Loading...
HomeMy WebLinkAboutC_VEK Aberdeen Townhomes_1-Year Extension Request_260421 Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 110 South Oakes Ave. #250, Cle Elum, WA 98922 Phone: (425) 392-0250 Phone: (509) 674-7433 www.EncompassES.net April 15, 2026 City of Renton Jennifer Henning, Planning Director Department of Community & Economic Development RE: File Number: LUA19-000280 Project Name: VEK on Aberdeen Townhomes Plat Project Address: 957 Aberdeen Avenue Northeast Project Parcel #: 311990-0066 Request for 1-Year Extension TO WHOM IT MAY CONCERN: Please consider this our formal request for a 1-year extension to the Land Use decision (LUA19- 000280) that was approved on May 22, 2021. The current Land Use approval expires on May 22, 2026 (5-years from the date of approval). The following progress has been made on obtaining the permits required to begin construction: • C25001302 – Civil Construction Permit o STATUS: Approved 3/27/26; Issuance pending City signatures • B26001464 – Demolition Permit o STATUS: Approved and Issued 4/8/2026 • LUA25-000245 – Critical Areas Exemption (CAE) o STATUS: Approved 8/2/2025 • B26000197 – Townhome Building A Building Permit o STATUS: Submitted for City Review on 1/12/2026 (pending 3rd party structural review) • B26000199 – Townhome Building B Building Permit o STATUS: Submitted for City Review on 1/12/2026 (pending 3rd party structural review) VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 2 In addition to the status of construction permits, the current status of all conditions of approval associated with the land use decision (LUA19-000280) are provided below: 1. The Applicant shall comply with the mitigation measures issued as part of the Determination of Non-Significance Mitigated, dated April 5, 2021. Response: In order to comply with the mitigation measures found in the Determination of Non Significance, the Geotechnical Engineer of Record has reviewed the final civil plans and provided a plan review memo with the Civil Construction Permit Submittal. See approved Civil Construction Permit C25001302. 2. The Applicant shall submit a final detailed wetland mitigation plan, for review and approval by the Current Planning Project Manager, prior to Civil Construction Permit issuance. Response: A final detailed wetland mitigation plan has been prepared by the Biologist and provided with the Civil Construction Permit submittal. See approved Civil Construction Permit C25001302. 3. The Applicant shall submit a final detailed landscape plan, consistent with RMC 4-8-120 and RMC 4-4-070, for review and approval by the Current Planning Project Manager, prior to Civil Construction Permit issuance. The final detailed landscape plan shall identify all utility box locations and any utility boxes that are visible to the public shall be screened with berms and/ or landscaping. In addition, the final detailed landscape plan shall demonstrate compliance with the City Approved Tree List for street trees and minimum tree spacing standards. Response: A final landscape plan has been submitted under the Civil Construction Permit. See approved Civil Construction Permit C25001302. 4. The final detailed landscape plan shall indicate the location of all new or replaced fences on the project site and demonstrate compliance with the maximum fence height requirements. The Applicant shall identify the location of the required permanent, split rail fencing (with required signage) for the native growth protection area containing critical area and buffers. In addition, the Applicant shall either revise the proposed retaining walls to comply with maximum height requirements, or the Applicant shall submit a Modification application to request the proposed retaining walls to exceed the maximum height requirements. The revised or modified retaining wall plans shall include the proposed materials. The revised plans shall be reviewed and approved by the Current Planning Project Manager, prior to Civil Construction Permit issuance. Any retaining wall height modification shall be issued prior to Civil Construction Permit issuance. VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 3 Response: The final detailed landscape plan identifies that a new split rail fence must be placed to protect the critical areas on the western side of the parcel. All retaining walls have been revised to comply with the maximum height requirement of 4-feet as shown on the Civil Plan Set for the Civil Construction Permit; therefore, a Modification is not required. Retaining walls will be landscape block walls as specified on the Civil Plan Set. See approved Civil Construction Permit C25001302. 5. The Applicant shall submit a request for a Critical Area Letter of Exemption for the installation of the storm drainage line within the geologic hazard area, and stream and wetland buffers areas. The request for Critical Area Letter of Exemption shall identify how it meets the exemption criteria for the installation of the storm drainage line within the stream and wetland buffer areas. If it is determined the action is not exempt, the Applicant shall receive approval via a separate critical areas permit, variance, or other applicable permit prior to Civil Construction Permit issuance, or the Applicant shall design an alternative method of conveyance that does not require the encroachment into the stream and wetland buffers. The exemption request shall be reviewed and issued prior to or concurrent with the Civil Construction Permit issuance. Response: A Critical Area Letter of Exemption for the installation of the storm drainage line within the geologic hazard, stream, and wetland buffer areas has been approved by the City. See approved CAE permit LUA25-000245. 6. The Applicant shall submit revised plans with the Building Permit or Civil Construction Permit application identifying the location of code compliant bicycle parking meeting the standards of RMC 4-4-080. F.11. The revised plans shall be reviewed and approved by the Current Planning Project Manager prior to Building Permit or Civil Construction Permit approval. Response: A bicycle parking plan is included with the Building Permits. See building permits B26000197 and B26000199. 7. A lighting plan shall be provided at the time of Building Permit review for review and approval by the Current Planning Project Manager. To ensure safety and avoid excessive brightness pedestrian scale lighting should be provided on the primary entries of each unit as well as along the pedestrian walkways as necessary to provide sufficient lighting for pedestrian safety but shall also be designed to minimize light spill and glare onto adjoining properties. Response: Lighting Plans are included with the Civil Construction Permit plan set. See approved Civil Construction Permit C25001302. VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 4 8. The Applicant shall either obtain verification from Republic Services that they can drive down the unit lot drive to pick- up each individual container, or the Applicant shall identify a location for a refuse and recycling pick-up location in compliance with RMC 4-4-090. The Applicant shall demonstrate compliance with the minimum container size for refuse and recycling, and approved pick-up location(s), in compliance with RMC 4-4-090, prior to Civil Construction Permit issuance. Response: Republic Services has approved the bins to be picked up at the street under the Civil Construction Permit. See approved Civil Construction Permit C25001302. 9. The Applicant shall submit a separate detailed plan set identifying the location and screening provided for all surface and roof top utility/mechanical equipment with the Building Permit application. The plan set shall be reviewed and approved by the Current Planning Project Manager prior to Building Permit approval. Response: Screening is included with the Landscaping plans in the Civil Construction Permit plan set. See approved Civil Construction Permit C25001302. 10. The Applicant shall submit revised architectural plans at the time of Building Permit application, for review and approval by the Current Planning Project Manager, that demonstrate compliance with the minimum 250 square feet of private yard space for each unit, outside of the required pedestrian easement. In addition, the Applicant shall either submit a modification request to allow for the roof top decks to qualify as private yard space, for review and approval by the Current Planning Project Manager, prior to Building Permit application, or the Applicant shall revise the plan to comply with private yard space on the ground floor. Response: Revised Architectural Plans have been submitted with the Building Permits. The revised architectural plans demonstrate compliance with the minimum private open space requirements. A Modification Request will be prepared by the Architect to qualify the private rooftop decks to meet the private open space requirement. See building permits B26000197 and B26000199. 11. Compliance with the maximum three- story limit and maximum 32-foot wall plate height shall be maintained for the proposed townhome development within 25 feet of the front yard (east) property line. Outside of the first 25 feet from the front (east) property line, the townhomes may increase to four stories, with a maximum wall plate height of 42 feet. Response: The architectural plans reflect that a 3-story height limit and maximum wall- plate height of 32-feet will be maintained within 25-ft of the east property line (Unit 1). The remainder of the units will comply with the modified wall-plate height limit of 42- ft and will not exceed 4-sotries. See building permits B26000197 and B26000199. VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 5 12. The Applicant shall submit a revised primary entry proposal for Unit Lot 1 that demonstrates clear direct connection to the public sidewalk from the front door. The Applicant shall submit the revised architectural plans demonstrating compliance for review and approval by the Current Planning Project Manager, prior to Building Permit issuance. Response: The Architectural Plans reflect a revised entry proposal for Unit 1 which provides a clear direct connection to the public sidewalk from the front door. See building permits B26000197 and B26000199. 13. The balcony railings for the proposed structures shall be mostly transparent. In addition, two different roof colors and two different color pallets shall be used for the two structures. A materials board showing the two color palettes, coded to the exterior building elevations, shall be provided to the Current Planning Project Manager for review and approval, prior to Building Permit issuance. Response: Architectural Plans reflect a revised balcony railing schedule, color palettes for the roof/structures, and material boards. See building permits B26000197 and B26000199. 14. The Applicant shall provide details regarding the site amenities, including the design, color, and brand for the proposed seating, barbeque and cover, picnic tables, as well as the tinted color for the proposed chessboard, for review and approval by the Current Planning Project Manager, prior to Building Permit issuance. Response: Details regarding the site amenities are shown on the Landscaping plans in the Civil Construction Permit plan set. See approved Civil Construction Permit C25001302. 15. The Applicant shall clearly demonstrate compliance with the maximum five percent (5%) slope for Tract C, prior to Civil Construction Permit issuance. Furthermore, the Applicant shall revise the proposed chessboard to be level and designed with tinted concrete, rather than painted concrete. If the concrete chessboard cannot be revised to be level, the Applicant shall provide a different recreational amenity alternative to the Current Planning Project Manager for review and approval, prior to Civil Construction Permit issuance. Response: Detailed grading with slopes and spot elevations for Tract C are provided on the “Road, Paving, & Grading Plan (East)” in the Civil Plan Set, which has been provided with the Civil Construction Permit. The plans illustrates that the maximum slope of 5% is adhered to within the boundaries of Tract C. Additionally, the chessboard amenity has been revised to be level and to include tinted concrete material, rather than painted concrete. See approved Civil Construction Permit C25001302. VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 6 16. The Applicant shall revise the concrete area within Tract C to utilize 2-foot by 2-foot 2’ x2’) scored concrete, compliant with emergency vehicle apparatus requirements, to match the other areas of the tract and the wheel stops and curb shall be removed. The revised common open space design stall be submitted for review and approval by the Current Planning Project Manager, prior to Civil Construction Permit issuance. Response: A Common Open Space design is provided in the Civil Construction Permit plan set. The wheel stops and curb have been removed from around the emergency vehicle turnaround in Tract C. The concrete areas within Tract C have been revised to be 2’ x 2’ scored concrete. See approved Civil Construction Permit C25001302. 17. The Applicant shall revise the proposed pedestrian connection to the open space Tract D to create and show clear pedestrian connection and eliminate obstructions to the tract. The Applicant shall demonstrate compliance with the required pedestrian connection to the common open space tracts for review and approval by the Current Planning Project Manager prior to of Civil Construction Permit issuance. Response: A revised pedestrian connection to Open Space Tract D is provided with the Civil Construction Permit. A 4-foot wide sidewalk has been provided within Tract B to allow pedestrians to get from the sidewalk in the public ROW to Tract D without obstruction. The sidewalk in Tract B will be colored/patterned stamped concrete to differentiate it from the adjacent asphalt unit-lot drive surfacing. See approved Civil Construction Permit C25001302. 18. The Applicant shall include a minimum four foot (4-foot) wide sidewalk, within the 20- foot-wide paved section flush with the unit lot drive asphalt, along the full length of the unit lot drive. The sidewalk shall be a different color and surface material than the unit lot drive asphalt surface and shall be differentiated by a stamped decorative pattern. The Applicant shall provide a unit lot drive sidewalk color and pattern design proposal for review and approval by the Current Planning Project Manager, prior to Civil Construction Permit Issuance. Response: A revised pedestrian connection to Open Space Tract D is provided with the Civil Construction Permit. A 4-foot wide sidewalk has been provided within Tract B to allow pedestrians to get from the sidewalk in the public ROW to Tract D without obstruction. The sidewalk in Tract B will be colored/patterned stamped concrete to differentiate it from the adjacent asphalt unit-lot drive surfacing. A unit lot drive sidewalk color and pattern design proposal is provided with the Landscaping Plans under the Civil Construction Permit. See approved Civil Construction Permit C25001302. VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 7 19. The Applicant shall provide a minimum five-foot wide landscape strip along the full length of the unit lot drive (north side), as well a 0.5-foot curb between the unit lot drive and the landscape strip. The Applicant shall show the revised unit lot drive landscape strip and 0.5-foot curb on the final detail landscape plan, for review and approval by the Current Planning Project Manager, prior to Civil Construction Permit issuance. Response: A 5’ landscape strip (Landscape Tract E) and a 0.5’ vertical curb have been provided along the northern edge of the unit lot drive. This is reflected on the Civil Plan Set for the Civil Construction Permit. A Final Detailed Landscape Plan has also been provided under the Civil Construction Permit. See approved Civil Construction Permit C25001302. 20. The Applicant shall record an access easement on the face of the plat to encumber the entirety of Tract B and the hammerhead turnaround in Tract C. The easement shall prohibit any temporary or permanent physical obstructions within the easement including, but not limited to, the parking of non-emergency vehicles. The Applicant shall install one “No Parking” sign on each side of the pavement within the turnaround, prior to plat recording. Response: A Public and Emergency Access Easement will be recorded on the face of the Final Plat to encumber the entirety of Tract B and the hammerhead turnaround in Tract C. The easement will prohibit any temporary or permanent physical obstructions within the easement including, but not limited to, the parking of non-emergency vehicles. “Fire Lane – No Parking – Tow Away Zone” Signs will be located on each side of the hammerhead turnaround in Tract C as shown on the “Signing Plan & Details” Sheet in the Civil Plan Set, which has been provided under the Civil Construction Permit. See approved Civil Construction Permit C25001302. 21. The Applicant shall create a Homeowners’ Association (“HOA”) that maintains all improvements and landscaping in the common space tracts and any and all other common improvements. A draft of the HOA documents shall be submitted to, and approved by, the Current Planning Project Manager prior to recording of the Unit Lot Subdivision. Such documents shall be recorded concurrently with the Unit Lot Subdivision. Response: HOA documents will be submitted to the Current Planning Manager for review prior to recording of the Unit Lot Subdivision. 22. Street names, if any, shall be approved by the City and street name signs shall be installed if required by City staff. Response: No new street names are being requested. The proposed unit lots will be addressed off of Aberdeen Ave NE. See approved Civil Construction Permit C25001302. VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 8 23. Sanitary sewers shall be provided by the developer at no cost to the City and designed in accordance with City standards. Side sewer lines shall be installed eight feet (8') into each lot if sanitary sewer mains are available. Response: Sanitary sewer connections for each unit will be provided as illustrated on the “Overall Composite Utility Plan & Profile” in the Civil Plan Set for the Civil Construction Permit. Grading sewer connections are not feasible for connection to the existing sanitary sewer main in Aberdeen Avenue NE; therefore, each building will be provided with an grinder pump system with forcemain connections to a privately maintained manhole located along the eastern property line. A gravity draining 8” sewer connection will be made from the private on-site sewer manhole to the existing sewer main in Aberdeen Avenue NE. See approved Civil Construction Permit C25001302. 24. All utilities designed to serve the subdivision shall be placed underground. Any utilities installed in the planting strip shall be placed in such a manner and depth to permit the planting of trees. Those utilities to be located beneath paved surfaces shall be installed, including all service connections, as approved by the Department. Such installation shall be completed and approved prior to the application of any surface material. Easements may be required for the maintenance and operation of utilities as specified by the Department. Response: All proposed utilities are proposed to be placed underground. All utilities proposed within the planting strip have been designed at a depth that will not inhibit the planting of street trees or have been designed to provide adequate spacing from proposed street trees. During construction, all utilities will be installed and approved by the City prior to applying any surface materials above the utilities. Easements for maintenance and operation of utilities will be provided if required by the Department. See approved Civil Construction Permit C25001302. 25. Any cable TV conduits shall be undergrounded at the same time as other basic utilities are installed to serve each lot. Conduit for service connections shall be laid to each lot line by subdivider as to obviate the necessity for disturbing the street area, including sidewalks, or alley improvements when such service connections are extended to serve any building. The cost of trenching, conduit, pedestals and/ or vaults and laterals as well as easements therefore required to bring service to the development shall be borne by the developer and/ or landowner. The subdivider shall be responsible only for conduit to serve his development. Conduit ends shall be elbowed to final ground elevation and capped. The cable TV company shall provide maps and specifications to the subdivider and shall inspect the conduit and certify to the City that it is properly installed. VEK on Aberdeen Townhomes Plat Request for 1-Year Extension 04/15/2026 Page | 9 Response: Cable TV conduits will be undergrounded at the same time as the other basic utilities that serve each unit. Conduit for services connections will be laid to each lot line, and conduit ends shall be elbowed to final ground elevation and capped. The Developer shall coordinate with the cable TV company to design and inspect the installation of the conduit. 26. Lot corners shall be marked as required by RMC 4-7-210. Response: Lot corner will be marked in accordance with RMC 4-7-210 prior to recording of the Final Plat Map. 27. As required by RMC 4-7-090F8a, the title of the final plat shall include the term “unit lot subdivision.” Response: The Final Plat Map title will be “VEK on Aberdeen Unit Lot Subdivision.” The approved Civil Construction Permit (C25001302), approved Demolition Permit (B26001464), approved Critical Areas Exemption Permit (LUA25-000245), and submitted building permits (B26000197 and B26000199) demonstrate compliance with the vast majority of the Land Use decision conditions of approval as outlined above. The only remining items required to satisfy the conditions of approval are completion of the work that was approved under the Civil Construction Permit, preparation of the Final Plat Map, and preparation of HOA documents prior to recording of the Final Plat Map. Construction of the plat infrastructure is able to begin as soon as the Civil Construction Permit is issued, and the Final Plat map and HOA documents can be submitted for City review as construction progresses. Due to the state of our progress with the VEK on Aberdeen Unit Lot Subdivision, we would like to request a 1-year extension, that would extend the expiration of the Land Use decision for LUA19-000280 to May 22, 2027. If you have questions or need additional information, please call me at 425-961-2075 or email me at bcannon@encompasses.net Sincerely, Briana Cannon, PE Encompass Engineering