Loading...
HomeMy WebLinkAboutCM_Construction_Mitigation_Description_260422_v2 Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 110 South Oakes Ave. #250, Cle Elum, WA 98922 Phone: (425) 392-0250 Phone: (509) 674-7433 www.EncompassES.net Date: November 20th, 2025, updated April 19th, 2026 To: City of Renton, Department of Community and Economic Development From: Encompass Engineering & Surveying on behalf of Trumark Homes Washington, LLC Re: Construction Mitigation Description for the Lincoln Peak Short Plat _____________________________________________________________________________________ APPLICANT TRUMARK HOMES WASHINGTON, LLC ATTN: GEOFF SHERWIN PO BOX 100 SUMNER, WA 98390 gsherwin@trumarkco.com 253-312-5780 SITE ADDRESS 3601 Lincoln Avenue NE, Renton, WA 98056 CONSTRUCTION MITIGATION DESCRIPTION a. The proposed approximate construction start date is anticipated to begin late spring Spring 2026 with an approximate timeline of six (6) months. b. Hours of construction operation will be Monday through Friday, between 7:AM and 5:PM. c. The proposed hauling and transportation route is north on Lincoln Avenue NE which turns into 110th Avenue SE and then NE 44th Street which connects to I-405 north and south. d. Water trucks, street sweepers and any other requirements deemed necessary will be implemented to minimize construction impacts. e. There are no anticipated weekend, late night or holiday work hours proposed for the construction or hauling at this time. f. Flag persons will be employed and signs will be installed for traffic control, when necessary. WSDOT Standard Traffic Control Plan is attached. Methods will be adapted to the proposed construction and route.