HomeMy WebLinkAbout042726 Admin Report - REVISED
DATE: April 23, 2026
TO: Ruth Pérez, Council President
Members of the Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• Does your posh pet like to strike a pose? Enjoy an afternoon of glamour, fun, and celebration
for pets and the people who love them by attending the Pet Gala, Saturday, May 2 at the Renton
Community Center from 11 a.m.-1 p.m. The event includes photo opportunities, contests, pet
tags, microchipping, treats, and more. Come early because the first 100 guests will receive a
sWAG bag curated by Poochie & Purrada. For more information and to register visit
rentonwa.gov/register.
• The City of Renton is preparing the 2027–2028 biennial budget, which guides the services we
provide, and community input is essential. Our community-wide budget survey opened
April 21 and is available through May 13 and can be accessed at rentonwa.gov/budgetsurvey.
Some residents may have already received an email or text from our research partner,
ReconMR, to participate in the survey and we appreciate the feedback we have received. The
survey is available in English, Spanish, Chinese (simplified), Vietnamese, Tagalog, and Russian.
• Information about preventative street maintenance, traffic impact projects, and road closures
happening this week can be found at http://rentonwa.gov/traffic. All projects are weather
permitting and unless otherwise noted, streets will always remain open.
Monday, April 27 through Friday, May 1, 7:00am-4:00pm. Road closure on SE 5th St
from Maple Valley Highway to east of SE 6th St for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed
to Casey Grant, 206-532-4380.
Monday, April 27 through Friday, May 1, 7:00am-4:00pm. Road closure on SE 6th St at
the intersection of SE 5th St for construction work. Approved traffic control plans were
issued for all work and will be followed. Questions may be directed to Casey Grant,
206-532-4380.
Thursday, April 30, 7:00am-4:00pm. West bound lane closure on SW 39th St from Lind
Ave SW for asphalt repairs. Questions may be directed to Public Works Shops,
425-430-7400.
Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on 122nd Ave
Ruth Pérez, Council President
Members of the Renton City Council
Page 2 of 3
April 23, 2026
SE between SE 172nd St and SE 168th St for construction work. Approved traffic control
plans were issued for all work and will be followed, including detour and spotters and
flaggers to assist with local traffic and pedestrians. Questions may be directed to
Rob Blackburn, 206-379-1489.
Ruth Pérez, Council President
Members of the Renton City Council
Page 3 of 3
April 23, 2026
Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on 123rd Ave
SE between SE 172nd St and SE 168th St for construction work. Approved traffic control
plans were issued for all work and will be followed, including detour and spotters and
flaggers to assist with local traffic and pedestrians. Questions may be directed to
Rob Blackburn, 206-379-1489.
Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on 124th Ave
SE between SE 172nd St and SE 168th St for construction work. Approved traffic control
plans were issued for all work and will be followed, including detour and spotters and
flaggers to assist with local traffic and pedestrians. Questions may be directed to
Rob Blackburn, 206-379-1489.
Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on SE 172nd St
between 121st Ave SE and 125th Pl SE for construction work. Approved traffic control
plans were issued for all work and will be followed. Questions may be directed to
Rob Blackburn, 206-379-1489.
Monday, April 27 through Friday, May 1, 8:00am-3:00pm. Intermittent lane closure on
SE Carr Rd at 106th Pl SE for construction work. Approved traffic control plans were
issued for all work and will be followed. Questions may be directed to Brad Stocco,
425-282-2373.
Tuesday, April 28 through Wednesday, April 29, 7:00am-4:00pm. Intermittent lane
closures at 1414 NE Sunset Blvd for asphalt repairs. Questions may be directed to
Public Works Shops, 425-430-7400.
Monday, April 27 through Friday, May 1, 8:00am-3:00pm. Intermittent lane closures
on Union Ave NE between NE 5th St and NE 7th St for construction work. Approved traffic
control plans were issued for all work and will be followed. Questions may be directed
to Piero D’Amore, 206-999-1833.
On-going Street Closure through May 15, 2026 (City of Renton Resolution No. 4571)
FULL STREET CLOSURE on Houser Way N between Lake Washington Blvd N and
Lowe’s business access road in support of the I-405, Renton to Bellevue Widening and
Express Toll Lanes (ETL) project.