HomeMy WebLinkAboutC_Hazardous_Materials_Management_Statement_260401_v1Date: March 25th, 2026
To: City of Renton, Department of Community and Economic Development
From: Amani Imran
Re: Hazardous Materials Management Statement for the Imran Subdivision
APPLICANT
Amani Imran
212 Chelan Ave NE
Renton, WA 98059
Amani.ewig@gmail.com
206-391-1871
SITE ADDRESS
4612 NE 1st Street, Renton, WA 98059
HAZARDOUS MATERIALS MANAGEMENT STATEMENT
To Whom It May Concern,
|, the undersigned property owner of Parcel No.152305-9115,understand that the City has
requested a Hazard Materials Management Statement. This letter addresses that requirement
but may need to be updated by the contractor once one has been chosen for the project.
1.Fueling of Construction Vehicles and Storage of Hazardous Materials: It is anticipated
that Track hoes, back hoes, dozers, vibratory rollers and loaders may all be present on site at
some point during construction. It is not anticipated that Construction vehicles will need to be
refueled while on site. Gas-powered hand-held construction equipment such as chain saws and
cut-off saws may require refueling during the construction process. If emergency refueling of
larger equipment is needed, it may be accomplished using portable fuel tanks carried in the
pickup bed of the construction foreman’s truck or by the contractor’s service truck. Care will be
taken at all time during refueling to ensure that no fuel is spilled. In an emergency, fuel spill
containment kits will be available to limit any unintended fuel spills and the Department of
Ecology will be contacted in case of a spill. Gas -powered hand-held construction equipment will
be refueled using portable gas containers meeting current DOE standards. Said gas containers
will typically be stored in the bed of the construction foreman’s truck or within an approved
location within a construction equipment shed. It is not anticipated that any other Hazardous
materials, with the possible exception of painting supplies during home construction, will be
stored on site during construction.
2.Construction Debris: All construction debris from the demolition of the existing house and
any created during construction will be removed from the site and disposed of in an approved
method at an appropriate disposal site.
Sincerely,
Amani Imran
Applicant