HomeMy WebLinkAboutChange Order - 9Public Works Facilities Division CONTRACT NO:CAG-25-016 CO NO. 9 CONTRACT CHANGE ORDER (CO)PROJECT TITLE:Renton Market and Piazza Renovations TO: Schuchart Corparation (CONTRACTOR) Description Amount CRP #012 - Add'l Trenching for Grease Drain - 107 35,756.52$ WSST 10.5% for 2026 3,754.43$ -$ -$ -$ -$ CONTRACT SUM: 39,510.95$ (WASHINGTON STATE SALES TAX INCLUDED) CONTRACT TIME: 0 CALENDAR DAYS CONTRACT SUMMARY (Internal Use Only) ORIGINAL CONTRACT SUM 6,424,546.00$ PREVIOUS ADDITIONS/DELETIONS 258,050.02$ PREVIOUS TOTAL 6,682,596.02$ CHANGE AMOUNT THIS CHANGE ORDER 39,510.95$ REVISED CONTRACT TOTAL 6,722,106.97$ PERCENT TOTAL CHANGE FROM ORIGINAL 4.63% NOTICE TO PROCEED DATE July 29, 2025 PREVIOUS CONTRACT CALENDAR DAYS 250 PREVIOUS SUBSTANTIAL COMPLETION DATE April 5, 2026 REVISED CONTRACT CALENDAR DAYS THIS CHANGE ORDER 250 CURRENT SUBSTANTIAL COMPLETION DATE April 5, 2026 GBA Acknowledgement Date Contractor Acknowledgement Date AUTHORIZING SIGNATURE DATE The following mutually agreed to and Owner approved Change Order Proposal(s) are hereby incorporated by reference into the contract. The foregoing amount covers everything required in connection with the change. All other provisions of the contract remain in full force and effect. The City of Renton hereby accepts the foregoing Change Order Proposal(s). This formal acceptance constitutes a Change to the contract only when authorizing signature is affixed. Invoices incorporating this Change Order constitute acceptance by the Contractor as total reimbursement due in connection with this Change Order. OF: OF: NO CHANGE INCREASE DECREASE NO CHANGE INCREASE DECREASE 3/19/2026 William G Wheaton Digitally signed by William G Wheaton DN: C=US, E=will@grahambaba.com, O=Graham Baba Architects, CN=William G Wheaton Location: Seattle Reason: I have reviewed this document Contact Info: 5098556961 Date: 2026.03.19 09:01:16-07'00'Ross Liston Digitally signed by Ross Liston DN: C=US, E=ross.liston@schuchart.com, O=Schuchart Corporation, OU=Sr. Project Manager, CN=Ross Liston Date: 2026.03.19 13:40:06-07'00' ! "        #  CAG-25-016, CO #9-26                                   !            "    #  !         "        $  %  #  "   %  ##    %    &%  %        '( "        "    #   %'( "    #    )*+,- .-/0-12 +034-.5 -16.78279+5 .9:-625 ;+*3- *+< *<<.-11=     ( >>  " &    ' # 01293-.5 <<7279+*? .-+6)7+, @9. !.-*1- .*7+ *2  ##  % &"  %" %   90,) 9.<-. 9@ 3*,+720<-5 -6-7A-< <*2-5 043722-< <*2-5 -/0-12-< <*B1 <-?*B5 043722-< *390+25 0- <*2-5 043722-< <*2-5     ! .7,7+*279+ <*2-5 2*2015 !"#   $%  % &' ()     $* !"#   $%  % &' ()         $* .7+2 *2-5     ' # +   ,) #  - -#  $-*   (³FII“ϙ! "                $  ./  00  11      )*+,- .-/0-12 +034-.5 -16.78279+5 .9:-625 ;+*3- *+< *<<.-11=     ( >>  " &    ' # 01293-.5 <<7279+*? .-+6)7+, @9. !.-*1- .*7+ *2  ##  % &"  %" %   '23* $* (- B5 9+2.*629.5  %" %   01293-.5     .7+2 *2-5     ' # *2-5 *2-5 B5 02)9.7C-< -8.-1-+2*27A-5 10/24/2025 ! "       ͻͳͻ   ǡͻͺͳ͸Ͷ ʹͲ͸Ǥ͸ͺʹǤ͵Ͳ͵Ͳ  ʹͲ͸Ǥ͸ͺʹǤ͸͸ʹ͹  ȗͳʹͳ Quantity Unit Rate 1hour 225.00$ 225.00$ 0hour 225.00$ -$ -$ -$ Total:225.00$ Quantity Unit Rate 8hour 146.68$ 1,173.44$ 4hour 108.88$ 435.52$ 4hour 133.71$ 534.84$ -$ Sub Total 2,143.80$ Small Tools @ 5%107.19$ Safety @ 2%42.88$ Total:2,293.87$ Quantity Unit Price Amount 15 ton 50.00$ 750.00$ 2ton 40.00$ 80.00$ -$ -$ -$ -$ -$ -$ -$ -$ Total: 830.00$ Quantity Unit Rate Amount 4hour 116.95$ 467.80$ 4hour 19.53$ 78.12$ 4hour 65.63$ 262.52$ 4hour 170.01$ 680.04$ 4hour 50.00$ 200.00$ Total: 1,688.48$ EQUIPMENT / TOOLS Description of Equipment/Tools - CAT 308 Excavator 8cyd Gravel Skiff Kenworth T800 Dump Truck Compactor - Plate Cat 299 Skid Steer Loader Operation Manager - Schedule equipment & crew, procure materials and transportation/trucking MATERIALS Description of Material - Truck Driver - Dump Truck 1-1/4" minus CSBC CRAFT LABOR Description of Labor - Operating Engineer - Excavator & Skidsteer Laborer - Pipe Underground 1-1/4" Ballast Client/Customer:City of Renton Work Authorized by: Site Location:233 Burnett AVE S Prepared By:Darren Hamlin, Rock On Earth Works P.M. Renton, WA 98057 Reference #:COR 07.1 Additional Fill at Lobby DESCRIPTION OF WORK PERFORMED Rock On was requested to provide additional ballast fill material at the Lobby and additional backfill material for the new 4" SS pipe located below the existing concrete slab. The area is 10' x 20' x 14" deep = 8.7 cyds = 15 tons ballast and the trench backfill is 10' x 2' x 1' deep = 1.4 tons trench backfill. The additional work would be performed with an CAT 308 excavator, Cat 299 Skid Steer Loader and a 8 cyd Gravel Skiff. MANAGEMENT Description of Labor - Project Manager - Estimating, project management, quality control, contract conformance & billing SUBCONTRACTOR CHANGE REQUEST Project: Renton Market & Piazza Date:10/17/2025 ! "       ͻͳͻ   ǡͻͺͳ͸Ͷ ʹͲ͸Ǥ͸ͺʹǤ͵Ͳ͵Ͳ  ʹͲ͸Ǥ͸ͺʹǤ͸͸ʹ͹  ȗͳʹͳ -$ -$ -$ -$ Total: -$ 225.00$ 2,293.87$ 830.00$ 1,688.48$ 5,037.35$ 604.48$ -$ 302.24$ 5,944.07$ -$ -$ -$ -$ 5,944.07$ CHANGE REQUEST TOTAL Self Perform FEE (4%) SUMMARY Management Materials Overhead < $50k (4%) Overhead > $50K (2%) SUBTOTAL Subcontractors Craft Labor Self Perform FEE (6%) Overhead > $50K (4%) Overhead < $50k (12%) SUBTOTAL Equipment SUBCONTRACTOR / SUPPLIER ! "       Change Order Request COR 07.1 Title: Project Name: Contract #:31-000-0000 10/17/2025 25042 Description: 1. ROCK ON DIRECT CRAFT LABOR COST (from attached cost breakdown form)2,332.70$ a.1,257.88$ b.-$ c.225.00$ DIRECT LABOR SUBTOTAL 1,482.88$ d. e.223.90$ f. Labor taxes 625.92$ 2. ROCK ON MATERIAL COST (from attached cost breakdown form)830.00$ 3. ROCK ON EQUIPMENT COST (from attached cost breakdown form)1,688.48$ 4. ROCK ON SMALL TOOLS (NTE 5% of 1a & 1b)62.89$ ROCK ON SUBTOTAL 1 thru 4 4,914.00$ 5. ROCK ON OVERHEAD & PROFIT ON ROCK ON WORK 737.11$ a.349.91$ b.387.21$ 6. SUB-TIER SUBCONTRACTORS -$ a.-$ b. -$ c.-$ d.-$ e.-$ 7. ROCK ON OVERHEAD & PROFIT ON SUB-TIER SUBCONTRACTORS -$ a.-$ b.-$ 8. ROCK ON INSURANCE - DIRECT COST 166.36$ a. 2.65 % of 1 61.82$ b. 1.85 % of 1-7 104.55$ 9. ROCK ON B&O - DIRECT COST 0.69 % of 1-8 40.14$ TOTAL AMOUNT (w/o WSST) 5,857.61$ CALENDAR DAYS added to CONTRACT .5 Volume Driven Liability Insurance foreman project manager / project engineer NTE 15% portion of 2, 3, & 4 NTE 15% portion of 1 direct supervision (NTE 15% of 1a) Labor adjustment 17.80% 49.76% Source Documents: Sub-Contractor: NTE 15% of Line 6 up to $25,000 for each sub NTE 10% of Line 6 in excess of $25,000 for each sub Payroll Driven Liability Insurance Rock On was requested to provide additional ballast fill material at the Lobby and additional backfill material for the new 4" SS pipe located below the existing concrete slab. The area is 10' x 20' x 14" deep = 8.7 cyds = 15 tons ballast and the trench backfill is 10' x 2' x 1' deep = 1.4 tons trench backfill. The additional work would be performed with an CAT 308 excavator, Cat 299 Skid Steer Loader and a 8 cyd Gravel Skiff. Supervision markup should be zero if any foreman time is included in direct labor costs. Labor Markups Date: Job #: A2.00 crew (apprentices, journeymen, & laborers) Rock On Earth Works, Inc. Renton Marketplace & Piazza Additional Fill at Lobby COR 07.1 - Additional Fill at Lobby Page __1____ of _3____Printed 10/17/2025 ! "       Project Name:07.1 Contract No: 31-000-0000 10/17/2025 Sub-Contractor: Unit Labor Material Equipment Total Quantity Type Unit $ Cost Unit $ Cost Unit $ Cost Cost 4 hour $85.24 340.96$ -$ -$ 340.96$ 0 hour $84.67 -$ -$ -$ -$ 4 hour $84.67 338.68$ -$ -$ 338.68$ 4 hour $64.76 259.04$ -$ -$ 259.04$ 4 hour $79.80 319.20$ -$ -$ 319.20$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 4 hour -$ -$ $116.95 467.82$ 467.82$ 0 hour -$ -$ 136.14$ -$ -$ 4 hour -$ -$ $170.01 680.02$ 680.02$ 4 hour -$ -$ $65.63 262.53$ 262.53$ 4 hour -$ -$ $50.00 200.00$ 200.00$ 4 hour -$ -$ $19.53 78.11$ 78.11$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 15 TON -$ $50.00 750.00$ -$ 750.00$ -$ -$ -$ -$ 2TON -$ $40.00 80.00$ -$ 80.00$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 1,257.88$ 830.00$ 1,688.48$ 3,776.36$ 0 hour $96.96 -$ -$ 0 hour $96.96 -$ -$ 1 hour $225.00 225.00$ 225.00$ 0 hour $225.00 -$ -$ 1,482.88$ 830.00$ 1,688.48$ 4,001.36$ Change Order Request Cost Breakdown Rock On Earth Works, Inc.Contract Ref. No. Date: CORRenton Marketplace & Piazza 25042 Description Operating Engineer - Excavator Operating Engineer - Excavator w/ breaker 1-1/4" Ballast Operating Engineer - SkidSteer Loader Laborer - Pipe Underground Truck Driver Excavator w/ bucket, blade & thumb Excavator w/ breaker solo Dump Truck - 14 TCY/19TONS Skid Steer Compactor - Plate OPERATIONS MANAGER Total Cost of Work Foreman Foreman PROJECT MANAGER 8CYD Gravel Skiff Subtotal CSBC - 1-1/2" minus COR 07.1 - Additional Fill at Lobby Page ___2____ of ___3____Printed 10/17/2025 ! "       Ch a n g e O r d e r R e q u e s t E q u i p m e n t R a t e s Pr o j e c t N a m e : CO R 0 7 . 1 Co n t r a c t # : 3 1 - 0 0 0 - 0 0 0 0 Su b - C o n t r a c t o r : 0. 9 8 2 AB C D E F G H I J Mo d e l # o r P o w e r M o d e B l u e B o o k B l u e B o o k H o u r l y R a t e H o u r l y To t a l Eq u i p m e n t D e s c r i p t i o n & S p e c i f i c a t i o n s M a n u f a c t u r e r A x l e C o n f i g , S i z e , Y e a r ( D i e s e l , G a s o l i n e , M o n t h l y R a t e M o n t h l y R a t e = ( F + G ) / 1 76 O p e r a t i n g Ho u r l y R a t e (i n c l . A t t a c h m e n t D e s c r i p t i o n , i f a p p l i c a b l e ) C a p a c i t y , e t c . H y d r a u l i c , e t c . ) f o r E q u i p m e n t f o r A t t a c h m e n t x R e g i o n a l A d j . C o s t = H + I Ex c a v a t o r w / b u c k e t , b l a d e & t h u m b C A T 3 0 8 e 2 0 2 4 D i e s e l 1 0 , 5 0 0 . 0 0 $ 1 , 5 0 0 . 0 0 $ 6 6 . 9 5 $ 5 0 . 0 0 $ 11 6 . 9 5 $ Sk i d S t e e r C A T 2 5 9 2 0 2 3 D i e s e l 4 , 5 0 0 . 0 0 $ 9 9 0 . 0 0 $ 3 0 . 6 3 $ 3 5 . 0 0 $ 65 . 6 3 $ Tr u c k & 2 a x l e t r a i l e r F o r d F 3 5 0 2 0 1 9 D i e s e l 6 , 5 0 0 . 0 0 $ 1 , 1 5 0 . 0 0 $ 4 2 . 6 8 $ 5 0 . 0 0 $ 92 . 6 8 $ so l o D u m p T r u c k - 1 4 T C Y / 1 9 T O N S K e n w o r t h T 8 0 0 2 0 0 5 D i e s e l 9 , 5 0 0 . 0 0 $ - $ 5 3 . 0 1 $ 1 1 7 . 0 0 $ 17 0 . 0 1 $ Tr u c k & T r a i l e r - 2 4 T C Y / 3 0 T O N S K e n w o r t h T 8 0 0 2 0 0 7 D i e s e l 9 , 5 0 0 . 0 0 $ 2 , 5 0 0 . 0 0 $ 6 6 . 9 5 $ 1 2 6 . 0 0 $ 19 2 . 9 5 $ Pi p e T r u c k w / t o o l s & s u p p l i e s F o r d F 3 5 0 2 0 1 9 D i e s e l 6 , 5 0 0 . 0 0 $ 3 6 . 2 7 $ 5 0 . 0 0 $ 86 . 2 7 $ Ba c k h o e - 4 w h e e l d r i v e C A T 4 2 0 2 0 1 1 D i e s e l 7 , 5 0 0 . 0 0 $ 4 1 . 8 5 $ 5 0 . 0 0 $ 91 . 8 5 $ Ex c a v a t o r w / b r e a k e r C A T 3 0 8 2 0 2 4 D i e s e l 1 0 , 5 0 0 . 0 0 $ 2 , 2 5 0 . 0 0 $ 7 1 . 1 4 $ 6 5 . 0 0 $ 13 6 . 1 4 $ 8C Y D G r a v e l S k i f f C A T 8 Y S 2 0 1 8 3 , 5 0 0 . 0 0 $ 1 9 . 5 3 $ - $ 19 . 5 3 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Fo r m R e v i s e d 1 2 / 1 / 2 0 0 9 Ro c k O n E a r t h W o r k s , I n c . Th e R e g i o n a l A d j u s t m e n t u s e d i n t h i s f o r m = Re n t o n M a r k e t p l a c e & P i a z z a CO R 0 7 . 1 - A d d i t i o n a l F i l l a t L o b b y Pa g e 3 of 3 Pr i n t e d 1 0 / 1 7 / 2 0 2 5   !       "                                     Page 1/1 POWERED BY Our Information Customer Information Performance Contracting Group 16220 Redmond - Woodinville Road Northeast Woodinville, WA 98072 Phone: (425)-806-8404 Project Address:233 Burnett Avenue South Renton, WA 98057 CHANGE ORDER REQUEST PAS-003 Title: Additional ~50LF of Concrete Cutting Project Name: Renton Market Piazza COR Date: 10/01/2025 Performance Contracting Group Job Number: 25-09586 Customer Job Number: Customer Reference Number: Description of Change Order Request Additional costs to remove ~50LF of 18" wide concrete cutting as coordinated between job walk and email conversations. This COR is for recoup of direct costs only Other Description Qty of Other Unit of Measure Rate Total Cost ~50LF of Concrete Cutting 1.00 LS $3,500.00 $3,500.00 Total Other: $3,500.00 Subtotal $3,500.00 Total $3,500.00 Markup 12.000% $420.00 Requested Total $3,920.00 Terms & Conditions Performance Abatement Services / PCI Democon hereinafter designated as PAS / PCI Democon, proposed to furnish all materials and labor required for the application of the following (hereinafter designated as "the work"). This proposal is subject to change and may be withdrawn if not accepted within 30 days of the above date: it is subject to all terms and conditions outlined. Issuance of a change order/notice to proceed is required prior to PAS / PCI Democon proceeding with this work. ! "        'DOODV+DWILHOG )URP'DOODV+DWILHOG 6HQW:HGQHVGD\2FWREHU$0 7R :HOOLQJWRQ$UDQWHV &F5RVV/LVWRQ5RGQH\%R\G.HYLQ%DNNHQ:LOO1HOVRQ$DURQ7RPDUDV 6XEMHFW5(5HQWRQ0DUNHW5HTXHVWWRSURYLGHSULFLQJIRUDGGLWLRQDOWUHQFKLQJ EDFNILOOIRU JUHDVHGUDLQ Wellington, Reviewed with Aaron this morning after his walk - we can include the additional scope for an additional $3,500. This is just reimbursing us for the cost, no markup. Hope that helps. Thanks, Dallas Hatfield | Estimator/Project Manager | Seattle PAS/PCI Mobile 425-999-0010 | Dallas.Hatfield@pcg.com 16220 Redmond-Woodinville Rd NE, Woodinville, WA 98072 7RKHOSSURWHFW\RXUSULY DF\0LFURVRIW2IILFHSUHYHQWHGDXWRPDWLFGRZQORDGRIWKLVSLFWXUHIURPWKH,QWHUQHW &ƌŽŵ͗tĞůůŝŶŐƚŽŶƌĂŶƚĞƐфtĞůůŝŶŐƚŽŶ͘ƌĂŶƚĞƐΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϯϬ͕ϮϬϮϱϯ͗ϭϵWD dŽ͗ĂůůĂƐ,ĂƚĨŝĞůĚфĂůůĂƐ͘,ĂƚĨŝĞůĚΛƉĐŐ͘ĐŽŵх Đ͗ZŽƐƐ>ŝƐƚŽŶфZŽƐƐ͘>ŝƐƚŽŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖ZŽĚŶĞLJŽLJĚфZŽĚŶĞLJ͘ŽLJĚΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖<ĞǀŝŶĂŬŬĞŶ ф<ĞǀŝŶ͘ĂŬŬĞŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖tŝůůEĞůƐŽŶфtŝůů͘EĞůƐŽŶΛƉĐŐ͘ĐŽŵх͖ĂƌŽŶdŽŵĂƌĂƐфĂƌŽŶ͘dŽŵĂƌĂƐΛƉĐŐ͘ĐŽŵх ^ƵďũĞĐƚ͗Z͗ZĞŶƚŽŶDĂƌŬĞƚͲZĞƋƵĞƐƚƚŽƉƌŽǀŝĚĞƉƌŝĐŝŶŐĨŽƌĂĚĚŝƚŝŽŶĂůƚƌĞŶĐŚŝŶŐΘďĂĐŬĨŝůůĨŽƌŐƌĞĂƐĞĚƌĂŝŶ Hi Dallas, Thanks for the reply. In speaking with Ross today, we are going to release you on the first additional request. I will generate the sub-mod for this additional work tomorrow morning. Knowing this information, any way we can get this work scheduled for this week by any chance? Obviously, with the signed sub-mod in hand first. I completely understand about the added scope. We will communicate this with the client tomorrow and make them aware of the unexpected additional work. Thanks for your patience and colleboration with us. :HOOLQJWRQ$UDQWHV 3URMHFW(QJLQHHU,, 0RELOH_0DLQ_)D[ ! "        :HOOLQJWRQ$UDQWHV#VFKXFKDUWFRP ZZZVFKXFKDUWFRP BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 6FKXFKDUWƔWK$YHQXHƔ6HDWWOHƔ:$Ɣ 7KHLQIRUPDWLRQWUDQVPLWWHGLQFOXGLQJDWWDFKPHQWVLVLQWHQGHGRQO\IRUWKHSHUVRQ V RU HQWLW\WRZKLFKLWLVDGGUHVVHGDQGPD\FRQWDLQFRQILGHQWLDODQGRUSULYLOHJHGPDWHULDO $Q\ UHYLHZUHWUDQVPLVVLRQ GLVVHPLQDWLRQ RU RWKHUXVH RI RU WDNLQJRIDQ\DFWLRQLQ UHOLDQFHXSRQWKLVLQIRUPDWLRQE\SHUVRQVRUHQWLWLHVRWKHUWKDQWKHLQWHQGHGUHFLSLHQWLV SURKLELWHG,I\RXUHFHLYHGWKLVLQHUURUSOHDVHFRQWDFWWKHVHQGHUDQGGHVWUR\DQ\FRSLHV RIWKLVLQIRUPDWLRQ &ƌŽŵ͗ĂůůĂƐ,ĂƚĨŝĞůĚфĂůůĂƐ͘,ĂƚĨŝĞůĚΛƉĐŐ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϯϬ͕ϮϬϮϱϭ͗ϰϭWD dŽ͗tĞůůŝŶŐƚŽŶƌĂŶƚĞƐфtĞůůŝŶŐƚŽŶ͘ƌĂŶƚĞƐΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх Đ͗ZŽƐƐ>ŝƐƚŽŶфZŽƐƐ͘>ŝƐƚŽŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖ZŽĚŶĞLJŽLJĚфZŽĚŶĞLJ͘ŽLJĚΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖<ĞǀŝŶĂŬŬĞŶ ф<ĞǀŝŶ͘ĂŬŬĞŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖tŝůůEĞůƐŽŶфtŝůů͘EĞůƐŽŶΛƉĐŐ͘ĐŽŵх͖ĂƌŽŶdŽŵĂƌĂƐфĂƌŽŶ͘dŽŵĂƌĂƐΛƉĐŐ͘ĐŽŵх ^ƵďũĞĐƚ͗Z͗ZĞŶƚŽŶDĂƌŬĞƚͲZĞƋƵĞƐƚƚŽƉƌŽǀŝĚĞƉƌŝĐŝŶŐĨŽƌĂĚĚŝƚŝŽŶĂůƚƌĞŶĐŚŝŶŐΘďĂĐŬĨŝůůĨŽƌŐƌĞĂƐĞĚƌĂŝŶ Hey Wellington, Aaron is going to come out and walk tomorrow morning to review this scope. We’ll review the past pricing and this pricing but at first glance I can almost guarantee a net add to overall pricing with this much added cutting. I don’t think it will be much and we can help out a bit and own some more cost so a rough ROM would be 13-14k for now. Will see how we need to adjust that ROM after Aaron’s review tomorrow. Did you receive funds and confirmation for the $9,298 portion of work yet or is this tied to it and waiting as well? Thanks, Dallas Hatfield | Estimator/Project Manager | Seattle PAS/PCI Mobile 425-999-0010 | Dallas.Hatfield@pcg.com 16220 Redmond-Woodinville Rd NE, Woodinville, WA 98072 7RKHOSSURWHFW\RXUSULY DF\0LFURVRIW2IILFHSUHYHQWHGDXWRPDWLFGRZQORDGRIWKLVSLFWXUHIURPWKH,QWHUQHW &ƌŽŵ͗tĞůůŝŶŐƚŽŶƌĂŶƚĞƐфtĞůůŝŶŐƚŽŶ͘ƌĂŶƚĞƐΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϯϬ͕ϮϬϮϱϭ͗ϮϯWD dŽ͗ĂůůĂƐ,ĂƚĨŝĞůĚфĂůůĂƐ͘,ĂƚĨŝĞůĚΛƉĐŐ͘ĐŽŵх Đ͗ZŽƐƐ>ŝƐƚŽŶфZŽƐƐ͘>ŝƐƚŽŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖ZŽĚŶĞLJŽLJĚфZŽĚŶĞLJ͘ŽLJĚΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖<ĞǀŝŶĂŬŬĞŶ ф<ĞǀŝŶ͘ĂŬŬĞŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх ^ƵďũĞĐƚ͗ZĞŶƚŽŶDĂƌŬĞƚͲZĞƋƵĞƐƚƚŽƉƌŽǀŝĚĞƉƌŝĐŝŶŐĨŽƌĂĚĚŝƚŝŽŶĂůƚƌĞŶĐŚŝŶŐΘďĂĐŬĨŝůůĨŽƌŐƌĞĂƐĞĚƌĂŝŶ Hi Dallas, ! "        I wanted to thank you for taking the time to chat with me about the additional request for trenching and backfilling for the grease drain. As we discussed over the phone, we are looking to add this new area to the previously priced additional concrete work that was discussed with Kevin and priced and we would like to get both done at the same time (ASAP). However, I did express my concern about the cost that we will need to present to the client. I am looking to you to see if we can work on a potentially better number from your team to cover both scopes. Your assistance with this would be greatly appreciated. Could you please let me know who will be onsite tomorrow and at what time? To recap, the approximate addition is 18” wide by 53’-0” in length as shown in the area below. Thank you again for your help, and I look forward to hearing back from you soon. ! "        Thanks, :HOOLQJWRQ$UDQWHV 3URMHFW(QJLQHHU,, 0RELOH_0DLQ_ )D[ :HOOLQJWRQ$UDQWHV#VFKXFKDUWFRP ! "        ZZZVFKXFKDUWFRP BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 6FKXFKDUWƔWK$YHQXHƔ6HDWWOH Ɣ:$ Ɣ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ͻͳͻ   ǡͻͺͳ͸Ͷ ʹͲ͸Ǥ͸ͺʹǤ͵Ͳ͵Ͳ  ʹͲ͸Ǥ͸ͺʹǤ͸͸ʹ͹  ȗͳʹͳ YƵĂŶƚŝƚLJ hŶŝƚ ZĂƚĞ ͲΨ ͲΨ ͲΨ ͲΨ dŽƚĂů͗ ͲΨ YƵĂŶƚŝƚLJ hŶŝƚ ZĂƚĞ ϯϲ ,ŽƵƌƐ ϭϬϭ͘ϲϲΨϯ͕ϲϱϵ͘ϳϲΨ ϳϮ ,ŽƵƌƐ ϵϬ͘ϳϯΨϲ͕ϱϯϮ͘ϱϲΨ ͲΨ ͲΨ ^ƵďdŽƚĂů ϭϬ͕ϭϵϮ͘ϯϮΨ ^ŵĂůůdŽŽůƐΛϱй ϱϬϵ͘ϲϮΨ ^ĂĨĞƚLJΛϮй ϮϬϯ͘ϴϱΨ dŽƚĂů͗ϭϬ͕ϵϬϱ͘ϳϴΨ YƵĂŶƚŝƚLJ hŶŝƚ WƌŝĐĞ ŵŽƵŶƚ ͲΨ ͲΨ ͲΨ ͲΨ dŽƚĂů͗ ͲΨ YƵĂŶƚŝƚLJ hŶŝƚ ZĂƚĞ ŵŽƵŶƚ ϭ͘ϱ tĞĞŬƐ ϭϱϬ͘ϬϬΨ ϮϮϱ͘ϬϬΨ ϭĂLJƐ ϯϬϬ͘ϬϬΨ ϯϬϬ͘ϬϬΨ ϭ͘ϱ tĞĞŬƐ ϭ͕ϲϬϬ͘ϬϬΨ Ϯ͕ϰϬϬ͘ϬϬΨ ϭ͘ϱ tĞĞŬƐ ϱϴϱ͘ϬϬΨ ϴϳϳ͘ϱϬΨ ϭ͘ϱ tĞĞŬƐ ϮϴϬ͘ϬϬΨ ϰϮϬ͘ϬϬΨ Yh/WDEdͬdKK>^ ĞƐĐƌŝƉƚŝŽŶŽĨƋƵŝƉŵĞŶƚͬdŽŽůƐͲ ŽŶĐƌĞƚĞ^Ŭŝůů^Ăǁ ŽƌĞƌŝůůǁͬϯΗŝƚ ͲŝŶŐŽϭϬϬϬ ϮLJĚdŝƉŝŶ ^ůƵƌƌLJsĂĐƵƵŵ DdZ/>^ ĞƐĐƌŝƉƚŝŽŶŽĨDĂƚĞƌŝĂůͲ Z&d>KZ ĞƐĐƌŝƉƚŝŽŶŽĨ>ĂďŽƌͲ >ĂďŽƌĞƌ&ŽƌĞŵĂŶ >ĂďŽƌĞƌ:ŽƵƌŶĞLJŵĂŶ ůŝĞŶƚͬƵƐƚŽŵĞƌ͗ŝƚLJŽĨZĞŶƚŽŶ tŽƌŬƵƚŚŽƌŝnjĞĚďLJ͗tĞůůŝŶŐƚŽŶƌĂŶƚĞƐ ^ŝƚĞ>ŽĐĂƚŝŽŶ͗ϮϯϯƵƌŶĞƚƚs^WƌĞƉĂƌĞĚLJ͗tŝůůEĞůƐŽŶ ZĞŶƚŽŶ͕tϵϴϬϱϳ ZĞĨĞƌĞŶĐĞη͗ ^Z/Wd/KEK&tKZ<WZ&KZD Additional costs to demo ~60LF of 18" wide concrete mechanical trenching, existing lobby RAF system, and perform core drilling at exterior wall. DE'DEd ĞƐĐƌŝƉƚŝŽŶŽĨ>ĂďŽƌͲ ^hKEdZdKZ,E'ZYh^d WƌŽũĞĐƚ͗ZĞŶƚŽŶDĂƌŬĞƚΘWŝĂnjnjĂ ĂƚĞ͗ϭϬͬϭϱͬϮϬϮϱ ! "       ͻͳͻ   ǡͻͺͳ͸Ͷ ʹͲ͸Ǥ͸ͺʹǤ͵Ͳ͵Ͳ  ʹͲ͸Ǥ͸ͺʹǤ͸͸ʹ͹  ȗͳʹͳ dŽƚĂů͗ ϰ͕ϮϮϮ͘ϱϬΨ ͲΨ dŽƚĂů͗ ͲΨ ͲΨ ϭϬ͕ϵϬϱ͘ϳϴΨ ͲΨ ϰ͕ϮϮϮ͘ϱϬΨ ϭϱ͕ϭϮϴ͘ϮϴΨ ϭ͕ϴϭϱ͘ϯϵΨ ͲΨ ϵϬϳ͘ϳϬΨ ϭϳ͕ϴϱϭ͘ϯϳΨ ͲΨ ͲΨ ͲΨ ͲΨ ϭϳ͕ϴϱϭ͘ϯϳΨ,E'ZYh^ddKd> ^ĞůĨWĞƌĨŽƌŵ&;ϰйͿ ^hDDZz DĂŶĂŐĞŵĞŶƚ DĂƚĞƌŝĂůƐ KǀĞƌŚĞĂĚфΨϱϬŬ;ϰйͿ KǀĞƌŚĞĂĚхΨϱϬ<;ϮйͿ ^hdKd> ^ƵďĐŽŶƚƌĂĐƚŽƌƐ ƌĂĨƚ>ĂďŽƌ ^ĞůĨWĞƌĨŽƌŵ&;ϲйͿ KǀĞƌŚĞĂĚхΨϱϬ<;ϰйͿ KǀĞƌŚĞĂĚфΨϱϬŬ;ϭϮйͿ ^hdKd> ƋƵŝƉŵĞŶƚ ^hKEdZdKZͬ^hWW>/Z ! "       Page 1/1 POWERED BY Our Information Customer Information Performance Contracting Group 16220 Redmond - Woodinville Road Northeast Woodinville, WA 98072 Phone: (425)-806-8404 Project Address:233 Burnett Avenue South Renton, WA 98057 CHANGE ORDER REQUEST PAS-003 Title: Additional ~50LF of Concrete Cutting Project Name: Renton Market Piazza COR Date: 10/01/2025 Performance Contracting Group Job Number: 25-09586 Customer Job Number: Customer Reference Number: Description of Change Order Request Additional costs to remove ~50LF of 18" wide concrete cutting as coordinated between job walk and email conversations. This COR is for recoup of direct costs only Other Description Qty of Other Unit of Measure Rate Total Cost ~50LF of Concrete Cutting 1.00 LS $3,500.00 $3,500.00 Total Other: $3,500.00 Subtotal $3,500.00 Total $3,500.00 Markup 12.000% $420.00 Requested Total $3,920.00 Terms & Conditions Performance Abatement Services / PCI Democon hereinafter designated as PAS / PCI Democon, proposed to furnish all materials and labor required for the application of the following (hereinafter designated as "the work"). This proposal is subject to change and may be withdrawn if not accepted within 30 days of the above date: it is subject to all terms and conditions outlined. Issuance of a change order/notice to proceed is required prior to PAS / PCI Democon proceeding with this work. ! "        'DOODV+DWILHOG )URP'DOODV+DWILHOG 6HQW:HGQHVGD\2FWREHU$0 7R :HOOLQJWRQ$UDQWHV &F5RVV/LVWRQ5RGQH\%R\G.HYLQ%DNNHQ:LOO1HOVRQ$DURQ7RPDUDV 6XEMHFW5(5HQWRQ0DUNHW5HTXHVWWRSURYLGHSULFLQJIRUDGGLWLRQDOWUHQFKLQJ EDFNILOOIRU JUHDVHGUDLQ Wellington, Reviewed with Aaron this morning after his walk - we can include the additional scope for an additional $3,500. This is just reimbursing us for the cost, no markup. Hope that helps. Thanks, Dallas Hatfield | Estimator/Project Manager | Seattle PAS/PCI Mobile 425-999-0010 | Dallas.Hatfield@pcg.com 16220 Redmond-Woodinville Rd NE, Woodinville, WA 98072 7RKHOSSURWHFW\RXUSULY DF\0LFURVRIW2IILFHSUHYHQWHGDXWRPDWLFGRZQORDGRIWKLVSLFWXUHIURPWKH,QWHUQHW &ƌŽŵ͗tĞůůŝŶŐƚŽŶƌĂŶƚĞƐфtĞůůŝŶŐƚŽŶ͘ƌĂŶƚĞƐΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϯϬ͕ϮϬϮϱϯ͗ϭϵWD dŽ͗ĂůůĂƐ,ĂƚĨŝĞůĚфĂůůĂƐ͘,ĂƚĨŝĞůĚΛƉĐŐ͘ĐŽŵх Đ͗ZŽƐƐ>ŝƐƚŽŶфZŽƐƐ͘>ŝƐƚŽŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖ZŽĚŶĞLJŽLJĚфZŽĚŶĞLJ͘ŽLJĚΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖<ĞǀŝŶĂŬŬĞŶ ф<ĞǀŝŶ͘ĂŬŬĞŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖tŝůůEĞůƐŽŶфtŝůů͘EĞůƐŽŶΛƉĐŐ͘ĐŽŵх͖ĂƌŽŶdŽŵĂƌĂƐфĂƌŽŶ͘dŽŵĂƌĂƐΛƉĐŐ͘ĐŽŵх ^ƵďũĞĐƚ͗Z͗ZĞŶƚŽŶDĂƌŬĞƚͲZĞƋƵĞƐƚƚŽƉƌŽǀŝĚĞƉƌŝĐŝŶŐĨŽƌĂĚĚŝƚŝŽŶĂůƚƌĞŶĐŚŝŶŐΘďĂĐŬĨŝůůĨŽƌŐƌĞĂƐĞĚƌĂŝŶ Hi Dallas, Thanks for the reply. In speaking with Ross today, we are going to release you on the first additional request. I will generate the sub-mod for this additional work tomorrow morning. Knowing this information, any way we can get this work scheduled for this week by any chance? Obviously, with the signed sub-mod in hand first. I completely understand about the added scope. We will communicate this with the client tomorrow and make them aware of the unexpected additional work. Thanks for your patience and colleboration with us. :HOOLQJWRQ$UDQWHV 3URMHFW(QJLQHHU,, 0RELOH_0DLQ_)D[ ! "        :HOOLQJWRQ$UDQWHV#VFKXFKDUWFRP ZZZVFKXFKDUWFRP BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 6FKXFKDUWƔWK$YHQXHƔ6HDWWOHƔ:$Ɣ 7KHLQIRUPDWLRQWUDQVPLWWHGLQFOXGLQJDWWDFKPHQWVLVLQWHQGHGRQO\IRUWKHSHUVRQ V RU HQWLW\WRZKLFKLWLVDGGUHVVHGDQGPD\FRQWDLQFRQILGHQWLDODQGRUSULYLOHJHGPDWHULDO $Q\ UHYLHZUHWUDQVPLVVLRQ GLVVHPLQDWLRQ RU RWKHUXVH RI RU WDNLQJRIDQ\DFWLRQLQ UHOLDQFHXSRQWKLVLQIRUPDWLRQE\SHUVRQVRUHQWLWLHVRWKHUWKDQWKHLQWHQGHGUHFLSLHQWLV SURKLELWHG,I\RXUHFHLYHGWKLVLQHUURUSOHDVHFRQWDFWWKHVHQGHUDQGGHVWUR\DQ\FRSLHV RIWKLVLQIRUPDWLRQ &ƌŽŵ͗ĂůůĂƐ,ĂƚĨŝĞůĚфĂůůĂƐ͘,ĂƚĨŝĞůĚΛƉĐŐ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϯϬ͕ϮϬϮϱϭ͗ϰϭWD dŽ͗tĞůůŝŶŐƚŽŶƌĂŶƚĞƐфtĞůůŝŶŐƚŽŶ͘ƌĂŶƚĞƐΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх Đ͗ZŽƐƐ>ŝƐƚŽŶфZŽƐƐ͘>ŝƐƚŽŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖ZŽĚŶĞLJŽLJĚфZŽĚŶĞLJ͘ŽLJĚΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖<ĞǀŝŶĂŬŬĞŶ ф<ĞǀŝŶ͘ĂŬŬĞŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖tŝůůEĞůƐŽŶфtŝůů͘EĞůƐŽŶΛƉĐŐ͘ĐŽŵх͖ĂƌŽŶdŽŵĂƌĂƐфĂƌŽŶ͘dŽŵĂƌĂƐΛƉĐŐ͘ĐŽŵх ^ƵďũĞĐƚ͗Z͗ZĞŶƚŽŶDĂƌŬĞƚͲZĞƋƵĞƐƚƚŽƉƌŽǀŝĚĞƉƌŝĐŝŶŐĨŽƌĂĚĚŝƚŝŽŶĂůƚƌĞŶĐŚŝŶŐΘďĂĐŬĨŝůůĨŽƌŐƌĞĂƐĞĚƌĂŝŶ Hey Wellington, Aaron is going to come out and walk tomorrow morning to review this scope. We’ll review the past pricing and this pricing but at first glance I can almost guarantee a net add to overall pricing with this much added cutting. I don’t think it will be much and we can help out a bit and own some more cost so a rough ROM would be 13-14k for now. Will see how we need to adjust that ROM after Aaron’s review tomorrow. Did you receive funds and confirmation for the $9,298 portion of work yet or is this tied to it and waiting as well? Thanks, Dallas Hatfield | Estimator/Project Manager | Seattle PAS/PCI Mobile 425-999-0010 | Dallas.Hatfield@pcg.com 16220 Redmond-Woodinville Rd NE, Woodinville, WA 98072 7RKHOSSURWHFW\RXUSULY DF\0LFURVRIW2IILFHSUHYHQWHGDXWRPDWLFGRZQORDGRIWKLVSLFWXUHIURPWKH,QWHUQHW &ƌŽŵ͗tĞůůŝŶŐƚŽŶƌĂŶƚĞƐфtĞůůŝŶŐƚŽŶ͘ƌĂŶƚĞƐΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх ^ĞŶƚ͗dƵĞƐĚĂLJ͕^ĞƉƚĞŵďĞƌϯϬ͕ϮϬϮϱϭ͗ϮϯWD dŽ͗ĂůůĂƐ,ĂƚĨŝĞůĚфĂůůĂƐ͘,ĂƚĨŝĞůĚΛƉĐŐ͘ĐŽŵх Đ͗ZŽƐƐ>ŝƐƚŽŶфZŽƐƐ͘>ŝƐƚŽŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖ZŽĚŶĞLJŽLJĚфZŽĚŶĞLJ͘ŽLJĚΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх͖<ĞǀŝŶĂŬŬĞŶ ф<ĞǀŝŶ͘ĂŬŬĞŶΛƐĐŚƵĐŚĂƌƚ͘ĐŽŵх ^ƵďũĞĐƚ͗ZĞŶƚŽŶDĂƌŬĞƚͲZĞƋƵĞƐƚƚŽƉƌŽǀŝĚĞƉƌŝĐŝŶŐĨŽƌĂĚĚŝƚŝŽŶĂůƚƌĞŶĐŚŝŶŐΘďĂĐŬĨŝůůĨŽƌŐƌĞĂƐĞĚƌĂŝŶ Hi Dallas, ! "        I wanted to thank you for taking the time to chat with me about the additional request for trenching and backfilling for the grease drain. As we discussed over the phone, we are looking to add this new area to the previously priced additional concrete work that was discussed with Kevin and priced and we would like to get both done at the same time (ASAP). However, I did express my concern about the cost that we will need to present to the client. I am looking to you to see if we can work on a potentially better number from your team to cover both scopes. Your assistance with this would be greatly appreciated. Could you please let me know who will be onsite tomorrow and at what time? To recap, the approximate addition is 18” wide by 53’-0” in length as shown in the area below. Thank you again for your help, and I look forward to hearing back from you soon. ! "        Thanks, :HOOLQJWRQ$UDQWHV 3URMHFW(QJLQHHU,, 0RELOH_0DLQ_ )D[ :HOOLQJWRQ$UDQWHV#VFKXFKDUWFRP ! "        ZZZVFKXFKDUWFRP BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 6FKXFKDUWƔWK$YHQXHƔ6HDWWOH Ɣ:$ Ɣ 7KHLQIRUPDWLRQWUDQVPLWWHGLQFOXGLQJDWWDFKPHQWVLVLQWHQGHGRQO\IRUWKHSHUVRQ V RU HQWLW\WRZKLFKLWLVDGGUHVVHGDQGPD\FRQWDLQFRQILGHQWLDODQGRUSULYLOHJHGPDWHULDO $Q\ UHYLHZUHWUDQVPLVVLRQ GLVVHPLQDWLRQ RU RWKHUXVH RI RU WDNLQJRIDQ\DFWLRQLQ UHOLDQFHXSRQWKLVLQIRUPDWLRQE\SHUVRQVRUHQWLWLHVRWKHUWKDQWKHLQWHQGHGUHFLSLHQWLV SURKLELWHG,I\RXUHFHLYHGWKLVLQHUURUSOHDVHFRQWDFWWKHVHQGHUDQGGHVWUR\DQ\FRSLHV RIWKLVLQIRUPDWLRQ ! "         !       "                                       !       "                                       !       "                                       !       "                                     Saw cut concrete and remove. Demo elevated floor SaSSSSSw cut concrete and rerrmooveve. ! "       919 FIFTH AVENUE SEATTLE, WA 98164 P 206.682.3030 F 206.682.6627 CC SCHUCC*121NC Quantity Unit Rate 0-$ -$ -$ -$ -$ Total: -$ Quantity Unit Rate 0-$ -$ -$ -$ -$ Sub Total -$ Small Tools @ 5% -$ Safety @ 2% -$ Total: -$ Quantity Unit Price Amount 0-$ -$ -$ -$ -$ -$ Total: -$ Quantity Unit Rate Amount 0-$ -$ -$ -$ -$ Total: -$ EQUIPMENT / TOOLS Description of Equipment/Tools - MATERIALS Description of Material - CRAFT LABOR Description of Labor - Client/Customer:City of Renton Work Authorized by: Site Location:233 Burnett AVE S Prepared By:RICK LEA Renton, WA 98057 Reference #:CO #1 DESCRIPTION OF WORK PERFORMED PLUMBING INFILL DRILL AND EPOXY MANAGEMENT Description of Labor - SUBCONTRACTOR CHANGE REQUEST Project: Renton Market & Piazza Date:10 22 2025 ! "       919 FIFTH AVENUE SEATTLE, WA 98164 P 206.682.3030 F 206.682.6627 CC SCHUCC*121NC 3,518.52$ Total:3,518.52$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 3,518.52$ 140.74$ -$ 140.74$ 3,800.00$ CHANGE REQUEST TOTAL Self Perform FEE (4%) SUMMARY Management Materials Overhead < $50k (4%) Overhead > $50K (2%) SUBTOTAL Subcontractors Craft Labor Self Perform FEE (6%) Overhead > $50K (4%) Overhead < $50k (12%) SUBTOTAL Equipment PLUMBING INFILL DRILL AND EPOXY SUBCONTRACTOR / SUPPLIER ! "