HomeMy WebLinkAboutAddendum - 1January 22, 2026
TO: Jack Odell, City of Renton
FROM: Rachel Whitezel, Contracts Specialist, (360) 239-4134
RE Agreement No. 2025-507 A (1), Amendment No. 1
M&V Agreement No. 2025-507 B (2)
Contract No. 2025-507 G (1-1)
City of Renton 200 Mill Bldg. Retro-commissioning
IAA No. K4137
McKinstry Essention, LLC
SUBJECT: Funding Approval
The Dept. of Enterprise Services (DES), Energy Program, requires funding approval for the above
referenced contract documents. The amount required is as follows (see page 2 for funding detail):
ESCO Audit $ 88,188.00*
ESCO Professional Services Total $ 37,432.08
ESCO Measurement and Verification Total $ 10,558.51
ESCO Construction Total $ 88,111.42
DES Energy Program Project Management Services Total (IAA) $ 20,700.00
Total Funding $ 156,802.01
In accordance with the provisions of RCW 43.88, the signature affixed below certifies to the
DES Energy Program that the above identified funds are appropriated, allotted or that
funding will be obtained from other sources available to the using client/agency. The
using/client agency bears the liability for any issues related to the funding for this project.
**Agency / State Board Project No. ______________________
YN
**Agency plans to utilize federal funding for this project:܆܆ ܆
By
Name / Title Date
Please sign and return this form to Contracts. If you have any questions, please call me.
By
Name / Title Date
CAG-25-017, Adden #1-26
Armondo Pavone, Mayor
4/21/2026
Attest:_________________________________________
Jason Seth, City Clerk
CAG-25-017, Adden #1-26
Agreement No. 2025-507 A (1), Amendment No. 1
M&V Agreement No. 2025-507 B (2)
Contract No. 2025-507 G (1-1)
Funding Approval Detail
ESCO Professional Services
Energy Audit and Energy Services Proposal $ 88,188.00
*Audit & Energy Services Proposal from Authorization 25-507 A (1) $ (88,188.00)
Design and Implementation of Energy Conservation Measures $ 25,588.00
Apprenticeship Incentive $ 0.00
Sales Tax (10.41%) (Includes tax on Audit proposal) Blended Rate $ 11,844.08
Total $ 37,432.08
ESCO Measurement and Verification
First Year Measurement & Verification $ 9,563.00
Sales Tax (10.41%) Blended Rate $ 995.51
Total $ 10,558.51
ESCO Construction
ESCO Contract Amount $ 76,387.00
Sales Tax (10.41%) Blended Rate $ 7,951.89
Contingency Amount (with Tax)$ 3,772.53
Total $ 88,111.42
DES Energy Program Project Management Services
Project Management Fee from IAA No. K4137, Amendment No. 8 $ 20,700.00
Total $ 20,700.00
Note: Items and dollar values shown in a lighter color shade have been approved via previous
funding authorizations and are shown for informational purposes only.
2025507GcontAamd1BagrFundrw
Interagency Agreement No. K4137 Page 1 of 5
State of Washington
ENERGY PROGRAM
Department of Enterprise Services
P.O. Box 41476
Olympia, WA 98504-1476
INTERAGENCY AMENDMENT
IAA No.:
Project No.
Amendment No.
K4137
2017-299, 2018-027,
2022-131, 2025-003,
2025-507
8
City of Renton
1055 South Grady Way
Renton, WA 98057
Date: January 22, 2026
INTERAGENCY AMENDMENT
Between
CITY OF RENTON
And
WASHINGTON STATE DEPARTMENT OF ENTERPRISE SERVICES
The parties to this Amendment, the Department of Enterprise Services, Energy Program, hereinafter
referred to as “DES”, and City of Renton, hereinafter referred to as the “CLIENT AGENCY”, hereby
amend the Agreement as follows:
The purpose of this Amendment is to establish a vehicle for DES to provide future Energy/Utility
Conservation Project Management and Monitoring Services to the CLIENT AGENCY and to authorize
the development of the energy services proposal.
1.TERM. The term of the agreement commences November 1, 2016, and ending on December 31,
2027 unless altered or amended as provided herein.
2.STATEMENT OF WORK; COMPENSATION. Energy Program shall provide the following
services, for the following compensation, to Client Agency.
a.SERVICES: DES shall furnish the necessary personnel and services and otherwise do all things
necessary for or incidental to the performance of the work set forth in Attachment “A” and
Attachment “C”, attached hereto and incorporated herein by reference. Unless otherwise specified,
DES shall be responsible for performing all fiscal and program responsibilities as set forth in
Attachment “A” and Attachment “C”.
Energy/Utility Conservation projects shall be authorized by Amendment to this Agreement.
1.1 Renton Senior Center Energy Efficiency Improvements outlined in the Sunset Air, Inc.
Energy Services Proposal dated July 18, 2017.
1.2 Review of Measurement and Verification reports for the Renton Senior Center Energy
Efficiency Improvements outlined in the Sunset Air, Inc. Energy Services Proposal dated
July 18, 2017.
1.3 ESP Addendum for Renton Senior Center Energy Efficiency Improvements
outlined in the Sunset Air Inc. Energy Services Proposal dated October 20, 2017.
1.4 City of Renton, City Hall Phase 1 outlined in the McKinstry Essention, LLC
Energy Services Proposal dated October 19, 2018, revised November 5, 2018.
1.5 Cancel years 2 & 3 Measurement & Verification fees for 2017-299 G (1-1).
1.6 City of Renton, City Hall Phase 2 outlined in the McKinstry Essention, LLC
Energy Services Proposal dated November 5, 2020. Project No. 2018-027 H
2a.1 City of Renton Energy Upgrades Phase 3 outlined in the McKinstry Essention, LLC
Energy Services Proposal dated February 24, 2023. Project No. 2022-131
2a.2 Review of Measurement and Verification reports for the City of Renton Energy
Upgrades Phase 3 outlined in the McKinstry Essention, LLC Energy Services Proposal
dated February 24, 2023. Project No. 2022-131
2a.3 City of Renton Ph 4 Energy Upgrades & 2022 Efficiency Grant outlined in the
McKinstry Essention, LLC Energy Services Proposal dated April 25, 2025, Project
No. 2025-003
2a.4 Review of Measurement and Verification reports for the City of Renton Ph 4 Energy
Upgrades & 2022 Efficiency Grant outlined in the McKinstry Essention, LLC Energy
Services Proposal dated April 25, 2025, Project No. 2025-003
2a.5 City of Renton 200 Mill Bldg. Retro-commissioning outlined in the McKinstry
Essention, LLC Energy Services Proposal dated January 20, 2026, Project No.
2025-507
2a.6 Review of Measurement and Verification reports for the City of Renton 200 Mill
Bldg. Retro-commissioning outlined in the McKinstry Essention, LLC Energy
Services Proposal dated January 20, 2026, Project No. 2025-507
The CLIENT AGENCY shall provide the Energy Services Company (ESCO) with any
additional contract language necessary to comply with the requirements established under
federal grants, the American Recovery & Reinvestment Act of 2009 (ARRA) and the Energy
Efficiency and Conservation Block Grant (EECBG). The ESCO and their subcontractors are
required to comply with all applicable federal regulations and reporting procedures.
Interagency Agreement No. K4137 Page 3 of 5
b. COMPENSATION. Compensation under this Agreement shall be by Amendment to this
Agreement for each authorized project. Each Amendment will include a payment schedule
for the specific project.
i. Project Management Services (Attachment A): For Project Management Services
provided by DES, the CLIENT AGENCY will pay DES a Project Management Fee for
services based on the total project value per Project Management Fees Schedule set forth
in Attachment “B”.
ii. Termination Fee: If the CLIENT AGENCY after authorizing an investment grade audit
and Energy Services Proposal, decides not to proceed with an Energy/Utility
Conservation project that meets the CLIENT AGENCY’s cost effective criteria, then the
CLIENT AGENCY will be charged a Termination Fee per Attachment “B”. The
Termination Fee will be based on the estimated Total Project Value outlined in the
Energy Audit and Energy Services Proposal prepared by the Energy Services Company
(ESCO).
iii. Measurement & Verification Services (Attachment C): If measurement and verification
services beyond the first three years following the Notice of Commencement of Energy
Services are requested by the CLIENT AGENCY, and provided by DES under
Attachment “C” of this Agreement, the CLIENT AGENCY will pay DES $2,000.00
annually for each year that monitoring and verification services are provided.
c. PAYMENT OF ESCO SERVICES. Compensation for services provided by the ESCO shall
be paid directly to the ESCO by the CLIENT AGENCY, after DES has reviewed,
recommended approval, and sent the invoices to the CLIENT AGENCY for payment.
4.1 Energy Project Management Fee for the work described in Section 1.1 is
$13,800.00. Anticipated billing date for this Amendment is September 30, 2017.
4.2 Measurement and Verification Fee for the work described in Section 1.2 is
$4,000.00. Anticipated billing dates for this Amendment are December 14, 2019
and 2020.
4.3 Revised Energy Project Management Fee for added kitchen scope of work
described in Section 1.3 is increased by $6,000.00 to a new fee of $19,800.00.
Anticipated billing date for this Amendment is January 31, 2018.
4.4 Energy Project Management Fee for the work described in Section 1.4 is
$58,300.00. Anticipated billing date for this Amendment is June 1, 2019.
4.5 Deduct $4,000.00 for years 2 & 3 Measurement & Verification Fee on Project No.
2017- 299 G (1-1).
4.6 Energy Project Management Fee for the work described in Section 1.6 is
$62,500.00. Anticipated Billing date for this Amendment is September 1, 2021.
Project No. 2018-027 H
Interagency Agreement No. K4137 Page 4 of 5
2c.1Energy Project Management Fee for the work described in Section 2a.1 is
$62,500.00. Anticipated billing date for this Amendment is July 19, 2024. Project
No. 2022-131
2c.2Measurement and Verification (M&V) Fee for the work described in Section 2a.2 is
included in the project management fee for the first three years. Duration of the M&V
period for this Amendment is One years. Anticipated M&V review dates for this
Amendment are November 2025. Project No. 2022-131
2c.3Energy Project Management Fee for the work described in Section 2a. 3 is $62,500.00.
Anticipated billing date for this Amendment is January 31, 2026. Project No. 2025-003
2c.4Measurement and Verification (M&V) Fee for the work described in Section 2a. 4 is
included in the project management fee for the first three years. Duration of the M&V
period for this Amendment is 1 one year. Anticipated M&V review dates for this
Amendment are December 2027, Project No. 2025-003
2c.5Energy Project Management Fee for the work described in Section 2a. 5 is
$20,700.00. Anticipated billing date for this Amendment is July 24, 2027. Project
No. 2025-507
2c.6Measurement and Verification (M&V) Fee for the work described in Section 2a. 6
is included in the project management fee for the first three years. Duration of the
M&V period for this Amendment is 1 one year. Anticipated M&V review dates
for this Amendment are June 2028, Project No. 2025-507
The new total Agreement value is $286,300.00.
Sections d. through e. terms and conditions of the original Agreement remain in full force and
effect.
3. INVOICES; BILLING.
a. BILLING PROCEDURE. Energy Program shall submit a single invoice to the CLIENT
AGENCY upon substantial completion of each authorized project, unless a project
specified a Special Billing Condition in the Amendment.Substantial completion of the
project will include the delivery and acceptance of the notice of commencement of
energy savings issued by the ESCO.Each invoice will clearly indicate that it is for the
services rendered in performance under this Agreement and shall reflect this Agreement and
Amendment number. Energy Program will invoice for any remaining services within 60
days of the expiration or termination of this Agreement.
b.PAYMENT PROCEDURE.The CLIENT AGENCY shall pay all invoices received from the
Energy Program within 90 days of receipt of properly executed invoice vouchers. The
CLIENT AGENCY shall notify DES in writing if the CLIENT AGENCY cannot pay an
invoice within 90 days.
Interagency Agreement No. K4137 Page 5 of 5
c. BILLING DETAIL. Each invoice submitted to Client Agency by Energy Program shall include
information as is necessary for Client Agency to determine the exact nature of all
expenditures. At a minimum, the invoice shall reference this Agreement and include the
following:
The date(s) such services were provided
Brief description of the services provided
Total invoice amount
d.BILLING ADDRESS. Invoices shall be delivered to Client Agency electronically.
All sections above have been fully amended and are shown in their entirety.
All other terms and conditions of this Agreement remain in full force and effect. The requirements
of RCW 39.34.030 are satisfied by the underlying Agreement and are incorporated by reference
herein.
Each party signatory hereto, having first had the opportunity to read this Amendment and discuss
the same with independent legal counsel, in execution of this document hereby mutually agree to
all terms and conditions contained herein, and as incorporated by reference in the original
Agreement.
City of Renton Department of Enterprise Services
Energy Program
Kirsten G. Wilson, PE
Energy Program Manager
Title Date Title Date
K4137IAAamd8rw
Title Date
K4137IAAamd8rw
Armondo Pavone, Mayor 4/21/2026
Attest:_____________________________________
Jason Seth, City Clerk
Interagency Agreement No. K4137
ATTACHMENT A
PROJECT MANAGEMENT SERVICES SCOPE OF WORK
Energy/Utility Conservation Projects
Statewide Energy Performance Contracting Program
Energy Program will provide the following project management services for each specific project
for the Client Agency. Each individual project shall be authorized by an amendment to this
Agreement.
1. Assist the Client Agency in the selection of an Energy Service Company (ESCO) consistent
with the requirements of RCW 39.35A for local governments; or 39.35C for state agencies and
school districts.
2. Assist in identifying potential energy/utility conservation measures and estimated cost savings.
3. Assist in negotiating scope of work and fee for an ESCO audit of the facility(s).
4. Assist in identifying appropriate project funding sources and assist with obtaining project
funding.
5. Assist in negotiating the technical, financial and legal issues associated with ESCO’s Energy
Services Proposal.
6. Review and recommend approval of ESCO energy/utility audits and Energy Services
Proposals.
7. Provide assistance during the design, construction and commissioning processes.
8. Review ESCO invoice voucher(s) received for reasonableness and forward to Client Agency
for review and payment.
9. Assist with final project acceptance.
10. Assist in resolution of disputes with the ESCO that arise during this Agreement, not to include
formal disputes.
11. Review up to the first three years of the ESCO’s annual Measurement and Verification (M&V)
reports for completeness and accuracy. Review any ESCO guarantee compared to reported
results and resolve differences, if needed. Review and forward ESCO invoice vouchers for
payment by the Client Agency.
Interagency Agreement No. K4137
ATTACHMENT B - Fee Schedule
2025-27 Interagency Reimbursement Costs
for Project Management Fees to Administer Energy/Utility Conservation Projects
PROJECT
TOTAL PROJECT VALUE MANAGEMENT FEE TERMINATION
5,000,001….....6,000,000.................................. $68,800................................. 25,700
4,000,001.........5,000,000.................................... 67,700................................. 25,400
3,000,001….....4,000,000.................................... 66,700................................. 25,000
2,000,001….....3,000,000.................................... 62,500................................. 23,400
1,500,001….....2,000,000.................................... 58,300................................. 21,800
1,000,001….....1,500,000.................................... 51,600................................. 19,300
900,001. ...… 1,000,000.................................... 43,800................................. 16,400
800,001…….....900,000.................................... 41,300................................. 15,400
700,001…….....800,000.................................... 38,300................................. 14,400
600,001…….....700,000.................................... 36,500................................. 13,700
500,001…….....600,000.................................... 33,800................................. 12,600
400,001…….....500,000.................................... 30,200................................. 11,300
300,001…….....400,000.................................... 25,800.................................. 9,700
200,001…….....300,000.................................... 20,700.................................. 7,700
100,001…….....200,000.................................... 14,400.................................. 5,400
50,001……......100,000...................................... 7,800.................................. 3,500
20,001……........50,000...................................... 4,200.................................. 2,000
The project management fee on projects over $6,000,000 is 1.15% of the project cost. The
maximum DES termination fee is $25,700.
1.These fees cover project management services for energy/utility conservation projects managed
by DES’s Energy Program.
2.Termination fees cover the selection and project management costs associated with managing
the ESCO's investment grade audit and energy service proposal. No termination fee will be
charged unless the CLIENT AGENCY decides not to proceed to construction based on an
energy services proposal that identifies projects that met the CLIENT AGENCY’S cost
effectiveness criteria.
3.If the project meets the CLIENT AGENCY’s cost effectiveness criteria and the CLIENT
AGENCY decides not to move forward with a project, then the CLIENT AGENCY will be
invoiced per Attachment B Termination or $25,700.00 whichever is less. If the CLIENT
AGENCY decides to proceed with the project then the Agreement will be amended per
Attachment B for Project Management Fee.
4.If the audit fails to produce a project that meets the CLIENT AGENCY’s established Cost
Effectiveness Criteria, then there is no cost to the CLIENT AGENCY and no further obligation
by the CLIENT AGENCY.
Interagency Agreement No. K4137
ATTACHMENT C – SCOPE OF WORK
Energy/Utility Conservation Projects
MEASUREMENT & VERIFICATION SERVICES
Statewide Energy Performance Contracting Program
If requested DES will provide the following measurement and verification services following the
Notice of Commencement of Energy Savings by the ESCO for the specific Client Agency project:
1.Review the ESCO’s annual Measurement and Verification (M&V) report for completeness
and accuracy. Review any ESCO guarantee compared to reported results and resolve
differences, if needed. Review and recommend approval of any ESCO invoice vouchers for
payment by the Client Agency.
2.Where necessary, review Client Agency facility operations including any changes in operating
hours, changes in square footage, additional energy consuming equipment and negotiate
changes in baseline energy use with the ESCO and the Client Agency that may impact achieved
energy savings.
3.Attend a meeting or meetings with the Client Agency and the ESCO to review and discuss the
annual M&V report.
ESCO Contract No. 2025-507 G (1-1)
Project City of Renton 200 Mill Bldg. Retro-commissioning
Agency City of Renton
Date January 22, 2026
STATE OF WASHINGTON
ENERGY SERVICE COMPANY (ESCO) CONSTRUCTION CONTRACT
For the DEPT. OF ENTERPRISE SERVICES, ENERGY PROGRAM
This Energy Service Company (ESCO) Construction Contract, made and entered into this 22nd day
of January, 2026, shall be the agreed basis of performing the following work by and between the
State of Washington, City of Renton acting through the Department of Enterprise Services, Energy
Program, hereinafter referred to as the Owner, and
McKinstry Essention, LLC
PO Box 24567
Seattle, WA 98134
Telephone (206) 762-3311
E-mail wades@mckinstry.com
hereinafter referred to as the ESCO or Contractor.
WITNESSETH: Whereas the parties hereto have mutually covenanted and by these presents do
covenant and agree with each other as follows:
FIRST: The said ESCO agrees to furnish all permits, material, labor, tools, equipment, apparatus,
facilities, etc., necessary to perform and complete in a workmanship like manner the work called
for in the attached Scope of Work, Energy Services Proposal dated January 20, 2026, for:
Energy Services Authorization No. 2025-507 A (1)
Main Energy Services Agreement No. 2025-535 F (6)
Audits and Proposals for this project were prepared by the ESCO according to the terms of the
Contract Documents which include, but are not limited to, the Main Energy Services Agreement,
Energy Services Authorization(s), the accepted Proposal, General Conditions for Washington
ESCO Construction Contract No. 2025-507 G (1-1)Page 2 of 6
Effective 03.14.2024
State Energy Savings Performance Contracting,Addenda, Specifications, Drawings, Bond, and
this Construction Contract.
SECOND: Time of Completion: The work to be performed under this contract shall commence as
soon as the ESCO has been officially notified to proceed and shall be substantially complete within
consecutive calendar days after the date of Notice to Proceed.
THIRD: In consideration of the Performance of the Work, herein contained on the part of the
ESCO, the Owner hereby agrees to pay the ESCO for said work completed according to the
Contract Documents, for not more than the sum of $76,387.00, plus 10.41% state sales tax (used
a blended rate) consisting of the following:
ESCO Contract Cost $ 76,387.00
The ESCO shall bond this contract in accordance with Section 2.04 of the General Conditions for
Washington State Energy Savings Performance Contracting. The construction value plus
contingency is a guaranteed maximum not-to-exceed cost and final payment to the ESCO shall be
reconciled to reflect the actual installed cost provided it does not exceed the guaranteed maximum
cost.
FOURTH: ESCO payments to subcontractors and materialmen shall not be contingent upon the
ESCO receiving payment from the Owner. Unless otherwise agreed upon, payment to the ESCO
shall be made only after completion of the energy efficiency measure(s) and the ESCO has issued
a Notice of Commencement of Energy Savings and the Owner has accepted such Notice.
FIFTH: Consistent with RCW 39.12.120, ESCO and its subcontractors shall keep accurate payroll
records for three years from the date of acceptance of the project and file a copy of its certified
payroll records using the Department of Labor and Industries’ online system at least once per
month. If the Department of Labor and Industries’ online system is not used, a contractor,
subcontractor, or employer shall file a copy of its certified payroll records directly with the
Department of Labor and Industries at least once per month in a format approved by the
Department of Labor and Industries. A contractor, subcontractor, or employer’s noncompliance
with this section constitutes a violation or RCW 39.12.050.
SIXTH: Civil Rights
Contractor represents and warrants that Contractor complies with all applicable requirements
regarding civil rights. Such requirements prohibit discrimination against individuals based on their
status as protected veterans or individuals with disabilities and prohibit discrimination against all
individuals based on their race, color, religion, sex, sexual orientation, gender identity, or national
origin.
SEVENTH: Non-Discrimination
1. Nondiscrimination Requirement. During the term of this Contract, Contractor, including any
subcontractor, shall not discriminate on the bases enumerated at RCW 49.60.530(3). In
addition, Contractor, including any subcontractor, shall give written notice of this
ESCO Construction Contract No. 2025-507 G (1-1) Page 3 of 6
Effective 03.14.2024
nondiscrimination requirement to any labor organizations with which Contractor, or
subcontractor, has a collective bargaining or other agreement.
2. Obligation to Cooperate. Contractor, including any subcontractor, shall cooperate and comply
with any Washington state agency investigation regarding any allegation that Contractor,
including any subcontractor, has engaged in discrimination prohibited by this Contract
pursuant to RCW 49.60.530(3).
3. Default. Notwithstanding any provision to the contrary, Agency may suspend Contractor,
including any subcontractor, upon notice of a failure to participate and cooperate with any state
agency investigation into alleged discrimination prohibited by this Contract, pursuant to RCW
49.60.530(3). Any such suspension will remain in place until Agency receives notification that
Contractor, including any subcontractor, is cooperating with the investigating state agency. In
the event Contractor, or subcontractor, is determined to have engaged in discrimination
identified at RCW 49.60.530(3), Agency may terminate this Contract in whole or in part, and
Contractor, subcontractor, or both, may be referred for debarment as provided in RCW
39.26.200. Contractor or subcontractor may be given a reasonable time in which to cure this
noncompliance, including implementing conditions consistent with any court-ordered
injunctive relief or settlement agreement.
4. Remedies for Breach. Notwithstanding any provision to the contrary, in the event of Contract
termination or suspension for engaging in discrimination, Contractor, subcontractor, or both,
shall be liable for contract damages as authorized by law including, but not limited to, any cost
difference between the original contract and the replacement or cover contract and all
administrative costs directly related to the replacement contract, which damages are distinct
from any penalties imposed under Chapter 49.60, RCW. Agency shall have the right to deduct
from any monies due to Contractor or subcontractor, or that thereafter become due, an amount
for damages Contractor or subcontractor will owe Agency for default under this provision.
IN WITNESS WHEREOF: The said Department of Enterprise Services, Energy Program, has
caused this ESCO Construction Contract to be subscribed in its behalf, and the said ESCO has
signed this ESCO Construction Contract the day and year first above written.
ESCO: Owner:
McKinstry Essention, LLC City of Renton
acting through the
Department of Enterprise Services
Energy Program
By By
Name Name Kirsten G. Wilson, PE
Title Title Energy Program Manager
Date Date
WA State Contractor’s License No. MCKINEL874CL
UBI Number 603 259 907
2025507Gcontrw
Owner:
City of Renton
acting through the
Department of Enterprise Services
Energy Program
By
Name Kirsten G. Wilson, PE
Title Energy Program Manager
Date
874CL
ESCO Construction Contract No. 2025-507 G (1-1) Page 4 of 6
January 22, 2026
SCOPE OF WORK
ESCO Contract No. 2025-507 G (1-1)
City of Renton 200 Mill Bldg. Retro-commissioning
City of Renton
200 Mill Building
Furnish and install the energy efficiency measures, including any and all necessary ancillary
equipment, as described in the City of Renton Energy Services Proposal dated January 20, 2026.
ESCO Construction Contract No. 2025-507 G (1-1) Page 5 of 6
CONTRACTOR'S OPTION
Contractor McKinstry Essention, LLC
Contract No. 2025-507 G (1-1)
Description City of Renton 200 Mill Bldg. Retro-commissioning
Client Agency City of Renton
Payment and Performance Bond Waiver
It is hereby requested that the payment and performance bond requirement be waived for the above
mentioned contract and 10% of the amount of the contract withheld for a period of
forty-five (45) days after date of final acceptance, or until receipt of all necessary releases from
the Department of Revenue, Department of Employment Security, and the Department of Labor
and Industries, and settlement of any liens filed under Chapter 60.28 RCW, whichever is the latest,
as set forth in 39.08 RCW.
If at any point prior to final acceptance the Contract Sum without tax reaches $150,000.00 or
more, this waiver will be null and void. Payment and Performance Bonds will be required.
Signature
Date
January 22, 2026
R E T A I N A G E I N V E S T M E N T
ESCO Contractor McKinstry Essention, LLC
ESCO Contract No. 2025-507 G (1-1)
Description City of Renton 200 Mill Bldg. Retro-commissioning
Client Agency City of Renton
Pursuant to R.C.W. 60.28, you are required to exercise your option, IN WRITING, on whether or
not monies reserved from the amounts due you on the above contract shall be placed in escrow.
You are therefore directed to complete and return this form with the signed copy of the above
contract to the Energy Program.
Should you desire to have the retained monies invested, it will then be necessary that you enter
into an escrow agreement with a bank, trust or savings and loan company, and the above Client
Agency.
This form will be transmitted to the Client Agency for further action in preparing the escrow
agreement.
E N E R G Y S E R V I C E S C O N T R A C T O R’S O P T I O N
I do not request retainage on the above contract to be invested.
I hereby request retainage on the above contract be invested.
I hereby request retainage on the above contract be invested and converted into
bonds and sureties.
Retainage Bond.
Signature Date
Title