HomeMy WebLinkAboutMFP26001210.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP26001210
IVR Number: 26001210
Permit Information
Permit Name: JB0000468090 SOUTH TIE-IN - Comcast Cable Franchise Permit - Trench and
place conduit with Fiber approximately 206 lfAddress/Location:03/10/2026Application Date:0823059231Parcel Number: 1000 GARDEN AVE N
Permit Type:04/20/2026Issue Date:Franchise
Permit Work Class:04/20/2027Expiration Date:Major Utility
Job Number: JB0000468090 SOUTH TIE-INFranchise Type:Cable
Description: JB0000468090 SOUTH TIE IN Comcast proposes to trench and place conduit with fiber. Restoration per City of
Renton standards.
Contacts
Name Address PhoneTypeBilling
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
ApplicantX
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Contact
Laurie Dietz
Comcast - Finance Questions
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Contact
Andrew Parker
comcast
410 Valley Ave NW
Puyallup, WA 98371
B: (253) 864-4249Contact
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contact
Permitting Department
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contractor
Business License Number: 20838Electrical Contractor: CANNOCL7941N
Construction Contractor: CANNOCL791JK
Joshua Ashley
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (503) 939-7931Emergency
Contact
BNSF PO BOX 961089
FORT WORTH , TX 76161
Owner
Comcast - Billing 1701 John F Kennedy BLVD John F.
Kennedy Blvd
Philadelphia, PA 19103
B: (425) 918-1140Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP26001210
Scott Warlick 4/20/2026
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
PUBLIC WORKS DEPARTMENT
Page 1 of 6 | Published: 3/12/2025
Transportation Systems Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 3/12/2025
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK AND FOR TRAFFIC SIGNAL
WORK WITHIN 150 FEET OF THE INTERSECTION AT LEAST FIFTEEN (15) WORKING DAYS BEFORE THE DATE OF WORK.
FOR PURPOSES OF THIS APPLICATION, WORKING DAYS ARE DEFINED AS MONDAY THRU FRIDAY, AND EXCLUDING
CITY HOLIDAYS.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a Traffic
Control Plan (TCP) and obtain City's approval of that plan when construction, repair, or maintenance work is to be
conducted within the City's right-of-way.
1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2.All TCPs must conform to all attached requirements. Failure to do so may be subject to resubmittal.
3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
4.Resubmittal may be required for TCPs that are incomplete and do not display proper requirements as
described in the guidelines. Additional review time may be needed.
By signing, I certify that the information on this application and within the submittal documents are accurate to the
best of my knowledge and I acknowledge and have read all the requirements and guidelines on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip: ___________
Description of Work:
24 Hour Emergency
Contact Name & Phone:
Approval By: ______________________________________________ Date:____________________
PW/Transportation or CED/Development Engineering Division
Monday Friday 3:00pm9:00am
Scott Warlick CED 4/20/2026
MFP26001210
S/
W
S/
W
S/WS/W
S/W
S/W
S/W
737
1000
N S
O
U
T
H
P
O
R
T
D
R
N S
O
U
T
H
P
O
R
T
D
R
G
A
R
D
E
N
A
V
E
N
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
RO
W
RO
W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW
ROW
R
O
W
RO
W
RO
W
RO
W
RO
W
RO
W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
EO
P
EO
P
EO
P
EO
P
EOP
EOP
EO
P
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
S/W
S/W
S/
W
S/W
S/
W
S/
W
EO
P
EO
P
EO
P
EOPEOP
EOP
EOP
EOP
FL
FL
FL
FL
FL
FL
FL
FL
FL
EOP
EOP
EOP
EOP
EO
P
EOP
EOP
EOP
EOP
EO
P
EOP
EO
P
EOP
EOP
EOP
EOP
EOP
EOP
EOP
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
EOP
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EO
P
EO
P
EO
P
EOP
EOP
EO
P
EOP
EO
P
EOP
EO
P
EOP
EOP
EOP
EOP
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
W
T
B
L
6
D
E
V
I
C
E
M
I
N
50
'
-
1
0
0
'
X
X
X
SPE
E
D
LIMI
T
POS
T
E
D
SPEE
D
L
I
M
I
T
25
R2-1
W4-2R RIGH
T
L
A
N
E
W20-5
R
CLOS
E
D
AHEA
D
ROAD
WOR
K
AHEA
D
W20-1
FA
S
X
X
X
ROA
D
WOR
K
AHE
A
D
W20-
1
ROAD
WORK
AHEAD
W20-1
R
O
A
D
W
O
R
K
A
H
E
A
D
W
2
0
-
1
PEDESTRIANSPOTTER
PEDESTRIANSPOTTER
5'12'
STEEL PLATE
RECESSED STEEL PLATES SHALL
BE PLACED OVER OPEN TRENCH
DURING NON-WORK HOURS. W8-24
SIGNS SHALL BE PLACED AS
ADVANCED WARNING TO VEHICLES
SPOTTER TO MOVE CONES &
GUIDE VEHICLES FROM
AFFECTED BUSINESSES WHEN
NEEDED/ACCESSIBLE DURING
TIME OF CONSTRUCTION
FLAGGER/SPOTTER TO STOP WORK
AND DIRECT/ ASSIST PEDESTRIANS
AROUND WORK AREA
CONTACT PROPERTY OWNER(S) 72
HOURS PRIOR TO START OF WORK.LAK
E
W
A
S
H
I
N
G
T
O
N
B
L
V
D
N
FAS
OK R3-6R
DISCLAIMERAll traffic control setups, sign spacing, and procedures will conform to the
specifications stated in the federal Manual on Uniform Traffic Control Devices
(M.U.T.C.D)
Cities and various municipalities may have also adopted specialized guidelinesfor traffic control within their jurisdiction. It is the responsibility of the on-site
traffic control personnel to verify if any special conditions exist.
TRAFFIC CONTROL PLAN
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHINTHIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
TRAFFIC CONTROL ADDITIONAL NOTES- Will coordinate with any businesses that will be affected by construction- Temporary "NO PARKING" signs to be placed at least 72 hours prior to work- Driveway access will be maintained unless otherwise noted- Sidewalk of 4' width minimum, existing preferred, will be maintained forpedestrian access unless otherwise noted, spotter on site to escort pedestrians
- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective
through work zone
FLA
G
G
E
R
SP
O
T
T
E
R
LEGEND
Work Vehicle Truck Mounted Attenuator Work Area
Flagger Spotter Traffic Safety Cone/Drum
WT WT
0'25'50'
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
WORK TYPE:UNDERGROUND WORK
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
Mike Cocke
(P): (253) 362-9555
(E): mcocke@teamcannon.com
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
GF SOUTHPORT OFFICE COMPLEX
T23N R05E S08
COULON BEACH PARK RD DR & LAKE WASHINGTON BLVD N RENTON WA 98056
JB0000468090
--------
MC RW 03/05/2026
COVER SHEET
COMCAST RW KB
001 001
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
F$1121 F216758F7H21 IIF
F2175
2
I
6
8
3
(
5
9
H
6
2
5
F (57H)H(G 75$))HF
.$KI$
%
8
F
.
I
(
K
(
;
3
B
C
C
E
MFP26001210
SHEET 5
CONTACT: Danny Cooley
PHONE: (253) 215-7020
EMAIL: Danny_Cooley@comcast.com
410 Valley Ave NW
Puyallup, WA 98371
COMCAST CABLE COMMUNICATION LLC
CLIENT
VICINITY MAP
406 Porter Way
Milton, WA 98354
CONTACT: Mike Cocke
PHONE: (253) 362-9555
EMAIL: mcocke@teamcannon.com
CANNON COMPANIES
HYPERBUILD
1 -COVER SHEET
2 -GENERAL NOTES
3 -LEGEND
4 -DETAILS
5 -CONSTRUCTION PLAN
6 -RESTORATION PLAN
NO
SCALE
SCOPE OF WORK
-REMOVE EXISTING LANDSCAPE AS NEEDED & TRENCH (1) 4"
CONDUIT PER DETAIL # 1 ON SHEET 4. PULL (1) 96CT FIBER
THROUGH
-REMOVE EXISTING CONCRETE SIDEWALK PANELS & TRENCH
(1) 4" CONDUIT PER DETAIL # 2 ON SHEET 4. PULL (1) 96CT
FIBER THROUGH
-REMOVE EXISTING ASPHALT CONCRETE AS NEEDED &
TRENCH (1) 4" CONDUIT PER DETAIL # 3 ON SHEET 4. PULL (1)
96CT FIBER THROUGH
N
S
EW
POLE COUNT =
TRANSMISSION =
DISTRIBUTION =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
POLE INFORMATION
0
0
0
0
0
BILL OF MATERIALS *ALL FOOTAGES AND
MATERIALS ARE ESTIMATED
OVER-LASH =FT
NEW AERIAL =FT
PROOF & PULL =FT
NEW UNDERGROUND =FT
RISER =FT
TOTAL ROW FOOTAGE =FT
RIGHT OF WAY FOOTAGES*:
=FT=FT+ 20% STORAGE
MATERIAL FOOTAGES*
0
0
0
206
(0)0
206
96CT 206247
SHEET INDEX
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
GF SOUTHPORT OFFICE COMPLEX
T23N R05E S08
COULON BEACH PARK DR & LAKE WASHINGTON BLVD N RENTON WA 98056
JB0000468090
--------
MC RW 03/05/2026
COVER SHEET
COMCAST RW KB
001 006
MFP26001210
This permit is for Major construction work in the ROW and will be billed at an additional
$158/HR for inspections. After hours and weekend work will be billed at $175/HR RESTORATION PER CITY OF RENTON STANDARDS
NO
SCALE
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36"
WITH A MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
GF SOUTHPORT OFFICE COMPLEX
T23N R05E S08
COULON BEACH PARK DR & LAKE WASHINGTON BLVD N RENTON WA 98056
JB0000468090
--------
MC RW 03/05/2026
GENERAL NOTES
COMCAST RW KB
002 006
MFP26001210
NO
SCALE
V
NEW
V
TH
NEW
TH
CAB
NEW
CAB
DH
NEW
DH
P
NEW
P
LINE TYPES
FL FL
EOP EOP
ROW ROW
S/W S/W
D/W D/W
X X
U U U U U U U U
P P
PARCEL LINE
BUILDING OUTLINE
LANE LINE
CENTERLINE / STATION LINE
FOG LINE
EDGE OF PAVEMENT (EOP)
RIGHT OF WAY (ROW)
SIDEWALK (S/W)
DRIVEWAY (D/W)
FENCE
GUARDRAIL
CROSSWALK
RAILROAD
POWER
TS TS TRAFFIC SIGNAL
F/O F/O FIBER OPTIC
T T TELECOMMUNICATION
S S SEWER MAIN
SS SS SANITARY SEWER
D D DRAIN MAIN
DD DD DRAINAGE DITCH
G G GAS
OIL OIL OIL
STM STM STEAM
W W WATER
UNK UNK UNKNOWN UTILITY
TRAFFIC CONES
STRAW WATTLES
A A EXISTING AERIAL
A A NEW AERIAL
C C EXISTING/PROOF & PULL CONDUIT
PROPOSED CONDUIT
SYMBOLS
HATCH PATTERNS
CONCRETE ASPHALT
CONCRETE PANELS
LANDSCAPELIMITS OF RESTORATION
GRAVEL
BRICK/COBBLE
ROWIP ALLEY / TRAVEL LANE WZ
ROWIP PARKING / BIKE LANE WZ
ROWIP SIDEWALK WZ
OH OH OVERHEAD UTILITIES
#VAULT
(EXIST / NEW)
SIZE MAY VARY
MANHOLE
(EXIST / NEW)
DOGHOUSE
(EXIST / NEW)
TIGERHOUSE
(EXIST / NEW)
NODE CABINET
(EXIST / NEW)
PEDESTAL
(EXIST / NEW)
R R
UTILITY POLE
(EXIST / NEW)
UTILITY RISER
(EXIST / NEW)
200'
EXISTING SPLICE CASE
NEW SPLICE CASE
NEW MAT. STORAGE
NEW COAX TAP
UTILITY POTHOLE
POLE ANCHOR
/ DOWN GUY
CB CATCH BASIN
CATCH BASIN
W/ SOCK
CW CROSSWALK SIGNAL
SL STREET LIGHT
FH
FIRE HYDRANT
M WATER METER
V UTILITY VALVE
TREE
SHRUBBERY
N
S
EW
STREET SIGN
MAP COMPASS
339'FOOTAGE NOTE
LANE DIRECTION INDICATOR
BUS STOP LOCATION
MARK-UP NOTATIONS
#
#
PHOTO LOCATOR/ORIENTATION
CALLOUT
CONSTRUCTION NOTE CALLOUT
POLE # CALLOUT
STA 0+00 DISTANCE STATION
A
#
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION SHEET #
#WORK
LOCATION PHOTO NOTE CALLOUT
#DISTANCE DIMENSION
ADA RAMP
CB
#VAULT # CALLOUT
MH MH
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
GF SOUTHPORT OFFICE COMPLEX
T23N R05E S08
COULON BEACH PARK DR & LAKE WASHINGTON BLVD N RENTON WA 98056
JB0000468090
--------
MC RW 03/05/2026
LEGEND
COMCAST RW KB
003 006
MFP26001210
NO
SCALE
6"
CONCRETE TRENCH DETAIL
STANDARD DETAIL
8" MIN CONCRETE (MATCH
EX IF GREATER
PANEL WIDTH PER PLAN
12" MIN.12" MIN
6" MIN COMPACT
MINERAL AGGREGATE
TYPE 2
COMPACTED
BACKFILL
3'
M
I
N
.
24"
12"
EX CONCRETE
SURFACE
ZONE OF INFLUENCE
2
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
GF SOUTHPORT OFFICE COMPLEX
T23N R05E S08
COULON BEACH PARK DR & LAKE WASHINGTON BLVD N RENTON WA 98056
JB0000468090
--------
MC RW 03/05/2026
DETAILS
COMCAST RW KB
004 006
TRENCH - SOFT SURFACE
STANDARD DETAIL
PROPOSED CONDUIT6"-12"
18"
18"
36"
EXISTING SOFT
SURFACE MAGNETIC LOCATOR TAPE
(ENTIRE TRENCH LENGTH)
BACKFILL COMPACTED TO
95% OF MAXIMUM
RELATIVE DENSITY OR
STONEWAY MIX 1004.
SURFACE RESTORATION
CONTRACTOR TO VERIFY
SPECIFICATION WITH LOCAL
JURISDICTION
1
6"
ASPHALT TRENCH DETAIL
STANDARD DETAIL
3" HMA (CL 1/2")
(MATCH EX IF GREATER
PATCH WIDTH PER PLAN
12" MIN.12" MIN
11" HMA
(CL 1/2 OR 1)
6" MIN COMPACT
MINERAL AGGREGATE
TYPE 2
COMPACTED
BACKFILL
3'
M
I
N
.
24"
12"
EX ASPHALT
SURFACE
CONTRACTOR TO VERIFY
SPECIFICATION WITH CITY OF
SEATTLE
3
MFP26001210
737
LAK
E
W
A
S
H
I
N
G
T
O
N
B
L
V
D
N
ROW
ROW
ROW
ROW
ROW
ROW
ROW
RO
W
RO
W
EO
P
EOP
EO
P
EOP
FL
FL
FL
FL
FL
FL
F
L
F
L
FL
FL
FL
FL
FL
FL
FL
FL
G
G
EOP
S/
W
S/W
E
O
P
EOP
EOP
E
O
P
EOP
EOP
EO
P
EO
P
EOP
EOP
P
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S
/
W
ROW
ROW
ROW
ROW
ROW
ROW
ROW
W
W
W
W
W
W
S
S
S
S
D
D
D
D
D
D
D
D
W
W
W
W
CB
MH
MH
MH
W
W
W
W
W
FH
M
V
VV
C
B
T
T
T
SL
SL
STA 11
+
0
0
STA 11+50
STA 12
+
0
0
S
T
A
1
2
+
5
0
STA 11
+
0
4
STA 1
1
+
6
9
1
1
VAC FROM VAULT DUE
TO LARGE WATER MAIN
LENGTH:
( )
'
CT
119
1 96
LENGTH:
( )
'
CT
87
1 96
P
V
3
2
2
26'
3'
4'
5'
12'
24'
2'
2'
3'
CA
B
5'
5'
21'
6'3'
1
CONSTRUCTION NOTES:
REMOVE EXISTING LANDSCAPE AS
NEEDED & TRENCH (1) 4" CONDUIT
PER DETAIL # 1 ON SHEET 4. PULL (1)
96CT FIBER THROUGH
REMOVE EXISTING CONCRETE
SIDEWALK PANELS & TRENCH (1) 4"
CONDUIT PER DETAIL # 2 ON SHEET
4. PULL (1) 96CT FIBER THROUGH
REMOVE EXISTING ASPHALT
CONCRETE AS NEEDED & TRENCH (1)
4" CONDUIT PER DETAIL # 3 ON
SHEET 4. PULL (1) 96CT FIBER
THROUGH
2
3
0'10'20'
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
N SOUTHPORT DR & LAKE WASHINGTON BLVD N
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
GF SOUTHPORT OFFICE COMPLEX
T23N R05E S08
COULON BEACH PARK DR & LAKE WASHINGTON BLVD N RENTON WA 98056
JB0000468090
--------
MC RW 03/05/2026
CONSTRUCTION PLAN
COMCAST RW KB
005 006
Additional approval
from BNSF will be
required for work in
their row.
Portions of this
work are on private
property and will
require approval
from the property
owner
Maintain maximum
separation from
Water main. 5-feet
minimum is required.
MFP26001210
737
LAK
E
W
A
S
H
I
N
G
T
O
N
B
L
V
D
N
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
R
O
W
E
O
P
EOP
EO
P
EOP
EOP
FL
FL
FL
FL
FL
FL
F
L
F
L
FL
FL
FL
FL
FL
FL
FL
EOP
S/W
S/
W
S/W
E
O
P
E
O
P
EO
P
EOP
E
O
P
EOP
EOP
EO
P
EO
P
EOP
EOP
S/W
S/W
S/W
S/W
S/W
S/W
S
/
W
S
/
W
ROW
ROW
ROW
ROW
ROW
ROW
1R
2R
3R
1R
2R
2'
9'
7'
33'
6'
8'
2R
18'
20'
8'
4'
29'
88'
1R
RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF
RENTON'S SPECIFICATIONS.
RESTORE CONCRETE SIDEWALK PANELS
PER CITY OF RENTON'S SPECIFICATIONS.
RESTORE ASPHALT CONCRETE ROADWAY
PER CITY OF RENTON'S SPECIFICATIONS.
2R
3R
0'10'20'
N
S
EW
Client:
Project No.
Permit No.
Revisions:
Original
1
2
3
4
5
6
PM DRAFTER
Sheet Title:
DATE
Sheet No.
Designed by: Drawn by: Checked by:
of
Sheet Scale:
COMCAST CABLE
COMMUNICATION LLC
410 Valley Ave NW Puyallup, WA 98371
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
GF SOUTHPORT OFFICE COMPLEX
T23N R05E S08
COULON BEACH PARK DR & LAKE WASHINGTON BLVD N RENTON WA 98056
JB0000468090
--------
MC RW 03/05/2026
RESTORATION PLAN
COMCAST RW KB
006 006
MFP26001210
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP26001210
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES