Loading...
HomeMy WebLinkAbout04-21-2026 - Addendum 2 Public Works Department Addendum No.2\ Rainier Ave S Stormwater Pump Station Upgrade Project CAG-26-069 ADDENDUM No. 2 Date of Addendum Issue: April 13, 2026 Due Date for Bids: 12:00 pm on April 23, 2026 12:00 pm on April 29, 2026 To: ALL PLAN HOLDERS AND/OR PROSPECTIVE BIDDERS The following changes, additions, and/or deletions are hereby made a part of the project bid documents for the Rainier Ave S Stormwater Pump Station Upgrade project and shall have the same effect as if set forth therein. Bidders shall acknowledge receipt and acceptance of this Addendum No. 2 by signing the addendum and submitting with the bid. Failure to acknowledge receipt of this addendum may result in your bid proposal being disqualified. Volume I – Technical Specifications The following formatting has been used to note deletions (to the original text) and changes/additions to the Contract Documents. • Deletions are formatted as stricken through (example). • Changes/additions to project manual are formatted as underlined (example). Updates include the following: 1.1 Call for Bids 1. Revise Call for Bids document to extend bid deadline to Wednesday 29, 2026 at 12:00 PM. 5.1. TECHNICAL SPECIFICATIONS a. DIVISION 16.31.1 DIGITAL POWER METER WAS REMOVED FROM THE TECHNICAL SPECIFICATIONS. b. DIVISION 16.91.2 NATURAL GAS ENGINE GENERATOR SET, PART 1 – GENERAL, PERFORMANCE CRITERIA CURRENTLY READS: Performance Criteria The engine generator set provided shall not have a standby rating less than 60 kW at 0.8 PF with fan. Rating of natural gas engine-generator set shall be based on operation of set when equipped with all necessary operating accessories such as radiator, fan, air cleaners, lubricating oil pump, jacket water pump, and governor charging generator. Public Works Department Addendum No.2\ Generator shall meet the following requirements: 1. Standby rating – 60 Kilowatt IS REVISED TO READ: Performance Criteria The engine generator set provided shall not have a standby rating less than 50 kW at 0.8 PF with fan. Rating of natural gas engine-generator set shall be based on operation of set when equipped with all necessary operating accessories such as radiator, fan, air cleaners, lubricating oil pump, jacket water pump, and governor charging generator. Generator shall meet the following requirements: 1. Standby rating – 50 Kilowatt c. DIVISION 17.51.2 SMOKE DETECTORS SHALL BE REPLACED IN ITS ENTIRETY WITH THE FOLLOWING: 17.51.2 Smoke Detectors Part 1 - General Design Requirements Provide all components suitable for installation in the environment where installed. Detector shall be provided complete with sensing head and mounting base. The photoelectric smoke detector shall be 24-volt powered with LED alarm indication and Form C contacts for remote annunciation through two-wire connection to the telemetry panel. Detector shall be explosion-proof and rated for installation in Class I Division 1 areas. Part 2 – Products Materials The smoke detector shall be a Honeywell Notifier 30-3013, or equal. Part 3 – Execution Site Testing Test each smoke detector with artificial smoke in a can per manufacturer’s instructions. Public Works Department Addendum No.2\ Other testing methods will only be acceptable if approved by the manufacturer. Each failed smoke detector shall be replaced. d. DIVISION 17.52.3 WASTEWATER LEVEL FLOAT SWITCHES WAS ADDED TO THE TECHNICAL SPECIFICATIONS: 17.52.3 Wastewater Level Float Switches Part 2 – Products Manufacturers Switches shall be Anchor Scientific, Inc., Roto-Float Type S, or equal. Manufactured Units Float switch shall be mercury tube switch-type enclosed in a sealed polyurethane float. A weight shall be on the cord near the float switch. 2/C # 16 flexible type SJO oil-proof, 300-volt cord shall be integral with the float switch and shall be of sufficient length to reach the splice handhole with an additional five feet of slack cord. Part 3 – Execution Installation Level switches shall be provided for the following: • High Wet Well Level • Low Wet Well Level • Emergency Stop Float The float switch shall indicate to the control system that the liquid level, at which the switch has been positioned, has been reached. Public Works Department Addendum No.2\ Volume II – Plans I. Plans 1. Replace the following sheets in their entirety with the revised sheets included as an attachment to this addendum: a. DWG No. E02, Electrical One-Line b. DWG No. E04, Electrical Plan 1 c. DWG No. E07, Pump Control Panel Details 2 d. DWG No. E09, Electrical Equipment Pedestal Details e. DWG No. E12, Electrical Schedules Attachments: 1. Revised Plan Sheets 2. Call for Bids ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT Sincerely, Casey Jeszeck, PE Civil Engineer III (Project Manager) City of Renton All Bidders must sign this Addendum No. 2 in the space provided below and attach the signed Addendum No. 2 to the Formal Bid Proposal Signature: __________________________________ Title:_______________________ Company: __________________________________ Date:_______________________ Public Works Department Addendum No.2\