SH
E
R
W
I
N
W
I
L
L
I
A
M
S
SHERWIN WILLIAMS REMODEL
206 WELLS AVENUE SOUTH, RENTON, WA 98057
6
R-4402
C2
6
0
0
1
2
3
8
TE
D
-
4
0
-
4
4
0
2
CIVIL DETAILS & NOTES
C1.5
5
05
NW 1/4 OF THE SW 1/4 OF SEC. 17, T. 23 N., R. 5 E., W.M.
04
/
0
2
/
2
6
BB
A
La
n
d
S
u
r
v
e
y
i
n
g
Ph
:
2
0
6
.
4
0
6
.
1
2
5
7
ni
c
o
l
e
b
@
b
b
a
s
u
r
v
e
y
i
n
g
.
c
o
m
ww
w
.
b
b
a
s
u
r
v
e
y
i
n
g
.
c
o
m
DA
T
E
RE
V
I
S
I
O
N
DR
N
JOB NO.
DRAWN BY:
CHECKED BY:
DATE:
SHEET
2
0
2
5
,
B
B
A
L
A
N
D
S
U
R
V
E
Y
I
N
G
,
L
L
C
,
A
L
L
R
I
G
H
T
S
R
E
S
E
R
V
E
D
C
AL
T
A
/
N
S
P
S
L
A
N
D
T
I
T
L
E
S
U
R
V
E
Y
SH
E
R
W
I
N
-
W
I
L
L
I
A
M
S
20
6
W
E
L
L
S
A
V
E
S
RE
N
T
O
N
,
W
A
9
8
0
5
7
12
/
1
5
/
2
0
2
5
12
/
1
7
/
2
0
2
5
04
/
0
2
/
2
0
2
6
SU
R
F
A
C
E
M
O
D
E
L
F
O
R
P
A
R
K
I
N
G
L
O
T
A
N
D
A
L
L
E
Y
DO
O
R
S
W
I
N
G
S
A
D
D
E
D
DA
T
U
M
U
P
D
A
T
E
S
MA
B
MA
B
MA
B
MAB
RSN
25183
10/23/2025
1 OF 1
LOTS 1 & 2, BLOCK 13, TOWN OF RENTON, ACCORDING TO THE PLAT THEREOF,
RECORDED IN VOLUME 1 OF PLATS, PAGE 135, IN KING COUNTY, WASHINGTON;
EXCEPT THE EAST 5 FEET THEREOF CONVEYED TO THE CITY OF RENTON BY
DEED RECORDED UNDER RECORDING NO. 7905070627.
LEGAL DESCRIPTION
N
WASHINGTON COORDINATE SYSTEM, NAD83(91), NORTH ZONE,
DERIVED FROM WASHINGTON STATE REFERENCE NETWORK - ACCEPTED THE
BEARING OF N 28°01'52" E BETWEEN THE SOUTH QUARTER CORNER OF SECTION
19, TOWNSHIP 23 N., RANGE 5 E., W.M., AND THE INTERSECTION OF SHATTUCK
AVE S AND LINDHOLM AVE, BEING CITY OF RENTON SURVEY CONTROL POINT
NOS. 1160 AND 476, RESPECTIVELY, BASED ON FOUND MONUMENTS IN CASE.
BASIS OF BEARINGS
LEGEND
EXTENDED TITLE INSURANCE
SURVEY PURPOSE
SURVEYOR'S NOTES
1.THE INFORMATION ON THIS MAP REPRESENTS THE RESULTS OF A
SURVEY MADE IN OCTOBER 2025 AND CAN ONLY BE CONSIDERED AS
INDICATING THE GENERAL CONDITIONS EXISTING AT THAT TIME.
2.INSTRUMENTATION FOR THIS SURVEY WAS A 3-SECOND LEICA TS16
ROBOTIC TOTAL STATION AND/OR LEICA GS16 GPS RECEIVER.
PROCEDURES USED IN THIS SURVEY MEET OR EXCEED STANDARDS SET
BY WAC 332-130-090.
3.UTILITIES SHOWN ON THIS SURVEY ARE BASED UPON ABOVE GROUND
OBSERVATIONS AND AS-BUILT PLANS WHERE AVAILABLE. ACTUAL
LOCATIONS OF UNDERGROUND UTILITIES MAY VARY AND UTILITIES NOT
SHOWN ON THIS SURVEY MAY EXIST ON THIS SITE.
4.SUBJECT PROPERTY TAX PARCEL NO. 7231501135.
5.APPROXIMATE SUBJECT PROPERTY AREA IS:
11,513 S.F. (0.26± ACRES) AS SURVEYED
6.ALL TITLE INFORMATION SHOWN ON THIS MAP HAS BEEN EXTRACTED
FROM FIRST AMERICAN TITLE INSURANCE COMPANY'S "ALTA
COMMITMENT FOR TITLE INSURANCE", CERTIFICATE NO.
NCS-1278727-WA1, DATED SEPTEMBER 18, 2025. IN PREPARING THIS
MAP, BBA LAND SURVEYING HAS CONDUCTED NO INDEPENDENT TITLE
SEARCH NOR IS BBA LAND SURVEYING AWARE OF ANY TITLE ISSUES
AFFECTING THE SURVEYED PROPERTY OTHER THAN THOSE SHOWN ON
THE MAP AND DISCLOSED BY THE REFERENCED "ALTA COMMITMENT
FOR TITLE INSURANCE". BBA LAND SURVEYING HAS RELIED WHOLLY ON
FIRST AMERICAN TITLE INSURANCE COMPANY'S REPRESENTATIONS OF
THE TITLE'S CONDITION TO PREPARE THIS SURVEY AND BBA LAND
SURVEYING QUALIFIES THE MAP'S ACCURACY AND COMPLETENESS TO
THAT EXTENT.
7.THE PROPERTY IS LOCATED WITHIN AN AREA HAVING A ZONE
DESIGNATION "X", PER THE FEDERAL EMERGENCY MANAGEMENT
AGENCY (FEMA), ON FLOOD INSURANCE RATE MAP NO. 53033C0977G,
WITH AN EFFECTIVE DATE OF AUGUST 19, 2020 FOR COMMUNITY NO.
530088, IN THE CITY OF RENTON, KING COUNTY, STATE OF WASHINGTON,
WHICH IS THE CURRENT FLOOD INSURANCE RATE MAP FOR THE
COMMUNITY IN WHICH THE PROPERTY IS SITUATED.
8.SUBJECT PROPERTY IS ZONED CD (COMMERCIAL DOWNTOWN),
PRESENTLY USED FOR SHERWIN-WILLIAMS.
SETBACK REQUIREMENTS:
MINIMUM FRONT YARD: FOR BUILDINGS, OR PORTIONS THEREOF, 25
FEET OR LESS IN HEIGHT, THE MAXIMUM FRONT YARD SETBACK IS 15
FEET.
MINIMUM REAR YARD: NONE, UNLESS THE GROUND FLOOR FAÇADE
PROVIDES WINDOWS FOR LIVING ROOMS OF ATTACHED DWELLINGS,
THEN 10 FEET.
MINIMUM SIDE YARD: NONE.
MAXIMUM BUILDING HEIGHT: NOT FOUND IN CODE
MAXIMUM LOT COVERAGE FOR BUILDINGS: NONE
MINIMUM LOT SIZE: NONE FOR LOTS CREATED AFTER JULY 11, 1993.
PARKING REQUIREMENT:
MINIMUM PARKING: PARKING REQUIREMENTS ARE DETERMINED BY THE
SPECIFIC USE AND ARE OUTLINED IN RMC CHAPTER 4-4-060,
OFF-STREET PARKING AND LOADING.
THE ABOVE ZONING INFORMATION IS PER RENTON MUNICIPAL CODE
(RMC), CHAPTER 4-2-120B AND RELATED SECTIONS. IT WAS NOT
PROVIDED BY THE INSURER AS IS REQUIRED BY THE 2021 ALTA/NSPS
STANDARDS FOR LAND TITLE SURVEYS. ALL ZONING INFORMATION
SHALL BE VERIFIED PRIOR TO USE.
9.THE TOTAL NUMBER OF DESIGNATED PARKING SPACES ON THE
PROPERTY IS 11, INCLUDING 10 STANDARD SPACES AND 1 HANDICAP
SPACE.
10. THERE IS NO OBSERVED EVIDENCE OF CURRENT EARTH MOVING WORK,
BUILDING CONSTRUCTION OR BUILDING ADDITIONS AT THE PROPERTY.
11. THERE IS NO OBSERVED EVIDENCE OF USE OF THE PROPERTY AS A
SOLID WASTE DUMP, SUMP OR SANITARY LANDFILL.
12.THERE IS NO EVIDENCE OF ANY PROPOSED CHANGES IN STREET RIGHT
OF WAY LINES AT THE PROPERTY.
13.THERE WERE NO WETLAND DELINEATION MARKERS AT THE PROPERTY.
TO:EDWARD ORDEMANN, MICHAEL F. FLETCHER AND LINDA FLETCHER AND
FIRST AMERICAN TITLE INSURANCE COMPANY;
THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON
WHICH IT IS BASED WERE MADE IN ACCORDANCE WITH THE 2021
MINIMUM STANDARD DETAIL REQUIREMENTS FOR ALTA/NSPS LAND
TITLE SURVEYS, JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND
NSPS, AND INCLUDES ITEMS 2 - 4, 6 - 9, 11, 13, 14, 16, 18, OF TABLE A,
THEREOF. THE FIELD WORK WAS COMPLETED ON OCTOBER 18, 2025.
MATTERS OF TITLE
NUMBERING CORRESPONDS WITH HEREIN-REFERENCED TITLE COMMITMENT
12.RESTRICTIONS, CONDITIONS, DEDICATIONS, NOTES, EASEMENTS AND
PROVISIONS, IF ANY, AS CONTAINED AND/OR DELINEATED ON THE FACE OF
THE PLAT OF TOWN OF RENTON RECORDED AS VOLUME 1 OF PLATS,
PAGE(S) 135, IN KING COUNTY, WASHINGTON.
(NO ADDITIONAL PLOTTABLE INFO)
13.THE TERMS AND PROVISIONS CONTAINED IN THE DOCUMENT ENTITLED
"HOLD HARMLESS AGREEMENT" RECORDED AUGUST 08, 2005 AS
RECORDING NO. 20050808002719 OF OFFICIAL RECORDS.
AT THE DATE OF RECORDING OF THE DOCUMENT, THE PARTIES THERETO
HAD NO RECORD INTEREST IN THE LAND.
(SHOWN HEREON)
14.ANY RIGHT, TITLE OR INTEREST OF PARKER PAINT MANUFACTURING CO.
INC, AS DISCLOSED BY THE DOCUMENT RECORDED AUGUST 08, 2005 AS
RECORDING NO. 20050808002719 OF OFFICIAL RECORDS.
(SHOWN HEREON)
MARK A. BORYS PLS# 46876 DATE
03/31/26
GRAPHIC SCALE
0
1 INCH = FT.
201055
10
CONTROL DIAGRAM
NTS
NAVD88 - ELEVATIONS SHOWN ON THIS DRAWING WERE DERIVED FROM
INFORMATION PROVIDED BY CITY OF RENTON SURVEY CONTROL DATABASE.
POINT ID NO. 476 - FOUND CONCRETE MONUMENT WITH BRASS PLUG, DOWN 1.0'
IN CASE AT THE INTERSECTION OF SHATTUCK AVE S AND LINDHOLM AVE.
ELEVATION: 132.86 FEET
2.0' CONTOUR INTERVAL ARE DERIVED FROM DIRECT FIELD OBSERVATIONS -
THE EXPECTED VERTICAL ACCURACY IS EQUAL TO 1/2 CONTOUR INTERVAL OR ±
1.0' FOR THIS PROJECT
VERTICAL DATUM & CONTOUR INTERVAL
MATCH LINE
MATCH LINE
SV1
TE
D
-
4
0
-
4
4
0
2
R-440206
C2
6
0
0
1
2
3
8
6 OF 6