Loading...
HomeMy WebLinkAboutAPPROVED_SRTC_CCP_DC1_20260422SIGN ASPH VLT CO HH X X XXX X X X X X X X X X X X X X X X X X X / / // / / // // / / / / / / / / / / // / / / / / / / / / / // // / / / / / / / / / / / / / / // / / / / / / / / / / / // / / / / / / / / / / / / / / / / / / / / /// / / / / / / / / / / / / / / / / / // / / / / / / / / / / / / / / / / / / / 1010 1009 2 2 5 4 2 5 4 7 4 3 1 3 N TC 511+00 N TC 512+00 N TC 513+00 N TC 514+00 S TC 611+00 S TC 612+00 S TC 613+00 S TC 614+00 RAINIER 207+00 3 2 221 220 222 5 224 225 11 11 22611 223 11 219 242 241 LEGEND*: CLEARING AND GRUBBING REMOVE GRAVEL HMA GRINDING SAWCUT LINE TREE PROTECTION ZONE TREE PROTECTION FENCING TREE TO BE REMOVED TREE TAG NUMBER SEE SHEET BT120-CSS101 SITE PREPARATION POINT SEE SHEETS GZN006-GZN007 FOR GENERAL SYMBOLS AND LEGEND 1036 X * REMOVE EXISTING STRUCTURE REMOVE CONCRETE PAVEMENT REMOVE BY OTHERS REMOVE ASPHALT PAVEMENT REMOVE BUILDING FOUNDATION REMOVE CEMENT CONC SIDEWALK REMOVE CEMENT CONC CURB REMOVE CEMENT CONC CURB AND GUTTER REMOVE EXISTING BUSINESS SIGN AND FOUNDATION REMOVE EXISTING FENCE REMOVE EXISTING BOLLARDS PROTECT DURING CONSTRUCTION ADJUST WELL TO GRADE CONSTRUCTION NOTES: 1 2 3 4 5 7 8 11 1.SEE SHEET BT120-CSP100 FOR SITE PREPARATION GENERAL NOTES. 2.SEE SHEETS BT120-CPP101-CPP106 AND BT120-CPP201-CPP205 FOR PAVING PLANS. 3.SEE SHEETS BT120-CSS101-CSS102 FOR SITE PREPARATION POINT TABLES. 4.SEE SHEETS BT120-LTS101-LTS102 FOR TREE INVENTORY TABLE AND TREE PROTECTION DETAIL. 5.SEE SHEETS BT120-GZK001 AND SHEETS BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 6.LIMITS OF GRAVEL ARE APPROXIMATE. GENERAL NOTES: 20 40 SCALE IN FEET 01020 (1" = 20') N SOUTH DRIVEWAY NORTH DRIVEWAY CL BT120-C-NTC CL BT120-C-STC No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 4 / 2 6 | 9: 4 2 A M | LR E D M A N C: \ P W W O R K I N G \ J A C O B S _ B & I \ J E G _ E X - R E D M A N L \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C S P 2 0 1 - 2 0 5 . D W G S1-BT120-CSP201-205 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 xS1-BT120-CAP001 xS1-BT120-VRX001 xS1-BT120-CSN001 xS1-BT120-CSP001 xS1-BT120-LTP001 xS1-BT120-VSF100 xS1-BT120-GZK020 xS1-BT120-GZK010 MATCHLINE: SEE DWG BT120-CSP103 MA T C H L I N E : SE E D W G BT 1 2 0 - C S P 1 0 2 MATCHLINE: SEE DWG BT120-CSP203 (MONITORING WELL) (MONITORING WELL) (MONITORING WELL) (MONITORING WELL) MA T C H L I N E : SE E D W G B T 1 2 0 - C S P 2 0 2 N 201 SW 7TH ST RAI N I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRADY WAY KEY MAP LA K E AV E S 101 102 103 202 203 204 205 104 105 106 107 SEE NOTE 6 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL SITE PREPARATION PLAN S RENTON TRANSIT CENTER BT120-CSP201 BT120 074 L. REDMAN L. REDMAN L. GILBERT L. REDMAN 0 12/10/2024 LBR LDG LBR ISSUED FOR BID 1 06/13/2025 LBR DP LBR ADDENDUM #1 A 03/20/2026 LBR MS LBR CNWD #004 RTA/LR RTA/CN 0205-24 1"=20' A 04/14/2026 A DEVELOPMENT ENGINEERING msippo 04/22/2026 R-433274 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 FO FO FO 2" DROP X X X X X X X X X X X X X X X X X X X X X PM X X X X X X X X X / /////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / / / / / / / / / / / / / / / / / / //////// / / / / / / / / / //////// 4 N TC 514+00 N TC 515+00 N TC 516+00 N TC 517+00 S TC 615+00 S TC 616+00 S TC 617+00 S TC 618+00 222 55 11 225 229 11 11 228 227 11 11 223 219 246 247 245 LEGEND*: CLEARING AND GRUBBING REMOVE GRAVEL HMA GRINDING SAWCUT LINE TREE PROTECTION ZONE TREE PROTECTION FENCING TREE TO BE REMOVED TREE TAG NUMBER SEE SHEET BT120-CSS101 SITE PREPARATION POINT SEE SHEETS GZN006-GZN007 FOR GENERAL SYMBOLS AND LEGEND 1036 X * REMOVE EXISTING STRUCTURE REMOVE CONCRETE PAVEMENT REMOVE BY OTHERS REMOVE ASPHALT PAVEMENT REMOVE BUILDING FOUNDATION CONSTRUCTION NOTES: 4 REMOVE EXISTING BUSINESS SIGN AND FOUNDATION REMOVE EXISTING FENCE PROTECT DURING CONSTRUCTION ADJUST WELL TO GRADE 5 8 11 1.SEE SHEET BT120-CSP100 FOR SITE PREPARATION GENERAL NOTES. 2.SEE SHEETS BT120-CPP101-CPP106 AND BT120-CPP201-CPP205 FOR PAVING PLANS. 3.SEE SHEETS BT120-CSS101-CSS102 FOR SITE PREPARATION POINT TABLES. 4.SEE SHEETS BT120-LTS101-LTS102 FOR TREE INVENTORY TABLE AND TREE PROTECTION DETAIL. 5.SEE SHEETS BT120-GZK001 AND SHEETS BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 6.LIMITS OF GRAVEL ARE APPROXIMATE. GENERAL NOTES: N 20 40 SCALE IN FEET 01020 (1" = 20') N NORTH DRIVEWAY SOUTH DRIVEWAY CL BT120-C-NTC CL BT120-C-STC No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 4 / 2 6 | 10 : 5 6 A M | LR E D M A N C: \ P W W O R K I N G \ J A C O B S _ B & I \ J E G _ E X - R E D M A N L \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C S P 2 0 1 - 2 0 5 . D W G S1-BT120-CSP201-205 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 xS1-BT120-CAP001 xS1-BT120-VRX001 xS1-BT120-CSN001 xS1-BT120-CSP001 xS1-BT120-LTP001 xS1-BT120-VSF100 xS1-BT120-GZK020 xS1-BT120-GZK010 MA T C H L I N E : SE E D W G BT 1 2 0 - C S P 2 0 1 MA T C H L I N E : SE E D W G BT 1 2 0 - C S P 1 0 6 MATCHLINE: SEE DWG BT120-CSP204 202 SW 7TH ST RAI N I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRADY WAY KEY MAP LA K E AV E S 101 102 103 201 203 204 205 104 105 106 107 (MONITORING WELL) (MONITORING WELL) (MONITORING WELL) SEE NOTE 6 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL SITE PREPARATION PLAN S RENTON TRANSIT CENTER BT120-CSP202 BT120 075 L. REDMAN L. REDMAN L. GILBERT L. REDMAN 0 12/10/2024 LBR LDG LBR ISSUED FOR BID 1 06/13/2025 LBR DP LBR ADDENDUM #1 A 03/20/2026 LBR MS LBR CNWD #004 RTA/LR RTA/CN 0205-24 1"=20' A 04/14/2026 A DEVELOPMENT ENGINEERING msippo 04/22/2026 R-433275 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 4 / 2 6 | 10 : 4 8 A M | LR E D M A N C: \ P W W O R K I N G \ J A C O B S _ B & I \ J E G _ E X - R E D M A N L \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C S S 1 0 1 - 1 0 2 . D W G S1-BT120-CSS101-102 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 S1-BT120-CSP101-107 S1-BT120-CSP201-205 xS1-BT120-CZN002 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL SITE PREP POINT TABLE BT120-CSS102 BT120 080 L. REDMAN L. REDMAN L. GILBERT L. REDMAN 0 12/10/2024 LBR LDG LBR ISSUED FOR BID 1 06/13/2025 LBR DP LBR ADDENDUM #1 03/20/2026 LBR MS LBR CNWD #004 RTA/LR RTA/CN 0205-24 NTS SITE PREPARATION POINT TABLE POINT NO.ALIGNMENT STATION OFFSET SITE PREPARATION POINT TABLE POINT NO. 230 231 232 233 234 235 23 23 23 23 ALIGNMENT RAINIER RAINIER RAINIER RAINIER RAINIER RAINIER RAINIER RAINIER RAINIER RAINIER STATION 20445 204454 20515 20532 2053550 204542 20421 20353 2022 20423 OFFSET 310 RT 5000 RT 500 RT 20 RT 3 RT 2524 RT 113 RT 131 RT 32 RT 5204 RT SITE PREPARATION POINT TABLE POINT NO. 250 251 252 ALIGNMENT RAI/A.D: RAI/A.D: RAI/A.D: STATION 21252 2051 1045 OFFSET 0 /T 1043 /T 542 RT SITE PREPARATION POINT TABLE POINT NO. 240 241 242 243 244 ALIGNMENT RAINIER RAINIER RAINIER RAINIER RAINIER STATION 2015110 2015150 20133 2014524 202301 OFFSET 23 RT 2 RT 23 RT 12430 RT 14 RT BT120-CSP201 BT120-CSP202 BT120-CSP203 BT120-CSP204 BT120-CSP205 SITE PREPARATION POINT TABLE POINT NO. 22 22 22 245 24 24 ALIGNMENT NTC NTC NTC NTC NTC NTC STATION 514041 51443 5143530 5141350 5142133 5142103 OFFSET 0 RT 312 /T 235 /T 34 /T 43 /T 350 /T 220 221 222 223 224 225 22 RAINIER RAINIER NTC NTC NTC NTC NTC 2044 200015 51402 51254 5135 51400 513053 502 RT 4 RT 334 /T 010 RT 140 RT 3230 /T 101 RT 21NTC 5141344 /T A A A 04/14/2026 A DEVELOPMENT ENGINEERING msippo 04/22/2026 R-433280 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ ^ ^ 15.0' (TYP.) 15 . 5 ' 15 . 5 ' 15 . 0 ' 5. 0 ' 15 . 5 ' 19 . 5 ' 15.0' (TYP.) 15.4' 9.3' 10.3' 12 . 0 ' 12 . 0 ' 15 . 5 ' 15 . 5 ' 15.0' (TYP.) 15.0' (TYP.) 132131 119 117 118 9 14 14 13 19 17 R=200.0' R=6.0' R=25.0' R=25.0' R=25.0' 101 106 107 114 26 101 11 17 13 104109 108 111 110 112 123 124 126 125 121 122 134 137 136 113 R=25.0'112 119 18 7 9 27 105 133 102 103 21 R=100.0' R=100.0' R=115.0' R=10.0' 116 128 R=10.0' 129 R=850.0' R=847.0' 115 R=75.0' R=111.0' 139 140 141 143 142 145 144 130 7 30 34 17 11 R=25.0' 243 245 148147 146 149 150 151 152 153 154 155 156 157 R=100.0' R=100.0'R=100.0' R=100.0' 159 158 162 163 167 166 164 16535 R=15.0' 27 168 39 39 11 39 26 39 41 169 101 12 . 0 ' N TC 511+00 N TC 512+00 N TC 513+00 N TC 514+00 S TC 611+00 S TC 612+00 S TC 613+00 S TC 614+00 RAINIER 207+00 9.8' 15.5' 16 . 7 ' 15 . 5 ' 15 . 5 ' 12 . 0 ' 12 . 0 ' 12 . 0 ' KEY NOTES: INSTALL CEMENT CONC TRAFFIC CURB AND GUTTER PER WSDOT STD PLAN F-10.12 INSTALL HMA PAVEMENT PER TYPICAL SECTIONS ON SHEETS BT120-CRY101-CRY106 INSTALL CEMENT CONC PAVEMENT PER TYPICAL SECTIONS ON SHEETS BT120-CRY101-CRY106 INSTALL DOWELED CURB PER KCM STD PLAN D109 INSTALL 9 IN DOWELED CURB PER DETAIL ON SHEET BT120-CRD122 INSTALL CEMENT CONC SIDEWALK PER CITY OF RENTON STD PLAN 102 SEE SHEET BT120-CRD125 AND STRUCTURAL SHEETS FOR STEEL PICKET FENCE NON-REMOVABLE DETAILS INSTALL CEMENT CONC TRAFFIC CURB PER CITY OF RENTON STD PLAN 101 INSTALL RETAINING WALL PER STRUCTURAL SHEETS INSTALL BUS PLATFORM PER DETAIL ON STRUCTURAL SHEET SEE SHEETS BT120-LHP101-LHP105, BT120-LHP201-LHP205 AND BT120-LHD101-LHD109 FOR HARDSCAPE PLAN AND DETAILS INSTALL 36 IN VALLEY GUTTER PER DETAIL ON SHEET BT120-CRD123 7 9 11 13 14 17 19 21 26 27 30 18 LEGEND*: PAVING POINT SEE SHEETS BT120-GZN006-GZN007 FOR GENERAL SYMBOLS AND LEGEND LONGITUDINAL JOINT TRANSVERSE JOINT LANDSCAPING X * HARDSCAPE GENERAL NOTES: 1.SEE SHEET BT120-CPP100 FOR GENERAL PAVING NOTES. 2.SEE SHEET BT120-CPS101-CPS108 FOR PAVING POINT TABLES. 3.SEE SHEETS BT120-CRD101-CRD119 FOR CURB RAMP PLAN AND DETAILS AND ADDITIONAL PAVING POINTS. 4.SEE SHEETS BT120-CRD120-CRD129 FOR PAVING DETAILS. 5.SEE SHEETS BT120-GZK001 AND BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 6.SEE SHEETS BT120-LPP101-LPP106 AND BT120-LPP201-LPP205 FOR LANDSCAPE PLANTING PLAN. 7.SEE ARCHITECTURAL AND STRUCTURAL SHEETS FOR DETAILS. 8.SEE WSDOT STD PLAN A-40.10 FOR INSTALLATION OF CEMENT CONCRETE PAVEMENT JOINTS ON RAINIER AVE OR CITY OF RENTON STD PLAN H033 ON GRADY WAY. INSTALL 8 IN CONC FOUNDATION FOR PARATRANSIT SHELTER. SEE SHEETS BT120-SGD163 AND BT120-SGD164 FOR STRUCTURAL INFORMATION FOR THE SHELTER. INSTALL 8 IN THICK CONC FOUNDATION FOR SIGN INSTALLATION. SEE CHANNELIZATION AND SIGNING PLANS FOR DETAILS. SEE TYPICAL SECTIONS FOR SUBGRADE PREPARATION 34 35 39 1 BT120-CRD108 N 20 40 SCALE IN FEET 01020 (1" = 20') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 4 / 2 6 | 9: 4 5 A M | LR E D M A N C: \ P W W O R K I N G \ J A C O B S _ B & I \ J E G _ E X - R E D M A N L \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C P P 2 0 1 - 2 0 5 . D W G S1-BT120-CPP201-205 FACILITY ID: Xrefs: xS1-BT120-CPP001 xS1-BT120-VRX001 xS1-BT120-CZN001 xBRT-CUD05-TB22x34 xS1-BT120-CAP001 xS1-BT120-CPP002 xS1-BTP120-VSF100 xS1-BT120-GZK020 xS1-BT120-GZK010 xS1-BT120-LHP001 xS1-BT120-CZN002 xS1-BT120-CRP001 SOUTH DRIVEWAY NORTH DRIVEWAY CL BT120-C-S TC 1 BT120-CRD105 1 BT120-CRD103 1 BT120-CRD104 1 BT120-CRD107 2 BT120-CRD107 1 BT120-CRD106 1 BT120-CRD109 MATCHLINE: SEE DWG BT120-CPP103 MA T C H L I N E : SE E D W G BT 1 2 0 - C P P 2 0 2 MA T C H L I N E : SE E D W G BT 1 2 0 - C P P 1 0 2 MATCHLINE: SEE DWG BT120-CPP203 127 CL BT120-C-N TC 3 BT120-CRD120 135 N 102 103 202 203 204 205 SW 7TH ST RAI N I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRADY WAY 101 104 105 KEY MAP LA K E AV E S 107 106 138 201 SEE NOTE 8 SEE SHEET BT120-CGP103 AND SHEET BT120-CGS102 FOR ADDITIONAL BUS PLATFORM PAVING POINTS. 9. SEE NOTE 8 SEE NOTE 9 SEE NOTE 8 SEE NOTE 9 160 161 41 INSTALL CHAIN LINK FENCE POST PER WSDOT STD PLAN L-20.10 AS CLOSE TO RETAINING WALL AS POSSIBLE AND STRETCH EXISTING CHAIN LINK FENCE TO POST AND SECURE. STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL PAVING PLAN S RENTON TRANSIT CENTER BT120-CPP201 BT120 088 L. REDMAN Y. SHEN D. POSTEN L. REDMAN 0 12/10/2024 LBR LDG LBR ISSUED FOR BID 1 06/13/2025 LBR DP LBR ADDENDUM #1 2 07/07/2025 YS MKR LBR ADDENDUM #3 A 03/20/2026 LBR MS LBR CNWD #004 RTA/LR RTA/CN 0205-24 1"=20' 170 43 INSTALL FULL DEPTH RECTANGULAR PATCH TO MATCH EXISTING PAVEMENT THICKNESS 43 A A 04/14/2026 A DEVELOPMENT ENGINEERING msippo 04/22/2026 R-433288 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 ^ ^ ^ ^ ^ ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ 27 15. 0 ' (TY P . ) 15.4' 9.3'10.3' 15 . 5 ' 15 . 5 ' 15.0' (TYP.) 15.0' (TYP.) 12 . 0 ' 15 . 0 ' 15 . 0 ' 12 . 0 ' 12 . 0 ' 6.3 ' 12.5' 114 20 9 26 14 13 14 20 13 101 R=10.0' R=55.0' 11 112 123 124 125 113 105 106 107 110 112 111 102 103 R=115.0' R=75.0' R=15.0' R=111.0' 104 108 109 18 17 105 R=1 0 0 . 0 ' R= 1 1 5 . 0 ' R= 1 0 . 0 ' 116 R= 7 5 . 0 ' R= 1 1 1 . 0 ' 113 R=35.0' 114 115 31 34116 117 119 118 120 121 122 123 124 125 127 126 R=100.0' R=100.0' R=100.0' R=100.0' 128 129 21 39 39 11 39 169 10 . 5 ' 12.0 (TYP.) 10 . 5 ' 13. 3 ' N TC 514+00 N TC 515+00 N TC 516+00 N TC 517+00 S TC 615+00 S TC 616+00 S TC 617+00 S TC 618+00 9.8' 15.5' 16 . 7 ' 12 . 0 ' 1 5 . 0 ' 12.5' 1 3 . 0 ' 9 . 8 ' 43 130 132 131 KEY NOTES: INSTALL HMA PAVEMENT PER TYPICAL SECTIONS ON SHEETS BT120-CRY101-CRY106 INSTALL CEMENT CONC PAVEMENT PER TYPICAL SECTIONS ON SHEETS BT120-CRY101-CRY106 INSTALL INTEGRAL DOWELED CURB PER KCM STD PLAN D109 INSTALL 9 IN INTEGRAL DOWELED CURB PER DETAIL ON SHEET BT120-CRD122 INSTALL CEMENT CONC SIDEWALK PER CITY OF RENTON STD PLAN 102 SEE SHEET BT120-CRD125 AND STRUCTURAL SHEETS FOR STEEL PICKET FENCE NON-REMOVABLE DETAILS INSTALL CEMENT ROLLED CURB PER DETAIL ON SHEET BT120-CRD121 INSTALL RETAINING WALL PER STRUCTURAL SHEETS INSTALL BUS PLATFORM PER DETAIL ON STRUCTURAL SHEET 9 11 13 14 20 21 26 17 18 LEGEND*: PAVING POINT SEE SHEETS BT120-GZN006-GZN007 FOR GENERAL SYMBOLS AND LEGEND LONGITUDINAL JOINT TRANSVERSE JOINT LANDSCAPING X * HARDSCAPE GENERAL NOTES: 1.SEE SHEET BT120-CPP100 FOR GENERAL PAVING NOTES. 2.SEE SHEET BT120-CPS101-CPS108 FOR PAVING POINT TABLES. 3.SEE SHEETS BT120-CRD101-CRD119 FOR CURB RAMP PLAN AND DETAILS AND ADDITIONAL PAVING POINTS. 4.SEE SHEETS BT120-CRD120-CRD129 FOR PAVING DETAILS. 5.SEE SHEETS BT120-GZK001 AND BT120-GZN001-GZN007 FOR GENERAL KEY PLAN, GENERAL ABBREVIATIONS, AND GENERAL SYMBOLS AND LEGEND. 6.SEE SHEETS BT120-LPP101-LPP106 AND BT120-LPP201-LPP205 FOR LANDSCAPE PLANTING PLAN. 7.SEE ARCHITECTURAL AND STRUCTURAL SHEETS FOR DETAILS. SEE WSDOT STD PLAN A-40.10 FOR INSTALLATION SHEET SEE SHEETS BT120-LHP101-LHP105, BT120-LHP201-LHP205 AND BT120-LHD101-LHD109 FOR HARDSCAPE PLAN AND DETAILS SEE SHEET BT120-CRD121 FOR CURB TRANSITION DETAILS SEE TYPICAL SECTIONS FOR SUBGRADE PREPARATION INSTALL FULL DEPTH RECTANGULAR PATCH TO MATCH EXISTING PAVEMENT THICKNESS 27 31 39 43 N N 20 40 SCALE IN FEET 01020 (1" = 20') No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 4 / 2 6 | 10 : 1 5 A M | LR E D M A N C: \ P W W O R K I N G \ J A C O B S _ B & I \ J E G _ E X - R E D M A N L \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C P P 2 0 1 - 2 0 5 . D W G S1-BT120-CPP201-205 FACILITY ID: Xrefs: xS1-BT120-CPP001 xS1-BT120-VRX001 xS1-BT120-CZN001 xBRT-CUD05-TB22x34 xS1-BT120-CAP001 xS1-BT120-CPP002 xS1-BTP120-VSF100 xS1-BT120-GZK020 xS1-BT120-GZK010 xS1-BT120-LHP001 xS1-BT120-CZN002 xS1-BT120-CRP001 1 BT120-CRD111 SOUTH DRIVEWAY NORTH DRIVEWAY CL BT120-C-N TC CL BT120-C-S TC 2 BT120-CRD112 MA T C H L I N E : SE E D W G BT 1 2 0 - C P P 2 0 1 MA T C H L I N E : SE E D W G BT 1 2 0 - C P P 1 0 6 MATCHLINE: SEE DWG BT120-CPP204 102 103 201 202 203 204 205 SW 7TH ST RAI N I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRADY WAY 101 104 105 KEY MAP LA K E AV E S 107 106 SEE SHEET BT120-CGP103 AND SHEET BT120-CGS102 FOR ADDITIONAL BUS PLATFORM PAVING POINTS. 8. SEE NOTE 8 SEE NOTE 9 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL PAVING PLAN S RENTON TRANSIT CENTER BT120-CPP202 BT120 089 L. REDMAN Y. SHEN L. GILBERT L. REDMAN 0 12/10/2024 LBR LDG LBR ISSUED FOR BID 1 06/13/2025 LBR DP LBR ADDENDUM #1 2 07/07/2025 YS MKR LBR ADDENDUM #3 A 03/20/2026 LBR MS LBR CNWD #004 RTA/LR RTA/CN 0205-24 1"=20' A A 04/14/2026 A DEVELOPMENT ENGINEERING msippo 04/22/2026 R-433289 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 PAVING POINT TABLE POINT NO. 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 ALIGNMENT BT120-C-RAINIER BT120-C-RAINIER BT120-C-RAINIER BT120-C-RAINIER BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-NTC BT120-C-NTC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-NTC BT120-C-NTC BT120-C-NTC STATION 206+53.70 206+52.65 206+52.33 206+50.35 612+56.79 612+56.80 612+75.46 612+75.45 511+84.81 511+94.74 512+04.80 512+14.74 512+20.74 512+30.70 512+40.79 512+50.75 613+20.79 613+20.79 613+96.60 613+96.53 511+89.78 512+45.76 612+92.10 612+95.10 612+92.10 612+95.10 510+83.86 514+07.99 514+13.69 OFFSET 53.00' RT 54.03' RT 50.00' RT 51.96' RT 31.54' RT 26.54' RT 26.56' RT 31.56' RT 23.45' LT 24.14' LT 25.34' LT 26.02' LT 26.13' LT 25.83' LT 25.01' LT 24.70' LT 16.00' RT 15.50' RT 17.27' RT 17.76' RT 23.67' LT 24.73' LT 37.59' RT 37.59' RT 34.59' RT 34.59' RT 56.97' LT 36.85' LT 48.64' LT ELEVATION 23.46 23.45 23.46 23.46 26.59 26.52 26.76 26.84 25.57 25.72 25.87 26.01 26.09 26.22 26.33 26.45 27.18 27.18 28.03 28.03 25.64 26.39 27.14 27.18 27.10 27.14 24.84 26.14 26.23 DESCRIPTION VALLEY GUTTER VALLEY GUTTER VALLEY GUTTER VALLEY GUTTER 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION PC-SW PRC-SW 1/2-SW PT-SW PC-SW 1/2-SW PRC-SW PT-SW 6" CONCRETE FOUNDATION 6" CONCRETE FOUNDATION 6" CONCRETE FOUNDATION 6" CONCRETE FOUNDATION 1/2-SW 1/2-SW 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION END SW/MATCH EX/BEGIN WALL CHAIN LINK FENCE POST AP/HMA PVMT/MATCH EX PAVING POINT TABLE POINT NO. 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 ALIGNMENT BT120-C-RAINIER BT120-C-NTC BT120-C-RAINIER BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-RAINIER BT120-C-RAINIER BT120-C-NTC BT120-C-NTC BT120-C-STC BT120-C-STC BT120-C-RAINIER BT120-C-NTC BT120-C-NTC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-NTC BT120-C-NTC BT120-C-RAINIER BT120-C-RAINIER BT120-C-STC BT120-C-NTC STATION 207+98.14 512+62.11 208+00.15 513+22.12 513+99.01 511+05.00 510+93.87 512+58.78 512+65.44 513+18.79 513+25.44 513+71.09 514+02.81 514+07.52 510+77.38 514+07.74 511+04.94 511+36.76 510+87.09 207+64.59 207+69.48 513+88.02 513+74.02 614+03.32 613+76.79 206+28.09 510+80.92 511+20.85 610+99.61 611+37.93 613+50.35 611+55.38 613+32.44 613+96.66 510+91.82 510+84.04 206+21.67 206+26.21 610+62.39 510+73.15 OFFSET 48.04' RT 15.06' LT 48.77' RT 18.94' LT 16.64' LT 39.10' LT 39.91' LT 15.00' LT 15.22' LT 18.78' LT 19.00' LT 18.64' LT 21.79' LT 35.33' LT 22.61' RT 35.84' LT 15.00' RT 15.00' RT 15.01' RT 53.00' RT 50.00' RT 16.58' RT 15.77' RT 15.00' LT 15.00' LT 48.49' RT 17.14' RT 15.02' RT 39.03' RT 46.59' RT 47.06' RT 39.50' RT 39.50' RT 16.77' RT 26.19' LT 57.59' LT 57.95' RT 56.22' RT 15.48' RT 24.96' LT ELEVATION 24.02 25.92 24.01 26.62 27.67 ??? 24.65 25.88 25.96 26.58 26.66 27.26 28.33 28.61 23.87 ??? 24.44 24.89 24.11 23.79 23.83 28.19 27.99 28.36 28.01 23.49 23.98 24.79 24.66 25.28 27.79 25.39 27.69 28.03 24.55 24.59 24.04 24.04 23.52 23.74 DESCRIPTION END C&G/END SW/MATCH EX 1/2 - FL END HMA PVMT/MATCH EX 1/2 - FL 1/2 - FL BEGIN FENCE (TOP OF WALL) PT/BEGIN HMA PVMT PC - FL PT - FL PC - FL PT - FL PC - FL PC - SW AP - SW PC - FL AP - FENCE (TOP OF WALL) PC - FL PT - FL PT - FL VALLEY GUTTER VALLEY GUTTER 1/2 - FL PC - FL 1/2 - FL PC - FL END HMA PVMT/BEGIN CEMENT CONCRETE PVMT 1/2 - FL 1/2 - FL SW 1/2 - T/C PT - T/C PT - T/C PC - T/C PC - T/C END SW/BEGIN HMA PVMT END SW/MATCH EX PT - SW 1/2 - SW FL - END C&G/BEGIN DOWELED CURB FL - END C&G/BEGIN DOWELED CURB No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 4 / 2 6 | 10 : 2 8 A M | LR E D M A N C: \ P W W O R K I N G \ J A C O B S _ B & I \ J E G _ E X - R E D M A N L \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C P S 1 0 1 - 1 0 8 . D W G S1-BT120-CPS101-108 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 S1-BT120-CPP201-205 S1-BT120-CPP101-106 xS1-BT120-CZN002 BT120-CPP201BT120-CPP201 25.21 29.18 23.79 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL PAVING PLAN POINT TABLES BT120-CPS104 BT120 096 L. REDMAN L. REDMAN D. POSTEN L. REDMAN 0 12/10/2024 LBR LDG LBR ISSUED FOR BID 1 06/13/2025 LBR DP LBR ADDENDUM #1 A 03/20/2026 LBR MS LBR CNWD #004 RTA/CN 0205-24 NTS A 04/14/2026 A DEVELOPMENT ENGINEERING msippo 04/22/2026 R-433296 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 PAVING POINT TABLE POINT NO. 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 ALIGNMENT BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC STATION 613+57.43 613+54.73 613+65.51 613+72.41 613+61.40 613+71.85 613+73.62 613+64.86 613+66.92 612+48.49 612+49.01 613+15.69 613+39.17 613+36.37 613+18.09 613+15.09 612+38.50 612+39.01 611+70.88 611+45.98 611+50.76 611+65.78 611+69.04 611+72.04 611+63.06 611+83.06 611+91.88 611+89.15 611+57.34 611+55.00 612+37.85 612+27.08 612+17.73 612+20.46 612+37.06 612+35.10 612+18.60 612+15.71 612+26.25 612+35.36 612+47.85 612+58.09 612+67.91 612+64.89 612+48.05 OFFSET 65.16' RT 167.35' RT 236.84' RT 235.68' RT 226.23' RT 230.38' RT 240.87' RT 230.68' RT 242.88' RT 80.50' RT 60.00' RT 60.00' RT 76.41' RT 80.50' RT 80.50' RT 77.42' RT 80.43' RT 60.00' RT 60.00' RT 82.53' RT 85.52' RT 80.50' RT 80.50' RT 77.58' RT 104.50' RT 104.50' RT 109.77' RT 114.19' RT 113.35' RT 108.57' RT 104.50' RT 104.50' RT 110.96' RT 115.02' RT 115.46' RT 189.43' RT 188.99' RT 193.03' RT 199.52' RT 198.45' RT 104.50' RT 104.50' RT 112.63' RT 116.19' RT 115.75' RT ELEVATION 27.89 27.40 27.35 27.24 27.41 27.28 27.21 27.38 27.32 26.66 26.54 27.42 27.39 27.37 27.32 27.31 26.51 26.39 25.23 24.82 24.96 25.25 25.33 25.37 26.12 26.62 26.94 26.96 26.15 26.00 27.75 27.59 27.60 27.74 28.00 29.69 29.08 29.08 29.61 29.92 27.84 27.97 28.26 28.30 28.09 DESCRIPTION PT - T/C END TRAFFIC CURB/BEGIN C&G 1/2 - SW 1/2 - SW END TRAFFIC CURB/BEGIN C&G PC - SW PT - SW PC - SW PT - SW BEGIN TRAFFIC CURB - T/C AP - T/C PC - T/C PRC - T/C PT - T/C PC - T/C PT - T/C BEGIN TRAFFIC CURB - T/C AP - T/C PC - T/C PT - T/C PRC -T/C PT - T/C PC - T/C PT - T/C PC - T/C PC - T/C PRC - T/C PT - T/C PT - T/C PRC - T/C AP - T/C PC - T/C PRC - T/C PT - T/C AP - T/C AP - T/C PC - T/C PRC - T/C PT - T/C AP - T/C AP - T/C PC - T/C PRC - T/C PT - T/C AP - T/C PAVING POINT TABLE POINT NO. 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 ALIGNMENT BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC STATION 612+46.34 612+63.33 612+66.25 612+66.20 612+57.36 612+45.40 613+02.11 613+22.11 613+32.11 613+29.03 612+95.05 612+92.13 613+10.55 613+27.55 613+30.47 613+30.42 613+21.58 613+01.51 612+92.34 612+94.83 613+10.31 613+03.39 613+23.56 613+34.30 613+35.51 613+33.50 613+17.22 613+14.63 612+98.45 612+94.61 612+46.66 612+59.01 612+68.14 612+66.61 612+50.74 612+36.57 612+40.21 612+23.92 612+20.19 612+19.31 612+27.74 611+83.35 611+94.09 611+94.61 611+92.60 OFFSET 180.72' RT 181.17' RT 184.25' RT 186.22' RT 195.89' RT 197.28' RT 104.50' RT 104.50' RT 114.76' RT 117.89' RT 116.99' RT 113.77' RT 173.42' RT 173.87' RT 176.95' RT 178.74' RT 188.41' RT 190.75' RT 186.80' RT 182.01' RT 182.42' RT 214.69' RT 212.34' RT 219.40' RT 223.45' RT 227.18' RT 232.06' RT 223.44' RT 228.29' RT 225.76' RT 221.30' RT 219.86' RT 223.76' RT 228.44' RT 233.20' RT 222.48' RT 236.36' RT 241.24' RT 239.22' RT 236.31' RT 223.50' RT 228.68' RT 235.74' RT 237.49' RT 241.23' RT ELEVATION 29.50 29.23 29.25 29.29 29.65 29.87 28.12 28.09 28.20 28.24 28.27 28.24 28.80 28.65 28.64 28.64 28.75 28.93 29.00 28.96 28.83 28.95 28.50 28.20 28.14 28.17 28.51 28.63 28.98 29.08 30.08 29.86 29.69 29.72 30.00 30.14 30.04 29.44 29.34 29.36 29.81 28.31 28.55 28.54 28.41 DESCRIPTION AP - T/C PC - T/C PT - T/C PC - T/C PT - T/C AP - T/C PC - T/C PC - T/C PRC - T/C PT - T/C PT - T/C PRC - T/C AP - T/C PC - T/C PT - T/C PC - T/C PT - T/C PC - T/C PRC - T/C PC - T/C AP - T/C PT - T/C PC - T/C PT - T/C PC - T/C PT - T/C AP - T/C AP - T/C PC - T/C PRC - T/C AP - T/C PC - T/C PRC - T/C PT - T/C AP - T/C AP - T/C AP - T/C PC - T/C PT - T/C PC - T/C PT - T/C PC - T/C PT - T/C PC - T/C PT - T/C PAVING POINT TABLE POINT NO. 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 ALIGNMENT BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-STC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC BT120-C-NTC STATION 514+07.56 514+25.18 514+02.03 614+29.85 614+06.69 617+89.89 617+86.30 617+95.91 617+85.97 617+19.32 616+82.79 616+49.57 617+46.79 614+04.57 616+62.30 616+68.64 616+87.31 616+68.64 616+87.31 515+06.76 515+17.42 515+26.90 515+37.43 515+43.43 515+54.90 515+62.53 515+73.88 515+12.09 515+68.19 514+21.33 514+21.03 514+13.50 OFFSET 21.30' LT 15.00' LT 15.77' RT 15.05' LT 32.88' RT 21.01' RT 26.24' RT 19.00' RT 31.50' RT 19.00' RT 19.00' RT 42.99' RT 28.33' RT 22.44' RT 25.63' RT 37.00' LT 37.00' LT 32.00' LT 32.00' LT 21.47' LT 22.04' LT 23.05' LT 23.62' LT 23.62' LT 22.98' LT 22.10' LT 21.45' LT 21.61' LT 21.62' LT 48.73' LT 36.50' LT 36.49' LT ELEVATION 28.40 28.06 28.36 29.34 28.13 26.98 27.32 27.48 26.78 27.99 28.46 29.01 27.46 27.65 28.76 29.86 29.62 29.91 29.67 29.75 29.85 29.92 29.97 29.97 29.94 29.89 29.80 29.80 29.84 26.23 26.21 26.16 DESCRIPTION PT - SW PT - FL PT - FL PT - FL PT - T/C 1/2 - FL T/C - END TRANSITION/BEGIN DOWELED CURB PT - T/C PC - FL/END ROLLED CURB/BEGIN TRANSITION PC - FL PT - FL PC - FL 1/2 - FL 1/2 - T/C 1/2 - FL 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION 8" CONCRETE FOUNDATION PC-SW PRC-SW 1/2-SW PT-SW PC-SW 1/2-SW PRC-SW PT-SW 1/2-SW 1/2-SW AP/HMA PVMT/MATCH EX AP/HMA PVMT/MATCH EX AP/HMA PVMT/MATCH EX No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 4 / 2 6 | 10 : 3 1 A M | LR E D M A N C: \ P W W O R K I N G \ J A C O B S _ B & I \ J E G _ E X - R E D M A N L \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - C P S 1 0 1 - 1 0 8 . D W G S1-BT120-CPS101-108 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 S1-BT120-CPP201-205 S1-BT120-CPP101-106 xS1-BT120-CZN002 BT120-CPP203 BT120-CPP203BT120-CPP202 STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 CIVIL PAVING PLAN POINT TABLES BT120-CPS105 BT120 097 L. REDMAN L. REDMAN L. GILBERT L. REDMAN 0 12/10/2024 LBR LDG LBR ISSUED FOR BID A 03/20/2026 LBR MS LBR CNWD #004 RTA/CN 0205-24 NTS A 04/14/2026 A DEVELOPMENT ENGINEERING msippo 04/22/2026 R-433297 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 DEBRISWW FO FO FO WM WM WV WV E E E E E E E E E E E E 2" DROP W W W W W S D S D S D S D SD X X X X X X X X X X X X X X X X X X X X X BLDG EQUIP 2 BLRD PM X X X X X X X X X / /////////////////// / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / // / / / / / / / / / / / / / / / / / / / / / / / //////// / / / / / / / / / //////// OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE BLDG SD SD SD E SS SS S S SS SS 6' 0 " 6' 3 " 6' 6 " 7'0 " 7' 2 " 7' 9 " ///////////////////////////////////////////// /// /// /// // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / // / ////////////////////////////////////////// ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// // / // / // / // / // / // / // / /////////////////////////////////////////////////////////////// ///////// /// /// /// // / // / // / / / / / / / / / / // / / / / ///////////////////////////////////////////// /// /// /// /// /// /// /// /// /// // / // / // / // / /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// // / /// // / // / // / // / // / // / // / // / // / /// // / // / // / // / // / /// /// /// /// 10 N TC 514+00 N TC 515+00 N TC 516+00 N TC 517+00 S TC 615+00 S TC 616+00 S TC 617+00 S TC 618+00 EX. PARCEL BOUNDARY (TYP) CL BT120-C-CENISLN LINE CL BT120-C-CENISLS LINE 10 ^ ^ ^ ^ ^ ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ 10 11 50 CONSTRUCTION NOTES: REMOVE MANHOLE, VAULT, OR CB PROTECT UTILITY IN PLACE REMOVE WATER METER 10 11 50 1.SEE SHEET BT120-UCP100 FOR GENERAL NOTES. 2.SEE ILLUMINATION PLAN FOR LIGHT POLE REMOVAL. GENERAL NOTES: N 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 UTILITIES DEMO PLAN S RENTON TRANSIT CENTER BT120-UCP202 BT120 206 1 M. ROUGH M. ROUGH M. STARLING M. ROUGH 0 12/10/2024 MR MS MR ISSUED FOR BID 1 06/13/2025 MR MS MR ADDENDUM#1 RTA/CN 0205-24 1"=20' N No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 3 / 2 6 | 12 : 0 3 P M | MR O U G H C: \ P W W O R K I N G \ J A C O B S _ B & I \ M A Y U M I . R O U G H @ H D R I N C . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - U C P 2 0 1 - 2 0 5 . D W G S1-BT120-UCP201-205 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 xS1-BT120-VSF100 xS1-BT120-UCN001 xS1-BT120-GZK020 GB-SEAL-MR46378 xS1-BT120-UCP001 xS1-BT120-VRX001 xS1-BT120-CAP001 xS1-BT120-CPP001 xS1-BT120-GZK010 xS1-BT120-CZN002 MA T C H L I N E : SE E D W G B T 1 2 0 - U C P 2 0 1 MATCHLINE: SEE DWG BT120-UCP204 MA T C H L I N E : SE E D W G B T 1 2 0 - U C P 1 0 6 103 201 202 203 204 205 SW 7TH ST RAI N I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRAD Y WAY 105 101 104 102 106 KEY MAP 107 SOUTH TRANSIT CENTER NORTH TRANSIT CENTER CNWD #004MRMRMS03/20/2026A A A 04/14/2026 B B DEVELOPMENT ENGINEERING msippo 04/22/2026 R-4332170 TE D - 4 0 - 4 3 3 2 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 SD SD SIGN VLT D R W CO W W W W W FO FO FO FO FO W W W W HH E E E E E C C CSD SD SD SD SD SD SD SD X X XXX X X X X X X X X X X X X X X X X X X CONC SD SD E E E E E E E E E E E E E S S S S S S EEEEEEEE G E E E E E E E E E E E E E E C C C C C C C C C C 1' 1 1 " D P 1' 7 " D P 2' 9 " D P 2' 1 " D P 1' 9 " D P 1' 6 " D P 2 ' 1 " D P 2 ' 3 " D P 4'6" DP 3'5" DP 3' 9 " D P 2 ' 2 " D P 2' 4 " D P 5' 8 " D P 8' 6 " D P 9 ' 1 1 " D P 1 0 ' D P 5 ' 1 0 " D P 1 0 ' D P 1' 8 " D P 2' D P 2' 6 " D P 2' 2 " D P 1' 9 " D P 1' D P 3' D P 3' D P 3 ' D P 2 ' 5 " D P 2 ' 6 " D P 1' D P 12 " W AB A N - W AB A N - W 2'5" D P 3'10" 4'1"4'9" 7 " 4'1" 3'11" 5 ' 9 " 2'1 " 1'1 1 " 1'9" 2'1 " 1'8 " 4'7" 3'11" 3'7" 3'1 1 " 1 0 " 1'9" 1'7" 5 " 2 ' 1 " 1' 1 1 " 9" 2'4" 4 ' 1 1 " 5' 1 1 " 6'8" 6'11 " 3'10 " 1'6" 4'1"4'2" 4'7" 5'9" 5'8" 4'8 " 5' 1 1 " SS SS SS SS SS SS SS SS SS SS SS S S 3'1 0 " 4'0" 4'3"4'6" 4'11"5'0" 5'5" 6'0" 6'3" 6'6" 7 ' 0 " 7 ' 2 " 1 ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ ^ ^ W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W S S S S S S SS 7 5 43 S TC 613+75.17, 18.53' R S TC 613+91.12, 3.83' R RA I N I E R A V E S S TC 612+87.67, 2.99' R 12" 11.25° V BEND, RJxRJ 37 7S TC 610+48.31, 2.71' R BEGIN PIPE CASING S TC 610+74.83, 2.98' R BEGIN PIPE CASING S TC 610+94.83, 3.00' R END PIPE CASING S TC 612+78.38, 3.00' R END PIPE CASING S TC 612+58.38, 3.00' R BEGIN PIPE CASING S TC 613+75.58, 3.01' R S TC 610+62.31, 2.96' R END PIPE CASING S TC 612+80.96, 3.02' R 12" 11.25° V BEND, RJxRJ 33 33 33 N TC 511+00 N TC 512+00 N TC 513+00 N TC 514+00 S TC 611+00 S TC 612+00 S TC 613+00 S TC 614+00 4140 40 40 41 414040 40 S TC 613+39.00, 2.99' R END PIPE CASING S TC 613+19.00, 2.99' R BEGIN PIPE CASING 33 53 53 32 N TC 514+16.28, 46.67' L 8" 90° BEND, RJxRJ CONSTRUCTION NOTES: 1 INSTALL WATER MAIN PER CITY OF RENTON STD. PLAN 300.0 INSTALL FIRE HYDRANT, 12"X6" TEE (FLXRJ), 6" GATE VALVE (FLXRJ), AND CONC BLOCK PER CITY OF RENTON STD. PLAN 310.1 INSTALL CAP AND THRUST BLOCK PER CITY OF RENTON STD. PLAN 330.1 INSTALL GATE VALVE (FLXRJ) INSTALL STEEL PIPE CASING PER CITY OF RENTON STD. PLAN 300.8 INSTALL 3/4" GROUND HYDRANT SET FLUSH IN FINISHED GROUND. SEE SHEET BT120-UWD101 FOR GROUND HYDRANT DETAIL. INSTALL 1" NON-POTABLE WATER PIPE AT A MINIMUM DEPTH OF 36" INSTALL 2" WATER SERVICE IN ROW BEHIND SIDEWALK WITH 2" WATER METER PER CITY OF RENTON STD. PLAN 320.3. SEE SHEET BT120-LRP101-205 FOR BACKFLOW PREVENTER. INSTALL FULL DEPTH RECTANGULAR PATCH TO MATCH EXISTING PAVEMENT THICKNESS 5 7 30 33 40 41 43 53 1.SEE SHEET BT120-UWP100 FOR GENERAL NOTES. 2.SEE SHEET BT120-LRP101-205 FOR LANDSCAPE IRRIGATION PLAN. 3.SEE SHEET BT120 MPP121-321 FOR MECHANICAL- PLUMBING. GENERAL NOTES: N 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 UTILITIES WATER PLANS S RENTON TRANSIT CENTER BT120-UWP201 BT120 216 1 M. ROUGH M. ROUGH M. STARLING M. ROUGH 0 12/10/2024 MR MS MR ISSUED FOR BID 1 06/13/2025 MR MS MR ADDENDUM#1 RTA/CN 0205-24 1"=20' N No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 3 / 2 6 | 12 : 0 3 P M | MR O U G H C: \ P W W O R K I N G \ J A C O B S _ B & I \ M A Y U M I . R O U G H @ H D R I N C . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - U W P 2 0 1 - 2 0 5 . D W G S1-BT120-UWP201-205 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 xS1-BT120-VSF100 xS1-BTP120-UCN001 xS1-BT120-GZK020 xS1-BT120-UWP001 xS1-BT120-CPP001 xS1-BT120-RPP001 xS1-BT120-VRX001 xS1-BT120-CAP001 xS1-BT120-USP001 xS1-BT120-CDP001 xS1-BT120-APP211 dS1-BT120-UCV001 GB-SEAL-MR46378 xS1-BT120-GZK010 xS1-BT120-CZN002 xS1-BT120-CZN003 12" DI WATER MAIN. SEE PROFILE 'A' ON SHEET BT120-UWV102 FOR WATER MAIN PROFILE MATCHLINE: SEE DWG BT120-UWP203 MA T C H L I N E : SE E D W G B T 1 2 0 - U W P 1 0 2 103 202 203 204 205 SW 7TH ST RAI N I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRAD Y WAY 105 101 104 102 201 SEE PROFILE 'D' ON BT120-UWV103 FOR HYDRANT PROFILE 2" SERVICE LINE FF=28.17 106 KEY MAP 107 MATCHLINE: NOT USED THIS SERIES SOUTH DRIVEWAY NORTH DRIVEWAY FOR PRIVATE GROUND HYDRANTS MA T C H L I N E : S E E D W G B T 1 2 0 - U W P 2 0 2 B CoR Permit Revision - CNWD #001MRMRMS10/24/2025A CNWD #004 B MRMRMS03/20/2026B B 04/14/2026 DEVELOPMENT ENGINEERING msippo 04/22/2026 W-433207 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 WT R - 2 7 - 4 3 3 2 C2 4 0 0 2 1 2 3 SD WW FO FO FO EE E E E E E E E E E E W W W W W S D S D S D S D SD X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE SD SD S D E 2'1 0 " 2'3 " 1' 10" 8"10" 5' 9 " 5'8 "4'8 " 5'1 1 " 3' 1 1 " 4'1 " S S SS S S SS SS 6' 0 " 6' 3 " 6' 6 " 7'0 " 7' 2 " 7' 9 " ^ ^ ^ ^ ^ ^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS 1 S TC 614+12.33, 8.30' R 12" 45° BEND, RJxRJ S TC 612+87.67, 2.99' R 12" 11.25° V BEND, RJxRJ S TC 617+94.47, 7.00' R 12" 22.5° V BEND, RJxRJ S TC 617+86.64, 7.00' R 12" 22.5° V BEND, RJxRJ 37 S TC 614+26.55, 7.05' R 12"x8" TEE, FLxFL 33 N TC 513+99.69, 11.50' R END PIPE CASING S TC 614+26.48, 10.50' L BEGIN PIPE CASING S TC 617+96.16, 7.00' R BEGIN PIPE CASING S TC 613+75.58, 3.01' R 33 N TC 514+00 N TC 515+00 N TC 516+00 N TC 517+00 S TC 615+00 S TC 616+00 S TC 617+00 S TC 618+00 32 32 30 40 41 40 40 N TC 514+15.76, 25.33' L BEGIN PIPE CASING N TC 514+16.15, 41.33' L END PIPE CASING33 N TC 514+15.39, 10.09' L 8" 45° BEND, RJxRJ 32 N TC 513+99.25, 6.83' R 8" 45° BEND, RJxRJ 30 N TC 514+19.86, 46.71' L CONNECT TO EXISTING MAIN 53 53 32 N TC 514+16.28, 46.67' L 8" 90° BEND, RJxRJ 1 INSTALL WATER MAIN PER CITY OF RENTON STD. PLAN 300.0 ADJUST METER OR VALVE TO GRADE INSTALL GATE VALVE (FLXRJ) INSTALL CONCRETE BLOCKING FOR HORIZONTAL FITTINGS PER CITY OF RENTON STD. PLAN 330.1 INSTALL STEEL PIPE CASING PER CITY OF RENTON STD. PLAN 300.8 INSTALL CONCRETE BLOCKING FOR VERTICAL FITTINGS WITH RESTRAINED JOINTS PER CITY OF RENTON STD. PLAN 330.3 INSTALL 3/4" GROUND HYDRANT SET FLUSH IN FINISHED GROUND. SEE SHEET BT120-UWD101 FOR GROUND HYDRANT DETAIL. INSTALL 1" NON-POTABLE WATER PIPE AT A MINIMUM DEPTH OF 36" INSTALL FULL DEPTH RECTANGULAR PATCH TO MATCH EXISTING PAVEMENT THICKNESS 13 CONSTRUCTION NOTES: 30 32 33 37 40 41 53 1.SEE SHEET BT120-UWP100 FOR GENERAL NOTES. 2.SEE SHEET BT120-LRP101-205 FOR LANDSCAPE IRRIGATION PLAN. 3.SEE SHEET BT120 MPP121-321 FOR MECHANICAL- PLUMBING. GENERAL NOTES: N 20 40 SCALE IN FEET 01020 (1" = 20') STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 UTILITIES WATER PLANS S RENTON TRANSIT CENTER BT120-UWP202 BT120 217 1 M. ROUGH M. ROUGH M. STARLING M. ROUGH 0 12/10/2024 MR MS MR ISSUED FOR BID 1 06/13/2025 MR MS MR ADDENDUM#1 RTA/CN 0205-24 1"=20' N No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 3 / 2 6 | 12 : 0 4 P M | MR O U G H C: \ P W W O R K I N G \ J A C O B S _ B & I \ M A Y U M I . R O U G H @ H D R I N C . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - U W P 2 0 1 - 2 0 5 . D W G S1-BT120-UWP201-205 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 xS1-BT120-VSF100 xS1-BTP120-UCN001 xS1-BT120-GZK020 xS1-BT120-UWP001 xS1-BT120-CPP001 xS1-BT120-RPP001 xS1-BT120-VRX001 xS1-BT120-CAP001 xS1-BT120-USP001 xS1-BT120-CDP001 xS1-BT120-APP211 dS1-BT120-UCV001 GB-SEAL-MR46378 xS1-BT120-GZK010 xS1-BT120-CZN002 xS1-BT120-CZN003 MA T C H L I N E : SE E D W G B T 1 2 0 - U W P 2 0 1 MATCHLINE: SEE DWG BT120-UWP204 MA T C H L I N E : SE E D W G B T 1 2 0 - U W P 1 0 6 WATER MAIN TO BE REMOVED. SEE SHEET BT120-UCP204 12 IN. DI WATER SEE PROFILE 'B' ON SHEET BT120-UWV102 FOR WATER MAIN PROFILE 103 201 203 204 205 SW 7TH ST RAI N I E R AVE S HA R D I E AV E S W SR - 1 6 7 SW GRAD Y WAY 105 101 104 102 202 106 KEY MAP 107 SOUTH DRIVEWAY NORTH DRIVEWAY 8" DI WATER MAIN. SEE PROFILE 'A' ON SHEET BT120-UWV105 FOR WATER MAIN PROFILE 2-12" 1-8" INSTALL ETHAFOAM PAD BETWEEN WATER AND SD PIPES B CoR Permit Revision - CNWD #001MRMRMS10/24/2025A CNWD #004B03/20/2026 MSMR MR 15' UTILITIES EASEMENT EASEMENT 1-8" B B 04/14/2026 EXISTING WATER MAIN TO BE CUT AND INSTALLATION OF 8" GATE VALVE TO BE INSTALLED FIRST TO PROVIDE WATER MAIN SHUT OFF, AND TO ALLOW INSTALLATION OF CASING AND NEW WATER MAIN. DEVELOPMENT ENGINEERING msippo 04/22/2026 W-433208 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 WT R - 2 7 - 4 3 3 2 1.VERIFY DEPTHS AND HORIZONTAL LOCATIONS OF ALL UTILITIES. 2.WATER MAINS ARE ASSUMED TO HAVE 4' OF COVER FOR 12" PIPE AND 3' OF COVER FOR 8" PIPE UNLESS OTHERWISE SHOWN ON THE PLANS. 3.ALL EXISTING UTILITY LOCATIONS SHOWN IN PLAN AND PROFILE ARE QUALITY LEVEL D PER ASCE 38-02 STANDARD GUIDELINE FOR THE COLLECTION AND DEPICTION OF EXISTING UTILITY SUBSURFACE DATA. BASE MAP WILL BE UPDATED WHEN SUBSURFACE UTILITY ENGINEERING IS COMPLETED. 4.PROVIDE 10' HORIZONTAL SEPARATION FROM PARALLEL STORM LINES OR SEWER LINES PER DEPARTMENT OF ECOLOGY STATE OF WASHINGTON, CRITERIA FOR SEWAGE WORKS DESIGN (ORANGE BOOK). WATER AND SEWER OR STORM DRAIN SHALL HAVE 18" MINIMUM VERTICAL SEPARATION. 5.WATER LINES SHALL BE PROTECTED FOR SEWER LINES OR STORM LINES PASSING OVER WATER LINES. SEE SPECIAL REQUIREMENTS PER DEPARTMENT OF ECOLOGY STATE OF WASHINGTON, CRITERIA FOR SEWAGE WORKS DESIGN (ORANGE BOOK) C1-9.1.4.B. 6.ALL NEW DUCTILE-IRON WATER MAINS SHALL BE RESTRAINED-JOINT PIPES. GASKETS FOR PUSH-ON JOINT PIPE WITH INTEGRALLY MOLDED STEEL OR METAL TEETH ARE NOT ALLOWED AS SUBSTITUTES FOR RESTRAINED-JOINT PIPES. 7.ALL FITTINGS AND VALVES WITH MECHANICAL ENDS SHALL HAVE A WEDGE-TYPE RESTRAINED RETAINER GLAND (E.G" MEGALUG SERIES 1100, ROMAC ROMAGRIP, OR APPROVED EQUAL) IN ADDITION TO CONCRETE THRUST BLOCKS. GENERAL NOTES: 5 10 15 20 25 30 35 5 10 15 20 25 30 35 27 . 1 GR A D Y 1 5 5 + 4 4 . 4 8 , 1 2 . 0 5 ' L 12 " x 8 " T E E , F L x F L IE 2 1 . 9 1 GR A D Y 1 5 5 + 4 4 . 4 8 , 9 . 4 1 ' L T 8" 4 5 ° B E N D , R J x R J W/ V E R T I C A L R O T A T I O N IE 2 1 . 9 1 GR A D Y 1 5 5 + 4 7 . 2 4 , 6 . 6 4 ' L T 8" 4 5 ° B E N D , R J x R J W/ V E R T I C A L R O T A T I O N IE 2 0 . 2 2 GR A D Y 1 5 5 + 4 7 . 1 6 , 4 . 6 4 ' L T 8" S L E E V E , R J 2 LF 8" DI 3 LF 8" DI EXIST GRADE 2 LF 8" DI EX 8" WATER 5 10 15 20 25 30 35 40 5 10 15 20 25 30 35 40 EXIST GRADE FINISH GRADE 45 LF CASING IN AREAS OF FILL, NEW ROADWAY SUBGRADE SHALL BE FILLED AND COMPACTED BEFORE EXCAVATION FOR INSTALLATION OF NEW WATER MAIN (TYP) 26 . 3 8 26 . 4 0+00 26 . 3 0 26 . 3 26 . 1 1 26 . 1 26 . 0 5 26 . 0 26 . 3 3 26 . 3 1+00 26 . 1 6 26 . 2 26 . 2 5 26 . 3 1+50 23 LF 8" DI 66 LF 8" DI EX 8" WATER S T C 6 1 4 + 2 6 . 5 5 , 7 . 0 5 ' R T 12 " X 8 " T E E , F L x F L IE 2 3 . 1 1 N T C 5 1 3 + 9 9 . 2 5 , 6 . 8 3 ' R T 8" 4 5 ° B E N D , R J x R J IE 2 2 . 3 1 N T C 5 1 4 + 1 5 . 3 9 , 1 0 . 0 9 ' L T 8" 4 5 ° B E N D , R J x R J IE 2 1 . 8 1 STEEL PICKET FENCE PL N T C 5 1 4 + 1 5 . 7 6 , 2 5 . 3 3 ' L T 16 LF CASING RETAINING WALL S T C 6 1 4 + 2 6 . 4 8 , 1 0 . 5 0 ' L T N T C 5 1 3 + 9 9 . 6 9 , 1 1 . 5 0 ' R T CONTRACTOR SHALL REFERENCE AND REPLACE HMA AND BASE COURSE WITHIN LIMITS OF EXCAVATION THICKNESS N T C 5 1 4 + 1 6 . 1 5 , 4 1 . 3 3 ' L T 36 LF 8" DI N T C 5 1 4 + 1 9 . 8 6 , 4 6 . 7 1 ' L T 3 LF 8" DI N T C 5 1 4 + 1 6 . 2 8 , 4 6 . 6 7 ' L T 8" 9 0 ° B E N D , R J x R J STRIDE BUS RAPID TRANSIT SOUTH RENTON TRANSIT CENTER BT105 R. PARGAS 12/10/2024 J. ALTCHECH 12/10/2024 12/10/2024 UTILITIES WATER PROFILE S RENTON TRANSIT CENTER BT120-UWV105 BT120 225 1 M. ROUGH M. ROUGH M. STARLING M. ROUGH 0 12/10/2024 MR MS MR ISSUED FOR BID 1 06/13/2025 MR MS MR ADDENDUM#1 RTA/CN 0205-24 1"=20' No.DATE DSN CHK APP REVISION SUBMITTED BY:DATE:REVIEWED BY:DATE:DATE: CONTRACT No.: FILENAME: SCALE:DRAWING No.: SHEET No.:REV: LI N E I S 1 " A T FU L L S C A L E DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: 04 / 1 3 / 2 6 | 12 : 0 4 P M | MR O U G H C: \ P W W O R K I N G \ J A C O B S _ B & I \ M A Y U M I . R O U G H @ H D R I N C . C O M \ D 0 4 3 6 1 2 0 \ S 1 - B T 1 2 0 - U W V 1 0 1 - 1 0 5 . D W G S1-BT120-UWV101-105 FACILITY ID: Xrefs: xBRT-CUD05-TB22x34 dS1-BT120-UCV001 GB-SEAL-MR46378 20 40 SCALE IN FEET 01020 (1" = 20') SCALE IN FEET 02.5 55 10 (1" = 5') (HOR.) (VERT.) 8" WATER MAIN ALONG NTC SCALE: H 1:20, V 1:5 A BT120-UWP202 8" WATER MAIN AT GRADY SCALE: H 1:20, V 1:5 B BT120-UWP104 B CoR Permit Revision - CNWD #001MRMRMS10/24/2025A CNWD #004MRMRMS03/20/2026B B B 04/14/2026 DEVELOPMENT ENGINEERING msippo 04/22/2026 W-433216 C2 4 0 0 2 1 2 3 LU A 2 4 - 0 0 0 2 3 3 PR 2 1 - 0 0 0 0 9 5 WT R - 2 7 - 4 3 3 2