Loading...
HomeMy WebLinkAbout042726 Admin Report DATE: April 23, 2026 TO: Ruth Pérez, Council President Members of the Renton City Council FROM: Armondo Pavone, Mayor Ed VanValey, Chief Administrative Officer SUBJECT: Administrative Report • Does your posh pet like to strike a pose? Enjoy an afternoon of glamour, fun, and celebration for pets and the people who love them by attending the Pet Gala, Saturday, May 2 at the Renton Community Center from 11 a.m.-1 p.m. The event includes photo opportunities, contests, pet tags, microchipping, treats, and more. Come early because the first 100 guests will receive a sWAG bag curated by Poochie & Purrada. For more information and to register visit rentonwa.gov/register. • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. All projects are weather permitting and unless otherwise noted, streets will always remain open.  Monday, April 27 through Friday, May 1, 7:00am-4:00pm. Road closure on SE 5th St from Maple Valley Highway to east of SE 6th St for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Casey Grant, 206-532-4380.  Monday, April 27 through Friday, May 1, 7:00am-4:00pm. Road closure on SE 6th St at the intersection of SE 5th St for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Casey Grant, 206-532-4380.  Thursday, April 30, 7:00am-4:00pm. West bound lane closure on SW 39th St from Lind Ave SW for asphalt repairs. Questions may be directed to Public Works Shops, 425-430-7400.  Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on 122nd Ave SE between SE 172nd St and SE 168th St for construction work. Approved traffic control plans were issued for all work and will be followed, including detour and spotters and flaggers to assist with local traffic and pedestrians. Questions may be directed to Rob Blackburn, 206-379-1489. Ruth Pérez, Council President Members of the Renton City Council Page 2 of 2 April 23, 2026  Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on 123rd Ave SE between SE 172nd St and SE 168th St for construction work. Approved traffic control plans were issued for all work and will be followed, including detour and spotters and flaggers to assist with local traffic and pedestrians. Questions may be directed to Rob Blackburn, 206-379-1489.  Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on 124th Ave SE between SE 172nd St and SE 168th St for construction work. Approved traffic control plans were issued for all work and will be followed, including detour and spotters and flaggers to assist with local traffic and pedestrians. Questions may be directed to Rob Blackburn, 206-379-1489.  Monday, April 27 through Friday, May 1, 8:00am-4:00pm. Road closure on SE 172nd St between 121st Ave SE and 125th Pl SE for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Rob Blackburn, 206-379-1489.  Monday, April 27 through Friday, May 1, 8:00am-3:00pm. Intermittent lane closure on SE Carr Rd at 106th Pl SE for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Brad Stocco, 425-282-2373.  Tuesday, April 28 through Wednesday, April 29, 7:00am-4:00pm. Intermittent lane closures at 1414 NE Sunset Blvd for asphalt repairs. Questions may be directed to Public Works Shops, 425-430-7400.  Monday, April 27 through Friday, May 1, 8:00am-3:00pm. Intermittent lane closures on Union Ave NE between NE 5th St and NE 7th St for construction work. Approved traffic control plans were issued for all work and will be followed. Questions may be directed to Piero D’Amore, 206-999-1833.  On-going Street Closure through May 15, 2026 (City of Renton Resolution No. 4571) FULL STREET CLOSURE on Houser Way N between Lake Washington Blvd N and Lowe’s business access road in support of the I-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) project.